ML032801581: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:15-SEP-03                                                                   Page: 19 DISTRIBUTION CONTROL LIST S cument Name:     EMER PLAN CCNAME NAME                         DEPT                      LOCATION 2 EP/TRAINING ADMINISTRATOR   TRAINING (ALL EP'S)       #48 3 RES DEPARTMENT MANAGER      RES (UNIT 3/IPEC ONLY)   45-4-A 4 REFERENCE LIBRARY          REC/TRN(UNT 3/IPEC ONLY) BLDG/17 9 JOINT NEWS CENTER          EMER PLN (ALL EP'S)       EOF 10 SHIFT MGR.(LUB-001-GEN)    OPS (UNIT 3/IPEC ONLY)   IP3 11 CONTROL ROOM & MASTER      OPS(3PT-D001/6(U3/IPEC)   IP3(ONLY) 14 EOF                        E-PLAN (ALL EP'S)         EOF 16 AEOF/A.GROSJEAN(ALL EP'S)  E-PLAN (EOP'S ONLY)       WPO-12D 19 NUC ENGINEERING LIBRARY    DOC (UNIT 3/IPEC ONLY)   WPO/7A 21 TSC                        RECORDS                   45-3-F 22 RESIDENT INSPECTOR          US NRC(UNIT 3/IPEC ONLY) 45-2-B 23 SILK DAVID                  NRC (ALL EP'S)           OFFSITE 24,-SLaK _PAVID                ,NRC,(ALL EP'S)           _OFFSITE L25 DOCUMENT CONTROL DESK        NRC (ALL EP'S)           OFFSITE 28 A'VI AXXOTS N              J A(UNIT 3fIPEC ONLY)     OFFSITE 29 E-PLAN STAFF                E-PLAN (ALL EP'S)         EOF 30 E-PLAN STAFF                E-PLAN (ALL EP'S)         EOF 31 BARANSKI J(VOLUME I ONLY)  ST. EMERG. MGMT. OFFICE OFFSITE 32 SUTTON A -(VOLUME  I ONLY)  DISASTER & EMERGENCY     WESTCHESTR 10        33 LONGO N (VOLUME I ONLY)    EMERGENCY SERVICES       ROCKLAND 34 GREENE D (VOLUME I ONLY)    DISASTER & CIVIL DEFENSE ORANGE 35 RAMPOLLA M(VOLUME I ONLY)  OFFICE OF EMERG MANAGE   PUTNAM 41 SIMULATOR                  TRAIN(UNIT 3/IPEC ONLY)   48-2-A 107 QA MANAGER                  QA (UNIT 3/IPEC)         K-IP2-4302 319 C.STELLATO(NRQ-OPS TRN)    NRQ (UNIT 3/IPEC ONLY)   #48 354 L.GRANT(LRQ-OPS/TRAIN)      LRQ (UNIT 3/IPEC ONLY)   #48 376 E-PLAN STAFF                E-PLAN (ALL EP'S)         EOF 424 J.CHIUSANO(OPS INSTR)        (UNIT 3/IPEC ONLY)       #48 510 L.GRANT(LRQ-OPS/TRAIN)      LRQ (UNIT 3/IPEC ONLY)   #48 511 L.GRANT(LRQ-OPS/TRAIN)      LRQ (UNIT 3/IPEC ONLY)   #48 512 C.STELLATO(NRQ-OPS TRN)    NRQ (UNIT 3/IPEC ONLY)   #48 513 C.STELLATO(NRQ-OPS TRN)    NRQ (UNIT 3/IPEC ONLY)   #48 517 PLANT MANAGER'S OFFICE      ADMIN/(UNIT 2/IPEC ONLY) IP2 518 DOCUMENT CONTROL            UNIT 2(UNIT 2/IPEC ONLY) IP2 520 CONTROL ROOM (UNIT 2)      OPS (UNIT 2 & IPEC ONLY) IP2 521 SIMULATOR                  TRAIN (UNIT 2/IPEC ONLY) IP2 522 NRC RESIDENT                US NRC(UNIT 2/IPEC ONLY) IP2 523 ROBERT VOGLE (UNIT 2)      TRAIN/LIB (ALL EP'S)     TODDVILLE 524 JOHN MCCANN (UNIT 2)        NUC SAFETY/LIC(ALL EP'S) IP2 552 TORRES DAMARIS(MASTER)      DOCUMENTS (EEC BLDG)     IP2 A4W   5
{{#Wiki_filter:15-SEP-03 Page:
19 DISTRIBUTION CONTROL LIST S cument Name:
EMER PLAN CCNAME NAME 2 EP/TRAINING ADMINISTRATOR 3 RES DEPARTMENT MANAGER 4 REFERENCE LIBRARY 9 JOINT NEWS CENTER 10 SHIFT MGR.(LUB-001-GEN) 11 CONTROL ROOM & MASTER 14 EOF 16 AEOF/A.GROSJEAN(ALL EP'S) 19 NUC ENGINEERING LIBRARY 21 TSC 22 RESIDENT INSPECTOR 23 SILK DAVID 24,-SLaK _PAVID L25 DOCUMENT CONTROL DESK 28 A'VI AXXOTS N 29 E-PLAN STAFF 30 E-PLAN STAFF 31 BARANSKI J(VOLUME I ONLY) 32 SUTTON A -(VOLUME I ONLY) 10 33 LONGO N (VOLUME I ONLY) 34 GREENE D (VOLUME I ONLY) 35 RAMPOLLA M(VOLUME I ONLY) 41 SIMULATOR 107 QA MANAGER 319 C.STELLATO(NRQ-OPS TRN) 354 L.GRANT(LRQ-OPS/TRAIN) 376 E-PLAN STAFF 424 J.CHIUSANO(OPS INSTR) 510 L.GRANT(LRQ-OPS/TRAIN) 511 L.GRANT(LRQ-OPS/TRAIN) 512 C.STELLATO(NRQ-OPS TRN) 513 C.STELLATO(NRQ-OPS TRN) 517 PLANT MANAGER'S OFFICE 518 DOCUMENT CONTROL 520 CONTROL ROOM (UNIT 2) 521 SIMULATOR 522 NRC RESIDENT 523 ROBERT VOGLE (UNIT 2) 524 JOHN MCCANN (UNIT 2) 552 TORRES DAMARIS(MASTER)
DEPT LOCATION TRAINING (ALL EP'S)  
#48 RES (UNIT 3/IPEC ONLY) 45-4-A REC/TRN(UNT 3/IPEC ONLY) BLDG/17 EMER PLN (ALL EP'S)
EOF OPS (UNIT 3/IPEC ONLY)
IP3 OPS(3PT-D001/6(U3/IPEC)
IP3(ONLY)
E-PLAN (ALL EP'S)
EOF E-PLAN (EOP'S ONLY)
WPO-12D DOC (UNIT 3/IPEC ONLY)
WPO/7A RECORDS 45-3-F US NRC(UNIT 3/IPEC ONLY) 45-2-B NRC (ALL EP'S)
OFFSITE
,NRC,(ALL EP'S)
_OFFSITE NRC (ALL EP'S)
OFFSITE J A(UNIT 3fIPEC ONLY)
OFFSITE E-PLAN (ALL EP'S)
EOF E-PLAN (ALL EP'S)
EOF ST. EMERG. MGMT. OFFICE OFFSITE DISASTER & EMERGENCY WESTCHESTR EMERGENCY SERVICES ROCKLAND DISASTER & CIVIL DEFENSE ORANGE OFFICE OF EMERG MANAGE PUTNAM TRAIN(UNIT 3/IPEC ONLY) 48-2-A QA (UNIT 3/IPEC)
K-IP2-4302 NRQ (UNIT 3/IPEC ONLY)  
#48 LRQ (UNIT 3/IPEC ONLY)  
#48 E-PLAN (ALL EP'S)
EOF (UNIT 3/IPEC ONLY)  
#48 LRQ (UNIT 3/IPEC ONLY)  
#48 LRQ (UNIT 3/IPEC ONLY)  
#48 NRQ (UNIT 3/IPEC ONLY)  
#48 NRQ (UNIT 3/IPEC ONLY)  
#48 ADMIN/(UNIT 2/IPEC ONLY)
IP2 UNIT 2(UNIT 2/IPEC ONLY)
IP2 OPS (UNIT 2 & IPEC ONLY)
IP2 TRAIN (UNIT 2/IPEC ONLY)
IP2 US NRC(UNIT 2/IPEC ONLY)
IP2 TRAIN/LIB (ALL EP'S)
TODDVILLE NUC SAFETY/LIC(ALL EP'S)
IP2 DOCUMENTS (EEC BLDG)
IP2 A4W 5


