Text

CCNSUMERS POWER CO.

RECE!VED JUM 190 Site Mgr.

STONE 6 WEBSTER ENGINEERING COMtSMdil8tT .

245 SUMMER STREET. BOSTON. M ASS A CHU SETTS ADDRESS ALL COR RESPONDENCE TO P.O. SOX 2325. DO5 TON. M A S S. 02107 W U TELEA 94 0001 h oma NstawcTioN R "5 ~ ~ ":::,,o .

C'o' tat

  • inn!T.L 1."S.'~' Sol"o'c ~

United Stated Nuclear Regulatory Commission December 34, 1982 Midland Site Resident Inspection Office Route 7 J.O. No. 14356 Midland, MI 48640 Ref. MFP 12 Attention Mr. R. Cook RE: DOCKET NO. 50-329/330 Midland Plant - UNITS 1 AND 2 INDEPENDENT ASSESSMENT OF AUXILIARY BUILDING UNDERPINNING REPORT NO. 12 A copy of the Independent Assessment of the Auxiliary Building Under-pinning Weekly Report No. 12 for the period December 5 through December 11, 1982, is enclosed with this letter. Included, as an attachment, are the minutes of the daily meetings held during the week between members of the Assessment Team and Site Engineering, Construction and Qualit:-

Assurance personnel during the week.

If you have any questions with respect to this report please contact me at (617) 589-2067.

$ M S (03A

, A. Stanley Lucks i Project Manager Enclosures l

ASL/ka ,k . - -

F ..__ _ I f'- I

~

l . - -.

l 1

~K- . . _ .

i C ._

l-8302040343 830120 I--

PDR ADOCK 05000329 G PDR .

J. O. NO. 14356 Midland Plant Units 1 and 2 Independent Assessment Auxiliary Building Underpinning Weekly Report No. 12 December 5 through December 11, 1982 Personnel en Site Stone & Webster Engineering Corporation (SWEC)

A. B. Scott 12/6 - 12/10 W. Kilker 12/6 - 12/10 Activities Reviewed and where necessary, updated status of drawings, procedures and specifications on file.

Meetings Attended Date Represented Purpose 12/7 Stone & Webster Daily Meeting through Bechtel 12/10 Consumers Power 12/6 Stone & Webster Pier 12 request Bechtel for Authorization Consumers Power Letter Mergentime 12/10 Stone & Webster Weekly Soils Review Bechtel Mergentime Consumers Pcwer Observations On December 9, 1982 the NRC released the work activities for piers E/W 12.

Work is expected to commence on W 12 and E 12 on December 13 and 20, respectively.

- 2 Non-Conformance Identification Report i

NIR No. #3 - Issued December 8, 1982 - Project requirements for testing ,

temperature of tapered threaded connectors does not confore to ASME III, ~

Division 2 requirements.

Status of previous issues:

NIR No. Description Date (OPEN) (CLOSED) 1 Mechanical Splicing 10/21/82 12/8/82 Procedure I

2 Document Control 4

Surveillance 10/29/82 ,

i

}

l.A.) L Y.Ldan, .<.S.  % k u g Project Engineer Project Manager-i 8

l l

f i

l 8

,,,m,-- -n.-- ,,. ,- , - - . = , . , , , - - - . , ,--------n, - - . r, -

! i j -

i . ,

4  :

1 i

j ,

l .

4 1

1  ;

I

)

1

INDEPENDElfr ASSESSMENT TEAM MEETING WITH BECETEL . l

{ i l Date: December 6, 1982 1

1 No meeting this date at the request of Bechtel Corporation. [

.o .

i t

i 1

i l

1 i  ;

i (

h

! .i i  !.

} i 1

9 A i'

r e

i 4

i l.

I t

t. ,

t '

r i

{

, INDEFEDENT ASSESSMER TEAM MEETING WITH BECHTEL Date: December 7, 1982 Attendees:

SWEC Bechtel MPQAD V. Kilker E. Cviki L. Kettron A. Scott J. Fisher

1. Full review of outstanding pier 12 items completed yesterday. CPCo letter to go te NRC todey.
2. J. Fisher asked if SWEC/FB@ can support present plan to start work on l 12/13/82. W. Kilker replied that assessment team will support any schedule that is set for the remediel work.

l l

---w-- - -. . - . . , _

~

IIDEPEKDDfr ASSE3SMEKI TEAM KEETIN3 WITE ZECHTEL Date: December 8, 1982 -

Attendees: Bechtel Steme/ Webster MPQAD J. Fisher W. Kilker L. Kettrez -

E. Cviki A. Scott R. Wieland

1. R. Wieland agreed to verify the status of the two outstanding SWEC NIR'S.
2. Assessement team is issueing NIR f3 concerminc level of temperature testing of Fox Bowlett couplers. At issue is ASME code requirements verses project project pocedure : equirements.

t

IC17.ENDENT ASSESSMENT TEAM MEPTING WITH EECHTEL Date: December 9, 1982 Attendees:

SWEC CPCo MPQAL Bechtel W. Killer R. Wieland L. Kettren J. Fisher A. Scott E. Cviki

1. W. Killer advised that NIR 81 and f2 replies had been recieved anu vill be closed out.
2. NIR 83 was issued on 12/8/82.'
3. Assessment team is updating it's files on specifications, Procedures end Drawings.

1 e

1

INDEFENDEFf ASSESSMEYf MEETING WITH BECHTEL Date: December 10, 1982 .

Attendees: Bechtel Stone / Webster MPQAD CPCo E. Cvik1 W. Killer L. Kettren R. Wieland J. Fisher A. Scott

1. J. Fisher advised that the NRC letter on work authorization was rece$ved.

Bechtel vill start work when a work permit from CPCo is seat. Tentatively set for December 13, 1982.

2. Use of the confined entry space permit was reviewed.
3. W. Kilker inquired as to what resulted from the settlement presentation to the NRC regarding tonitored building movements. J. Fisher and E. Cviki replied that co written opinion had been expressed by the NRC but that data is constantly updated and available.