{{#Wiki_filter:Exelon Nuclear Job Performance Measure Control Rod Exercise JPM Number: S-N-a Revision Number: 00 Date: 10/05 Developed By:
{{#Wiki_filter:Page 1 of 79 Exelon Nuclear Job Performance Measure Control Rod Exercise JPM Number: S-N-a Revision Number: 00 Date: 10/05 Developed By:
Instructor                 Date Approved By:
Instructor Date Approved By:
Training Department       Date Page 1 of 79
Training Department Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
Page 2 of 79 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________  1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
________  2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
________  3. Performance location specified. (in-plant, control room, or simulator)
: 3. Performance location specified. (in-plant, control room, or simulator)
________  4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
________  5. Initiating and terminating cues are properly identified.
: 5. Initiating and terminating cues are properly identified.
________  6. Task standards identified and verified by SME review.
: 6. Task standards identified and verified by SME review.
________  7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________  8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
: 8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.                 Date
Procedure Rev.
________  9. Pilot test the JPM:
Date
: 9. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: b. ensure performance time is accurate.
________  10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________  11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
: 11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                         Date SME/Instructor                                         Date SME/Instructor                                         Date Page 2 of 79
SME/Instructor Date SME/Instructor Date SME/Instructor Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
Page 3 of 79 Revision Record (Summary)
From Bank: JPM S-0300-04 Page 3 of 79
From Bank: JPM S-0300-04  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
Page 4 of 79 SIMULATOR SETUP INSTRUCTIONS
: 1. Reset the simulator to any IC with control rod C-13 at position 48.
: 1. Reset the simulator to any IC with control rod C-13 at position 48.
: 2. Verify NO Control Rods are selected.
: 2. Verify NO Control Rods are selected.
NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:
It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
: 3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
: 4. This completes the setup for this JPM.
: 4. This completes the setup for this JPM.
Line 55: Line 57:
o Mark all rods Except C-13 N/A on Checklist 1.
o Mark all rods Except C-13 N/A on Checklist 1.
o Print out 2 copies of a Control Rod position scan after the simulator has been setup.
o Print out 2 copies of a Control Rod position scan after the simulator has been setup.
Designate one as the before exercising copy and the other as the after exercising copy.
Designate one as the before exercising copy and the other as the after exercising copy.  
Page 4 of 79


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
Page 5 of 79 INITIAL CONDITIONS
: 1. The CRD System engineer has requested exercising Control Rod C-13.
: 1. The CRD System engineer has requested exercising Control Rod C-13.
INITIATING CUE
INITIATING CUE
Line 70: Line 71:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
* Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
If a CRITICAL step has more than one part, then:  
    *   (filled bullet) indicates a CRITICAL part of the step.
* (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
Page 5 of 79


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
Page 6 of 79 JPM Start Time: _________
Comment #
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT        UNSAT PERFORMANCE CHECKLIST                    STANDARDS Note: Provide the Examinee the included copies of DOS 0300-01 and DOP 0400-02.
Note: Provide the Examinee the included copies of DOS 0300-01 and DOP 0400-
  *1. Enable the ROD
: 02.  
* Selects Special Modes on EXERCISE function of the         RWM.
*1. Enable the ROD EXERCISE function of the Rod Worth Minimizer per DOP 0400-02, Rod Worth Minimizer. (RWM).
Rod Worth Minimizer per
Selects Special Modes on RWM.
* Selects Rod Exercise on    _____      _____    _____
Selects Rod Exercise on RWM.
DOP 0400-02, Rod Worth Minimizer. (RWM).               RWM.
Note: Although not a procedure step a second verifier is required.
Note: Although not a procedure step a second verifier is required.
Second Verifier Duties:
Second Verifier Duties:
Line 92: Line 91:
3/4 Verifies RWM is in exercise mode, has no errors and has blocks enabled.
3/4 Verifies RWM is in exercise mode, has no errors and has blocks enabled.
3/4 Check off each control rod movement on the CRD Exercise Checklist.
3/4 Check off each control rod movement on the CRD Exercise Checklist.
: 2. Request a second verifier   VERIFIES second verifier available.
: 2. Request a second verifier VERIFIES second verifier available.
Cue:   Inform examinee that you will perform duties of second verifier.
Cue:
: 3. Obtain initial Control Rod   At any NSO Process position information.        Computer Display, navigate to and print the Rod Monitoring display.
Inform examinee that you will perform duties of second verifier.
Page 6 of 79
: 3. Obtain initial Control Rod position information.
At any NSO Process Computer Display, navigate to and print the Rod Monitoring display.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Comment #
Page 7 of 79 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT        UNSAT PERFORMANCE CHECKLIST                          STANDARDS Cue:   When the examinee has located a control rod position screen, provide the examinee with the before exercise copy of the rod position print out.
Cue:
Note:   If inserted past position 46, performs DOA 0300-12.
When the examinee has located a control rod position screen, provide the examinee with the before exercise copy of the rod position print out.
Evaluator will have to determine if proper steps are followed based on current conditions.
Note:
  *4. Select Control Rod C-13.         Depresses Select Pushbutton for Control Rod C-13.
If inserted past position 46, performs DOA 0300-12.
  *5. Insert Control Rod C-13 to
Evaluator will have to determine if proper steps are followed based on current conditions.  
* Momentarily places Rod notch 46 and verify                  Movement Control switch       _____      _____    _____
*4. Select Control Rod C-13.
latched.                              to Rod In.
Depresses Select Pushbutton for Control Rod C-13.  
o   Verifies Control Rod C-13 latches at position 46.
*5. Insert Control Rod C-13 to notch 46 and verify latched.
: 6. Verify indicated control rod     Monitors rod position changes position changes during          to 46 on Four Rod and/or Full movement.                        Core display.
Momentarily places Rod Movement Control switch to Rod In.
  *7. While returning the control       Simultaneously holds rod to position 48, perform
o Verifies Control Rod C-13 latches at position 46.
* Rod Movement Control the following:
: 6. Verify indicated control rod position changes during movement.
Switch to Rod Notch Out 3/4 Apply continuous withdraw signal utilizing
Monitors rod position changes to 46 on Four Rod and/or Full Core display.  
* Rod Out Notch Override the Rod Out Notch                 Switch to Notch Out Override switch.                  Override                      _____      _____    _____
*7. While returning the control rod to position 48, perform the following:
: 8. 3/4 Verify indicated control       o   Monitors rod position rod position changes                changes to 48 on Four during movement.                    Rod and/or Full Core display.
3/4 Apply continuous withdraw signal utilizing the Rod Out Notch Override switch.
: 9. 3/4 Verify control rod does         o   Verifies NO loss of position not go to the overtravel            indication on Four Rod position.                          display or double red dashes on Full Core display.
Simultaneously holds Rod Movement Control Switch to Rod Notch Out Rod Out Notch Override Switch to Notch Out Override
Page 7 of 79
: 8. 3/4 Verify indicated control rod position changes during movement.
o Monitors rod position changes to 48 on Four Rod and/or Full Core display.
: 9. 3/4 Verify control rod does not go to the overtravel position.
o Verifies NO loss of position indication on Four Rod display or double red dashes on Full Core display.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Comment #
Page 8 of 79 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT        UNSAT PERFORMANCE CHECKLIST                       STANDARDS
*10. Removes continuous withdraw signal.
*10. Removes continuous             Releases:
Releases:
withdraw signal.
Rod Movement Control Switch Rod Out Notch Override Switch
* Rod Movement Control Switch
: 11. Checks off C-13 control rod move on the CRD exercise checklist.
* Rod Out Notch Override Switch
CRD checklist marked for C-13 control rod move.
: 11. Checks off C-13 control         CRD checklist marked for C-rod move on the CRD            13 control rod move.            _____      _____    _____
: 12. Place RWM in desired mode.
exercise checklist.
Selects EXIT function on RWM.
: 12. Place RWM in desired           Selects EXIT function on mode.                          RWM.                           _____      _____    _____
Cue: If asked as the Unit Supervisor, respond:
Cue: If asked as the Unit Supervisor, respond:
return the RWM to the Primary screen.
return the RWM to the Primary screen.
: 13. Obtain an edit of final         At any NSO Process Control Rod positions.          Computer Display, navigate to and print the Rod Monitoring display.
: 13. Obtain an edit of final Control Rod positions.
Cue:   When the examinee has located a control rod position screen, provide the examinee with the after exercise copy of the rod position print out.
At any NSO Process Computer Display, navigate to and print the Rod Monitoring display.
: 14. Verify all Control Rods are     VERIFIES all Control Rods are at their initial positions. at their initial positions.
Cue:
Page 8 of 79
When the examinee has located a control rod position screen, provide the examinee with the after exercise copy of the rod position print out.
: 14. Verify all Control Rods are at their initial positions.
VERIFIES all Control Rods are at their initial positions.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Comment #
Page 9 of 79 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT        UNSAT PERFORMANCE CHECKLIST                       STANDARDS
: 15. Inform Unit Supervisor that Control Rod C-13 exercising is complete and second verification and Unit Supervisor verification is required.
: 15. Inform Unit Supervisor that    Informs Unit Supervisor that Control Rod C-13               Control Rod C-13 exercising is exercising is complete and    complete and second second verification and        verification and Unit            _____      _____    _____
Informs Unit Supervisor that Control Rod C-13 exercising is complete and second verification and Unit Supervisor verification is required.
Unit Supervisor verification  Supervisor verification is is required.                  required.
Cue: Acknowledge the report as the Unit Supervisor END JPM Stop Time:_________
Cue: Acknowledge the report as the Unit Supervisor END JPM Stop Time:_________
Page 9 of 79


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name: ___________________________________
Page 10 of 79 Operators Name: ___________________________________
Job
Job


==Title:==
==Title:==
RO       SRO; JPM
RO SRO; JPM


==Title:==
==Title:==
Control Rod Exercise JPM Number: S-N-a                       Revision Number: 00 Task Number and
Control Rod Exercise JPM Number: S-N-a Revision Number:
00 Task Number and


==Title:==
==Title:==
201L006, Perform daily/weekly CRD exercise.
201L006, Perform daily/weekly CRD exercise.
K/A Number and Importance: 201003A4.02                   3.5 /3.5 Suggested Testing Environment:           Simulator Actual Testing Environment:       ;Simulator Plant         Control Room Testing Method: Simulate           Alternate Path: Yes         ; No
K/A Number and Importance: 201003A4.02 3.5 /3.5 Suggested Testing Environment:
                  ; Perform             SRO Only: Yes         ; No Time Critical:     Yes         ;No Estimated Time to Complete:       5 minutes       Actual Time Used: _______minutes
Simulator Actual Testing Environment:  
;Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes  
; No  
; Perform SRO Only: Yes  
; No Time Critical:
Yes  
;No Estimated Time to Complete:
5 minutes Actual Time Used: _______minutes  


