ML20066D891: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.
APPENDIX D AVERAGE DAILY POWER LEVEL DOCl(ET NO. 000-0325 UNIT BRUNSWICl( UNIT 1 DATE 11/02/82 COMPLETED DY FRANCES HARRISON TELEPHONE ( 919 ) <157-9521 OCTODER              1982 DAY        AVG. DAILY POWER LEVEL          DAY  AVO. DAILY POWER LEVEL (MWE-NCT~,                          (MWE-NLT) 1                  -10                  17              -6 2                  -10                  18            319 3                  -10                  19            404 el                  -11                  20            414 0                  -10                  21            407 6                  -10                  22            -14 7                  -10                  23            -13 0                  -10                  24            -11 9                  -11                  25              4 l
1 10                    -12                  26            401 f                          ,
11                    -12                  27            463 12                    -11                  28            600 1
13                    -12                  29            576 l ei                  -12                  30            493 l 15                    -10                  31            526 16                    -11 1.16 - 0 8211120327 821104 PDR ADOCK 05000324 R                PDR
 
i                                                                                                                                1 OPERATING DATA REPORT pAit J AEET11/o4      NO,/8a053-0325 COMPLETED BY FRANCE 5 HARRISON t
TELEPHONE 919-457-9521
      .:FERATING STATU?
: 1. UNIT NAME: BRUNSWICK UNIT 1                            I NOTES                                                        I
: 2. , REPORTING PERIOD: OCTOBER 82                        ]                                                              I
: 3. LICENSED THERr'ALfPOWER (MWT): 2436                    I                                                              I 4, NAMEPLATE RATING tCROS5 MWE): 867.0                    I                                                              I
: 5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0 I                                                                          I
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I                                                                          I
: 7. MAX DEPENDABLE CADACITY (NET MWE) 790.0
: 8. IF CHANGES OCCUR IN CAPACIT( RATINGS (ITEMS 3 THRU 7) SINCE LAST REFORT, GIVE, REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE la. REASONS IJP RESTRICTION IF ANY:
i.
THIS                      YR TO                CUMUL MONTH                            DATE              ATIVE
: 11. HOURS IN REPGRTING PERIOD                                  745.0                      7296.0            49297.0
: 12. NUMDER OF HOURS REACTOR WA5 CRITIC AL                        309.6                    4661.6              32926.9 13, 3.EACTOR RESEh')E SHUTDOWN HUUR9                                  0.0                          6.0          1647.1
: 14. HOURS GENERATOR ON LINE                                      244.2                      4468.7            31003.a
: 15. UNIT RESERVE SHUTDOWN HOURS                                        3.0                          0.0              0.0
: 16. GROSS THERMAL ENERGY GENERATED ( MWH)                359033.6                    7900320.5          62318125.1
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)              115714.0                    2541153.0          20542361.0
: 18. NET ELECT 3l:ICIAL ENERGY GENERATED ( PNH)            105927.0                    2425399.6* 19728896.0
: 19. UNIT SERjfCE F ETOR                                            32.8                          61.2                62.9
: 20. UNIT 4/AlLABILITi FAC MR                                        32.3                        61.2                62.9 i_1. UNIT CAPACITY FACTOR (USING MDC NET)                            18.0                        4,2 .1              50.7
: 22. UNIT CAPACITY FACTOR (USING DER NET)                            17.3                        40.5                48.7
: 25. UNIT FOM ED OUTACE RATE                                        67.2                          37.4                24.7
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION                                    OF EACH):
Refueling 11/27/82 - 5/12/83 s
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:                                          0/ O/ 9
: 26. UNITS IN TEST :.laiU3 (PRIOR TO COMMERICI AL OPERATION): FORCA5T                                        ACHEIVED INITIAL CRITICALITY                                                          --------        --------
INITIAL ELECTRICITY                                                          --------        --------
COMMERICI AL OPERATIO!?                                                      --------        --------
1.16 - O
* Year To Date & Cumulative have been adjusted to reflect correction made to Sept.
report of 1 mwh.
s                            t s                                    ,
g
_s  ,
 
APPENDIX DOCKET NO.:    050-325 UNIT:    Brunswick No. 1 DATE: November 1982 COMPLETED BY:    Francis Harrison OPERATIONS
 
==SUMMARY==
 
BRUNSWICK UNIT NO. 1 Brunswick Unit No. I returned to service on October 17, 1982, after the Integrated Leak Rate Testing outage. The unit operated at 32.8 percent availability factor and 18.0 percent capacity factor. There were three off-line outages and two power reductions.
The Integrated Leak Rate Testing Outage detailed report will follow at a later date when completed.
There are 476 BWR and    160 PWR spent fuel bundles in the Brunswick Unit No. 1 fuel pool.
 
_i o __
O                                                                              n o
UNITSilUTDOWNS AND POWER REDUCTIONS                                  DOCKET NO.      050-0325                .
UNIT NASIE Brunswick I DATE November 1982 REPORT MONTil October                                    COMPLETED BY Froncoa Morriann TELEPHONE (919) 457-9521 "E                                        -
No.
                              ;,    .! E        S      .h .5 k        Licensee              ,E%        be.
Date      g      3g          g    ,3 g 5                                                                Cause & Corrective H
                                    $5          5 Event              u?        83                            Action to ji5g 6
Report #            @G
[u                    Prevent Recurrence 82-92A    821010      2    Unit          A          1          %                  IE      VALVEX was                                                                            Reactor scram - manual - scram due to down.                                                                          relief valve F013J stuck open.
At, temp-ting I&C replaced solenoid valve and as a precautionary measure Mechanical                  ,
to Maintenance replaced the pilot Startup                                                                        assembly.
h
                                                                                                                                                                          .i I                    2                                                                                                                                  .
F: Forced                                                                        3                                  4 Reason:
S: Schedufed                                                                        Method:
A Equipment Failure (Explain)                                    1-Manual Exhibit G-Instructions          -
B-Maintenance of Test                                                                              for Preparation of Data        '
2 Manual Scrarn.                  Entry Sheets for Licensee
        '                C Refueling D. Regulatory Restriction                                        3 Automatic Scram.                Event Report (LER) File (NUREG .
I' Opee.iion Ti iining & I.leense IIxaminatloa                  4-Continuations                    0161) 12-Adnunistiative                                                5-Load Reductions G-Operational Error (Explain)                                                                    5 (9/77)                  li-Other (Explain)                                              6-Other                            Exhibit !- Same Source
 