Is IPEC SITE                 QUALITY RELATED           IP-SMM-AD-103         Revision 0
Is IPEC SITE QUALITY RELATED IP-SMM-AD-103 Revision 0
* Entergy                 MANAGEMENT             ADMINISTRATIVE PROCEDURE MANUAL INFORMATIONAL USE               Page         13     of     21 ATTACHMENT 10.1                                                       SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES Paae I of 1
* Entergy MANAGEMENT ADMINISTRATIVE PROCEDURE MANUAL INFORMATIONAL USE Page 13 of 21 ATTACHMENT 10.1 SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES Paae I of 1
            @Entergy TO: DISTRIBUTION                 DATE: 912412003                       TRANSMITTAL NO: 28631 (Circle one)
@Entergy TO: DISTRIBUTION DATE: 912412003 TRANSMITTAL NO: 28631 (Circle one)
FROM: IPEC DOCUMENT CONTROL: E EEC                   or IP2 53'EL     PHONE NUMBER: 271-7056 The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-103, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.
FROM: IPEC DOCUMENT CONTROL: E EEC or IP2 53'EL PHONE NUMBER: 271-7056 The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-103, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.
AFFECTED DOCUMENT: EMERGENCY PLANNING DOC #           REV #                       TITLE                           INSTRUCTIONS
AFFECTED DOCUMENT: EMERGENCY PLANNING DOC #
      ********SEE ATTACHED INSTRUCTIONS**********
REV #
                          **********PLEASE NOTE EFFECTIVE DATE*********
TITLE INSTRUCTIONS
********SEE ATTACHED INSTRUCTIONS**********
**********PLEASE NOTE EFFECTIVE DATE*********
RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).
RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).
NA_ (_IT                         SINTR     _                      _ _
NA_ (_IT SINTR DAT NAME (PRINT)
DAT NAME   (PRINT)                     SIGNATURE                         DATE                         Cc#Y
SIGNATURE DATE Cc#Y


I.- ft
I.-
:Needs                     #2AR&S /
ft
TO:             Nuclear Regulatory Commission FROM:           IPEC Emergency Planning
:Needs
#2AR&S /
TO:
Nuclear Regulatory Commission FROM:
IPEC Emergency Planning


==SUBJECT:==
==SUBJECT:==
Emergency Planning Document Update Date:           09/19/03 Please update your controlled copy of the documents listed below as specified with the copy(s) attached.
Emergency Planning Document Update Date:
New Rev./   -Old Rev. #J Document#             Document Name'             De           t       -    Instructions I
09/19/03 Please update your controlled copy of the documents listed below as specified with the copy(s) attached.
Un13V II.     7 Emergency.Plan Implementing Procedures TOC               Unit 3 Volume II       9/18103       7/03       Replace old with new IP-2003           CR Watch Chemist           Rev. 7       Rev. 6     Replace old with new 9/18103       7/02
New Rev./  
-Old Rev. #J Document#
Document Name' De t
Instructions I
Un13V II.
7 Emergency.Plan Implementing Procedures TOC Unit 3 Volume II 9/18103 7/03 Replace old with new IP-2003 CR Watch Chemist Rev. 7 Rev. 6 Replace old with new 9/18103 7/02


VOLUME II TABLE OF CONTENTS 09/18/03 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN - VOLUME II EMERGENCY RESPONSE ACTIVATION TABLE OF CONTENTS REV. I  /    DATE IC/EAL'S INITIATING CONDITIONS AND EMERGENCY ACTION LEVELS     9   -    07/02 CONTROL ROOM IP-2000   Emergency Activation of the Control Room (CR)         4  -    09/98 IP-2001   Emergency Director (ED), Plant Operations Manager   18  -    05/03 (POM), Shift Manager (SM) Procedure IP-2002   CR Health Physics Technician                         3  -    02/99 IP-2003   CR Watch Chemist                                     7  -    09/03 IP-2004   CR Clerk                                             3  -    09/00 IP-2005   CR Offsite Communicator                             VOID N/A  06/01 IP-2006   CR Direct-Line Communicator                           4   -    10/99 TECHNICAL SUPPORT CENTER (TSC)
VOLUME II TABLE OF CONTENTS 09/18/03 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN -
IP-2100   Emergency Activation of the Technical Support         4  -    11/00 Center (TSC)
VOLUME II EMERGENCY RESPONSE ACTIVATION TABLE OF CONTENTS IC/EAL'S INITIATING CONDITIONS AND EMERGENCY ACTION LEVELS REV. I
IP-2101  Technical Support Center (TSC) Manager               9        02/01 IP-2102  TSC Communicator(s)                                   3        12/98 IP-2103  TSC SPDS Computer Operator                           4         08/99 IP-2104  TSC Video Operator                                    2        06/01 IP-2105  TSC Accountability Officer                          VOID      N/A IP-2106  TSC Clerk                                            5        06/99 OPERATIONS SUPPORT CENTER (OSC)
/
IP-2200   Emergency Activation of the Operations               7  -    8/02 Support Center (OSC)
DATE 9
IP-2201   Operations Support Center (OSC) Manager               10  -    07/03 IP-2202   OSC Direct-Line Communicator                         2  -    12/98 IP-2203   OSC Dispatcher                                       3  -    07/02 IP-2204   OSC Team Leaders                                       4  -    07/03 IP-2205   OSC H.P. Team Leader                                   9  -    07/03 IP-2206   OSC Accountability Officer                           VOID  -    N/A IP-2207   OSC Clerk                                             5  -    06/99 IP-2208   OSC Security Team Leader                               4  -    03/02 IP-2209   OSC H.P. Technician                                   5  -    12/02 IP-2210   OSC Dosimetry Technician                               3  -    06/98 IP-2211   OSC Chemistry Team Leader                             2   -   03/00 i
07/02 CONTROL ROOM IP-2000 Emergency Activation of the Control Room (CR)
IP-2001 Emergency Director (ED), Plant Operations Manager (POM), Shift Manager (SM) Procedure IP-2002 CR Health Physics Technician IP-2003 CR Watch Chemist IP-2004 CR Clerk IP-2005 CR Offsite Communicator IP-2006 CR Direct-Line Communicator 4
09/98 18 05/03 3
02/99 7
09/03 3
09/00 VOID N/A 06/01 4
10/99 TECHNICAL SUPPORT CENTER (TSC)
IP-2100 IP-2101 IP-2102 IP-2103 IP-2104 IP-2105 IP-2106 Emergency Activation of the Technical Support Center (TSC)
Technical Support Center (TSC) Manager TSC Communicator(s)
TSC SPDS Computer Operator TSC Video Operator TSC Accountability Officer TSC Clerk 4
11/00 9
3 4
2 VOID 5
02/01 12/98 08/99 06/01 N/A 06/99 OPERATIONS SUPPORT CENTER (OSC)
IP-2200 Emergency Activation of the Operations Support Center (OSC)
IP-2201 Operations Support Center (OSC) Manager IP-2202 OSC Direct-Line Communicator IP-2203 OSC Dispatcher IP-2204 OSC Team Leaders IP-2205 OSC H.P. Team Leader IP-2206 OSC Accountability Officer IP-2207 OSC Clerk IP-2208 OSC Security Team Leader IP-2209 OSC H.P. Technician IP-2210 OSC Dosimetry Technician IP-2211 OSC Chemistry Team Leader 7
8/02 10 07/03 2
12/98 3
07/02 4
07/03 9
07/03 VOID -
N/A 5
06/99 4
03/02 5
12/02 3
06/98 2
03/00 i