==References:==
==References:==
Line 160: Line 170:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?     Yes         No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
Evaluators Name: ____________________________
(Print)
(Print)
Evaluators Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________  
Page 10 of 79


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
Page 11 of 1 INITIAL CONDITIONS
: 1. The CRD System engineer has requested exercising Control Rod C-13.
: 1. The CRD System engineer has requested exercising Control Rod C-13.
INITIATING CUE
INITIATING CUE
Line 173: Line 184:
: 2. The prerequisites are completed except for enabling the ROD EXERCISE function of the Rod Worth Minimizer.
: 2. The prerequisites are completed except for enabling the ROD EXERCISE function of the Rod Worth Minimizer.
: 3. Stall flow and drive pressure are NOT required.
: 3. Stall flow and drive pressure are NOT required.
: 4. Inform the Unit Supervisor when the task is complete.
: 4. Inform the Unit Supervisor when the task is complete.  
Page 11 of 1


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 12 of 1
Page 12 of 1  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Exelon Nuclear Job Performance Measure Perform Core Spray Pump Test With Torus Available JPM Number: S-N-b Revision Number: 00 Date: 10/05 Developed By:
Page 13 of 1 Exelon Nuclear Job Performance Measure Perform Core Spray Pump Test With Torus Available JPM Number: S-N-b Revision Number: 00 Date: 10/05 Developed By:
Instructor                   Date Approved By:
Instructor Date Approved By:
Training Department           Date Page 13 of 1
Training Department Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Page 14 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________        12. Task description and number, JPM description and number are identified.
: 12. Task description and number, JPM description and number are identified.
________        13. Knowledge and Abilities (K/A) references are included.
: 13. Knowledge and Abilities (K/A) references are included.
________        14. Performance location specified. (in-plant, control room, or simulator)
: 14. Performance location specified. (in-plant, control room, or simulator)
________        15. Initial setup conditions are identified.
: 15. Initial setup conditions are identified.
________        16. Initiating and terminating cues are properly identified.
: 16. Initiating and terminating cues are properly identified.
________        17. Task standards identified and verified by SME review.
: 17. Task standards identified and verified by SME review.
________        18. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 18. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________        19. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
: 19. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
Procedure Rev. _____ Date _____________
________        20. Pilot test the JPM:
: 20. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: b. ensure performance time is accurate.
________        21. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 21. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________        22. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
: 22. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                           Date SME/Instructor                                           Date SME/Instructor                                           Date Page 14 of 10
SME/Instructor Date SME/Instructor Date SME/Instructor Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
Page 15 of 10 Revision Record (Summary)
From Bank: S-1400-04 Page 15 of 10
From Bank: S-1400-04  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
Page 16 of 10 SIMULATOR SETUP INSTRUCTIONS
: 1. Core Spray pump operability surveillance can be performed from any IC with Core Spray in the normal standby lineup.
: 1. Core Spray pump operability surveillance can be performed from any IC with Core Spray in the normal standby lineup.
NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:
It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 2. Start the LPCI/CS room cooler fans.
: 2. Start the LPCI/CS room cooler fans.
: 3. Enter the following Expert commands to set up an automatic trigger to trip the Core Spray pump after the test valve is opened.
: 3. Enter the following Expert commands to set up an automatic trigger to trip the Core Spray pump after the test valve is opened.
NOTE:     The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs.
NOTE:
      # Event Trigger 1 Activates when MO 1402-4B OPEN light turns ON.
The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs.  
      # After 10 sec, inserts a 2B Core Spray pump trip.
# Event Trigger 1 Activates when MO 1402-4B OPEN light turns ON.  
# After 10 sec, inserts a 2B Core Spray pump trip.
Enter the following Expert commands:
Enter the following Expert commands:
* trgset 1 "cslop4b"
* trgset 1 "cslop4b"
* imf csppbflt (1 10)
* imf csppbflt (1 10)
DOCUMENT PREPARATION Markup a copy of DOS 1400-05 as complete up through Step I.6. (Ready to start 2B Core Spray Pump per step I.7)
DOCUMENT PREPARATION Markup a copy of DOS 1400-05 as complete up through Step I.6. (Ready to start 2B Core Spray Pump per step I.7)  
Page 16 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
Page 17 of 10 INITIAL CONDITIONS
: 1. The Unit 2 Core Spray operability surveillance is due.
: 1. The Unit 2 Core Spray operability surveillance is due.
: 2. The operability surveillance for the 2A Core Spray pump has already been completed (system is filled and vented).
: 2. The operability surveillance for the 2A Core Spray pump has already been completed (system is filled and vented).
Line 239: Line 250:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
* Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
If a CRITICAL step has more than one part, then:  
    *   (filled bullet) indicates a CRITICAL part of the step.
* (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of Page 17 of 10
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of  


Job Performance Measure (JPM) the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Job Performance Measure (JPM)
Page 18 of 10 the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM.
It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The time clock starts when the candidate acknowledges the initiating cue.
The time clock starts when the candidate acknowledges the initiating cue.  
Page 18 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
Page 19 of 10 JPM Start Time: _________
Comment #
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT      UNSAT PERFORMANCE CHECKLIST                        STANDARDS Note Provide the Examinee the provided copy of DOS 1400-05
Note Provide the Examinee the provided copy of DOS 1400-05
: 1. Verify the following valve     Verifies the following:
: 1. Verify the following valve line up.
line up.
MO 2-1402-4B Closed MO 2-1402-38B Open 2-1402-6B Open MO 2-1402-25B Closed MO 2-1402-3B Open 2-1402-40B-SV Closed Verifies the following:
* MO 2-1402-4B Closed       Green Closed light On
Green Closed light On Green Open light On Green Open light On Green Closed light On Green Open light On Directs NLO to Verify 2-1402-40B SV Closed.
* MO 2-1402-38B Open         Green Open light On
* 2-1402-6B Open             Green Open light On
* MO 2-1402-25B Closed       Green Closed light On
* MO 2-1402-3B Open         Green Open light On
* 2-1402-40B-SV Closed       Directs NLO to Verify 2-1402-     _____    _____    _____
40B SV Closed.
CUE 2-1402-40B, INST SV is closed.
CUE 2-1402-40B, INST SV is closed.
: 2. Verify 2B CORE SPRAY           Contacts NLO to verify 2B CS MOTOR has adequate              Motor oil level +0 to -1/8 inch lubrication.                    of the Oil Sightglass Standstill Line.
: 2. Verify 2B CORE SPRAY MOTOR has adequate lubrication.
CUE 2B Core Spray motor oil level is normal (within +0 to
Contacts NLO to verify 2B CS Motor oil level +0 to -1/8 inch of the Oil Sightglass Standstill Line.
    -1/8 inch band).
CUE 2B Core Spray motor oil level is normal (within +0 to  
: 3. Verify 2B LPCI/CS Room         Contacts NLO to verify proper Cooler is operating properly. room cooler operation.
-1/8 inch band).
: 3. Verify 2B LPCI/CS Room Cooler is operating properly.
Contacts NLO to verify proper room cooler operation.
CUE 2B LPCI/CS room cooler is operating normally.
CUE 2B LPCI/CS room cooler is operating normally.
: 4. Direct NLO to open 2-1402-     Directs SV 2-1402-40B Open.
: 4. Direct NLO to open 2-1402-40B-SV and report pressure.
40B-SV and report pressure.
Directs SV 2-1402-40B Open.
CUE 2-1402-40B Inst SV is Open. Pressure is 7 psig.
CUE 2-1402-40B Inst SV is Open. Pressure is 7 psig.
: 5. Record suction pressure         Pressure of 7 psig recorded on provided by NLO.                Data Sheet 1.
: 5. Record suction pressure provided by NLO.
Page 19 of 10
Pressure of 7 psig recorded on Data Sheet 1.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Comment #
Page 20 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT      UNSAT PERFORMANCE CHECKLIST                     STANDARDS
: 6. Calculate 2-1402-8B initial closed DP.
: 6. Calculate 2-1402-8B initial   DP Calculated:
DP Calculated:
closed DP.
2-1450-1B ________ psig Minus 2-1402-40B ________psig  
2-1450-1B ________ psig Minus                         _____    _____    _____
*7. Close PP DISCH VLV, MO 2-1402-24B Rotates MO 2-1402-24B C/S CCW to Close.
2-1402-40B ________psig
Only the Red Closed light illuminated.  
*7. Close PP DISCH VLV, MO         Rotates MO 2-1402-24B C/S 2-1402-24B                    CCW to Close.
*8. Start 2B CORE SPRAY Pump.
Only the Red Closed light illuminated.
Rotates 2B Core Spray Pump C/S CW Only the Red On light illuminated Note 2B Core Spray Pump overcurrent trip malfunction is automatically inserted 10 seconds after the 2-1402-4B valve has dual indication  
*8. Start 2B CORE SPRAY           Rotates 2B Core Spray Pump Pump.                          C/S CW Only the Red On light illuminated Note 2B Core Spray Pump overcurrent trip malfunction is automatically inserted 10 seconds after the 2-1402-4B valve has dual indication
*9. Open FLOW TEST VLV MO 2-1402-4B.
*9. Open FLOW TEST VLV MO         Rotates and holds MO 2-1402-2-1402-4B.                    4B Control switch CW to Open.
Rotates and holds MO 2-1402-4B Control switch CW to Open.
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
: 10. Acknowledge and report         Acknowledges alarm and alarm for 2B CS pump trip. makes report.
: 10. Acknowledge and report alarm for 2B CS pump trip.
CUE Acknowledge report.
Acknowledges alarm and makes report.
*11. Immediately Close             Rotates and holds MO 2-1402-4B.                     2-1402-4B Control switch CCW to Close until only Green Closed light is         _____    _____    _____
CUE Acknowledge report.  
illuminated.
*11. Immediately Close 2-1402-4B.
: 12. Enters DAN for Core Spray     Enters DAN 902-3-B-5.
Rotates and holds MO 2-1402-4B Control switch CCW to Close until only Green Closed light is illuminated.
pump trip.
: 12. Enters DAN for Core Spray pump trip.
Page 20 of 10
Enters DAN 902-3-B-5.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Comment #
Page 21 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT      UNSAT PERFORMANCE CHECKLIST                       STANDARDS
: 13. May dispatch operator to check the pump and switch gear.
: 13. May dispatch operator to         NLO dispatched to pump.
NLO dispatched to pump.
check the pump and switch NLO dispatched to Bus 24-1         _____    _____    _____
NLO dispatched to Bus 24-1 CUE Acknowledge requests.
gear.
: 14. May enter DOA 6500-10, for 4kV breaker trip.
CUE Acknowledge requests.
States procedure should be entered.
: 14. May enter DOA 6500-10, for       States procedure should be 4kV breaker trip.                entered.
CUE If examinee enters DOA 6500-10, respond that the assist NSO will execute that procedure.
CUE If examinee enters DOA 6500-10, respond that the assist NSO will execute that procedure.
CUE If examinee terminates, or requests permission to terminate the surveillance OR If examinee references the DAN for pump trip and has at least considered the actions to take, then cue:
CUE If examinee terminates, or requests permission to terminate the surveillance OR If examinee references the DAN for pump trip and has at least considered the actions to take, then cue:
Terminate the surveillance.
Terminate the surveillance.
Leave the system in the current lineup. Someone else will be assigned to verify the system is restored to normal.
Leave the system in the current lineup. Someone else will be assigned to verify the system is restored to normal.
: 15. Notify Unit Supervisor of       Unit Supervisor notified of task task completion.                completion.
: 15. Notify Unit Supervisor of task completion.
Unit Supervisor notified of task completion.
CUE Acknowledge report of task completion.
CUE Acknowledge report of task completion.
END JPM Stop Time:_________
END JPM Stop Time:_________
Page 21 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name: ___________________________________
Page 22 of 10 Operators Name: ___________________________________
Job
Job