                                                                                                                                                          ,, e. __ , , _ _
O n
o UNITSilUTDOWNS AND POWER REDUCTIONS                                    DOCKET NO. 050-0325                                          ,
UNIT NAh!E Brunswick 1 DATE _ November 1982.
REPORT MONTil _0c tober                                  COMPLETED By Frances Harrison TELEPHONE (414) 457-9521
: e.    .
t                                        -
                              ~
                                      =          re    .3 -x =                                          E a5d y,""
    '            y, #          u    5 _E        E                        Licensee Ev.      g*o                                                                        '
gge                                                                      Cause & Currective h    y .g        g                              Event          p                                                                                .
g]
: g.                            Action to c0
* y i3 5              Report #          mO Prevent Recurrence 6                                                                                                                  -
82-92B    821014          F    Unit was      A                              NA            IE    VALVEX 1
Re' actor shutdown due to problems with.
* down.
F013D and E safecy relief valve.
                                . Attempt-
* ing.to                                                                      Action dependent on outcome of root sta'rtup                                              .
cause investigation, when                                                                    .
problem occurred                                                                                                  -
j s
I                      2                                                          '                                                                                .
F: Forced                                                                            3                                4 Reason:                                                                                                                                      -
S: Scheduled                                                                            Method:
A Equipment Failure (Exolain)                                    1-Manual                          Exhibit G-Instructions                '
B-Maintenance of Test                                                                                for Preparation of Data                                  -
C-Refucting                                                      2 Manual Scram.      .              Entry Sheets for I.ieensee D Regulatory Restriction                                        3-Automatic Scram.                  Event Report (LER) File (NUREG .
* 17 O pes.ito Ti.ilning & IJecuse lixamination le-Continuations                    0161) 12 Administiative G. Operational Error (Explain) 5-Load Reductions .            5 (9/77)                      Il-Other (Explain)                                              6-Other                            Exhibit I Same Sourec
 
                                                          ,              .s                                                                                                          _ _ _      . . _ .
                                                                                                                                                                                                                                      's u-O O
O                      .
UNIT SilUTDOWNS AND POWER REDUCTIONS                                          DOCKET NO. 050-ovs                                      '
UNIT NAME Brim =t.      f, te t DATE November 1982 REPORT MONTil October                                            COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521 No.                                          Date o      .! E 3g 3  .-).Ek        Licensee 5%      !E.
                                                                                    *g                                        5 ,3 g 5                Event            wT                                    Cause & Currective                              .'
                                                                                          $E                                $                                        N0        83-                                Action to
* j15g          Report *
[U                            Prevent Recurrence 0                                  .
82-95                                              821021    F      94.3 B    3          NA                                                                                                            .
IIA        TURBIN
                                                                                                                                                              ,                              Reactor scram. Turbine load unbalance test with CV closure.
(REPORT WILL FOLLOW WilEN COMPLETED) .                    ,
                                                                                                                                                                                                ,                              e      .
6 I                                                              -
2
* F: Forced                                            Reason:
3                                          4                                        -
S: Scheduled                                                                                                                              Method:                                                                                                  .
A Equipment Failure (Explain)                                                      1 Manual                                  Exhibit C-Instructions
* B Maintenance of Test                                                                                                        for Preparation of Data          '                            .
C Refueling                                                                      2 Manual Scram.            .              Entry Sheets for Licensee                  .
D Regulatory Restriction                                                          3 Automatic Scram.                          Event Report (LER) File (NUREG .
I 17 Opesatos Taaluing & 1,leenso lixamination                                      h-Continuations                            0161) 13 Administiative G-Operational Error (Explain)                                                    S-Load Reductions.                  -
5 (9/77)                                                                        H Other (Explain)                                                                6-Other                                    Exhibit I Same Source                                      .
 
n .          . .      .      2u_ ,
O                                                                                                      n
                                                                                                                                                                                      .g                    ,
UNITSilUTDOWNS AND POWER REDUC 110NS                                  DOCK E T NO. 050-ovs                                          4 UNIT NAME Brunswick 1 DATE November 1982 REPORT MONTl! - Octohnr                              COMPLETED BY _ Frances Harrison TELEPHONE (919) 457-9521
: e.          .
                                                                                            =                                                                                                  .
                                                        =                  rs .3 ss. O                                            C No.            D.ite                    E. j                  j gjy                              a jj        $j                  Cause & Corrective y      g .2                E  5a e                          vent        a CC                  %
                                                                              $ I?i g Report #      'sue      g gRo                          Action to Prevent Recurrence O                                                                                                      -
82-97          821030                    F      9.5                A'  5                        NA            XX      PUMPXX Recirc. pump tripped.
J                                                                                                                                    ,
(REPORT WILL FOLLOW WHEN COMPLETED) t
\                                                                                                                                                                                                                      .
ll                                          2                                                                    *                                                                    -
F: Forced                                                                                                  3                                4 Re.ison:                                                                                                                                    -
0: Scheduled                                                                                                  Method:                                                                                          .
A Equipment Failure (Explain)                                          1. Manual                        Exhibit C Instructions          '
: n. Maintenance of Test                                                                                  for Preparation of Data
* C Refueling                                                            2 Manual Serarn.      .
Entry Sheets for Licensee D Regulatory Restricti.m                                                3 Automatic Scram.                Event Report (LER) File (NUREC. .                            '
l
              -                              Itopeiatos Tialaing A 1.leense fixamination                            4-ContInuaeions                  0161)
F Adnunlunative                                                                                                                                                        t C-Operational Error (Explain)                                          5-Load Reductions.          -
5 i F4/77)
                ~
it-Other (Explain)                                                      6-Cther                          Exhibit I Same Souree
\
 