VOLUME II TABLE OF CONTENTS 09/18/03 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN - VOLUME II EMERGENCY RESPONSE ACTIVATION TABLE OF CONTENTS EMERGENCY OPERATIONS FACILITY (EOF)                         REV. #    /  DATE IP-2300   Emergency Activation of the Emergency             VOID -      N/A Operations Facility (EOF)
VOLUME II TABLE OF CONTENTS 09/18/03 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN -
Replaced by IP-EP-250 IP-2301   Emergency Director                                 VOID -      N/A Replaced by IP-EP-255 IP-2302   EOF Technical Advisor and Information Liaison     VOID -      N/A Replaced by IP-EP-250 IP-2303   EOF Radiological Assessment Team Leader (RATL)     VOID -      N/A Replaced by IP-EP-250 IP-2304   EOF Dose Assessment Health Physicist               VOID -      N/A Replaced by IP-EP-250 IP-2305   EOF MIDAS Operator                                 VOID -      N/A Replaced by IP-EP-250 IP-2306   EOF Security Officer                               VOID -      N/A Replaced by IP-EP-250 IP-2307   EOF Clerk                                         VOID -      N/A Replaced by IP-EP-250 IP-2308   EOF Direct-Line Communicator                       VOID -      N/A Replaced by IP-EP-250 IP-2309   EOF Offsite Communicator                           VOID -      N/A Replaced by IP-EP-250 IP-2310   EOF Onsite Radiological Communicator               VOID -      N/A Replaced by IP-EP-250 IP-2311   EOF Offsite Radiological Communicator             Void  -      N/A IP-2312   EOF Public Relations Liaison                       VOID  -      N/A IP-2313   EOF Public Relations Technical Advisor             VOID  -      N/A IP-2314   EOF Radiological Assessment Monitor               VOID -     N/A ALTERNATE EMERGENCY OPERATIONS FACILITY (AEOF)
VOLUME II EMERGENCY RESPONSE ACTIVATION TABLE OF CONTENTS EMERGENCY OPERATIONS FACILITY (EOF)
IP-2400   Emergency Activation of the Alternate Emergency   VOID -      N/A Operations Facility (AEOF)
IP-2300 Emergency Activation of the Emergency Operations Facility (EOF)
Replaced by IP-EP-251 SECURITY ACTIVATION IP-2500   Security Emergency Activation Responsibilities     13   -      07/03 RECOVERY/TERMINATION IP-2600   Emergency Termination and Transition to Recovery     VOID -    N/A Replaced by IP-EP-610 IP-2601   Recovery Manager                                     VOID -    N/A Replaced by IP-EP-610 IP-2602   Development of a Recovery Action Plan               VOID -    N/A Replaced by IP-EP-610 IP-2603   Recovery Support Group Manager                       1    -    07/02 EP-FORMS SECTION - Index                                       07/02 ii
Replaced by IP-EP-250 IP-2301 Emergency Director Replaced by IP-EP-255 IP-2302 EOF Technical Advisor and Information Liaison Replaced by IP-EP-250 IP-2303 EOF Radiological Assessment Team Leader (RATL)
Replaced by IP-EP-250 IP-2304 EOF Dose Assessment Health Physicist Replaced by IP-EP-250 IP-2305 EOF MIDAS Operator Replaced by IP-EP-250 IP-2306 EOF Security Officer Replaced by IP-EP-250 IP-2307 EOF Clerk Replaced by IP-EP-250 IP-2308 EOF Direct-Line Communicator Replaced by IP-EP-250 IP-2309 EOF Offsite Communicator Replaced by IP-EP-250 IP-2310 EOF Onsite Radiological Communicator Replaced by IP-EP-250 IP-2311 EOF Offsite Radiological Communicator IP-2312 EOF Public Relations Liaison IP-2313 EOF Public Relations Technical Advisor IP-2314 EOF Radiological Assessment Monitor REV. # /
DATE VOID -
N/A VOID -
N/A VOID -
N/A VOID -
N/A VOID -
N/A VOID -
N/A VOID -
N/A VOID -
N/A VOID -
N/A VOID -
N/A VOID -
N/A Void -
N/A VOID -
N/A VOID -
N/A VOID -
N/A ALTERNATE EMERGENCY OPERATIONS FACILITY (AEOF)
IP-2400 Emergency Activation of the Alternate Emergency Operations Facility (AEOF)
Replaced by IP-EP-251 VOID -
N/A SECURITY ACTIVATION IP-2500 Security Emergency Activation Responsibilities 13 07/03 RECOVERY/TERMINATION IP-2600 Emergency Termination and Transition to Recovery Replaced by IP-EP-610 IP-2601 Recovery Manager Replaced by IP-EP-610 IP-2602 Development of a Recovery Action Plan Replaced by IP-EP-610 IP-2603 Recovery Support Group Manager EP-FORMS SECTION -
Index VOID -
N/A VOID -
N/A VOID -
N/A 1
07/02 07/02 ii


VOLUME II TABLE OF CONTENTS 09/18/03 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN - VOLUME II EMERGENCY RESPONSE ACTIVATION TABLE OF CONTENTS APPENDIX 'A' ROSTER I                                     Void Replaced by IPEC ETD ROSTER II                                     Void Replaced by IPEC ETD ROSTER III                                   Void No longer used for Emergency Response Activities APPENDIX 'B' Emergency Offsite Telephone List             Void Replaced by IPEC ETD APPENDIX 'C' Emergency Response Facility Telephone List   Void Replaced by IPEC ETD iii
VOLUME II TABLE OF CONTENTS 09/18/03 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN -
VOLUME II EMERGENCY RESPONSE ACTIVATION TABLE OF CONTENTS APPENDIX 'A' APPENDIX 'B' APPENDIX 'C' ROSTER I Void Replaced by IPEC ETD ROSTER II Void Replaced by IPEC ETD ROSTER III Void No longer used for Emergency Response Activities Emergency Offsite Telephone List Void Replaced by IPEC ETD Emergency Response Facility Telephone List Void Replaced by IPEC ETD iii


NEW YORK POWER AUTHORITY INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN - VOLUME II EMERGENCY RESPONSE ACTIVATION LIST OF ATTACHMENTS IP-2000 Emergency Activation of the Control Room (CCR) 5.1 CCR Setup 5.2* CCR Floor plan IP-2001 Emergency Director (ED), Plant Operations Manager (POM),
NEW YORK POWER AUTHORITY INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN -
VOLUME II EMERGENCY RESPONSE ACTIVATION LIST OF ATTACHMENTS IP-2000 Emergency Activation of the Control Room (CCR) 5.1 CCR Setup 5.2* CCR Floor plan IP-2001 Emergency Director (ED), Plant Operations Manager (POM),
Shift Supervisor (SS) Procedure 5.1* Notification of Unusual Event Classification Flowchart 5.2* Alert Classification Flowchart 5.3* Site Area Emergency Classification Flowchart 5.4* General Emergency Classification Flowchart 5.5 Emergency Director Turnover Checklist 5.6 Relocation to AEOF Checklist IP-2005 CCR Offsite Communicator 5.1* Offsite Communications System Diagram IP-2006 CCR Direct Line Communicator 5.1* Communications System Diagram IP-2100 Emergency Activation of the Technical Support Center (TSC) 5.1 TSC Setup 5.2* TSC Floor plan IP-2102 TSC Communicator(s) 5.1* Communications System Diagram IP-2103 TSC SPDS Computer Operator 5.1 Accessing and Using SPDS IP-2104 TSC Video Operator 5.1 Video Cameras IP-2200 Emergency Activation of the Operations Support Center (OSC) 5.1 OSC Setup 5.2* OSC Floor plan IP-2202 OSC Direct Line Communicator 5.1* Communications System Diagram ii
Shift Supervisor (SS) Procedure 5.1* Notification of Unusual Event Classification Flowchart 5.2* Alert Classification Flowchart 5.3* Site Area Emergency Classification Flowchart 5.4* General Emergency Classification Flowchart 5.5 Emergency Director Turnover Checklist 5.6 Relocation to AEOF Checklist IP-2005 CCR Offsite Communicator 5.1* Offsite Communications System Diagram IP-2006 CCR Direct Line Communicator 5.1* Communications System Diagram IP-2100 Emergency Activation of the Technical Support Center (TSC) 5.1 TSC Setup 5.2* TSC Floor plan IP-2102 TSC Communicator(s) 5.1* Communications System Diagram IP-2103 TSC SPDS Computer Operator 5.1 Accessing and Using SPDS IP-2104 TSC Video Operator 5.1 Video Cameras IP-2200 Emergency Activation of the Operations Support Center (OSC) 5.1 OSC Setup 5.2* OSC Floor plan IP-2202 OSC Direct Line Communicator 5.1* Communications System Diagram ii


NEW YORK POWER AUTHORITY INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN - VOLUME II EMERGENCY RESPONSE ACTIVATION LIST OF ATTACHMENTS, Continued IP-2203 OSC Dispatcher 5.1 OSC Area Communication Setup and Operations IP-2205 OSC H.P. Team Leader 5.1 Post-Accident Emergency Entry Brief, Dress and Undress Sequences IP-2209 OSC H.P. Technician 5.1* Figure 1 Survey Map 5.2 OSC/TSC Interlocking doors IP-2300 Emergency Activation of the Emergency Operations Facility (EOF) 5.1 EOF Setup 5.2* EOF Floor plan IP-2301 Emergency Director 5.1 Emergency Director Turnover Checklist 5.2 Relocation to AEOF Checklist IP-2302 EOF Technical Advisor 5.1 Accessing and Using SPDS IP-2307 EOF Clerks 5.1 Processing EP-Forms Part I and Part II 5.2 Processing EP-Forms #31a, #31b and #31c IP-2308 Direct Line Communicator 5.1* Communications System Diagram IP-2309 EOF Offsite Communicator 5.1* Offsite Communications System Diagram 5.2 AEOF Preparatory Actions ii
NEW YORK POWER AUTHORITY INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN -
VOLUME II EMERGENCY RESPONSE ACTIVATION LIST OF ATTACHMENTS, Continued IP-2203 OSC Dispatcher 5.1 OSC Area Communication Setup and Operations IP-2205 OSC H.P. Team Leader 5.1 Post-Accident Emergency Entry Brief, Dress and Undress Sequences IP-2209 OSC H.P. Technician 5.1* Figure 1 Survey Map 5.2 OSC/TSC Interlocking doors IP-2300 Emergency Activation of the Emergency Operations Facility (EOF) 5.1 EOF Setup 5.2* EOF Floor plan IP-2301 Emergency Director 5.1 Emergency Director Turnover Checklist 5.2 Relocation to AEOF Checklist IP-2302 EOF Technical Advisor 5.1 Accessing and Using SPDS IP-2307 EOF Clerks 5.1 Processing EP-Forms Part I and Part II 5.2 Processing EP-Forms #31a, #31b and #31c IP-2308 Direct Line Communicator 5.1* Communications System Diagram IP-2309 EOF Offsite Communicator 5.1* Offsite Communications System Diagram 5.2 AEOF Preparatory Actions ii


IP-2314 EOF Radiological Assessment Monitor 5.1* EOF Floor plah 5.2 EOF Halon System ii
IP-2314 EOF Radiological Assessment Monitor 5.1* EOF Floor plah 5.2 EOF Halon System ii