==Title:==
==Title:==
RO       ; SRO JPM
RO  
; SRO JPM


==Title:==
==Title:==
Perform Core Spray Pump Test With Torus Available JPM Number: S-N-b                       Revision Number: 00 Task Number and
Perform Core Spray Pump Test With Torus Available JPM Number: S-N-b Revision Number: 00 Task Number and


==Title:==
==Title:==
209L004 K/A Number and Importance: 209001A4.01                     3.8/3.6 Suggested Testing Environment:             Simulator Actual Testing Environment:         ; Simulator     Plant     Control Room Testing Method: Simulate           Alternate Path: ; Yes           No
209L004 K/A Number and Importance: 209001A4.01 3.8/3.6 Suggested Testing Environment:
                  ; Perform               SRO Only: Yes           ; No Time Critical:     Yes         ;No Estimated Time to Complete: _ 20 minutes Actual Time Used:
Simulator Actual Testing Environment:  
_______minutes
; Simulator Plant Control Room Testing Method: Simulate Alternate Path: ; Yes No  
; Perform SRO Only: Yes  
; No Time Critical:
Yes  
;No Estimated Time to Complete:
_ 20 minutes Actual Time Used:
_______minutes  


==References:==
==References:==
Line 331: Line 344:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?       Yes         No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:               Satisfactory Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
Evaluators Name: ____________________________
(Print)
(Print)  
Page 22 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Evaluators Signature: ___________________________ Date: _________
Page 23 of 10 Evaluators Signature: ___________________________ Date: _________
INITIAL CONDITIONS
INITIAL CONDITIONS
: 1. The Unit 2 Core Spray operability surveillance is due.
: 1. The Unit 2 Core Spray operability surveillance is due.
Line 349: Line 363:
: 2. All applicable Prerequisites have been met.
: 2. All applicable Prerequisites have been met.
: 3. Your Pre-Job Brief has been completed.
: 3. Your Pre-Job Brief has been completed.
: 4. Notify the Unit Supervisor upon completion of step I.7.
: 4. Notify the Unit Supervisor upon completion of step I.7.  
Page 23 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Exelon Nuclear Job Performance Measure Manually Operate the Isolation Condenser JPM Number: S-N-c Revision Number: 00 Date: 10/05 Developed By:
Page 24 of 10 Exelon Nuclear Job Performance Measure Manually Operate the Isolation Condenser JPM Number: S-N-c Revision Number: 00 Date: 10/05 Developed By:
Instructor                       Date Approved By:
Instructor Date Approved By:
Training Department             Date Page 24 of 10
Training Department Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
Page 25 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________      23. Task description and number, JPM description and number are identified.
: 23. Task description and number, JPM description and number are identified.
________      24. Knowledge and Abilities (K/A) references are included.
: 24. Knowledge and Abilities (K/A) references are included.
________      25. Performance location specified. (in-plant, control room, or simulator)
: 25. Performance location specified. (in-plant, control room, or simulator)
________      26. Initial setup conditions are identified.
: 26. Initial setup conditions are identified.
________      27. Initiating and terminating cues are properly identified.
: 27. Initiating and terminating cues are properly identified.
________      28. Task standards identified and verified by SME review.
: 28. Task standards identified and verified by SME review.
________      29. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 29. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________      30. Verify the procedure referenced by this JPM matches the most current revision of that procedure: DOP 1300-03 Procedure Rev. _____ Date _____________
: 30. Verify the procedure referenced by this JPM matches the most current revision of that procedure: DOP 1300-03 Procedure Rev. _____ Date _____________
________      31. Pilot test the JPM:
: 31. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: b. ensure performance time is accurate.
________      32. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 32. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________      33. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
: 33. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                         Date SME/Instructor                                         Date SME/Instructor                                         Date Page 25 of 10
SME/Instructor Date SME/Instructor Date SME/Instructor Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
Page 26 of 10 Revision Record (Summary)
From Bank: S-1300-01 Page 26 of 10
From Bank: S-1300-01  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS:
Page 27 of 10 SIMULATOR SETUP INSTRUCTIONS:
: 1. JPM can be conducted with any IC/setup where reactor pressure is greater than 150 psig, but less than the Isolation condenser auto initiation setpoint.
: 1. JPM can be conducted with any IC/setup where reactor pressure is greater than 150 psig, but less than the Isolation condenser auto initiation setpoint.
: 2. Close the Isolation Condenser 2-1301-17 and 2-1301-20 Vent Valves as Initial Conditions for this JPM state that Unit 2 has a Group I Isolation condition.
: 2. Close the Isolation Condenser 2-1301-17 and 2-1301-20 Vent Valves as Initial Conditions for this JPM state that Unit 2 has a Group I Isolation condition.
: 3. Verify Hardcard for Isolation Condenser Manual Operation erased and at its proper location.
: 3. Verify Hardcard for Isolation Condenser Manual Operation erased and at its proper location.
REMOTES/ALARMS REQUIRED None MALFUNCTIONS REQUIRED None Page 27 of 10
REMOTES/ALARMS REQUIRED None MALFUNCTIONS REQUIRED None  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
Page 28 of 10 INITIAL CONDITIONS
: 1. A transient has occurred on Unit 2 resulting in a Group I Isolation.
: 1. A transient has occurred on Unit 2 resulting in a Group I Isolation.
: 2. Due to the transient, Emergency Depressurization is required.
: 2. Due to the transient, Emergency Depressurization is required.
Line 398: Line 411:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
* Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
If a CRITICAL step has more than one part, then:  
    *   (filled bullet) indicates a CRITICAL part of the step.
* (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.  
Page 28 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Page 29 of 10 Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The time clock starts when the candidate acknowledges the initiating cue.
The time clock starts when the candidate acknowledges the initiating cue.  
Page 29 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
Page 30 of 10 JPM Start Time: _________
Comment #
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT        UNSAT PERFORMANCE CHECKLIST                   STANDARDS
: 1. Obtain Hardcard for Isolation Condenser Manual Operation.
: 1. Obtain Hardcard for       Obtains Hardcard for Isolation Isolation Condenser        Condenser Manual Operation Manual Operation.          from 902-3 panel book rack.
Obtains Hardcard for Isolation Condenser Manual Operation from 902-3 panel book rack.
Note The 2-1301-17 & 2-1301-20 valves will already be Closed due to Group I Isolation.
Note The 2-1301-17 & 2-1301-20 valves will already be Closed due to Group I Isolation.
: 2. Close the 2-1301-17 and   Determines 2-1301-17 & 1301-2-1301-20 valves.          20 Red Closed lights         _____        _____        _____
: 2. Close the 2-1301-17 and 2-1301-20 valves.
illuminated.
Determines 2-1301-17 & 1301-20 Red Closed lights illuminated.  
  *3. Rotate HAND/RESET to       Rotates HAND/RESET to HAND position and          HAND (CW) and releases.
*3. Rotate HAND/RESET to HAND position and release.
release.
Rotates HAND/RESET to HAND (CW) and releases.
: 4. Acknowledge annunciator    Acknowledges annunciator 902(3)-3 B-4, ISOL         902(3)-3 B-4, ISOL CONDR CONDR VLVS OFF            VLVS OFF NORMAL, alarms.
: 4. Acknowledge annunciator 902(3)-3 B-4, ISOL CONDR VLVS OFF NORMAL, alarms.
NORMAL, alarms.
Acknowledges annunciator 902(3)-3 B-4, ISOL CONDR VLVS OFF NORMAL, alarms.  
  *5. Open the 2-1301-3 valve.
*5. Open the 2-1301-3 valve.
* Places 2-1301-3 valve C/S to the Open position.
Places 2-1301-3 valve C/S to the Open position.
o   Only the Red OPEN light is   _____    _____        _____
o Only the Red OPEN light is illuminated.  
illuminated.
*6. Open the 2-4399-74 valve.
  *6. Open the 2-4399-74
Places 2-4399-74 valve C/S to Open position.
* Places 2-4399-74 valve valve.                        C/S to Open position.
o Only Red OPEN light is illuminated.  
o   Only Red OPEN light is       _____    _____        _____
illuminated.
Page 30 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Comment #
Page 31 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT        UNSAT PERFORMANCE CHECKLIST                       STANDARDS
*7. Start one ISOL CNDR M-U PP from 923-1 panel.
  *7. Start one ISOL CNDR
Places 2/3A or 2/3B ISOL CNDR M-U PP C/S to Close.
* Places 2/3A or 2/3B ISOL M-U PP from 923-1 panel.          CNDR M-U PP C/S to Close.
o Amber TRIP light illuminates and then extinguishes.
o   Amber TRIP light illuminates and then extinguishes.
o Red ON light is illuminated.
o   Red ON light is illuminated.
o 923-1 A-6 ISO CONDR DEMIN WTR M-U TROUBLE annunciator illuminated - alarm acknowledged.
o   923-1 A-6 ISO CONDR DEMIN WTR M-U TROUBLE annunciator           _____    _____        _____
Note Examinee may report IC initiated to max flow prior to monitoring level.
illuminated - alarm acknowledged.
Note   Examinee may report IC initiated to max flow prior to monitoring level.
: 8. Open/Close 2-4399-74 valve as needed to maintain level
: 8. Open/Close 2-4399-74 valve as needed to maintain level
: 9. Notify Unit Supervisor of     Unit Supervisor notified of task task completion.              completion.
: 9. Notify Unit Supervisor of task completion.
CUE   Acknowledge report of task completion.
Unit Supervisor notified of task completion.
CUE Acknowledge report of task completion.
END JPM Stop Time:_________
END JPM Stop Time:_________
Page 31 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name: ___________________________________
Page 32 of 10 Operators Name: ___________________________________
Job
Job