        .          ~  .                                                                                        ...          . _ _ _
                                                                                                                                                    '4 c._-  . . _ _
O O                                                                      o                .
UNITSilUTDOWNS AND POWER REDUCTIONS                                DOCKETNO. 050-0179
* UNIT NAME Brunswick 1 DATE November 1982 REPORTMONTil          October                      COMPLETED BY Frances Harrison TELEPliONE (919) 457-9521 q      .
No.          Date
                                  ,    .! ?
3g 3g        .Y              Licensee        ,Evo      bE
                                                        ,g g 5
                              *g                                            Event                    E "o                  Cause & Corrective                            .
:t ?
c i:.,      5    ji5g                Report *r    N0                                      Action to
* Q
[d-                  . Prevent Recurrence 82-98          821031      F        9.0        A-      5                  NA          XX      XXXXXX Reduced power to less than 30 percent-due to EHC-PSL-1759 problems.                              -
(REPORT WILL FOLLOW WilEN COMPLETED) ,
t
* 2                                                      '                                                                            .
F: Forced                                                                          3                                4 Reason:                                                                                                                                -
S: Scheduled                                                                          Method:
A Equipment Failure (Explain)                                1 Manual                          Exhibit G-Instructions                *
* B-Maintenance of Test                                                                          for Preparation of Data            '
* C-Refueling                                                  2 Manual Scram.      .            Entry Sheets for Licensee D-Regulatory Restriction                                      3-Automatic Scram.                Event Report (LER) Fi!c (NUREG. .
* I' Opci ito rialning & 1.leense !!xamination                  4-Continuations                  0161) 17 Administiative C-Operational Error (Explain) 5-Load Reductions .        -
5 (9/77)                      ll Other (Explain)                                            6-Other                          Exhibit ! Same Souree                                      .
 
APPENDIX DOCKET NO.: 050-324 UNIT: Brunswick No. 2 DATE: November 1982 COMPLETED BY: Francis Harrison OPERATIONS
 
==SUMMARY==
 
BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 returned to service on October 3, 1982, after the refueling and Integrated Leak Rate Testing outages. The unit operated at a 53.8 percent availability factor and 27.5 capacity factor. There were four off-line outages this month.
i The refueling and Integrated Leak Rate Testing outages detailed reports will follow n1 a later date when c unple_ted.
There are 424    BWR and 144  PWR spent fuel bundles in the Brunswick No. 2 fuel pool.
l l
l l
l
 
    . _ . _ _ _.-. _ _... _ ___ _ _ __.- _ - _ . _ . _ . . - _ _ _ . . _ . _ _ - ~ . . . _ _ _ . . - - . _ _ . _ . . _ _ . . _
i                                                                                                                                                                      -
l' '                                                                                                                                                                  I I 4 l1 i
l                                                                                                        APPENDIX B i
I AVERAGE DAILY POWER LEVEL i                                                                                                                                                                      !
;                                                                                                                                        DOCKET NO. 050-0324            {
i                                                                                                                                        UNIT BRUNSWICK UNIT 2          i l                                                                                                                                        DATE 11/01/82                l l                                                                                                                                      CnMPLETED BY FRANCEA HARRISON :
;                                                                                                                                        TBLEPHUNE 919-457-9321        l l
I                  OCTOBER 8'                                                                                                                                          '
DAY              AVG. DAILY POWER LEVEL                                                                    DAY AVG. DAILY POWER LEVEL              l (MWE-NET)                                                                            (MWE-NET) .                  j 1                                        -16.                                                          17            -15.                    i 2                                        -18.                                                          18            214, 3                                          32.                                                        19            514.                    }
4                                        184.                                                          20            540.                    P 5                                        197.                                                          21            571.
t 6                                        237.                                                          22            593.                    ;
7                                        283.                                                          23            613.
+
i                                                                                                                                                                      ,
l                        8                                        423.                                                          24            208,                    i
!                        9                                        423.                                                          25            315.                    5 i
10                                          341.                                                          26            610.                    i i
1 11                                          -12.                                                          27            582.                    l
!                      12                                          -11.                                                          28            29.                    '
l                                                                                                                                                                      !
I                                                                                                                                                                      "
13                                          -11.                                                          29            -11.
i 1
14                                          -14.                                                          30            -11.                    !
4
;                      15                                          -14.                                                          31            -11.                    ;
1                                                                                                                                                                      i i                    16                                          -14.
I i                                                                                                                                                                      l i
I i
l                                                                                                                                                                    i
{                                                                                                                                                                      i i                                                                                                                                                                      !
i                                                                                                                  1.16 - 8 i
l 1                                                                                                                                                                      i, 4.-,,,- - ,                                                . . , _
 