NEW YORK POWER AUTHORITY INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN - VOLUME II EMERGENCY RESPONSE ACTIVATION LIST OF ATTACHMENTS, Continued IP-2400 Emergency Activation of the Alternate Emergency Operations Center (AEOF) 5.1 AEOF Setup 5.2* AEOF Floor plan 5.3 Instructions for White Plains Telephones 5.4 Instructions for AEOF Radios IP-2500 Security Emergency Activation Responsibilities 5.1* Notification of Unusual Event Security Flowchart 5.2* Alert Security Flowchart 5.3* Site Area Emergency Security Flowchart 5.4* General Emergency Security Flowchart 5.5* Offsite Monitor Notification Security CAS Flowchart 5.6* Notification Testing Security CAS Flowchart 5.7* Notifications for IP-2 Events 5.8* Notifications for Security Events IP-2600 Emergency Termination and Transition to Recovery 5.1* Criteria for Emergency Termination 5.2* Emergency Director Turnover to Recovery Manager Checklist ii
NEW YORK POWER AUTHORITY INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN -
* Indicates that this Attachment is a Drawing, not text.
VOLUME II EMERGENCY RESPONSE ACTIVATION LIST OF ATTACHMENTS, Continued IP-2400 Emergency Activation of the Alternate Emergency Operations Center (AEOF) 5.1 AEOF Setup 5.2* AEOF Floor plan 5.3 Instructions for White Plains Telephones 5.4 Instructions for AEOF Radios IP-2500 Security Emergency Activation Responsibilities 5.1* Notification of Unusual Event Security Flowchart 5.2* Alert Security Flowchart 5.3* Site Area Emergency Security Flowchart 5.4* General Emergency Security Flowchart 5.5* Offsite Monitor Notification Security CAS Flowchart 5.6* Notification Testing Security CAS Flowchart 5.7* Notifications for IP-2 Events 5.8* Notifications for Security Events IP-2600 Emergency Termination and Transition to Recovery 5.1* Criteria for Emergency Termination 5.2* Emergency Director Turnover to Recovery Manager Checklist ii
 
Indicates that this Attachment is a Drawing, not text.
ii
ii


Enitergy EMERGENCY PLAN PROCEDURES PROCEDURE NO.       IP-2003                 REV.             7 TITLE:                    CR Watch Chemist THIS PROCEDURE IS TSR                   x THIS PROCEDURE IS NOT TSR               03 WRITTEN BY:  -
Enitergy EMERGENCY PLAN PROCEDURES PROCEDURE NO.
A)C4\,           L SWNATU13E/DATE 21II3 REVIEWED BY:       V4411-      wej
TITLE:
                                                  -- /^VG&ATU7TE                7 7 APPROVED BY:      "A..'' Q _zLe,     Mlrg- -
IP-2003 REV.
EFFECTIVE DATE:            cl /,: .I I o -
7 CR Watch Chemist THIS PROCEDURE IS TSR THIS PROCEDURE IS NOT TSR x
v               I 4.'
03 A)C4\\,
L WRITTEN BY: -
REVIEWED BY:
SWNATU13E/DATE V4411-wej 21II3 APPROVED BY:
EFFECTIVE DATE:
--/^VG&ATU7TE 7 7 "A..'' Q _zLe, Mlrg- -
cl /,:.I I o -
v I
4.'
PROCEDURE USE IS REFERENCE
PROCEDURE USE IS REFERENCE


Volume II IP-2003 Rev. 7 CR WATCH CHEMIST TABLE OF CONTENTS Section Title                                           Pane 1.0   PURPOSE ....................                       3 2.0   RESPONSIBILITIES ....................             3
Volume II IP-2003 Rev. 7 CR WATCH CHEMIST TABLE OF CONTENTS Section Title Pane 1.0 PURPOSE....................
3 2.0 RESPONSIBILITIES....................
3


==3.0   REFERENCES==
==3.0 REFERENCES==
....................                    3 4.0   PROCEDURE                                 .3
3 4.0 PROCEDURE  
.3


Volume II IP-2003 Rev. 7 CR WATCH CHEMIST 1.0 PURPOSE 1.1 This procedure provides instruction to the Watch Chemistry in the Control Room or Simulator for performing Dose Assessment calculations.
Volume II IP-2003 Rev. 7 CR WATCH CHEMIST 1.0 PURPOSE 1.1 This procedure provides instruction to the Watch Chemistry in the Control Room or Simulator for performing Dose Assessment calculations.
2.0 RESPONSIBILITIES 2.1 Watch Chemists are responsible for Dose Assessment calculations, while the EOF is being staffed and/or while the EOF is being transferred to the AEOF.
2.0 RESPONSIBILITIES 2.1 Watch Chemists are responsible for Dose Assessment calculations, while the EOF is being staffed and/or while the EOF is being transferred to the AEOF.
2.2 The Watch Chemist position is a normal on-duty staff position, See E-Plan Volume II, Appendix A for current staffing.
2.2 The Watch Chemist position is a normal on-duty staff position, See E-Plan Volume II, Appendix A for current staffing.


==3.0 REFERENCES==
==3.0 REFERENCES==
 
3.1 E-Plan, Volume I, Section 5.0, "Organizational Control of Emergencies" 3.2 EP Form, #4, "Control Room Emergency Staffing Chart" 3.3 Form EP-1, Part I, 'NYS Radiological Emergency Data Form" 3.4 Form EP-2, Part II, UNYS Radiological Emergency Data Form" 3.5 IP-EP-310, "Dose Assessment' 3.6 IP-EP-410, "Protective Action Recommendations" 3.7 IP-2000, "Emergency Activation of the Control Room" 3.8 IP-EP-51 0, "Meteorological, Radiological and Plant Data Acquisition System" 4.0 PROCEDURE NOTE Initial the blank lines upon completion of the designated step 4.1 Card in if appropriate for accountability.
3.1 E-Plan, Volume I, Section 5.0, "Organizational Control of Emergencies" 3.2 EP Form, #4, "Control Room Emergency Staffing Chart" 3.3 Form EP-1, Part I, 'NYS Radiological Emergency Data Form" 3.4 Form EP-2, Part II, UNYS Radiological Emergency Data Form" 3.5 IP-EP-310, "Dose Assessment' 3.6 IP-EP-410, "Protective Action Recommendations" 3.7 IP-2000, "Emergency Activation of the Control Room" 3.8 IP-EP-51 0, "Meteorological, Radiological and Plant Data Acquisition System" 4.0 PROCEDURE NOTE Initial the blank lines upon completion of the designated step 4.1 Card in if appropriate for accountability.
4.2 Obtain the Watch Chemist E-Plan position book.
4.2 Obtain the Watch Chemist E-Plan position book.
4.3 Get a turnover on the event from the Control Room crew to determine if a release is in progress and if so determine the release point (document on Event Log Sheets located in the position book).
4.3 Get a turnover on the event from the Control Room crew to determine if a release is in progress and if so determine the release point (document on Event Log Sheets located in the position book).
Page 3 of 8
Page 3 of 8


Volume 11 IP-2003 Rev. 7 4.4     Synchronize your time with the CR flight panel clock or remove watch.                 L 4.5     Using the PC at the STA location, sign on (using your personal ENN sign-on) and open the desktop E-Plan Folder.
Volume 11 IP-2003 Rev. 7 4.4 Synchronize your time with the CR flight panel clock or remove watch.
4.6     Obtain Met tower data using one of the following methods:
L 4.5 Using the PC at the STA location, sign on (using your personal ENN sign-on) and open the desktop E-Plan Folder.
* Control Room meteorological display panel.
4.6 Obtain Met tower data using one of the following methods:
* Unit-2 Control Room meteorological display panel (phone 9-734-5294).             I
Control Room meteorological display panel.
* From the desktop E-Plan folder, double click on Connect to Met Tower.
Unit-2 Control Room meteorological display panel (phone 9-734-5294).
Login as CCREOF and hit enter (Time will be displayed in Eastern Standard Time and wind speed will be in mph [mph x .447 = meter/sec].
From the desktop E-Plan folder, double click on Connect to Met Tower.
* For any other back-up method refer to IP-EP-510, "Meteorological, Radiological and Plant Data Acquisition System".
Login as CCREOF and hit enter (Time will be displayed in Eastern Standard Time and wind speed will be in mph [mph x.447 = meter/sec].
4.7     Determine whether or not the release is greater than the IPEC Effluent               l Technical Specifications by one of the following methods.                           I
For any other back-up method refer to IP-EP-510, "Meteorological, Radiological and Plant Data Acquisition System".
* IP-2003, Computer program (From the desktop E-Plan folder and double click on the E-Plan IP-2003 icon) or access IP-2003 via the 3 2 Floppy disk in the Watch Chemist E-Plan position book.
I 4.7 Determine whether or not the release is greater than the IPEC Effluent l
* IP-EP-510, "Meteorological, Radiological and Plant Data Acquisition System".
Technical Specifications by one of the following methods.
* The following table:
I IP-2003, Computer program (From the desktop E-Plan folder and double click on the E-Plan IP-2003 icon) or access IP-2003 via the 3 2 Floppy disk in the Watch Chemist E-Plan position book.
Release Point           Rad Monitor               Tech Spec Release Rate Setpoint Plant Vent uCVsec             R-27             60,000 uCi/sec NG or 20 uCisec Iodine Plant Vent uCi/cc     R-44 (U2) I R-14 (U3)                     2E-3 uCi/cc SG Safety or         Main Steam Line       If there isANY identified Pri to Sec Leak, the Atmospheric               Mons           Iodine Tech Spec release rate limit is exceeded if a Safety or Atmospheric valve opens.
IP-EP-510, "Meteorological, Radiological and Plant Data Acquisition System".
Hole in the VC             R-25126                                 I R/hr
The following table:
* IF an unmonitored release path exists, THEN estimate the release rate and in BLOCK 6 of Form EP-1 Part 1,circle MD"                                   I Page 4 of 8
Release Point Rad Monitor Tech Spec Release Rate Setpoint Plant Vent uCVsec R-27 60,000 uCi/sec NG or 20 uCisec Iodine Plant Vent uCi/cc R-44 (U2) I R-14 (U3) 2E-3 uCi/cc SG Safety or Main Steam Line If there is ANY identified Pri to Sec Leak, the Atmospheric Mons Iodine Tech Spec release rate limit is exceeded if a Safety or Atmospheric valve opens.
Hole in the VC R-25126 I R/hr IF an unmonitored release path exists, THEN estimate the release rate and in BLOCK 6 of Form EP-1 Part 1, circle MD" I
Page 4 of 8