==Title:==
==Title:==
RO     ; SRO JPM
RO  
; SRO JPM


==Title:==
==Title:==
Manually Operate the Isolation Condenser JPM Number: S-N-c                       Revision Number: 00 Task Number and
Manually Operate the Isolation Condenser JPM Number: S-N-c Revision Number: 00 Task Number and


==Title:==
==Title:==
207L003, Manually Operate the Isolation Condenser K/A Number and Importance: 207000A4.07                 4.2/4.3 Suggested Testing Environment:             Simulator Actual Testing Environment:       ; Simulator       Plant     Control Room Testing Method: Simulate           Alternate Path: Yes         ; No
207L003, Manually Operate the Isolation Condenser K/A Number and Importance: 207000A4.07 4.2/4.3 Suggested Testing Environment:
                  ; Perform               SRO Only: Yes         ; No Time Critical:     Yes         ;No Estimated Time to Complete:       _ 5__minutes     Actual Time Used: _______minutes
Simulator Actual Testing Environment:  
; Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes  
; No  
; Perform SRO Only: Yes  
; No Time Critical:
Yes  
;No Estimated Time to Complete:
_ 5__minutes Actual Time Used: _______minutes  


==References:==
==References:==
Line 465: Line 479:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?       Yes       No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: RSatisfactory               RUnsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
RSatisfactory RUnsatisfactory Comments:
Evaluators Name: ____________________________
Evaluators Name: ____________________________
(Print)
(Print)
Evaluators Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________  
Page 32 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
Page 33 of 9 INITIAL CONDITIONS
: 1. A transient has occurred on Unit 2 resulting in a Group I Isolation.
: 1. A transient has occurred on Unit 2 resulting in a Group I Isolation.
: 2. Due to the transient, Emergency Depressurization is required.
: 2. Due to the transient, Emergency Depressurization is required.
Line 479: Line 494:
: 1. The Unit Supervisor has directed you to initiate the Isolation Condenser to maximum flow.
: 1. The Unit Supervisor has directed you to initiate the Isolation Condenser to maximum flow.
: 2. Use Hardcards.
: 2. Use Hardcards.
: 3. Notify the Unit Supervisor upon task completion.
: 3. Notify the Unit Supervisor upon task completion.  
Page 33 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 34 of 9
Page 34 of 9  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Exelon Nuclear Job Performance Measure Verify Spurious Group 3 Isolation - Incomplete JPM Number: S-N-d Revision Number: 00 Date: 10/05 Developed By:
Page 35 of 9 Exelon Nuclear Job Performance Measure Verify Spurious Group 3 Isolation - Incomplete JPM Number: S-N-d Revision Number: 00 Date: 10/05 Developed By:
Instructor                       Date Approved By:
Instructor Date Approved By:
Training Department             Date Page 35 of 9
Training Department Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
Page 36 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________  34. Task description and number, JPM description and number are identified.
: 34. Task description and number, JPM description and number are identified.
________  35. Knowledge and Abilities (K/A) references are included.
: 35. Knowledge and Abilities (K/A) references are included.
________  36. Performance location specified. (in-plant, control room, or simulator)
: 36. Performance location specified. (in-plant, control room, or simulator)
________  37. Initial setup conditions are identified.
: 37. Initial setup conditions are identified.
________  38. Initiating and terminating cues are properly identified.
: 38. Initiating and terminating cues are properly identified.
________  39. Task standards identified and verified by SME review.
: 39. Task standards identified and verified by SME review.
________  40. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 40. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________  41. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
: 41. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.                   Date
Procedure Rev.
________  42. Pilot test the JPM:
Date
: 42. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: b. ensure performance time is accurate.
________  43. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 43. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________  44. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
: 44. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                           Date SME/Instructor                                           Date SME/Instructor                                           Date Page 36 of 9
SME/Instructor Date SME/Instructor Date SME/Instructor Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
Page 37 of 9 Revision Record (Summary)
Previously used JPM S-1200-03 (ILT 03-1 Cert Exam)
Previously used JPM S-1200-03 (ILT 03-1 Cert Exam)  
Page 37 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
Page 38 of 9 SIMULATOR SETUP INSTRUCTIONS
: 5. Reset the simulator to any IC with RWCU operating with a RWCU Recirc PP operating.
: 5. Reset the simulator to any IC with RWCU operating with a RWCU Recirc PP operating.
NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:
It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 6. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
: 6. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
: 7. Enter the following Expert commands:
: 7. Enter the following Expert commands:
Line 526: Line 541:
: 8. Acknowledge alarms.
: 8. Acknowledge alarms.
: 9. Verify MO 2-1201-1 & 2 remained open.
: 9. Verify MO 2-1201-1 & 2 remained open.
: 10. This completes the setup for this JPM.
: 10. This completes the setup for this JPM.  
Page 38 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
Page 39 of 9 INITIAL CONDITIONS
: 2. A spurious Group 3 isolation has occurred.
: 2. A spurious Group 3 isolation has occurred.
INITIATING CUE
INITIATING CUE
Line 539: Line 553:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
* Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
If a CRITICAL step has more than one part, then:  
    *   (filled bullet) indicates a CRITICAL part of the step.
* (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
Page 39 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
Page 40 of 9 JPM Start Time: _________
Comment #
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT        UNSAT PERFORMANCE CHECKLIST                   STANDARDS
: 1. Examinee acquires DAN 902-5 D-5, GROUP 3 ISOLATION INITIATED or Hard Card.
: 1. Examinee acquires DAN 902-   Examinee acquires DAN 5 D-5, GROUP 3 ISOLATION     902-5 D-5, GROUP 3 INITIATED or Hard Card.      ISOLATION INITIATED hard card or DAN.             _____    _____    _____
Examinee acquires DAN 902-5 D-5, GROUP 3 ISOLATION INITIATED hard card or DAN.
: 2. Examinee verifies closed:   Verifies RWCU valves RWCU Valves           closed by checking each
: 2. Examinee verifies closed:
* MO 2-1201-1A           valves OPEN light OFF and
RWCU Valves MO 2-1201-1A MO 2-1201-3 MO 2-1201-7 MO 2-1201-1 MO 2-1201-2 Verifies RWCU valves closed by checking each valves OPEN light OFF and CLOSED light LIT.
* MO 2-1201-3             CLOSED light LIT.
Examinee recognizes that MO 2-1201-1 & 2-1201-2 did not close.  
* MO 2-1201-7             Examinee recognizes that
*3. Close RWCU Valve MO 2-1201-1 Momentarily places RWCU Valve MO 2-1201-1 control switch to the CLOSE position.
* MO 2-1201-1             MO 2-1201-1 & 2-1201-2        _____    _____    _____
o Verifies CLOSE light turns ON immediately.
* MO 2-1201-2             did not close.
o Verifies OPEN light turns OFF when valve full closes.  
  *3. Close RWCU Valve MO
*4. Close RWCU Valve MO 2-1201-2 Momentarily places RWCU Valve MO 2-1201-2 control switch to the CLOSE position.
* Momentarily places 2-1201-1                         RWCU Valve MO 2-1201-1 control switch to the CLOSE position. _____    _____    _____
o Verifies CLOSE light turns ON immediately.
o   Verifies CLOSE light turns ON immediately.
o Verifies OPEN light turns OFF when valve full closes.  
o   Verifies OPEN light turns OFF when valve full closes.
  *4. Close RWCU Valve MO
* Momentarily places 2-1201-2                         RWCU Valve MO 2-1201-2 control switch to the CLOSE position. _____    _____    _____
o   Verifies CLOSE light turns ON immediately.
o   Verifies OPEN light turns OFF when valve full closes.
Page 40 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Comment #
Page 41 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT        UNSAT PERFORMANCE CHECKLIST                   STANDARDS
: 5. Examinee verifies closed:
: 5. Examinee verifies closed:     Verifies SDC valves closed SDC Valves             by checking each valves
SDC Valves MO 2-1001-1A MO 2-1001-1B MO 2-1001-2A MO 2-1001-2B MO 2-1001-2C MO 2-1001-4A MO 2-1001-4B MO 2-1001-4C MO 2-1001-5A MO 2-1001-5B Verifies SDC valves closed by checking each valves OPEN light OFF and CLOSED light LIT.
* MO 2-1001-1A             OPEN light OFF and
: 6. Informs the Unit Supervisor Group 3 isolation has been verified complete.
* MO 2-1001-1B             CLOSED light LIT.
Report Group 3 isolation complete and MO 2-1201-1 and MO 2-1201-2 failed to close automatically.
* MO 2-1001-2A
CUE Respond as US when examinee informs the US the task is complete.
* MO 2-1001-2B
* MO 2-1001-2C
* MO 2-1001-4A
* MO 2-1001-4B
* MO 2-1001-4C
* MO 2-1001-5A
* MO 2-1001-5B                                         _____    _____      _____
: 6. Informs the Unit Supervisor   Report Group 3 isolation Group 3 isolation has been    complete and MO 2-1201-1 verified complete.            and MO 2-1201-2 failed to close automatically.         _____    _____      _____
CUE   Respond as US when examinee informs the US the task is complete.
END JPM Stop Time:_________
END JPM Stop Time:_________
Page 41 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name: ___________________________________
Page 42 of 9 Operators Name: ___________________________________
Job
Job


