{{#Wiki_filter:CCNSUMERS POWER CO.
CCNSUMERS POWER CO.
RECE!VED JUM 190 Site Mgr.
RECE!VED JUM             190 Site Mgr.
STONE 6 WEBSTER ENGINEERING COMtSMdil8tT 245 SUMMER STREET. BOSTON. M ASS A CHU SETTS ADDRESS ALL COR RESPONDENCE TO P.O. SOX 2325. DO5 TON. M A S S. 02107 W U TELEA 94 0001 h
STONE 6 WEBSTER ENGINEERING COMtSMdil8tT                                                                         .
oma NstawcTioN R "5 ~ ~
245 SUMMER STREET. BOSTON. M ASS A CHU SETTS ADDRESS ALL COR RESPONDENCE TO P.O. SOX 2325. DO5 TON. M A S S. 02107 W U TELEA 94 0001 h     oma                                                                                   NstawcTioN R "5 ~ ~                                                                                 ":::,,o .
":::,,o.
C'o' tat
C'o' tat
* inn!T.L 1."S.'~' Sol"o'c ~
* inn!T.L 1."S.'~' Sol"o'c ~
United Stated Nuclear Regulatory Commission                                 December 34, 1982 Midland Site Resident Inspection Office Route 7                                                                     J.O.       No. 14356 Midland, MI 48640                                                             Ref. MFP 12 Attention Mr. R. Cook RE:     DOCKET NO.     50-329/330 Midland Plant - UNITS 1 AND 2 INDEPENDENT ASSESSMENT OF AUXILIARY BUILDING UNDERPINNING REPORT NO.         12 A copy of the Independent Assessment of the Auxiliary Building Under-pinning Weekly Report No. 12 for the period December 5 through December 11, 1982, is enclosed with this letter. Included, as an attachment, are the minutes of the daily meetings held during the week between members of the Assessment Team and Site Engineering, Construction and Qualit:-
United Stated Nuclear Regulatory Commission December 34, 1982 Midland Site Resident Inspection Office Route 7 J.O.
No. 14356 Midland, MI 48640 Ref. MFP 12 Attention Mr. R. Cook RE:
DOCKET NO.
50-329/330 Midland Plant - UNITS 1 AND 2 INDEPENDENT ASSESSMENT OF AUXILIARY BUILDING UNDERPINNING REPORT NO.
12 A copy of the Independent Assessment of the Auxiliary Building Under-pinning Weekly Report No. 12 for the period December 5 through December 11, 1982, is enclosed with this letter. Included, as an attachment, are the minutes of the daily meetings held during the week between members of the Assessment Team and Site Engineering, Construction and Qualit:-
Assurance personnel during the week.
Assurance personnel during the week.
If you have any questions with respect to this report please contact me at (617) 589-2067.
If you have any questions with respect to this report please contact me at (617) 589-2067.
            $                        M S (03A
M S (03A A. Stanley Lucks i
,          A. Stanley Lucks i         Project Manager Enclosures l
Project Manager Enclosures l
ASL/ka                                                                                ,k . - -
,k. - -
F                   ..__ _ I f'-                               I
ASL/ka F
                                                                                                ~
..__ _ I f'-
l                                                                                                         ''. -    -.
I
l 1
~
                                                                                                ~K-                   . . _ .
l l
i          C ._
~K-1 i
l-8302040343 830120                                                                         I--
C._
PDR ADOCK 05000329 G                     PDR                                                               .
l-8302040343 830120 I--
PDR ADOCK 05000329 G
PDR