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 11/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS
: 1. UNIT NAME: BRUNSWICK UNIT 2                              I NOTES                                                    I i      2. REPORTING PERIOD: OCTOBER 82                            I                                                            I
: 3. LICENSED THERMAL POWER (MWT): 2436                      I                                                          I
: 4. NAMEPLATE RATING (GROSS MWE): 867.0                    I                                                            I
: 5. DESIGN ELECTR1 CAL RATING (NET MWE): 821.0 I                                                                        I
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I                                                                        I i
: 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0                -------------------------------
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
: 10. REASONS FOR RESTRICTION IF ANY:
THIS                      YR TO                CUMUL MONTH                          DATE              ATIVE
: 11. HOURS IN REPORTING PERIOD                                    745.0                    7296.0'          61321.0
: 12. NUMBER OF HOURS REACTOR uA3 CRITICAL                        483.6                    2975.8            38142.7
: 13. REACTOR RESERVE SHUTDOWN HOURS                                    0.0                          0.0              0.0
: 14. HOURS GENERATOR ON LINE                                      400.7                    2785.3            35554.6
: 15. UNIT RES'ERVE SHUTDOWN HOURS                                      0.0                          0.0              0.0
: 16. GROSS THERMAL ENERGY GENERATED (MWH)              557346.4                  5025312.2            65022849.9
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)            174335.0                    1589624.0          21583561.0
: 18. NET ELECTRICIAL ENERGY GENERATED (H4H)            161984.0                    1491798.0. 20681200.0
: 19. UNIT SERVICE FACTOR                                            53.8                        38.2                58.0
: 20. UNIT AVAILABILITY FACTOR                                      53.8                        38.2                58.0
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                          27.5                        25.9                42.7 l    22. UNIT CAPACITY FACTOR (USING DER NET)                          26.5                        24.9                41.1 i
: 23. UNIT FORCED OUTAGE RATE                                        18.3                        17.3                17.1
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEr DATER AND DURATION OF EACH):
: 25. IF SHUTDOWN AT END OF REPORT PERIODr ESTIMATED DATE OF START UP: 11/ 2/92
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCAST                                      ACHEIVED INITIAL CRITICALITY                                                          --------      --------
INITIAL ELECTRICITY                                                          --------      --------
COMMERICIAL OPERATION                                                        --------      --------
1.16 - 9
 
                                                                ...._z                                      . _ ,
* 4 L. .___ . . . .
UNIT SilUTDOWNS AND POWER REDUCTIONS                            DOCKET NO. 050-0324                                    .
UNIT NAME Brunswick 2 DATE November 1982 REPORT MONTil o c e nh n ,.                      COMPLETED BY Frances Harrison TELEPilONE (919) 457-9521
                                      =
                                                            "E                                                                                                  '
en    .5 -a =
                                    .2 _e      s    , .s X          Licensee No.          Dste o
g      3g          g    jg5              Event
                                                                                    %          -2 c' 'L Cause & Corrective                              .'
s cc s-        u a:
Report #      :*?
m0 83-EU                          Action to
* 3 Di 's                                  g                    Prevent Recurrence 6                                                                                                      *  '
82-057      821021        S      1.3    B-        1              NA          IE    XL W          Unit separated from grid for routine e
overspeed trip test.
                                                                                    ~
I 3
j
                                                                                                                                                                                ?
I              ~
2                                                  *                                                                            .
F: Forced              Reason:
3                                  4 S: Scheduled                                                                  Method:
A Equipment Failure (Explain)                            1-Manual                          Exhibit G-Instructions              -
B-Maintenance of Test                                                                      for Preparation of Data            '
C-Refueling                                            2 Manual Scrarn.                    Entry Sheets for Licensee D Regulatory Restriction                                3-Automatic Scram.                  Event Report (LER) File (NUREG. .
li Opciato Ti Ining & l.leense lixumination            4-Con t inua t ions                0161)
F Adminisisative G-Operational Error (Explain)                          5-Load Reductions .          -
5 (9/77)                    Il-Other (Explain)                                      6-Other                            Exhibit ! Same Source
 
                                                                                        -.                          _-      __ _                      _m. _ _ _ _
O                                                                              n                                                                  .m  .  <
                                                                    ~
UNITSHUTDOWNS AND POWER REDUCTIONS                                DOCKETNO. 050-0324                                        .
UNIT NAME Brunswick 2 DATE _ November 1982 REPORTMON111_ October                              COMPLETED BY - Frances Harrison TELEPHONE        (919) 457-9521 e                    ce t m2                                      c No.          Date      E.
p      h 32 5
0 35b 5a e      Lh'v#
ent          I*4o a        ok gg E*"S* A C""''8I''
Action to CO                      " 3 Di j    Report #          NU        g                        Prevent Recurrence 6
82-059      821010    F      175.7                    A-  3          NA              SB        PIPEXX                                                            .
Reactor scram. Cracks in heater drain
                                                                                                                , piping. Loss of E-3 Bus #3 diesel g'nerator e      output breaker would not close in on E-3 bus.
(REPORT WILL FOLLOW UHEN COMPLETED)
                                                                                                                                                                  +
i l.
l:
I l                    2 F: Forced                                                                        3                                4 Reason:
S: Scheduled                                                                        Method:                                                                                          ,
A liguipment Failure (Exp!ain)                                  1 Manual                            Exhibit G-Instructions            -
l B Maintenance of Test                                                                                for Preparation of Data        '
C-Refueling                                                    2. Manual Scram.                      Entry Sheets for Licensee D Regulatory Restriction                                        3-Automatic Scram.                    Event Report (LER) File (NUREG. .
17 Opes.itos is.iining & 1lecuse l*xamination 4-Continuations                      0161)
F Adnunist ative G-Oper:.:ional Error (Explain)                                  S-Load Reductions.            5 (9/77)                  H-Other (Explain)                                              6-Other                              Exhibit ! Same Source i
 