Volume II IP-2003 Rev. 7 4.8 Determine the magnitude of the release using one of the following:
Volume II IP-2003 Rev. 7 4.8 Determine the magnitude of the release using one of the following:
* IP-2003, Computer program (From the desktop E-Plan folder and double click on the E-Plan IP-2003 icon) or access IP-2003 via the 3 /2 Floppy disk in the Watch Chemist E-Plan position book.
IP-2003, Computer program (From the desktop E-Plan folder and double click on the E-Plan IP-2003 icon) or access IP-2003 via the 3 /2 Floppy disk in the Watch Chemist E-Plan position book.
* IP-EP-310, "Dose Assessment" and IP-EP-410, "Protective Action Recommendations".
IP-EP-310, "Dose Assessment" and IP-EP-410, "Protective Action Recommendations".
4.9 IF there is no release due to the event AND A General Emergency has not been declared, THEN record the following on Form EP-1 Part I, "NYS Radiological Emergency Data Form" within 15 minutes of the initial E-Plan classification or classification change(s) and every 30 minutes thereafter.
4.9 IF there is no release due to the event AND A General Emergency has not been declared, THEN record the following on Form EP-1 Part I, "NYS Radiological Emergency Data Form" within 15 minutes of the initial E-Plan classification or classification change(s) and every 30 minutes thereafter.
* In BLOCK 6, circle "A" and record "A" in the box.
In BLOCK 6, circle "A" and record "A" in the box.
* In BLOCK 7, circle "A" and record "A" in the box.
In BLOCK 7, circle "A" and record "A" in the box.
* In BLOCK 11, enter wind speed and elevation (10 meters) from Step 4.6.
In BLOCK 11, enter wind speed and elevation (10 meters) from Step 4.6.
* In BLOCK 12, enter wind direction & elevation (10 meters) from Step 4.6.
In BLOCK 12, enter wind direction & elevation (10 meters) from Step 4.6.
* In BLOCK 13, circle stability class and record letter in box per Step 4.6.
In BLOCK 13, circle stability class and record letter in box per Step 4.6.
* Provide Form EP-1 Part I to the ED for review.
Provide Form EP-1 Part I to the ED for review.
* After the ED has reviewed the Form EP-1 Part I, provide the form to the clerk for faxing.
After the ED has reviewed the Form EP-1 Part I, provide the form to the clerk for faxing.
4.10 IF there is a release due to the event that is below IPEC Tech Spec
4.10 IF there is a release due to the event that is below IPEC Tech Spec
(< 60,000 ptCi/sec NG and < 20 uCi/sec Iodine) AND the site boundary doses are below Protective Action Recommendations (< I Rem whole body {TEDE}
(< 60,000 ptCi/sec NG and < 20 uCi/sec Iodine) AND the site boundary doses are below Protective Action Recommendations (< I Rem whole body {TEDE}
and < 5 Rem thyroid {TODE}) AND A General Emergency has not been declared, THEN record the following on Form EP-1 Part I, "NYS Radiological Emergency Data Form" within 15 minutes of the initial E-Plan classification or E-Plan classification change(s) and every 30 minutes thereafter.
and < 5 Rem thyroid {TODE}) AND A General Emergency has not been declared, THEN record the following on Form EP-1 Part I, "NYS Radiological Emergency Data Form" within 15 minutes of the initial E-Plan classification or E-Plan classification change(s) and every 30 minutes thereafter.
* In BLOCK 6, circle "B"and determine if the release is to the atmosphere or water and check the appropriate box record "B" in the box.
In BLOCK 6, circle "B" and determine if the release is to the atmosphere or water and check the appropriate box record "B" in the box.
* In BLOCK 7, circle "A"and record "A" in the box.
In BLOCK 7, circle "A" and record "A" in the box.
* In BLOCK 11, enter wind speed and elevation (10 meters) from Step 4.6.
In BLOCK 11, enter wind speed and elevation (10 meters) from Step 4.6.
* In BLOCK 12, enter wind direction from and elevation (10 meters) from Step 4.6.
In BLOCK 12, enter wind direction from and elevation (10 meters) from Step 4.6.
Page 5 of 8
Page 5 of 8


Volume II IP-2003 Rev. 7
Volume II IP-2003 Rev. 7 In BLOCK 13, circle the stability class and record the letter in the box from Step 4.6.
* In BLOCK 13, circle the stability class and record the letter in the box from Step 4.6.
Provide Form EP-1 Part I to the ED for review.
* Provide Form EP-1 Part I to the ED for review.
After the ED has reviewed the Form EP-1 Part I, provide the form to the l
* After the ED has reviewed the Form EP-1 Part I, provide the form to the       l clerk for faxing.
clerk for faxing.
4.11 IF there is a release due to the event that is above IPEC Tech Spec (>60000 uCUsec NG or 20 uCi/sec Iodine) AND Site Boundary Doses are below Protective Action Recommendations (< I Rem whole body {TEDE) and < 5 Rem thyroid {TODE)) AND a General Emergency has not been declared, THEN record the following on Form EP-1 Part I and Forrn EP-2 Part II , "NYS Radiological Emergency Data Forms" within 15 minutes of the initial E-plan classification or E-plan classification change(s) and every 30 minutes thereafter.
4.11 IF there is a release due to the event that is above IPEC Tech Spec (>60000 uCUsec NG or 20 uCi/sec Iodine) AND Site Boundary Doses are below Protective Action Recommendations (< I Rem whole body {TEDE) and < 5 Rem thyroid {TODE)) AND a General Emergency has not been declared, THEN record the following on Form EP-1 Part I and Forrn EP-2 Part II, "NYS Radiological Emergency Data Forms" within 15 minutes of the initial E-plan classification or E-plan classification change(s) and every 30 minutes thereafter.
Fill out Form EP-1 Part I as follows:
Fill out Form EP-1 Part I as follows:
* In BLOCK 6, circle UCn and determine if the release is to the atmosphere or water and check the appropriate box record 'C" in the box.
In BLOCK 6, circle UCn and determine if the release is to the atmosphere or water and check the appropriate box record 'C" in the box.
* In BLOCK 7, circle 'A' and record 'A" in the box.
In BLOCK 7, circle 'A' and record 'A" in the box.
* In BLOCK 11, enter wind speed and elevation (10 meters) from Step 4.6
In BLOCK 11, enter wind speed and elevation (10 meters) from Step 4.6 In BLOCK 12, enter wind direction from and elevation (10 meters) from Step 4.6.
* In BLOCK 12, enter wind direction from and elevation (10 meters) from Step 4.6.
In BLOCK 13, circle the stability class and record the letter in the l
* In BLOCK 13, circle the stability class and record the letter in the   l box from Step 4.6.
box from Step 4.6.
4.11.1   Fill out Form EP-2 Part II as follows:
4.11.1 Fill out Form EP-2 Part II as follows:
* In BLOCKS 16, 17, 18, and 19 fill out the known data in the appropriate spaces per the Dose Assessment program. Fill in NIA for the results/data that are unknown.
In BLOCKS 16, 17, 18, and 19 fill out the known data in the appropriate spaces per the Dose Assessment program. Fill in NIA for the results/data that are unknown.
4.11.2   Provide Form EP-1 Part I and Form EP-2 Part II to the ED for review.
4.11.2 Provide Form EP-1 Part I and Form EP-2 Part II to the ED for review.
4.11.3 After the ED has reviewed the Form EP-1 Part I and Form EP-2 Part II, provide the form to the clerk for faxing.
4.11.3 After the ED has reviewed the Form EP-1 Part I and Form EP-2 Part II, provide the form to the clerk for faxing.
Page 6 of 8
Page 6 of 8