==Title:==
==Title:==
RO       SRO; JPM
RO SRO; JPM


==Title:==
==Title:==
Verify Spurious Group 3 Isolation - Incomplete JPM Number: S-N-d                         Revision Number: 00 Task Number and
Verify Spurious Group 3 Isolation - Incomplete JPM Number: S-N-d Revision Number:
00 Task Number and


==Title:==
==Title:==
295L022, Initiate/Verify automatic actuations of Emergency Systems.
295L022, Initiate/Verify automatic actuations of Emergency Systems.
K/A Number and Importance: 223002A4.01                     3.6 /3.5 Suggested Testing Environment:           Simulator Actual Testing Environment:       ;Simulator Plant         Control Room Testing Method: Simulate           Alternate Path: ; Yes         No
K/A Number and Importance: 223002A4.01 3.6 /3.5 Suggested Testing Environment:
                  ; Perform               SRO Only: Yes         ; No Time Critical:     Yes         ;No Estimated Time to Complete:       5 minutes       Actual Time Used: _______minutes
Simulator Actual Testing Environment:  
;Simulator Plant Control Room Testing Method: Simulate Alternate Path: ; Yes No  
; Perform SRO Only: Yes  
; No Time Critical:
Yes  
;No Estimated Time to Complete:
5 minutes Actual Time Used: _______minutes  


==References:==
==References:==
Line 606: Line 610:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?     Yes       No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
Evaluators Name: ____________________________
(Print)
(Print)
Evaluators Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________  
Page 42 of 9


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
Page 43 of 10 INITIAL CONDITIONS
: 1. A spurious Group 3 isolation has occurred.
: 1. A spurious Group 3 isolation has occurred.
INITIATING CUE
INITIATING CUE
: 1. The Unit 2 Unit Supervisor has directed you to verify the Group 3 isolation is complete.
: 1. The Unit 2 Unit Supervisor has directed you to verify the Group 3 isolation is complete.
: 2. Inform the Unit Supervisor when the task is complete.
: 2. Inform the Unit Supervisor when the task is complete.  
Page 43 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 44 of 10
Page 44 of 10  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Exelon Nuclear Job Performance Measure Transfer Auxiliary Power to TR-21 from TR-22 JPM Number: S-N-e Revision Number: 00 Date: 10/05 Developed By:
Page 45 of 10 Exelon Nuclear Job Performance Measure Transfer Auxiliary Power to TR-21 from TR-22 JPM Number: S-N-e Revision Number: 00 Date: 10/05 Developed By:
Instructor                       Date Approved By:
Instructor Date Approved By:
Training Department               Date Page 45 of 10
Training Department Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
Page 46 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________      45. Task description and number, JPM description and number are identified.
: 45. Task description and number, JPM description and number are identified.
________      46. Knowledge and Abilities (K/A) references are included.
: 46. Knowledge and Abilities (K/A) references are included.
________      47. Performance location specified. (in-plant, control room, or simulator)
: 47. Performance location specified. (in-plant, control room, or simulator)
________      48. Initial setup conditions are identified.
: 48. Initial setup conditions are identified.
________      49. Initiating and terminating cues are properly identified.
: 49. Initiating and terminating cues are properly identified.
________      50. Task standards identified and verified by SME review.
: 50. Task standards identified and verified by SME review.
________      51. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 51. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________      52. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
: 52. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
Procedure Rev. _____ Date _____________
________      53. Pilot test the JPM:
: 53. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: b. ensure performance time is accurate.
________      54. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 54. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________      55. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
: 55. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                         Date SME/Instructor                                         Date SME/Instructor                                         Date Page 46 of 10
SME/Instructor Date SME/Instructor Date SME/Instructor Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
Page 47 of 10 Revision Record (Summary)
New JPM Page 47 of 10
New JPM  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS:
Page 48 of 10 SIMULATOR SETUP INSTRUCTIONS:
: 1. Initialize in IC 10 OR an IC where the following conditions exist:
: 1. Initialize in IC 10 OR an IC where the following conditions exist:
* Recirc pumps at minimum speed.
* Recirc pumps at minimum speed.
* ONLY 1 RFP and 2 Condensate pumps running.
* ONLY 1 RFP and 2 Condensate pumps running.
* Generator on line with normal TR-21 and TR-22 lineup.
* Generator on line with normal TR-21 and TR-22 lineup.  
Page 48 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
Page 49 of 10 INITIAL CONDITIONS
: 1. Unit 2 is performing a special test procedure for the electric plant.
: 1. Unit 2 is performing a special test procedure for the electric plant.
: 2. The next step is to transfer Auxiliary Power to TR-21.
: 2. The next step is to transfer Auxiliary Power to TR-21.
Line 668: Line 671:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
* Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
If a CRITICAL step has more than one part, then:  
    *   (filled bullet) indicates a CRITICAL part of the step.
* (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
Page 49 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
Page 50 of 10 JPM Start Time: _________
Comment #
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT        UNSAT PERFORMANCE CHECKLIST                    STANDARDS NOTE: This JPM has two parts, which can be done in any order. Go to the appropriate section based on the examinees actions.
NOTE: This JPM has two parts, which can be done in any order. Go to the appropriate section based on the examinees actions.
Note Provide the examinee the included copy of DOS 7500-02.
Note Provide the examinee the included copy of DOS 7500-02.
Transfer Bus 22 to TR-21
Transfer Bus 22 to TR-21  
  *1. Position appropriate
*1. Position appropriate synchroscope selector switch to On.
* Rotates TR-21 to Bus 22 synchroscope selector            Synchroscope selector       _____      _____      _____
Rotates TR-21 to Bus 22 Synchroscope selector switch CW to ON.
switch to On.                    switch CW to ON.
o Verify incoming and running voltages ~ equal.
o   Verify incoming and running voltages ~ equal.
o Verify Synchronizing meter at 12 oclock position and not rotating.
o   Verify Synchronizing meter at 12 oclock position and not rotating.
o Verify Synchronizing meter lights not glowing.  
o   Verify Synchronizing meter lights not glowing.
*2. Position appropriate breaker control switch to Close.
  *2. Position appropriate
Rotates TR-21 to Bus 22 ACB control switch CW to Close.
* Rotates TR-21 to Bus 22 breaker control switch to        ACB control switch CW to     _____      _____      _____
o Verify Synchronizing meter at 12 oclock.
Close.                            Close.
o TR-21 to Bus 22 ACB red closed light illuminated.
o   Verify Synchronizing meter at 12 oclock.
o Annunciator 902-8 D-2 is in alarm  
o   TR-21 to Bus 22 ACB red closed light illuminated.
o   Annunciator 902-8 D-2 is in alarm Page 50 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Comment #
Page 51 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT      UNSAT PERFORMANCE CHECKLIST                   STANDARDS
*3. Open breaker of power source being removed.
*3. Open breaker of power
Rotates TR-22 to Bus 22 ACB CCW to Trip.
* Rotates TR-22 to Bus 22 source being removed.            ACB CCW to Trip.             _____    _____      _____
o TR-22 to Bus 22 ACB Green Open light illuminated.
o   TR-22 to Bus 22 ACB Green Open light illuminated.
o Annunciator 902-8 D-2 resets.
o   Annunciator 902-8 D-2 resets.
: 4. Return appropriate Synchroscope switch to Off.
: 4. Return appropriate           Rotates TR-21 to Bus 22 Synchroscope switch to Off. Synchroscope selector switch CCW to Off.
Rotates TR-21 to Bus 22 Synchroscope selector switch CCW to Off.
: 5. Verify normal Bus 22         Verifies Bus 22 amps and volts indications.                  normal.
: 5. Verify normal Bus 22 indications.
Transfer Bus 24 to TR-21
Verifies Bus 22 amps and volts normal.
*6. Position appropriate
Transfer Bus 24 to TR-21  
* Rotates TR-21 to Bus 24 synchroscope selector            Synchroscope selector       _____    _____      _____
*6. Position appropriate synchroscope selector switch to On.
switch to On.                    switch CW to ON.
Rotates TR-21 to Bus 24 Synchroscope selector switch CW to ON.
o   Verify incoming and running voltages ~ equal.
o Verify incoming and running voltages ~ equal.
o   Verify Synchronizing meter at 12 oclock position and not rotating.
o Verify Synchronizing meter at 12 oclock position and not rotating.
o   Verify Synchronizing meter lights not glowing.
o Verify Synchronizing meter lights not glowing.  
Page 51 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Comment #
Page 52 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT      UNSAT PERFORMANCE CHECKLIST                     STANDARDS
*7. Position appropriate breaker control switch to Close.
*7. Position appropriate
Rotates TR-21 to Bus 24 ACB control switch CW to Close.
* Rotates TR-21 to Bus 24 breaker control switch to        ACB control switch CW to     _____    _____      _____
o Verify Synchronizing meter at 12 oclock.
Close.                            Close.
o TR-21 to Bus 24 ACB red closed light illuminated.
o   Verify Synchronizing meter at 12 oclock.
o Annunciator 902-8 B-5 in alarm.  
o   TR-21 to Bus 24 ACB red closed light illuminated.
*8. Open breaker of power source being removed.
o   Annunciator 902-8 B-5 in alarm.
Rotates TR-22 to Bus 24 ACB CCW to Trip.
*8. Open breaker of power
o TR-22 to Bus 24 ACB Green Open light illuminated.
* Rotates TR-22 to Bus 24 source being removed.            ACB CCW to Trip.             _____    _____      _____
o Annunciator 902-8 B-5 resets.
o   TR-22 to Bus 24 ACB Green Open light illuminated.
: 9. Return appropriate Synchroscope switch to Off.
o   Annunciator 902-8 B-5 resets.
Rotates TR-21 to Bus 24 Synchronization Switch CCW to Off.
: 9. Return appropriate           Rotates TR-21 to Bus 24 Synchroscope switch to Off. Synchronization Switch CCW to Off.
: 10. Verify normal Bus 23 indications.
: 10. Verify normal Bus 23         Verifies Bus 24 amps and volts indications.                  normal.
Verifies Bus 24 amps and volts normal.
END JPM Stop Time:_________
END JPM Stop Time:_________
Page 52 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name: ___________________________________
Page 53 of 10 Operators Name: ___________________________________
Job
Job


==Title:==
==Title:==
RO       SRO; JPM
RO SRO; JPM


==Title:==
==Title:==
Transfer Auxiliary Power to TR-21 from TR-22 JPM Number: S-N-e                     Revision Number: 00 Task Number and
Transfer Auxiliary Power to TR-21 from TR-22 JPM Number: S-N-e Revision Number: 00 Task Number and


