ML20083J706

From kanterella
Jump to navigation Jump to search
Supplemental Final Deficiency Rept Re Rework Associated W/Asme Code Section Iii,Class 3 Piping Supports Supplied by Transamerica Delaval,Inc.Unit 2 Rework Will Not Be Completed Until 840207 Due to Scheduling Delays
ML20083J706
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 12/22/1983
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
RDC-67(83), NUDOCS 8401050375
Download: ML20083J706 (1)


Text

N8

u. , ,

P.O. Box 5000 - CLEVELAND. OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG - 55 PUBLIC SOUARE Serving The Best Location in the Nation MURRAY R. EDELMAN December 22, 1983 VICE PRESloENT NUCLE A R Mr. James G. Keppler Regional Administrator, Region III Of fice of Inspection and Enforcement U.S. Nuclear Regulatcry Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos.50-44u; 50-441 Piping Support Supplied by Transamerica Delaval, Inc.

[RDC 67(83)]

Dear Mr. Keppler:

Our final report to you dated July 1, 1983, stated that the rework associated with ASME Code Section III, Class 3 piping supports supplied by Transamerica Delaval Inc. would be complete by December 1983.

Presently, all Unit I rework is complete and the document package review is in process. However, due to scheduling delays, the Unit 2 rework is now scheduled to be complete by February 7, 1984.

Please contact us if you have any questions.

Sincerely, f

Murray R. Edelman Vice President Nuclear Group MRE:pab cc: Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C. 20555 8401050375 831222 DR ADOCK 05000440 Records Center, SEE-IN PDR Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 $