_w-.--_-
O n                                                                            o UNIT SIIUTDOWNS AND POWER REDUCTIONS                        DOCKET NO. 050-0324                                      ,
UNIT N AME Brunswick 2 DATE November 1982 REPORTMONTif _ October                            COMPLETED BY Frances Harrison TELEPliONE (919) 457-9571 e.
e        en      '3 2 E                                      5c No.
                              ;.,    .a _:      s      7 .E X          Licensee Date      g.      gg          g                                          _=%                      Cause & Corrective
                                                          ,3 g 5            Event          5?        8.4                                                                  -
                                      $ F.        5      j di g          Report
* N0          jb"                  Action to                                        '
Prevent Recurrence 6                                                                                                          '
82-062      821024    F      15.5        A*        2              NA            XX
* XXXXXX  Normal reactor shutdown in order to lower AT between steam dome saturation temperature and bottom head drain, e
t i
1 I
t i                  2 F: Forced                                                                    3                            4 Reason:                                                                                                                                            !
S: Scheduled                                                                    Method:
A Equipment Failure (Explain)                              1. Manual                      Exhibit G-Instructions
* B. Maintenance or Test                                                                    for Preparation of Data
: 2. Manual Scra,m.                                                                        .
          '                C. Refueling                                                                              Entry Sheets for Licensee                                '
D-Regulatory Restriction                                    3-Automatic Scram.            Event Report (LER) File (NUREG .
17 Opes.itos Ts.iining & l.icense Examination              4-Continuations                0161)
I .Administiative G-Operationa! Error (Explain)                              S-Load Reductions.          5 (9/77)                li-Other(Explain)                                          6-Other                        Exliibi I-Same Source                                    ?
 
                                                                                                      .=                    .-    *-u  -
O                                                                    O                                                            O UNIT SHUTDOWNS AND POWER REDUCTIONS                      DOCKETNO. 050-0324                          .
UNIT NAME Brunswick 2 DATE _ November 1982 REPORTMONTH October                          COMPLETED BY Frances Harrison TELEPHONE        (919) 457-9521 No.          Date
                            ;,    .!E 3g 3g        .$
                                                    ,;; g 5 Licensee    ,E%      !
o%                  Cause & Corrective
                          *g                                        Event      =?        o-lv c3 5        5      jgg            Report #    #G                                  Action to Prevent Recurrence c5 82-064    821028    F                A'          2              NA                        TIP outage in progress.
e
                                                                                                                                .      .                          k i
i.
b 1
2                                                                                                                    -
1 F: Forced                                                                3                            4 Reason:                                                Method:
I S: Scheduled        A 1:quipment Failure (Explain)                                                        Exhibit G-Instruellons          -
1-Manual                        for Preparation of Data
* B Maintenance of Test                                  2-Manual Scram.
      .                  C-Refucting                                                                .        Entry Sheets for Licensee D-Regulatory Restriction                              3 Automatic Scram.            Event Report (LER) File (NUREG .
1:-Opeiason Tiaining & I.iecuse !!xamination          4-Continuations                0161)
* I Administrative                                      5-Load Reductions .
G-Operational Error (Explain)                                                      $
19/77)                H-Other (Explain)                                      6-Other                        Exhibit I- Same Source
.}}

Latest revision as of 14:56, 21 December 2020

Monthly Operating Repts for Oct 1982
ML20066D891
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/02/1982
From: Harrison F
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20066D885 List:
References
NUDOCS 8211120327
Download: ML20066D891 (15)


Text

.

APPENDIX D AVERAGE DAILY POWER LEVEL DOCl(ET NO. 000-0325 UNIT BRUNSWICl( UNIT 1 DATE 11/02/82 COMPLETED DY FRANCES HARRISON TELEPHONE ( 919 ) <157-9521 OCTODER 1982 DAY AVG. DAILY POWER LEVEL DAY AVO. DAILY POWER LEVEL (MWE-NCT~, (MWE-NLT) 1 -10 17 -6 2 -10 18 319 3 -10 19 404 el -11 20 414 0 -10 21 407 6 -10 22 -14 7 -10 23 -13 0 -10 24 -11 9 -11 25 4 l

1 10 -12 26 401 f ,

11 -12 27 463 12 -11 28 600 1

13 -12 29 576 l ei -12 30 493 l 15 -10 31 526 16 -11 1.16 - 0 8211120327 821104 PDR ADOCK 05000324 R PDR

i 1 OPERATING DATA REPORT pAit J AEET11/o4 NO,/8a053-0325 COMPLETED BY FRANCE 5 HARRISON t

TELEPHONE 919-457-9521

.:FERATING STATU?

1. UNIT NAME: BRUNSWICK UNIT 1 I NOTES I
2. , REPORTING PERIOD: OCTOBER 82 ] I
3. LICENSED THERr'ALfPOWER (MWT): 2436 I I 4, NAMEPLATE RATING tCROS5 MWE): 867.0 I I
5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0 I I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
7. MAX DEPENDABLE CADACITY (NET MWE) 790.0
8. IF CHANGES OCCUR IN CAPACIT( RATINGS (ITEMS 3 THRU 7) SINCE LAST REFORT, GIVE, REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE la. REASONS IJP RESTRICTION IF ANY:

i.