==Title:==
==Title:==
262L024, Transfer a 4160 volt bus between power supplies.
262L024, Transfer a 4160 volt bus between power supplies.
K/A Number and Importance: 262001A4.04                     3.6/3.7 Suggested Testing Environment:           Simulator Actual Testing Environment:       ; Simulator     Plant     Control Room Testing Method: Simulate           Alternate Path: Yes         ; No
K/A Number and Importance: 262001A4.04 3.6/3.7 Suggested Testing Environment:
                  ; Perform               SRO Only: Yes         ; No Time Critical:     RYes         ;No Estimated Time to Complete:       _ 14__minutes Actual Time Used: _______minutes
Simulator Actual Testing Environment:  
; Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes  
; No  
; Perform SRO Only: Yes  
; No Time Critical:
RYes  
;No Estimated Time to Complete:
_ 14__minutes Actual Time Used: _______minutes  


==References:==
==References:==
Line 750: Line 755:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?       Yes         No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
Evaluators Name: ____________________________
(Print)
(Print)
Evaluators Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________  
Page 53 of 10


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
Page 54 of 12 INITIAL CONDITIONS
: 1. Unit 2 is performing a special test procedure for the electric plant.
: 1. Unit 2 is performing a special test procedure for the electric plant.
: 2. The next step is to transfer Auxiliary Power to TR-21.
: 2. The next step is to transfer Auxiliary Power to TR-21.
: 3. Another operator will verify TR-21 loading remains below the restrictions of the procedure.
: 3. Another operator will verify TR-21 loading remains below the restrictions of the procedure.
INITIATING CUE The Unit Supervisor has directed you to transfer Auxiliary Power from TR-22 to TR-21 in accordance with DOP 6500-01.
INITIATING CUE The Unit Supervisor has directed you to transfer Auxiliary Power from TR-22 to TR-21 in accordance with DOP 6500-01.  
Page 54 of 12


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Page 55 of 12
Page 55 of 12  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Exelon Nuclear Job Performance Measure Driving Tip Detectors To The Isolation Test Position JPM Number: S-N-f Revision Number: 00 Date: 10/05 Developed By:
Page 56 of 12 Exelon Nuclear Job Performance Measure Driving Tip Detectors To The Isolation Test Position JPM Number: S-N-f Revision Number: 00 Date: 10/05 Developed By:
Instructor                         Date Approved By:
Instructor Date Approved By:
Training Department               Date Page 56 of 12
Training Department Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
Page 57 of 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________  56. Task description and number, JPM description and number are identified.
: 56. Task description and number, JPM description and number are identified.
________  57. Knowledge and Abilities (K/A) references are included.
: 57. Knowledge and Abilities (K/A) references are included.
________  58. Performance location specified. (in-plant, control room, or simulator)
: 58. Performance location specified. (in-plant, control room, or simulator)
________  59. Initial setup conditions are identified.
: 59. Initial setup conditions are identified.
________  60. Initiating and terminating cues are properly identified.
: 60. Initiating and terminating cues are properly identified.
________  61. Task standards identified and verified by SME review.
: 61. Task standards identified and verified by SME review.
________  62. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 62. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________  63. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
: 63. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev.                   Date
Procedure Rev.
________  64. Pilot test the JPM:
Date
: 64. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: b. ensure performance time is accurate.
________  65. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 65. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________  66. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
: 66. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                           Date SME/Instructor                                           Date SME/Instructor                                           Date Page 57 of 12
SME/Instructor Date SME/Instructor Date SME/Instructor Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
Page 58 of 12 Revision Record (Summary)
New JPM Page 58 of 12
New JPM  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
Page 59 of 12 SIMULATOR SETUP INSTRUCTIONS
: 11. Reset the simulator to any IC with the Group 2 Isolation reset.
: 11. Reset the simulator to any IC with the Group 2 Isolation reset.
NOTE:     It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:
It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 12. Enter the following Expert command:
: 12. Enter the following Expert command:
* SET NIRK11R = FALSE (changes the TIP Group 2 Isolation relay status to the NOT reset state)
* SET NIRK11R = FALSE (changes the TIP Group 2 Isolation relay status to the NOT reset state)
: 13. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
: 13. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
: 14. This completes the setup for this JPM.
: 14. This completes the setup for this JPM.  
Page 59 of 12


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
Page 60 of 12 INITIAL CONDITIONS
: 3. Post Maintenance Testing is required on the 2A TIP machine.
: 3. Post Maintenance Testing is required on the 2A TIP machine.
: 4. A Group 2 Isolation occurred several minutes ago and was reset on the 902-5 panel.
: 4. A Group 2 Isolation occurred several minutes ago and was reset on the 902-5 panel.
Line 813: Line 819:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
* Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
If a CRITICAL step has more than one part, then:  
    *   (filled bullet) indicates a CRITICAL part of the step.
* (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
Page 60 of 12


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
Page 61 of 12 JPM Start Time: _________
Comment #
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT      UNSAT PERFORMANCE CHECKLIST                    STANDARDS Note: Provide the examinee the included copy of DOS 7500-02.
Note: Provide the examinee the included copy of DOS 7500-02.
: 1. Verify all BALL VALVES       Verifies CLOSED light lit for closed at Panel 902-13       ALL BALL VALVES at Panel 902-13.
: 1. Verify all BALL VALVES closed at Panel 902-13 Verifies CLOSED light lit for ALL BALL VALVES at Panel 902-13.
: 2. IF a Group 2 Isolation has   Since a Group 2 Isolation has occurred, THEN reset the    occurred, verifies that Group 2 TIP System by performing    TIP Isolation reset light is NOT Step G.4.                    lit.
: 2. IF a Group 2 Isolation has occurred, THEN reset the TIP System by performing Step G.4.
Since a Group 2 Isolation has occurred, verifies that Group 2 TIP Isolation reset light is NOT lit.
Proceeds to Step G.4.
Proceeds to Step G.4.
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
: 3. Verify the Group 2           Condition met from initiating Isolation has been reset. cue. Examinee still may verify the Group 2 Isolation has been reset at the 902-5 panel by verifying alarm window 902-5 E-5 is NOT lit.
: 3. Verify the Group 2 Isolation has been reset.
: 4. Verify MANUAL switches      Verifies MANUAL switches in in OFF:                      OFF for:
Condition met from initiating cue. Examinee still may verify the Group 2 Isolation has been reset at the 902-5 panel by verifying alarm window 902-5 E-5 is NOT lit.
o   Drive Control Ch A     o   Drive Control Ch A o   Drive Control Ch B      o   Drive Control Ch B o   Drive Control Ch C      o   Drive Control Ch C o   Drive Control Ch D      o   Drive Control Ch D o Drive Control Ch E        o Drive Control Ch E Page 61 of 12
: 4. Verify MANUAL switches in OFF:
o Drive Control Ch A o
Drive Control Ch B o
Drive Control Ch C o
Drive Control Ch D o Drive Control Ch E Verifies MANUAL switches in OFF for:
o Drive Control Ch A o
Drive Control Ch B o
Drive Control Ch C o
Drive Control Ch D o Drive Control Ch E  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Comment #
Page 62 of 12 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT      UNSAT PERFORMANCE CHECKLIST                     STANDARDS
: 5. Verify all BALL VALVES closed:
: 5. Verify all BALL VALVES      Verifies all BALL VALVES closed:                     closed for:                        _____    _____    _____
o Vlv Control Ch 1 o
o   Vlv Control Ch 1         o   Vlv Control Ch 1 o   Vlv Control Ch 2        o   Vlv Control Ch 2 o   Vlv Control Ch 3        o   Vlv Control Ch 3 o   Vlv Control Ch 4        o   Vlv Control Ch 4 o Vlv Control Ch 5          o Vlv Control Ch 5
Vlv Control Ch 2 o
: 6. Verify MAN. VALVE            Verifies MAN. VALVE CONTROL switches in         CONTROL switches in CLOSE          _____    _____    _____
Vlv Control Ch 3 o
CLOSE:                      for:
Vlv Control Ch 4 o Vlv Control Ch 5 Verifies all BALL VALVES closed for:
o   Drive Control Ch A       o   Drive Control Ch A o   Drive Control Ch B      o   Drive Control Ch B o   Drive Control Ch C      o   Drive Control Ch C o   Drive Control Ch D      o   Drive Control Ch D o Drive Control Ch E        o Drive Control Ch E
o Vlv Control Ch 1 o
*7. Momentarily depress
Vlv Control Ch 2 o
* Momentarily depresses GROUP 2 TIP ISOLATION             GROUP 2 TIP ISOLATION RESET pushbutton;                 RESET pushbutton; AND,                         AND, Verify the green indicator  o   Verifies the green indicator light comes on.                  light comes on.
Vlv Control Ch 3 o
: 8. Verify NO TIP Detector       Verifies NO TIP Detector movement occurs.             movement occurs.                    _____    _____    _____
Vlv Control Ch 4 o Vlv Control Ch 5
END ALTERNATE PATH
: 6. Verify MAN. VALVE CONTROL switches in CLOSE:
*9. Select DRIVE CONTROL        Locates DRIVE CONTROL CH CH A to insert detector. A.                                 _____    _____    _____
o Drive Control Ch A o
Page 62 of 12
Drive Control Ch B o
Drive Control Ch C o
Drive Control Ch D o Drive Control Ch E Verifies MAN. VALVE CONTROL switches in CLOSE for:
o Drive Control Ch A o
Drive Control Ch B o
Drive Control Ch C o
Drive Control Ch D o Drive Control Ch E  
*7. Momentarily depress GROUP 2 TIP ISOLATION RESET pushbutton;
: AND, Verify the green indicator light comes on.
Momentarily depresses GROUP 2 TIP ISOLATION RESET pushbutton;
: AND, o
Verifies the green indicator light comes on.
: 8. Verify NO TIP Detector movement occurs.
Verifies NO TIP Detector movement occurs.
END ALTERNATE PATH  
*9. Select DRIVE CONTROL CH A to insert detector.
Locates DRIVE CONTROL CH A.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Comment #
Page 63 of 12 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT      UNSAT PERFORMANCE CHECKLIST                       STANDARDS
*10. Place MODE switch in MAN.
*10. Place MODE switch in           Turns MODE switch CW from MAN.                          OFF to MAN.                 _____    _____    _____
Turns MODE switch CW from OFF to MAN.  
*11. Place MAN. VALVE               Turns MAN. VALVE CONTROL in OPEN.              CONTROL CW from CLOSED     _____    _____    _____
*11. Place MAN. VALVE CONTROL in OPEN.
to OPEN.
Turns MAN. VALVE CONTROL CW from CLOSED to OPEN.
Note: NO unwanted light indications will be present.
Note: NO unwanted light indications will be present.
Therefore, the next step is not necessary. However, the examinee may still cycle the MODE switch to ensure the machine is operating properly.
Therefore, the next step is not necessary. However, the examinee may still cycle the MODE switch to ensure the machine is operating properly.
: 12. IF necessary, THEN cycle       May turn the MODE switch MODE switch to AUTO            CW from MAN to AUTO, then   _____    _____    _____
: 12. IF necessary, THEN cycle MODE switch to AUTO AND back to MAN.
AND back to MAN.              CCW back to MAN.
May turn the MODE switch CW from MAN to AUTO, then CCW back to MAN.
: 13. Place MANUAL switch in         Turns MANUAL switch CCW REV.                          from OFF to REV.           _____    _____    _____
: 13. Place MANUAL switch in REV.
: 14. Place MANUAL switch in         Turns MANUAL switch CW OFF.                          from REV to OFF.           _____    _____    _____
Turns MANUAL switch CCW from OFF to REV.
: 15. Verify READY light LIT.       Verifies READY light LIT.
: 14. Place MANUAL switch in OFF.
: 16. Place CORE LIMIT               Turns CORE LIMIT selector selector in TOP.              CW from BOTTOM to TOP.
Turns MANUAL switch CW from REV to OFF.
Page 63 of 12
: 15. Verify READY light LIT.
Verifies READY light LIT.
: 16. Place CORE LIMIT selector in TOP.
Turns CORE LIMIT selector CW from BOTTOM to TOP.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Comment #
Page 64 of 12 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT      UNSAT PERFORMANCE CHECKLIST                     STANDARDS
: 17. Verify CORE LIMIT display produces a digit symbol in each digit window.
: 17. Verify CORE LIMIT display    Verifies CORE LIMIT display produces a digit symbol in   produces a digit symbol in each digit window.          each digit window.
Verifies CORE LIMIT display produces a digit symbol in each digit window.
: 18. Place CORE LIMIT             Turns CORE LIMIT selector selector in BOTTOM.          CCW from TOP to BOTTOM.
: 18. Place CORE LIMIT selector in BOTTOM.
: 19. Verify CORE LIMIT display    Verifies CORE LIMIT display produces a digit symbol in   produces a digit symbol in each digit window.          each digit window.
Turns CORE LIMIT selector CCW from TOP to BOTTOM.
: 20. Verify CORE LIMIT switch     Verifies CORE LIMIT switch in in BOTTOM position.          BOTTOM position.
: 19. Verify CORE LIMIT display produces a digit symbol in each digit window.
*21. At DRIVE CONTROL CH         At DRIVE CONTROL CH A, A, place MANUAL switch      turns MANUAL switch CW in FWD to start TIP        from OFF to FWD to start TIP detector insertion.        detector insertion.
Verifies CORE LIMIT display produces a digit symbol in each digit window.
22 Verify DETECTOR              Verifies DETECTOR POSITION rises from the     POSITION rises from the IN-IN-SHIELD position toward    SHIELD position toward 0000 0000 in slow speed.          in slow speed.
: 20. Verify CORE LIMIT switch in BOTTOM position.
*23. WHEN DETECTOR              WHEN DETECTOR POSITION has counted 20     POSITION has counted 20 to to 25 digits, THEN place   25 digits, THEN turns MANUAL switch in OFF.      MANUAL switch CCW from FWD to OFF.
Verifies CORE LIMIT switch in BOTTOM position.  
: 24. Verify the IN-SHIELD light   Verifies the IN-SHIELD light is is off at the applicable    off at the applicable Drive Unit.
*21. At DRIVE CONTROL CH A, place MANUAL switch in FWD to start TIP detector insertion.
Drive Unit.
At DRIVE CONTROL CH A, turns MANUAL switch CW from OFF to FWD to start TIP detector insertion.
Page 64 of 12
22 Verify DETECTOR POSITION rises from the IN-SHIELD position toward 0000 in slow speed.
Verifies DETECTOR POSITION rises from the IN-SHIELD position toward 0000 in slow speed.  
*23. WHEN DETECTOR POSITION has counted 20 to 25 digits, THEN place MANUAL switch in OFF.
WHEN DETECTOR POSITION has counted 20 to 25 digits, THEN turns MANUAL switch CCW from FWD to OFF.
: 24. Verify the IN-SHIELD light is off at the applicable Drive Unit.
Verifies the IN-SHIELD light is off at the applicable Drive Unit.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Comment #
Page 65 of 12 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT      UNSAT PERFORMANCE CHECKLIST                       STANDARDS
: 25. Inform the Unit Supervisor that 2A TIP Detector is at the isolation test position.
: 25. Inform the Unit Supervisor    Informs the Unit Supervisor that 2A TIP Detector is at     that 2A TIP Detector is at the the isolation test position. isolation test position.
Informs the Unit Supervisor that 2A TIP Detector is at the isolation test position.
Cue: Acknowledge report.
Cue: Acknowledge report.
END JPM Stop Time:_________
END JPM Stop Time:_________
Page 65 of 12