Volume II IP-2003 Rev. 7 4.12 IF A General Emergency is declared OR Site Boundary Doses are above Protective Action Recommendations (> 1 Rem whole body (TEDE) or > 5 Rem thyroid (TODE}), THEN record the following on Form EP-1 Part I and Form EP-2 Part II, "NYS Radiological Emergency Data Forms" within 15 minutes of the initial E-plan classification or E-plan classification change(s) and every 30 minutes thereafter.
Volume II IP-2003 Rev. 7 4.12 IF A General Emergency is declared OR Site Boundary Doses are above Protective Action Recommendations (> 1 Rem whole body (TEDE) or > 5 Rem thyroid (TODE}), THEN record the following on Form EP-1 Part I and Form EP-2 Part II, "NYS Radiological Emergency Data Forms" within 15 minutes of the initial E-plan classification or E-plan classification change(s) and every 30 minutes thereafter.
4.12.1     Fill out Form EP-1 Part I as follows:
4.12.1 Fill out Form EP-1 Part I as follows:
* In BLOCK 6, circle the appropriate letter, which corresponds to the type of release in progress and record that letter in the box.
In BLOCK 6, circle the appropriate letter, which corresponds to the type of release in progress and record that letter in the box.
* In BLOCK 7, circle "1B and C" and record "B" and "C"in the box. In section "B"circle the appropriate ERPA's per the IP-2003 computer program or applicable E-Plan procedures, IP-EP-510, uMeteorological, Radiological and Plant Data Acquisition System.
In BLOCK 7, circle "1B and C" and record "B" and "C" in the box. In section "B" circle the appropriate ERPA's per the IP-2003 computer program or applicable E-Plan procedures, IP-EP-510, uMeteorological, Radiological and Plant Data Acquisition System.
* In BLOCK 11, enter wind speed and elevation (10 meters) from Step 4.6.
In BLOCK 11, enter wind speed and elevation (10 meters) from Step 4.6.
* In BLOCK 12, enter wind direction from and elevation (10 meters) from Step 4.6.
In BLOCK 12, enter wind direction from and elevation (10 meters) from Step 4.6.
* In BLOCK 13, circle the stability class and record the letter in the box from Step 4.6.
In BLOCK 13, circle the stability class and record the letter in the box from Step 4.6.
4.12.2 Fill out Form EP-2 Part II as follows:
4.12.2 Fill out Form EP-2 Part II as follows:
* In BLOCKS 16, 17, 18, and 19 fill out the known data in the appropriate spaces per the Dose Assessment program.
In BLOCKS 16, 17, 18, and 19 fill out the known data in the appropriate spaces per the Dose Assessment program.
Fill in N/A for the results/data that are unknown.
Fill in N/A for the results/data that are unknown.
4.12.3 Provide Form EP-1 Part I and Form EP-2 Part II to the ED for review.             -
4.12.3 Provide Form EP-1 Part I and Form EP-2 Part II to the ED for review.
4.12.4 After the ED has reviewed the Form EP-1 Part I and Form EP-2 Part II, provide the forms to the clerk for faxing.
4.12.4 After the ED has reviewed the Form EP-1 Part I and Form EP-2 Part II, provide the forms to the clerk for faxing.
4.13 Ensure you are signed in on EP-Form #4, "Control Room Emergency Staff Chart".
4.13 Ensure you are signed in on EP-Form #4, "Control Room Emergency Staff Chart".
4.14 Display the plume direction on the 10-mile map using the plume overlay.
4.14 Display the plume direction on the 10-mile map using the plume overlay.
Page 7 of 8
Page 7 of 8



Latest revision as of 07:30, 16 January 2025

Emergency Planning Document Update
ML032801581
Person / Time
Site: Indian Point 
Issue date: 09/15/2003
From:
Entergy Nuclear Indian Point 2
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
28631 IP-2003, Rev 7
Download: ML032801581 (19)


Text

15-SEP-03 Page:

19 DISTRIBUTION CONTROL LIST S cument Name:

EMER PLAN CCNAME NAME 2 EP/TRAINING ADMINISTRATOR 3 RES DEPARTMENT MANAGER 4 REFERENCE LIBRARY 9 JOINT NEWS CENTER 10 SHIFT MGR.(LUB-001-GEN) 11 CONTROL ROOM & MASTER 14 EOF 16 AEOF/A.GROSJEAN(ALL EP'S) 19 NUC ENGINEERING LIBRARY 21 TSC 22 RESIDENT INSPECTOR 23 SILK DAVID 24,-SLaK _PAVID L25 DOCUMENT CONTROL DESK 28 A'VI AXXOTS N 29 E-PLAN STAFF 30 E-PLAN STAFF 31 BARANSKI J(VOLUME I ONLY) 32 SUTTON A -(VOLUME I ONLY) 10 33 LONGO N (VOLUME I ONLY) 34 GREENE D (VOLUME I ONLY) 35 RAMPOLLA M(VOLUME I ONLY) 41 SIMULATOR 107 QA MANAGER 319 C.STELLATO(NRQ-OPS TRN) 354 L.GRANT(LRQ-OPS/TRAIN) 376 E-PLAN STAFF 424 J.CHIUSANO(OPS INSTR) 510 L.GRANT(LRQ-OPS/TRAIN) 511 L.GRANT(LRQ-OPS/TRAIN) 512 C.STELLATO(NRQ-OPS TRN) 513 C.STELLATO(NRQ-OPS TRN) 517 PLANT MANAGER'S OFFICE 518 DOCUMENT CONTROL 520 CONTROL ROOM (UNIT 2) 521 SIMULATOR 522 NRC RESIDENT 523 ROBERT VOGLE (UNIT 2) 524 JOHN MCCANN (UNIT 2) 552 TORRES DAMARIS(MASTER)

DEPT LOCATION TRAINING (ALL EP'S)

  1. 48 RES (UNIT 3/IPEC ONLY) 45-4-A REC/TRN(UNT 3/IPEC ONLY) BLDG/17 EMER PLN (ALL EP'S)

EOF OPS (UNIT 3/IPEC ONLY)

IP3 OPS(3PT-D001/6(U3/IPEC)

IP3(ONLY)

E-PLAN (ALL EP'S)

EOF E-PLAN (EOP'S ONLY)

WPO-12D DOC (UNIT 3/IPEC ONLY)

WPO/7A RECORDS 45-3-F US NRC(UNIT 3/IPEC ONLY) 45-2-B NRC (ALL EP'S)

OFFSITE

,NRC,(ALL EP'S)

_OFFSITE NRC (ALL EP'S)

OFFSITE J A(UNIT 3fIPEC ONLY)

OFFSITE E-PLAN (ALL EP'S)

EOF E-PLAN (ALL EP'S)

EOF ST. EMERG. MGMT. OFFICE OFFSITE DISASTER & EMERGENCY WESTCHESTR EMERGENCY SERVICES ROCKLAND DISASTER & CIVIL DEFENSE ORANGE OFFICE OF EMERG MANAGE PUTNAM TRAIN(UNIT 3/IPEC ONLY) 48-2-A QA (UNIT 3/IPEC)

K-IP2-4302 NRQ (UNIT 3/IPEC ONLY)

  1. 48 LRQ (UNIT 3/IPEC ONLY)
  1. 48 E-PLAN (ALL EP'S)

EOF (UNIT 3/IPEC ONLY)

  1. 48 LRQ (UNIT 3/IPEC ONLY)
  1. 48 LRQ (UNIT 3/IPEC ONLY)
  1. 48 NRQ (UNIT 3/IPEC ONLY)
  1. 48 NRQ (UNIT 3/IPEC ONLY)
  1. 48 ADMIN/(UNIT 2/IPEC ONLY)

IP2 UNIT 2(UNIT 2/IPEC ONLY)

IP2 OPS (UNIT 2 & IPEC ONLY)

IP2 TRAIN (UNIT 2/IPEC ONLY)

IP2 US NRC(UNIT 2/IPEC ONLY)

IP2 TRAIN/LIB (ALL EP'S)

TODDVILLE NUC SAFETY/LIC(ALL EP'S)

IP2 DOCUMENTS (EEC BLDG)

IP2 A4W 5

Is IPEC SITE QUALITY RELATED IP-SMM-AD-103 Revision 0

  • Entergy MANAGEMENT ADMINISTRATIVE PROCEDURE MANUAL INFORMATIONAL USE Page 13 of 21 ATTACHMENT 10.1 SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES Paae I of 1

@Entergy TO: DISTRIBUTION DATE: 912412003 TRANSMITTAL NO: 28631 (Circle one)

FROM: IPEC DOCUMENT CONTROL: E EEC or IP2 53'EL PHONE NUMBER: 271-7056 The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-103, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.

AFFECTED DOCUMENT: EMERGENCY PLANNING DOC #

REV #

TITLE INSTRUCTIONS

                • SEE ATTACHED INSTRUCTIONS**********
                    • PLEASE NOTE EFFECTIVE DATE*********

RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).

NA_ (_IT SINTR DAT NAME (PRINT)

SIGNATURE DATE Cc#Y

I.-

ft

Needs
  1. 2AR&S /

TO:

Nuclear Regulatory Commission FROM:

IPEC Emergency Planning

SUBJECT:

Emergency Planning Document Update Date:

09/19/03 Please update your controlled copy of the documents listed below as specified with the copy(s) attached.

New Rev./

-Old Rev. #J Document#

Document Name' De t

Instructions I

Un13V II.