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPGRTING PERIOD 745.0 7296.0 49297.0
12. NUMDER OF HOURS REACTOR WA5 CRITIC AL 309.6 4661.6 32926.9 13, 3.EACTOR RESEh')E SHUTDOWN HUUR9 0.0 6.0 1647.1
14. HOURS GENERATOR ON LINE 244.2 4468.7 31003.a
15. UNIT RESERVE SHUTDOWN HOURS 3.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED ( MWH) 359033.6 7900320.5 62318125.1
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 115714.0 2541153.0 20542361.0
18. NET ELECT 3l:ICIAL ENERGY GENERATED ( PNH) 105927.0 2425399.6* 19728896.0
19. UNIT SERjfCE F ETOR 32.8 61.2 62.9
20. UNIT 4/AlLABILITi FAC MR 32.3 61.2 62.9 i_1. UNIT CAPACITY FACTOR (USING MDC NET) 18.0 4,2 .1 50.7
22. UNIT CAPACITY FACTOR (USING DER NET) 17.3 40.5 48.7
25. UNIT FOM ED OUTACE RATE 67.2 37.4 24.7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling 11/27/82 - 5/12/83 s

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 0/ O/ 9
26. UNITS IN TEST :.laiU3 (PRIOR TO COMMERICI AL OPERATION): FORCA5T ACHEIVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERICI AL OPERATIO!? -------- --------

1.16 - O

  • Year To Date & Cumulative have been adjusted to reflect correction made to Sept.

report of 1 mwh.

s t s ,

g

_s ,

APPENDIX DOCKET NO.: 050-325 UNIT: Brunswick No. 1 DATE: November 1982 COMPLETED BY: Francis Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 1 Brunswick Unit No. I returned to service on October 17, 1982, after the Integrated Leak Rate Testing outage. The unit operated at 32.8 percent availability factor and 18.0 percent capacity factor. There were three off-line outages and two power reductions.

The Integrated Leak Rate Testing Outage detailed report will follow at a later date when completed.

There are 476 BWR and 160 PWR spent fuel bundles in the Brunswick Unit No. 1 fuel pool.

_i o __

O n o

UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 .

UNIT NASIE Brunswick I DATE November 1982 REPORT MONTil October COMPLETED BY Froncoa Morriann TELEPHONE (919) 457-9521 "E -

No.

, .! E S .h .5 k Licensee ,E% be.

Date g 3g g ,3 g 5 Cause & Corrective H

$5 5 Event u? 83 Action to ji5g 6

Report # @G

[u Prevent Recurrence 82-92A 821010 2 Unit A 1  % IE VALVEX was Reactor scram - manual - scram due to down. relief valve F013J stuck open.

At, temp-ting I&C replaced solenoid valve and as a precautionary measure Mechanical ,

to Maintenance replaced the pilot Startup assembly.

h

.i I 2 .

F: Forced 3 4 Reason:

S: Schedufed Method:

A Equipment Failure (Explain) 1-Manual Exhibit G-Instructions -

B-Maintenance of Test for Preparation of Data '

2 Manual Scrarn. Entry Sheets for Licensee

' C Refueling D. Regulatory Restriction 3 Automatic Scram. Event Report (LER) File (NUREG .

I' Opee.iion Ti iining & I.leense IIxaminatloa 4-Continuations 0161) 12-Adnunistiative 5-Load Reductions G-Operational Error (Explain) 5 (9/77) li-Other (Explain) 6-Other Exhibit !- Same Source

,, e. __ , , _ _

O n

o UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 ,

UNIT NAh!E Brunswick 1 DATE _ November 1982.

REPORT MONTil _0c tober COMPLETED By Frances Harrison TELEPHONE (414) 457-9521

e. .

t -

~

= re .3 -x = E a5d y,""

' y, # u 5 _E E Licensee Ev. g*o '

gge Cause & Currective h y .g g Event p .

g]

g. Action to c0
  • y i3 5 Report # mO Prevent Recurrence 6 - 82-92B 821014 F Unit was A NA IE VALVEX 1

Re' actor shutdown due to problems with.

  • down.

F013D and E safecy relief valve.

. Attempt-

  • ing.to Action dependent on outcome of root sta'rtup .

cause investigation, when .

problem occurred -

j s

I 2 ' .

F: Forced 3 4 Reason: -

S: Scheduled Method:

A Equipment Failure (Exolain) 1-Manual Exhibit G-Instructions '

B-Maintenance of Test for Preparation of Data -

C-Refucting 2 Manual Scram. . Entry Sheets for I.ieensee D Regulatory Restriction 3-Automatic Scram. Event Report (LER) File (NUREG .

  • 17 O pes.ito Ti.ilning & IJecuse lixamination le-Continuations 0161) 12 Administiative G. Operational Error (Explain) 5-Load Reductions . 5 (9/77) Il-Other (Explain) 6-Other Exhibit I Same Sourec

, .s _ _ _ . . _ .

's u-O O

O .

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-ovs '

UNIT NAME Brim =t. f, te t DATE November 1982 REPORT MONTil October COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521 No. Date o .! E 3g 3 .-).Ek Licensee 5% !E.

  • g 5 ,3 g 5 Event wT Cause & Currective .'

$E $ N0 83- Action to

  • j15g Report *

[U Prevent Recurrence 0 .

82-95 821021 F 94.3 B 3 NA .

IIA TURBIN

, Reactor scram. Turbine load unbalance test with CV closure.

(REPORT WILL FOLLOW WilEN COMPLETED) . ,

, e .

6 I -

2

  • F: Forced Reason:

3 4 -

S: Scheduled Method: .

A Equipment Failure (Explain) 1 Manual Exhibit C-Instructions

  • B Maintenance of Test for Preparation of Data ' .

C Refueling 2 Manual Scram. . Entry Sheets for Licensee .

D Regulatory Restriction 3 Automatic Scram. Event Report (LER) File (NUREG .

I 17 Opesatos Taaluing & 1,leenso lixamination h-Continuations 0161) 13 Administiative G-Operational Error (Explain) S-Load Reductions. -

5 (9/77) H Other (Explain) 6-Other Exhibit I Same Source .

n . . . . 2u_ ,

O n

.g ,

UNITSilUTDOWNS AND POWER REDUC 110NS DOCK E T NO. 050-ovs 4 UNIT NAME Brunswick 1 DATE November 1982 REPORT MONTl! - Octohnr COMPLETED BY _ Frances Harrison TELEPHONE (919) 457-9521

e. .