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name: ___________________________________
Page 66 of 12 Operators Name: ___________________________________
Job
Job


==Title:==
==Title:==
RO       SRO; JPM
RO SRO; JPM


==Title:==
==Title:==
Driving Tip Detectors to the Isolation Test Position JPM Number: S-N-f                         Revision Number: 00 Task Number and
Driving Tip Detectors to the Isolation Test Position JPM Number: S-N-f Revision Number:
00 Task Number and


==Title:==
==Title:==
215L032, Manually drive the TIPs Detectors to the Isolation Test Position.
215L032, Manually drive the TIPs Detectors to the Isolation Test Position.
K/A Number and Importance: 215001A4.03                     3.0 /3.1 Suggested Testing Environment:           Simulator Actual Testing Environment:       ;Simulator Plant         Control Room Testing Method: Simulate           Alternate Path: ; Yes         No
K/A Number and Importance: 215001A4.03 3.0 /3.1 Suggested Testing Environment:
                  ; Perform               SRO Only: Yes         ; No Time Critical:     Yes         ;No Estimated Time to Complete:       5 minutes       Actual Time Used: _______minutes
Simulator Actual Testing Environment:  
;Simulator Plant Control Room Testing Method: Simulate Alternate Path: ; Yes No  
; Perform SRO Only: Yes  
; No Time Critical:
Yes  
;No Estimated Time to Complete:
5 minutes Actual Time Used: _______minutes  


==References:==
==References:==
Line 905: Line 949:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?     Yes         No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
Evaluators Name: ____________________________
(Print)
(Print)
Evaluators Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________  
Page 66 of 12


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-g Page 67 of 11 INITIAL CONDITIONS
: 1. Post Maintenance Testing is required on the 2A TIP machine.
: 1. Post Maintenance Testing is required on the 2A TIP machine.
: 2. A Group 2 Isolation occurred several minutes ago and was reset on the 902-5 panel.
: 2. A Group 2 Isolation occurred several minutes ago and was reset on the 902-5 panel.
INITIATING CUE The Unit Supervisor has directed you to drive the 2A TIP Detector in 20 to 25 digits from its current position by using step G.3 of DOP 0700-06, Traversing Incore Probe (TIP) System Operation.
INITIATING CUE The Unit Supervisor has directed you to drive the 2A TIP Detector in 20 to 25 digits from its current position by using step G.3 of DOP 0700-06, Traversing Incore Probe (TIP) System Operation.  
S-N-g                                                                        Page 67 of 11


Job Performance Measure (JPM)
Job Performance Measure (JPM)
S-N-g                               Page 68 of 11
S-N-g Page 68 of 11  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Exelon Nuclear Job Performance Measure SBGT Post Maintenance Testing with receipt of an Auto Initiation Signal JPM Number: S-N-g Revision Number: 00 Date: 10/05 Developed By:
S-N-g Page 69 of 11 Exelon Nuclear Job Performance Measure SBGT Post Maintenance Testing with receipt of an Auto Initiation Signal JPM Number: S-N-g Revision Number: 00 Date: 10/05 Developed By:
Instructor                                   Date Approved By:
Instructor Date Approved By:
Facility Representative                         Date S-N-g                                                                        Page 69 of 11
Facility Representative Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
S-N-g Page 70 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.
________  67. Task description and number, JPM description and number are identified.
: 67. Task description and number, JPM description and number are identified.
________  68. Knowledge and Abilities (K/A) references are included.
: 68. Knowledge and Abilities (K/A) references are included.
________  69. Performance location specified. (in-plant, control room, or simulator)
: 69. Performance location specified. (in-plant, control room, or simulator)
________  70. Initial setup conditions are identified.
: 70. Initial setup conditions are identified.
________  71. Initiating and terminating cues are properly identified.
: 71. Initiating and terminating cues are properly identified.
________  72. Task standards identified and verified by SME review.
: 72. Task standards identified and verified by SME review.
________  73. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 73. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________  74. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
: 74. Verify the procedure referenced by this JPM matches the most current revision of that procedure:
Procedure Rev. _____ Date _____________
Procedure Rev. _____ Date _____________
________  75. Pilot test the JPM:
: 75. Pilot test the JPM:
: a. verify cues both verbal and visual are free of conflict, and
: a. verify cues both verbal and visual are free of conflict, and
: b. ensure performance time is accurate.
: b. ensure performance time is accurate.
________  76. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 76. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________  77. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
: 77. When JPM is revalidated, SME or Instructor sign and date JPM cover page.
SME/Instructor                                           Date SME/Instructor                                           Date SME/Instructor                                           Date S-N-g                                                                                Page 70 of 11
SME/Instructor Date SME/Instructor Date SME/Instructor Date  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Revision Record (Summary)
S-N-g Page 71 of 11 Revision Record (Summary)
Previously used JPM S-7500-03. (ILT 03-1 NRC Exam)
Previously used JPM S-7500-03. (ILT 03-1 NRC Exam)  
S-N-g                                                  Page 71 of 11