7 Emergency.Plan Implementing Procedures TOC Unit 3 Volume II 9/18103 7/03 Replace old with new IP-2003 CR Watch Chemist Rev. 7 Rev. 6 Replace old with new 9/18103 7/02

VOLUME II TABLE OF CONTENTS 09/18/03 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN -

VOLUME II EMERGENCY RESPONSE ACTIVATION TABLE OF CONTENTS IC/EAL'S INITIATING CONDITIONS AND EMERGENCY ACTION LEVELS REV. I

/

DATE 9

07/02 CONTROL ROOM IP-2000 Emergency Activation of the Control Room (CR)

IP-2001 Emergency Director (ED), Plant Operations Manager (POM), Shift Manager (SM) Procedure IP-2002 CR Health Physics Technician IP-2003 CR Watch Chemist IP-2004 CR Clerk IP-2005 CR Offsite Communicator IP-2006 CR Direct-Line Communicator 4

09/98 18 05/03 3

02/99 7

09/03 3

09/00 VOID N/A 06/01 4

10/99 TECHNICAL SUPPORT CENTER (TSC)

IP-2100 IP-2101 IP-2102 IP-2103 IP-2104 IP-2105 IP-2106 Emergency Activation of the Technical Support Center (TSC)

Technical Support Center (TSC) Manager TSC Communicator(s)

TSC SPDS Computer Operator TSC Video Operator TSC Accountability Officer TSC Clerk 4

11/00 9

3 4

2 VOID 5

02/01 12/98 08/99 06/01 N/A 06/99 OPERATIONS SUPPORT CENTER (OSC)

IP-2200 Emergency Activation of the Operations Support Center (OSC)

IP-2201 Operations Support Center (OSC) Manager IP-2202 OSC Direct-Line Communicator IP-2203 OSC Dispatcher IP-2204 OSC Team Leaders IP-2205 OSC H.P. Team Leader IP-2206 OSC Accountability Officer IP-2207 OSC Clerk IP-2208 OSC Security Team Leader IP-2209 OSC H.P. Technician IP-2210 OSC Dosimetry Technician IP-2211 OSC Chemistry Team Leader 7

8/02 10 07/03 2

12/98 3

07/02 4

07/03 9

07/03 VOID -

N/A 5

06/99 4

03/02 5

12/02 3

06/98 2

03/00 i

VOLUME II TABLE OF CONTENTS 09/18/03 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN -

VOLUME II EMERGENCY RESPONSE ACTIVATION TABLE OF CONTENTS EMERGENCY OPERATIONS FACILITY (EOF)

IP-2300 Emergency Activation of the Emergency Operations Facility (EOF)

Replaced by IP-EP-250 IP-2301 Emergency Director Replaced by IP-EP-255 IP-2302 EOF Technical Advisor and Information Liaison Replaced by IP-EP-250 IP-2303 EOF Radiological Assessment Team Leader (RATL)

Replaced by IP-EP-250 IP-2304 EOF Dose Assessment Health Physicist Replaced by IP-EP-250 IP-2305 EOF MIDAS Operator Replaced by IP-EP-250 IP-2306 EOF Security Officer Replaced by IP-EP-250 IP-2307 EOF Clerk Replaced by IP-EP-250 IP-2308 EOF Direct-Line Communicator Replaced by IP-EP-250 IP-2309 EOF Offsite Communicator Replaced by IP-EP-250 IP-2310 EOF Onsite Radiological Communicator Replaced by IP-EP-250 IP-2311 EOF Offsite Radiological Communicator IP-2312 EOF Public Relations Liaison IP-2313 EOF Public Relations Technical Advisor IP-2314 EOF Radiological Assessment Monitor REV. # /

DATE VOID -

N/A VOID -

N/A VOID -

N/A VOID -

N/A VOID -

N/A VOID -

N/A VOID -

N/A VOID -

N/A VOID -

N/A VOID -

N/A VOID -

N/A Void -

N/A VOID -

N/A VOID -

N/A VOID -

N/A ALTERNATE EMERGENCY OPERATIONS FACILITY (AEOF)

IP-2400 Emergency Activation of the Alternate Emergency Operations Facility (AEOF)

Replaced by IP-EP-251 VOID -

N/A SECURITY ACTIVATION IP-2500 Security Emergency Activation Responsibilities 13 07/03 RECOVERY/TERMINATION IP-2600 Emergency Termination and Transition to Recovery Replaced by IP-EP-610 IP-2601 Recovery Manager Replaced by IP-EP-610 IP-2602 Development of a Recovery Action Plan Replaced by IP-EP-610 IP-2603 Recovery Support Group Manager EP-FORMS SECTION -

Index VOID -

N/A VOID -

N/A VOID -

N/A 1

07/02 07/02 ii

VOLUME II TABLE OF CONTENTS 09/18/03 ENTERGY NUCLEAR NORTHEAST INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN -

VOLUME II EMERGENCY RESPONSE ACTIVATION TABLE OF CONTENTS APPENDIX 'A' APPENDIX 'B' APPENDIX 'C' ROSTER I Void Replaced by IPEC ETD ROSTER II Void Replaced by IPEC ETD ROSTER III Void No longer used for Emergency Response Activities Emergency Offsite Telephone List Void Replaced by IPEC ETD Emergency Response Facility Telephone List Void Replaced by IPEC ETD iii

NEW YORK POWER AUTHORITY INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN -

VOLUME II EMERGENCY RESPONSE ACTIVATION LIST OF ATTACHMENTS IP-2000 Emergency Activation of the Control Room (CCR) 5.1 CCR Setup 5.2* CCR Floor plan IP-2001 Emergency Director (ED), Plant Operations Manager (POM),

Shift Supervisor (SS) Procedure 5.1* Notification of Unusual Event Classification Flowchart 5.2* Alert Classification Flowchart 5.3* Site Area Emergency Classification Flowchart 5.4* General Emergency Classification Flowchart 5.5 Emergency Director Turnover Checklist 5.6 Relocation to AEOF Checklist IP-2005 CCR Offsite Communicator 5.1* Offsite Communications System Diagram IP-2006 CCR Direct Line Communicator 5.1* Communications System Diagram IP-2100 Emergency Activation of the Technical Support Center (TSC) 5.1 TSC Setup 5.2* TSC Floor plan IP-2102 TSC Communicator(s) 5.1* Communications System Diagram IP-2103 TSC SPDS Computer Operator 5.1 Accessing and Using SPDS IP-2104 TSC Video Operator 5.1 Video Cameras IP-2200 Emergency Activation of the Operations Support Center (OSC) 5.1 OSC Setup 5.2* OSC Floor plan IP-2202 OSC Direct Line Communicator 5.1* Communications System Diagram ii

NEW YORK POWER AUTHORITY INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN -

VOLUME II EMERGENCY RESPONSE ACTIVATION LIST OF ATTACHMENTS, Continued IP-2203 OSC Dispatcher 5.1 OSC Area Communication Setup and Operations IP-2205 OSC H.P. Team Leader 5.1 Post-Accident Emergency Entry Brief, Dress and Undress Sequences IP-2209 OSC H.P. Technician 5.1* Figure 1 Survey Map 5.2 OSC/TSC Interlocking doors IP-2300 Emergency Activation of the Emergency Operations Facility (EOF) 5.1 EOF Setup 5.2* EOF Floor plan IP-2301 Emergency Director 5.1 Emergency Director Turnover Checklist 5.2 Relocation to AEOF Checklist IP-2302 EOF Technical Advisor 5.1 Accessing and Using SPDS IP-2307 EOF Clerks 5.1 Processing EP-Forms Part I and Part II 5.2 Processing EP-Forms #31a, #31b and #31c IP-2308 Direct Line Communicator 5.1* Communications System Diagram IP-2309 EOF Offsite Communicator 5.1* Offsite Communications System Diagram 5.2 AEOF Preparatory Actions ii

IP-2314 EOF Radiological Assessment Monitor 5.1* EOF Floor plah 5.2 EOF Halon System ii

NEW YORK POWER AUTHORITY INDIAN POINT NO. 3 NUCLEAR POWER PLANT EMERGENCY PLAN -

VOLUME II EMERGENCY RESPONSE ACTIVATION LIST OF ATTACHMENTS, Continued IP-2400 Emergency Activation of the Alternate Emergency Operations Center (AEOF) 5.1 AEOF Setup 5.2* AEOF Floor plan 5.3 Instructions for White Plains Telephones 5.4 Instructions for AEOF Radios IP-2500 Security Emergency Activation Responsibilities 5.1* Notification of Unusual Event Security Flowchart 5.2* Alert Security Flowchart 5.3* Site Area Emergency Security Flowchart 5.4* General Emergency Security Flowchart 5.5* Offsite Monitor Notification Security CAS Flowchart 5.6* Notification Testing Security CAS Flowchart 5.7* Notifications for IP-2 Events 5.8* Notifications for Security Events IP-2600 Emergency Termination and Transition to Recovery 5.1* Criteria for Emergency Termination 5.2* Emergency Director Turnover to Recovery Manager Checklist ii

Indicates that this Attachment is a Drawing, not text.

ii

Enitergy EMERGENCY PLAN PROCEDURES PROCEDURE NO.

TITLE:

IP-2003 REV.

7 CR Watch Chemist THIS PROCEDURE IS TSR THIS PROCEDURE IS NOT TSR x

03 A)C4\\,

L WRITTEN BY: -

REVIEWED BY:

SWNATU13E/DATE V4411-wej 21II3 APPROVED BY:

EFFECTIVE DATE:

--/^VG&ATU7TE 7 7 "A.. Q _zLe, Mlrg- -

cl /,:.I I o -

v I

4.'

PROCEDURE USE IS REFERENCE

Volume II IP-2003 Rev. 7 CR WATCH CHEMIST TABLE OF CONTENTS Section Title Pane 1.0 PURPOSE....................