= .

= rs .3 ss. O C No. D.ite E. j j gjy a jj $j Cause & Corrective y g .2 E 5a e vent a CC  %

$ I?i g Report # 'sue g gRo Action to Prevent Recurrence O -

82-97 821030 F 9.5 A' 5 NA XX PUMPXX Recirc. pump tripped.

J ,

(REPORT WILL FOLLOW WHEN COMPLETED) t

\ .

ll 2 * -

F: Forced 3 4 Re.ison: -

0: Scheduled Method: .

A Equipment Failure (Explain) 1. Manual Exhibit C Instructions '

n. Maintenance of Test for Preparation of Data
  • C Refueling 2 Manual Serarn. .

Entry Sheets for Licensee D Regulatory Restricti.m 3 Automatic Scram. Event Report (LER) File (NUREC. . '

l

- Itopeiatos Tialaing A 1.leense fixamination 4-ContInuaeions 0161)

F Adnunlunative t C-Operational Error (Explain) 5-Load Reductions. -

5 i F4/77)

~

it-Other (Explain) 6-Cther Exhibit I Same Souree

\

. ~ . ... . _ _ _

'4 c._- . . _ _

O O o .

UNITSilUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0179

  • UNIT NAME Brunswick 1 DATE November 1982 REPORTMONTil October COMPLETED BY Frances Harrison TELEPliONE (919) 457-9521 q .

No. Date

, .! ?

3g 3g .Y Licensee ,Evo bE

,g g 5

  • g Event E "o Cause & Corrective .
t ?

c i:., 5 ji5g Report *r N0 Action to

  • Q

[d- . Prevent Recurrence 82-98 821031 F 9.0 A- 5 NA XX XXXXXX Reduced power to less than 30 percent-due to EHC-PSL-1759 problems. -

(REPORT WILL FOLLOW WilEN COMPLETED) ,

t

  • 2 ' .

F: Forced 3 4 Reason: -

S: Scheduled Method:

A Equipment Failure (Explain) 1 Manual Exhibit G-Instructions *

  • B-Maintenance of Test for Preparation of Data '
  • C-Refueling 2 Manual Scram. . Entry Sheets for Licensee D-Regulatory Restriction 3-Automatic Scram. Event Report (LER) Fi!c (NUREG. .
  • I' Opci ito rialning & 1.leense !!xamination 4-Continuations 0161) 17 Administiative C-Operational Error (Explain) 5-Load Reductions . -

5 (9/77) ll Other (Explain) 6-Other Exhibit ! Same Souree .

APPENDIX DOCKET NO.: 050-324 UNIT: Brunswick No. 2 DATE: November 1982 COMPLETED BY: Francis Harrison OPERATIONS

SUMMARY

BRUNSWICK UNIT NO. 2 Brunswick Unit No. 2 returned to service on October 3, 1982, after the refueling and Integrated Leak Rate Testing outages. The unit operated at a 53.8 percent availability factor and 27.5 capacity factor. There were four off-line outages this month.

i The refueling and Integrated Leak Rate Testing outages detailed reports will follow n1 a later date when c unple_ted.

There are 424 BWR and 144 PWR spent fuel bundles in the Brunswick No. 2 fuel pool.

l l

l l

l

. _ . _ _ _.-. _ _... _ ___ _ _ __.- _ - _ . _ . _ . . - _ _ _ . . _ . _ _ - ~ . . . _ _ _ . . - - . _ _ . _ . . _ _ . . _

i -

l' ' I I 4 l1 i

l APPENDIX B i

I AVERAGE DAILY POWER LEVEL i  !

DOCKET NO. 050-0324 {

i UNIT BRUNSWICK UNIT 2 i l DATE 11/01/82 l l CnMPLETED BY FRANCEA HARRISON :

TBLEPHUNE 919-457-9321 l l

I OCTOBER 8' '

DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL l (MWE-NET) (MWE-NET) . j 1 -16. 17 -15. i 2 -18. 18 214, 3 32. 19 514. }

4 184. 20 540. P 5 197. 21 571.

t 6 237. 22 593.  ;

7 283. 23 613.

+

i ,

l 8 423. 24 208, i

! 9 423. 25 315. 5 i

10 341. 26 610. i i

1 11 -12. 27 582. l

! 12 -11. 28 29. '

l  !

I "

13 -11. 29 -11.

i 1

14 -14. 30 -11.  !

4

15 -14. 31 -11.  ;

1 i i 16 -14.

I i l i

I i

l i

{ i i  !

i 1.16 - 8 i

l 1 i, 4.-,,,- - , . . , _

OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 11/01/82 COMPLETED BY FRANCES HARRISON TELEPHONE 919-457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I i 2. REPORTING PERIOD: OCTOBER 82 I I
3. LICENSED THERMAL POWER (MWT): 2436 I I
4. NAMEPLATE RATING (GROSS MWE): 867.0 I I
5. DESIGN ELECTR1 CAL RATING (NET MWE): 821.0 I I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I i
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 745.0 7296.0' 61321.0
12. NUMBER OF HOURS REACTOR uA3 CRITICAL 483.6 2975.8 38142.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 400.7 2785.3 35554.6
15. UNIT RES'ERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 557346.4 5025312.2 65022849.9
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 174335.0 1589624.0 21583561.0
18. NET ELECTRICIAL ENERGY GENERATED (H4H) 161984.0 1491798.0. 20681200.0
19. UNIT SERVICE FACTOR 53.8 38.2 58.0
20. UNIT AVAILABILITY FACTOR 53.8 38.2 58.0
21. UNIT CAPACITY FACTOR (USING MDC NET) 27.5 25.9 42.7 l 22. UNIT CAPACITY FACTOR (USING DER NET) 26.5 24.9 41.1 i
23. UNIT FORCED OUTAGE RATE 18.3 17.3 17.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPEr DATER AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIODr ESTIMATED DATE OF START UP: 11/ 2/92
26. UNITS IN TEST STATUS (PRIOR TO COMMERICI AL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERICIAL OPERATION -------- --------

1.16 - 9

...._z . _ ,

  • 4 L. .___ . . . .