J. O. NO. 14356 Midland Plant Units 1 and 2 Independent Assessment Auxiliary Building Underpinning Weekly Report No.       12 December 5 through December 11, 1982 Personnel en Site Stone & Webster Engineering Corporation (SWEC)
J. O. NO.
A. B. Scott                 12/6 - 12/10 W. Kilker                   12/6 - 12/10 Activities Reviewed and where necessary, updated status of drawings, procedures and specifications on file.
14356 Midland Plant Units 1 and 2 Independent Assessment Auxiliary Building Underpinning Weekly Report No.
Meetings Attended Date                         Represented                         Purpose 12/7                         Stone & Webster                     Daily Meeting through                       Bechtel 12/10                         Consumers Power 12/6                         Stone & Webster                     Pier 12 request Bechtel                             for Authorization Consumers Power                     Letter Mergentime 12/10                         Stone & Webster                     Weekly Soils Review Bechtel Mergentime Consumers Pcwer Observations On December 9, 1982 the NRC released the work activities for piers E/W 12.
12 December 5 through December 11, 1982 Personnel en Site Stone & Webster Engineering Corporation (SWEC)
A. B. Scott 12/6 - 12/10 W. Kilker 12/6 - 12/10 Activities Reviewed and where necessary, updated status of drawings, procedures and specifications on file.
Meetings Attended Date Represented Purpose 12/7 Stone & Webster Daily Meeting through Bechtel 12/10 Consumers Power 12/6 Stone & Webster Pier 12 request Bechtel for Authorization Consumers Power Letter Mergentime 12/10 Stone & Webster Weekly Soils Review Bechtel Mergentime Consumers Pcwer Observations On December 9, 1982 the NRC released the work activities for piers E/W 12.
Work is expected to commence on W 12 and E 12 on December 13 and 20, respectively.
Work is expected to commence on W 12 and E 12 on December 13 and 20, respectively.


                              -                                                                                  2 Non-Conformance Identification Report i
2 Non-Conformance Identification Report i
NIR No. #3 - Issued December 8, 1982 - Project requirements for testing                                                                                                   ,
NIR No. #3 - Issued December 8, 1982 - Project requirements for testing temperature of tapered threaded connectors does not confore to ASME III,
temperature of tapered threaded connectors does not confore to ASME III,                                                                                               ~
~
;                  Division 2 requirements.
Division 2 requirements.
Status of previous issues:
Status of previous issues:
;                  NIR No.                                               Description                                                                         Date (OPEN)                     (CLOSED) 1                                                 Mechanical Splicing                                                 10/21/82                   12/8/82 Procedure I
NIR No.
2                                                 Document Control 4
Description Date (OPEN)
Surveillance                                                       10/29/82                                       ,
(CLOSED) 1 Mechanical Splicing 10/21/82 12/8/82 Procedure I
2 Document Control Surveillance 10/29/82 4
i
i
}
}
l.A.) L Y.Ldan,                                 .<.S.   % k u g Project Engineer                                 Project Manager-i 8
l.A.) L Y.Ldan,
l l
.<.S. % k u g i
f i
Project Engineer Project Manager-8 l
l 8
l f
                                          ,,,m,--         -n.--   ,,. ,-          , - - . = , . , , , - - - . ,           ,--------n,                 - - . r,                         -
i l
8
,,,m,--
-n.--
, - -. =,.,,, - - -.,
,--------n, r,
,.., - ~.


!                                                                                                                                            i j                         -
i j
i               .                                                                                                                              ,
i 4
4                                                                                                                                             :
1 i
1 i
j                                                                                                                                             ,
j l
l                                                                                             .
4 1
4 1
1                                                                                                                                          ;
I
)
1
1
:                                          INDEPENDElfr ASSESSMENT TEAM MEETING WITH BECETEL                                           . l
)
{                                                                                                                                            i l                                    Date:  December 6, 1982 1
I INDEPENDElfr ASSESSMENT TEAM MEETING WITH BECETEL l
1 No meeting this date at the request of Bechtel Corporation.                                              [
1
.o                                                                                                                                            .
{
i t
i 1
i l
i l
1 i                                                                                                                                             ;
Date:
i                                                                                                                                             (
December 6, 1982 1
1 No meeting this date at the request of Bechtel Corporation.
[
.o i
t i
1 i
l 1
i i
(
h
h
!                                                                                                                                            .i i                                                                                                                                             !.
.i i
}                                                                                                                                             i 1
}
9   A i'
i 1
r e
9 A
i 4
i r
i l.
e i
4 i
l.
I t
I t
: t.                                                                                                                                           ,
t.
t                                                                                                                                             '
t r
r i
i
{
{