3 2.0 RESPONSIBILITIES....................

3

3.0 REFERENCES

3 4.0 PROCEDURE

.3

Volume II IP-2003 Rev. 7 CR WATCH CHEMIST 1.0 PURPOSE 1.1 This procedure provides instruction to the Watch Chemistry in the Control Room or Simulator for performing Dose Assessment calculations.

2.0 RESPONSIBILITIES 2.1 Watch Chemists are responsible for Dose Assessment calculations, while the EOF is being staffed and/or while the EOF is being transferred to the AEOF.

2.2 The Watch Chemist position is a normal on-duty staff position, See E-Plan Volume II, Appendix A for current staffing.

3.0 REFERENCES

3.1 E-Plan, Volume I, Section 5.0, "Organizational Control of Emergencies" 3.2 EP Form, #4, "Control Room Emergency Staffing Chart" 3.3 Form EP-1, Part I, 'NYS Radiological Emergency Data Form" 3.4 Form EP-2, Part II, UNYS Radiological Emergency Data Form" 3.5 IP-EP-310, "Dose Assessment' 3.6 IP-EP-410, "Protective Action Recommendations" 3.7 IP-2000, "Emergency Activation of the Control Room" 3.8 IP-EP-51 0, "Meteorological, Radiological and Plant Data Acquisition System" 4.0 PROCEDURE NOTE Initial the blank lines upon completion of the designated step 4.1 Card in if appropriate for accountability.

4.2 Obtain the Watch Chemist E-Plan position book.

4.3 Get a turnover on the event from the Control Room crew to determine if a release is in progress and if so determine the release point (document on Event Log Sheets located in the position book).

Page 3 of 8

Volume 11 IP-2003 Rev. 7 4.4 Synchronize your time with the CR flight panel clock or remove watch.

L 4.5 Using the PC at the STA location, sign on (using your personal ENN sign-on) and open the desktop E-Plan Folder.

4.6 Obtain Met tower data using one of the following methods:

Control Room meteorological display panel.

Unit-2 Control Room meteorological display panel (phone 9-734-5294).

From the desktop E-Plan folder, double click on Connect to Met Tower.

Login as CCREOF and hit enter (Time will be displayed in Eastern Standard Time and wind speed will be in mph [mph x.447 = meter/sec].

For any other back-up method refer to IP-EP-510, "Meteorological, Radiological and Plant Data Acquisition System".

I 4.7 Determine whether or not the release is greater than the IPEC Effluent l

Technical Specifications by one of the following methods.

I IP-2003, Computer program (From the desktop E-Plan folder and double click on the E-Plan IP-2003 icon) or access IP-2003 via the 3 2 Floppy disk in the Watch Chemist E-Plan position book.

IP-EP-510, "Meteorological, Radiological and Plant Data Acquisition System".

The following table:

Release Point Rad Monitor Tech Spec Release Rate Setpoint Plant Vent uCVsec R-27 60,000 uCi/sec NG or 20 uCisec Iodine Plant Vent uCi/cc R-44 (U2) I R-14 (U3) 2E-3 uCi/cc SG Safety or Main Steam Line If there is ANY identified Pri to Sec Leak, the Atmospheric Mons Iodine Tech Spec release rate limit is exceeded if a Safety or Atmospheric valve opens.

Hole in the VC R-25126 I R/hr IF an unmonitored release path exists, THEN estimate the release rate and in BLOCK 6 of Form EP-1 Part 1, circle MD" I

Page 4 of 8

Volume II IP-2003 Rev. 7 4.8 Determine the magnitude of the release using one of the following:

IP-2003, Computer program (From the desktop E-Plan folder and double click on the E-Plan IP-2003 icon) or access IP-2003 via the 3 /2 Floppy disk in the Watch Chemist E-Plan position book.

IP-EP-310, "Dose Assessment" and IP-EP-410, "Protective Action Recommendations".

4.9 IF there is no release due to the event AND A General Emergency has not been declared, THEN record the following on Form EP-1 Part I, "NYS Radiological Emergency Data Form" within 15 minutes of the initial E-Plan classification or classification change(s) and every 30 minutes thereafter.

In BLOCK 6, circle "A" and record "A" in the box.

In BLOCK 7, circle "A" and record "A" in the box.

In BLOCK 11, enter wind speed and elevation (10 meters) from Step 4.6.

In BLOCK 12, enter wind direction & elevation (10 meters) from Step 4.6.

In BLOCK 13, circle stability class and record letter in box per Step 4.6.

Provide Form EP-1 Part I to the ED for review.

After the ED has reviewed the Form EP-1 Part I, provide the form to the clerk for faxing.

4.10 IF there is a release due to the event that is below IPEC Tech Spec

(< 60,000 ptCi/sec NG and < 20 uCi/sec Iodine) AND the site boundary doses are below Protective Action Recommendations (< I Rem whole body {TEDE}

and < 5 Rem thyroid {TODE}) AND A General Emergency has not been declared, THEN record the following on Form EP-1 Part I, "NYS Radiological Emergency Data Form" within 15 minutes of the initial E-Plan classification or E-Plan classification change(s) and every 30 minutes thereafter.

In BLOCK 6, circle "B" and determine if the release is to the atmosphere or water and check the appropriate box record "B" in the box.

In BLOCK 7, circle "A" and record "A" in the box.

In BLOCK 11, enter wind speed and elevation (10 meters) from Step 4.6.

In BLOCK 12, enter wind direction from and elevation (10 meters) from Step 4.6.

Page 5 of 8

Volume II IP-2003 Rev. 7 In BLOCK 13, circle the stability class and record the letter in the box from Step 4.6.

Provide Form EP-1 Part I to the ED for review.

After the ED has reviewed the Form EP-1 Part I, provide the form to the l

clerk for faxing.

4.11 IF there is a release due to the event that is above IPEC Tech Spec (>60000 uCUsec NG or 20 uCi/sec Iodine) AND Site Boundary Doses are below Protective Action Recommendations (< I Rem whole body {TEDE) and < 5 Rem thyroid {TODE)) AND a General Emergency has not been declared, THEN record the following on Form EP-1 Part I and Forrn EP-2 Part II, "NYS Radiological Emergency Data Forms" within 15 minutes of the initial E-plan classification or E-plan classification change(s) and every 30 minutes thereafter.

Fill out Form EP-1 Part I as follows:

In BLOCK 6, circle UCn and determine if the release is to the atmosphere or water and check the appropriate box record 'C" in the box.

In BLOCK 7, circle 'A' and record 'A" in the box.

In BLOCK 11, enter wind speed and elevation (10 meters) from Step 4.6 In BLOCK 12, enter wind direction from and elevation (10 meters) from Step 4.6.

In BLOCK 13, circle the stability class and record the letter in the l

box from Step 4.6.

4.11.1 Fill out Form EP-2 Part II as follows:

In BLOCKS 16, 17, 18, and 19 fill out the known data in the appropriate spaces per the Dose Assessment program. Fill in NIA for the results/data that are unknown.

4.11.2 Provide Form EP-1 Part I and Form EP-2 Part II to the ED for review.

4.11.3 After the ED has reviewed the Form EP-1 Part I and Form EP-2 Part II, provide the form to the clerk for faxing.

Page 6 of 8

Volume II IP-2003 Rev. 7 4.12 IF A General Emergency is declared OR Site Boundary Doses are above Protective Action Recommendations (> 1 Rem whole body (TEDE) or > 5 Rem thyroid (TODE}), THEN record the following on Form EP-1 Part I and Form EP-2 Part II, "NYS Radiological Emergency Data Forms" within 15 minutes of the initial E-plan classification or E-plan classification change(s) and every 30 minutes thereafter.

4.12.1 Fill out Form EP-1 Part I as follows:

In BLOCK 6, circle the appropriate letter, which corresponds to the type of release in progress and record that letter in the box.

In BLOCK 7, circle "1B and C" and record "B" and "C" in the box. In section "B" circle the appropriate ERPA's per the IP-2003 computer program or applicable E-Plan procedures, IP-EP-510, uMeteorological, Radiological and Plant Data Acquisition System.

In BLOCK 11, enter wind speed and elevation (10 meters) from Step 4.6.

In BLOCK 12, enter wind direction from and elevation (10 meters) from Step 4.6.

In BLOCK 13, circle the stability class and record the letter in the box from Step 4.6.

4.12.2 Fill out Form EP-2 Part II as follows:

In BLOCKS 16, 17, 18, and 19 fill out the known data in the appropriate spaces per the Dose Assessment program.

Fill in N/A for the results/data that are unknown.

4.12.3 Provide Form EP-1 Part I and Form EP-2 Part II to the ED for review.

4.12.4 After the ED has reviewed the Form EP-1 Part I and Form EP-2 Part II, provide the forms to the clerk for faxing.

4.13 Ensure you are signed in on EP-Form #4, "Control Room Emergency Staff Chart".

4.14 Display the plume direction on the 10-mile map using the plume overlay.

Page 7 of 8

Volume II IP-2003 Rev. 7 4.15 Recalculate the Dose Assessment as necessary based on changes in release rate or Met data and re-evaluate the PARs as necessary.

4.16 Update the ED of any changes that could affect the release rate, dose assessment calculation or PARs.

END OF TEXT Page 8 of 8