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 .

UNIT NAME Brunswick 2 DATE November 1982 REPORT MONTil o c e nh n ,. COMPLETED BY Frances Harrison TELEPilONE (919) 457-9521

=

"E '

en .5 -a =

.2 _e s , .s X Licensee No. Dste o

g 3g g jg5 Event

% -2 c' 'L Cause & Corrective .'

s cc s- u a:

Report #  :*?

m0 83-EU Action to

  • 3 Di 's g Prevent Recurrence 6 * '82-057 821021 S 1.3 B- 1 NA IE XL W Unit separated from grid for routine e

overspeed trip test.

~

I 3

j

?

I ~

2 * .

F: Forced Reason:

3 4 S: Scheduled Method:

A Equipment Failure (Explain) 1-Manual Exhibit G-Instructions -

B-Maintenance of Test for Preparation of Data '

C-Refueling 2 Manual Scrarn. Entry Sheets for Licensee D Regulatory Restriction 3-Automatic Scram. Event Report (LER) File (NUREG. .

li Opciato Ti Ining & l.leense lixumination 4-Con t inua t ions 0161)

F Adminisisative G-Operational Error (Explain) 5-Load Reductions . -

5 (9/77) Il-Other (Explain) 6-Other Exhibit ! Same Source

-. _- __ _ _m. _ _ _ _

O n .m . <

~

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0324 .

UNIT NAME Brunswick 2 DATE _ November 1982 REPORTMON111_ October COMPLETED BY - Frances Harrison TELEPHONE (919) 457-9521 e ce t m2 c No. Date E.

p h 32 5

0 35b 5a e Lh'v#

ent I*4o a ok gg E*"S* A C""8I

Action to CO " 3 Di j Report # NU g Prevent Recurrence 6

82-059 821010 F 175.7 A- 3 NA SB PIPEXX .

Reactor scram. Cracks in heater drain

, piping. Loss of E-3 Bus #3 diesel g'nerator e output breaker would not close in on E-3 bus.

(REPORT WILL FOLLOW UHEN COMPLETED)

+

i l.

l:

I l 2 F: Forced 3 4 Reason:

S: Scheduled Method: ,

A liguipment Failure (Exp!ain) 1 Manual Exhibit G-Instructions -

l B Maintenance of Test for Preparation of Data '

C-Refueling 2. Manual Scram. Entry Sheets for Licensee D Regulatory Restriction 3-Automatic Scram. Event Report (LER) File (NUREG. .

17 Opes.itos is.iining & 1lecuse l*xamination 4-Continuations 0161)

F Adnunist ative G-Oper:.:ional Error (Explain) S-Load Reductions. 5 (9/77) H-Other (Explain) 6-Other Exhibit ! Same Source i

_w-.--_-

O n o UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 ,

UNIT N AME Brunswick 2 DATE November 1982 REPORTMONTif _ October COMPLETED BY Frances Harrison TELEPliONE (919) 457-9571 e.

e en '3 2 E 5c No.

., .a _
s 7 .E X Licensee Date g. gg g _=% Cause & Corrective

,3 g 5 Event 5? 8.4 -

$ F. 5 j di g Report

  • N0 jb" Action to '

Prevent Recurrence 6 '82-062 821024 F 15.5 A* 2 NA XX

  • XXXXXX Normal reactor shutdown in order to lower AT between steam dome saturation temperature and bottom head drain, e

t i

1 I

t i 2 F: Forced 3 4 Reason:  !

S: Scheduled Method:

A Equipment Failure (Explain) 1. Manual Exhibit G-Instructions

  • B. Maintenance or Test for Preparation of Data
2. Manual Scra,m. .

' C. Refueling Entry Sheets for Licensee '

D-Regulatory Restriction 3-Automatic Scram. Event Report (LER) File (NUREG .

17 Opes.itos Ts.iining & l.icense Examination 4-Continuations 0161)

I .Administiative G-Operationa! Error (Explain) S-Load Reductions. 5 (9/77) li-Other(Explain) 6-Other Exliibi I-Same Source  ?

.= .- *-u -

O O O UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO. 050-0324 .

UNIT NAME Brunswick 2 DATE _ November 1982 REPORTMONTH October COMPLETED BY Frances Harrison TELEPHONE (919) 457-9521 No. Date

, .!E 3g 3g .$

,;; g 5 Licensee ,E%  !

o% Cause & Corrective

  • g Event =? o-lv c3 5 5 jgg Report # #G Action to Prevent Recurrence c5 82-064 821028 F A' 2 NA TIP outage in progress.

e

. . k i

i.

b 1

2 -

1 F: Forced 3 4 Reason: Method:

I S: Scheduled A 1:quipment Failure (Explain) Exhibit G-Instruellons -

1-Manual for Preparation of Data

  • B Maintenance of Test 2-Manual Scram.

. C-Refucting . Entry Sheets for Licensee D-Regulatory Restriction 3 Automatic Scram. Event Report (LER) File (NUREG .

1:-Opeiason Tiaining & I.iecuse !!xamination 4-Continuations 0161)

  • I Administrative 5-Load Reductions .

G-Operational Error (Explain) $

19/77) H-Other (Explain) 6-Other Exhibit I- Same Source

.