,                  INDEFEDENT ASSESSMER TEAM MEETING WITH BECHTEL Date: December 7, 1982 Attendees:
INDEFEDENT ASSESSMER TEAM MEETING WITH BECHTEL Date: December 7, 1982 Attendees:
SWEC                                           Bechtel                                 MPQAD V. Kilker                                     E. Cviki                               L. Kettron A. Scott                                       J. Fisher
SWEC Bechtel MPQAD V. Kilker E. Cviki L. Kettron A. Scott J. Fisher 1.
: 1. Full review of outstanding pier 12 items completed yesterday. CPCo letter to go te NRC todey.
Full review of outstanding pier 12 items completed yesterday. CPCo letter to go te NRC todey.
: 2. J. Fisher asked if SWEC/FB@ can support present plan to start work on l           12/13/82. W. Kilker replied that assessment team will support any schedule that is set for the remediel work.
2.
J. Fisher asked if SWEC/FB@ can support present plan to start work on l
12/13/82.
W. Kilker replied that assessment team will support any schedule that is set for the remediel work.
l l
l l
                          ---w--                     -                          -. . - .        . , _
---w--


  ~
IIDEPEKDDfr ASSE3SMEKI TEAM KEETIN3 WITE ZECHTEL
IIDEPEKDDfr ASSE3SMEKI TEAM KEETIN3 WITE ZECHTEL Date: December 8, 1982                                                       -
~
Attendees:       Bechtel         Steme/ Webster         MPQAD J. Fisher       W. Kilker             L. Kettrez             -
Date: December 8, 1982 Attendees:
E. Cviki       A. Scott               R. Wieland
Bechtel Steme/ Webster MPQAD J. Fisher W. Kilker L. Kettrez E. Cviki A. Scott R. Wieland 1.
: 1. R. Wieland agreed to verify the status of the two outstanding SWEC NIR'S.
R. Wieland agreed to verify the status of the two outstanding SWEC NIR'S.
: 2. Assessement team is issueing NIR f3 concerminc level of temperature testing of Fox Bowlett couplers. At issue is ASME code requirements verses project project pocedure : equirements.
2.
Assessement team is issueing NIR f3 concerminc level of temperature testing of Fox Bowlett couplers. At issue is ASME code requirements verses project project pocedure : equirements.
t
t


IC17.ENDENT ASSESSMENT TEAM MEPTING WITH EECHTEL Date:       December 9, 1982 Attendees:
IC17.ENDENT ASSESSMENT TEAM MEPTING WITH EECHTEL Date:
SWEC                   CPCo           MPQAL         Bechtel W. Killer             R. Wieland     L. Kettren     J. Fisher A. Scott                                             E. Cviki
December 9, 1982 Attendees:
: 1. W. Killer advised that NIR 81 and f2 replies had been recieved anu vill be closed out.
SWEC CPCo MPQAL Bechtel W. Killer R. Wieland L. Kettren J. Fisher A. Scott E. Cviki 1.
: 2. NIR 83 was issued on 12/8/82.'
W. Killer advised that NIR 81 and f2 replies had been recieved anu vill be closed out.
: 3. Assessment team is updating it's files on specifications, Procedures end Drawings.
2.
NIR 83 was issued on 12/8/82.'
3.
Assessment team is updating it's files on specifications, Procedures end Drawings.
1 e
1 e
1
1


INDEFENDEFf ASSESSMEYf MEETING WITH BECHTEL Date: December 10, 1982                                                         .
INDEFENDEFf ASSESSMEYf MEETING WITH BECHTEL Date: December 10, 1982 Attendees:
Attendees:           Bechtel       Stone / Webster   MPQAD         CPCo E. Cvik1       W. Killer         L. Kettren   R. Wieland J. Fisher     A. Scott
Bechtel Stone / Webster MPQAD CPCo E. Cvik1 W. Killer L. Kettren R. Wieland J. Fisher A. Scott 1.
: 1. J. Fisher advised that the NRC letter on work authorization was rece$ved.
J. Fisher advised that the NRC letter on work authorization was rece$ved.
Bechtel vill start work when a work permit from CPCo is seat. Tentatively set for December 13, 1982.
Bechtel vill start work when a work permit from CPCo is seat. Tentatively set for December 13, 1982.
: 2. Use of the confined entry space permit was reviewed.
2.
: 3. W. Kilker inquired as to what resulted from the settlement presentation to the NRC regarding tonitored building movements. J. Fisher and E. Cviki replied that co written opinion had been expressed by the NRC but that data is constantly updated and available.}}
Use of the confined entry space permit was reviewed.
3.
W. Kilker inquired as to what resulted from the settlement presentation to the NRC regarding tonitored building movements.
J. Fisher and E. Cviki replied that co written opinion had been expressed by the NRC but that data is constantly updated and available.}}

Latest revision as of 09:09, 16 December 2024

Forwards Independent Assessment of Auxiliary Bldg Underpinning Weekly Rept 12 for 821205-11
ML20070S293
Person / Time
Site: Midland
Issue date: 12/14/1982
From: Lucks A
STONE & WEBSTER, INC.
To: Cook R
NRC
Shared Package
ML20070S237 List:
References
MFP-12, NUDOCS 8302040343
Download: ML20070S293 (8)


Text

CCNSUMERS POWER CO.

RECE!VED JUM 190 Site Mgr.

STONE 6 WEBSTER ENGINEERING COMtSMdil8tT 245 SUMMER STREET. BOSTON. M ASS A CHU SETTS ADDRESS ALL COR RESPONDENCE TO P.O. SOX 2325. DO5 TON. M A S S. 02107 W U TELEA 94 0001 h

oma NstawcTioN R "5 ~ ~

":::,,o.

C'o' tat

  • inn!T.L 1."S.'~' Sol"o'c ~

United Stated Nuclear Regulatory Commission December 34, 1982 Midland Site Resident Inspection Office Route 7 J.O.

No. 14356 Midland, MI 48640 Ref. MFP 12 Attention Mr. R. Cook RE:

DOCKET NO.

50-329/330 Midland Plant - UNITS 1 AND 2 INDEPENDENT ASSESSMENT OF AUXILIARY BUILDING UNDERPINNING REPORT NO.

12 A copy of the Independent Assessment of the Auxiliary Building Under-pinning Weekly Report No. 12 for the period December 5 through December 11, 1982, is enclosed with this letter. Included, as an attachment, are the minutes of the daily meetings held during the week between members of the Assessment Team and Site Engineering, Construction and Qualit:-

Assurance personnel during the week.

If you have any questions with respect to this report please contact me at (617) 589-2067.

M S (03A A. Stanley Lucks i

Project Manager Enclosures l

,k. - -

ASL/ka F

..__ _ I f'-

I

~

l l

~K-1 i

C._

l-8302040343 830120 I--

PDR ADOCK 05000329 G

PDR

J. O. NO.

14356 Midland Plant Units 1 and 2 Independent Assessment Auxiliary Building Underpinning Weekly Report No.

12 December 5 through December 11, 1982 Personnel en Site Stone & Webster Engineering Corporation (SWEC)

A. B. Scott 12/6 - 12/10 W. Kilker 12/6 - 12/10 Activities Reviewed and where necessary, updated status of drawings, procedures and specifications on file.

Meetings Attended Date Represented Purpose 12/7 Stone & Webster Daily Meeting through Bechtel 12/10 Consumers Power 12/6 Stone & Webster Pier 12 request Bechtel for Authorization Consumers Power Letter Mergentime 12/10 Stone & Webster Weekly Soils Review Bechtel Mergentime Consumers Pcwer Observations On December 9, 1982 the NRC released the work activities for piers E/W 12.

Work is expected to commence on W 12 and E 12 on December 13 and 20, respectively.

2 Non-Conformance Identification Report i

NIR No. #3 - Issued December 8, 1982 - Project requirements for testing temperature of tapered threaded connectors does not confore to ASME III,

~

Division 2 requirements.

Status of previous issues:

NIR No.

Description Date (OPEN)

(CLOSED) 1 Mechanical Splicing 10/21/82 12/8/82 Procedure I

2 Document Control Surveillance 10/29/82 4

i

}

l.A.) L Y.Ldan,

.<.S. % k u g i

Project Engineer Project Manager-8 l

l f

i l

8

,,,m,--

-n.--

, - -. =,.,,, - - -.,

,--------n, r,

,.., - ~.

i j

i 4

1 i

j l

4 1

1

)

I INDEPENDElfr ASSESSMENT TEAM MEETING WITH BECETEL l

1

{

i l

Date:

December 6, 1982 1

1 No meeting this date at the request of Bechtel Corporation.

[

.o i

t i

1 i

l 1

i i

(

h

.i i

}

i 1

9 A

i r

e i

4 i

l.

I t

t.

t r

i

{

INDEFEDENT ASSESSMER TEAM MEETING WITH BECHTEL Date: December 7, 1982 Attendees:

SWEC Bechtel MPQAD V. Kilker E. Cviki L. Kettron A. Scott J. Fisher 1.

Full review of outstanding pier 12 items completed yesterday. CPCo letter to go te NRC todey.

2.

J. Fisher asked if SWEC/FB@ can support present plan to start work on l

12/13/82.

W. Kilker replied that assessment team will support any schedule that is set for the remediel work.

l l

---w--

IIDEPEKDDfr ASSE3SMEKI TEAM KEETIN3 WITE ZECHTEL

~

Date: December 8, 1982 Attendees:

Bechtel Steme/ Webster MPQAD J. Fisher W. Kilker L. Kettrez E. Cviki A. Scott R. Wieland 1.

R. Wieland agreed to verify the status of the two outstanding SWEC NIR'S.

2.

Assessement team is issueing NIR f3 concerminc level of temperature testing of Fox Bowlett couplers. At issue is ASME code requirements verses project project pocedure : equirements.

t

IC17.ENDENT ASSESSMENT TEAM MEPTING WITH EECHTEL Date:

December 9, 1982 Attendees:

SWEC CPCo MPQAL Bechtel W. Killer R. Wieland L. Kettren J. Fisher A. Scott E. Cviki 1.

W. Killer advised that NIR 81 and f2 replies had been recieved anu vill be closed out.

2.

NIR 83 was issued on 12/8/82.'

3.

Assessment team is updating it's files on specifications, Procedures end Drawings.

1 e

1

INDEFENDEFf ASSESSMEYf MEETING WITH BECHTEL Date: December 10, 1982 Attendees:

Bechtel Stone / Webster MPQAD CPCo E. Cvik1 W. Killer L. Kettren R. Wieland J. Fisher A. Scott 1.

J. Fisher advised that the NRC letter on work authorization was rece$ved.

Bechtel vill start work when a work permit from CPCo is seat. Tentatively set for December 13, 1982.

2.

Use of the confined entry space permit was reviewed.

3.

W. Kilker inquired as to what resulted from the settlement presentation to the NRC regarding tonitored building movements.

J. Fisher and E. Cviki replied that co written opinion had been expressed by the NRC but that data is constantly updated and available.