Job Performance Measure (JPM)
Job Performance Measure (JPM)
SIMULATOR SETUP INSTRUCTIONS
S-N-g Page 72 of 11 SIMULATOR SETUP INSTRUCTIONS
: 15. Reset the simulator to any IC with Reactor Building Ventilation operating in a normal lineup.
: 15. Reset the simulator to any IC with Reactor Building Ventilation operating in a normal lineup.
NOTE:       It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
NOTE:
It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
: 16. Place the 2/3A SBGT train in STBY and the 2/3B SBGT train in PRI.
: 16. Place the 2/3A SBGT train in STBY and the 2/3B SBGT train in PRI.
: 17. Place control switches for Unit 2 and 3 DW and Torus Purge fans in PTL on 923-5 panel.
: 17. Place control switches for Unit 2 and 3 DW and Torus Purge fans in PTL on 923-5 panel.
: 18. Have the following malfunction ready to automatically insert when the 2/3A SBGT Control Switch is placed to start.
: 18. Have the following malfunction ready to automatically insert when the 2/3A SBGT Control Switch is placed to start.
NOTE:       The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs.
NOTE:
    # Event Trigger 1 Activates when 2/3A SBGT switch is placed to START.
The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs.  
    # After 60 sec, inserts a spurious Group II isolation.
# Event Trigger 1 Activates when 2/3A SBGT switch is placed to START.  
# After 60 sec, inserts a spurious Group II isolation.
Enter the following Expert commands:
Enter the following Expert commands:
* trgset 1 "vgdstrta_drw"
* trgset 1 "vgdstrta_drw"
* imf cigp2i (1 60)
* imf cigp2i (1 60)
DOCUMENT PREPARATION Markup a copy of DOS 7500-02 as follows:
DOCUMENT PREPARATION Markup a copy of DOS 7500-02 as follows:
o   Initial ALL Prerequisites as completed.
o Initial ALL Prerequisites as completed.
o   Mark IST Testing steps N/A.
o Mark IST Testing steps N/A.
o   Mark steps for testing 2/3B SBGT Train N/A.
o Mark steps for testing 2/3B SBGT Train N/A.
o   Enter a Cumulative Run Time on Checklist A.
o Enter a Cumulative Run Time on Checklist A.  
S-N-g                                                                                  Page 72 of 11


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
S-N-g Page 73 of 11 INITIAL CONDITIONS
: 1. 2/3B SBGT train is operable and 2/3A SBGT train is in day 2 of a 7 day LCO per TS 3.6.4.3 Condition A.
: 1. 2/3B SBGT train is operable and 2/3A SBGT train is in day 2 of a 7 day LCO per TS 3.6.4.3 Condition A.
: 2. Minor maintenance has been completed on the 2/3 A SBGT train and the train is back in service.
: 2. Minor maintenance has been completed on the 2/3 A SBGT train and the train is back in service.
Line 983: Line 1,027:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes CRITICAL steps.
* Denotes CRITICAL steps.
If a CRITICAL step has more than one part, then:
If a CRITICAL step has more than one part, then:  
    *   (filled bullet) indicates a CRITICAL part of the step.
* (filled bullet) indicates a CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
o (open bullet) indicates a NON-CRITICAL part of the step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.  
S-N-g                                                                          Page 73 of 11


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
S-N-g Page 74 of 11 Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
S-N-g                                                                              Page 74 of 11


Job Performance Measure (JPM)
Job Performance Measure (JPM)
JPM Start Time: _________
S-N-g Page 75 of 11 JPM Start Time: _________
Comment #
PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT    UNSAT PERFORMANCE CHECKLIST                          STANDARDS Note Provide the examinee the included copy of DOS 7500-02.
Note Provide the examinee the included copy of DOS 7500-02.
: 1. Ensures the following:     Correctly verifies.
: 1. Ensures the following:
* 2/3 A and B AIR HEATERS are OFF.
2/3 A and B AIR HEATERS are OFF.
* 2/3 A and B Fans are OFF.
2/3 A and B Fans are OFF.
* The following Annunciators are not in alarm:
The following Annunciators are not in alarm:
923-5 A-6, STBY GAS TRT SYS A TROUBLE 923-5 B-6, STBY                                         _____  _____    _____
923-5 A-6, STBY GAS TRT SYS A TROUBLE 923-5 B-6, STBY GAS TRT SYS B TROUBLE Correctly verifies.
GAS TRT SYS B TROUBLE
* 2. Verify 2/3B SBGT SELECT switch in STBY position.
* 2. Verify 2/3B SBGT               Turns 2/3 B SBGT SELECT SELECT switch in STBY          switch CCW from PRI to position.                      STBY.
Turns 2/3 B SBGT SELECT switch CCW from PRI to STBY.
Note 60 sec. after the 2/3A SBGT control switch is placed to START, the following malfunction is inserted automatically: CIGP2I.
Note 60 sec. after the 2/3A SBGT control switch is placed to START, the following malfunction is inserted automatically: CIGP2I.
(Spurious Group II isolation)
(Spurious Group II isolation)
* 3. Place 2/3A SBGT               Turns 2/3A SBGT SELECT SELECT switch to              switch from STBY to START.
* 3. Place 2/3A SBGT SELECT switch to START position Turns 2/3A SBGT SELECT switch from STBY to START.
START position Note The Initial Run Time data has already been recorded.
Note The Initial Run Time data has already been recorded.
(This was in the initial cues)
(This was in the initial cues)
: 4. Records the Initial Run    Verifies the Initial Run Time Time data for SBGT          data for SBGT Train "A" on Train "A" on Checklist A. Checklist A.
: 4. Records the Initial Run Time data for SBGT Train "A" on Checklist A.
S-N-g                                                                              Page 75 of 11
Verifies the Initial Run Time data for SBGT Train "A" on Checklist A.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Comment #
S-N-g Page 76 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT    UNSAT PERFORMANCE CHECKLIST                       STANDARDS
: 5. Verify the 2/3A SBGT train equipment aligned properly.
: 5. Verify the 2/3A SBGT       Begins to verify the 2/3A train equipment aligned    SBGT train equipment aligned properly.                  properly.
Begins to verify the 2/3A SBGT train equipment aligned properly.
: 6. Determine Group 2         Determines Group 2 Isolation Isolation has occurred. has occurred.
: 6. Determine Group 2 Isolation has occurred.
Determines Group 2 Isolation has occurred.
Proceeds to the Limitation and Action section for required actions.
Proceeds to the Limitation and Action section for required actions.
BEGIN ALTERNATE PATH
BEGIN ALTERNATE PATH
* 7. Place the SELECT             Turns the SELECT SWITCH SWITCH for the non-           for 2/3B SBGT train CW from running train to PRI.        STBY to PRI.
* 7. Place the SELECT SWITCH for the non-running train to PRI.
* 8. Place the control switch     Turns the SELECT SWITCH for the train under test to   for 2/3A SBGT train CCW from OFF.                          START to OFF.
Turns the SELECT SWITCH for 2/3B SBGT train CW from STBY to PRI.
: 9. Verify train in PRI has   Verifies flow of 3900 to 4700 sufficient flow AND the    cfm AND 2/3B SBGT heater is heater is operating.      ON.
* 8. Place the control switch for the train under test to OFF.
* 10. Place the Train             Turns the SELECT SWITCH previously under test        for 2/3A SBGT train CW from to STBY.                    OFF to STBY.
Turns the SELECT SWITCH for 2/3A SBGT train CCW from START to OFF.
: 11. Verifies a Reactor       Starts to take action to verify Building Isolation has    the Reactor Building Isolation.
: 9. Verify train in PRI has sufficient flow AND the heater is operating.
occurred on Panel 923-4.
Verifies flow of 3900 to 4700 cfm AND 2/3B SBGT heater is ON.
Cue: When the examinee starts to take action to verify the Reactor Building Isolation, inform him as the Unit Supervisor that another operator will be assigned the verification.
* 10. Place the Train previously under test to STBY.
S-N-g                                                                              Page 76 of 11
Turns the SELECT SWITCH for 2/3A SBGT train CW from OFF to STBY.
: 11. Verifies a Reactor Building Isolation has occurred on Panel 923-4.
Starts to take action to verify the Reactor Building Isolation.
Cue: When the examinee starts to take action to verify the Reactor Building Isolation, inform him as the Unit Supervisor that another operator will be assigned the verification.  


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Comment #
S-N-g Page 77 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #
SAT    UNSAT PERFORMANCE CHECKLIST                         STANDARDS
: 12. Verify the control switches for U2 AND U3 DW & Torus Purge Fans in PULL TO LOCK at Panel 923-5.
: 12. Verify the control          Verifies the control switches switches for U2 AND U3       for U2 AND U3 DW & Torus DW & Torus Purge Fans        Purge Fans in PULL TO LOCK in PULL TO LOCK at          at Panel 923-5:
Verifies the control switches for U2 AND U3 DW & Torus Purge Fans in PULL TO LOCK at Panel 923-5:
Panel 923-5.
o 2-8605A, 2A DW &
o   2-8605A, 2A DW &
TORUS PURGE FAN o
TORUS PURGE FAN o   2-8605B, 2B DW &
2-8605B, 2B DW &
TORUS PURGE FAN o   3-8605A, 3A DW &
TORUS PURGE FAN o
TORUS PURGE FAN o   3-8605B, 3B DW &
3-8605A, 3A DW &
TORUS PURGE FAN o
3-8605B, 3B DW &
TORUS PURGE FAN
TORUS PURGE FAN
: 13. Notify Unit Supervisor of   Unit Supervisor notified.
: 13. Notify Unit Supervisor of the change in status of the surveillance.
the change in status of the surveillance.
Unit Supervisor notified.
Cue: Acknowledge report END JPM Stop Time:_________
Cue: Acknowledge report END JPM Stop Time:_________  
S-N-g                                                                              Page 77 of 11


Job Performance Measure (JPM)
Job Performance Measure (JPM)
Operators Name: ___________________________________
S-N-g Page 78 of 11 Operators Name: ___________________________________
Job
Job


==Title:==
==Title:==
RO       SRO; JPM
RO SRO; JPM


==Title:==
==Title:==
SBGT Post Maintenance Testing with receipt of an Auto Initiation Signal JPM Number: S-N-g                         Revision Number: 00 Task Number and
SBGT Post Maintenance Testing with receipt of an Auto Initiation Signal JPM Number: S-N-g Revision Number:
00 Task Number and


==Title:==
==Title:==
261L002, Start the SBGT system.
261L002, Start the SBGT system.
K/A Number and Importance: 261000A2.10                   3.1/3.2 Suggested Testing Environment:           Simulator Actual Testing Environment:       ;Simulator Plant         Control Room Testing Method: Simulate           Alternate Path: ; Yes           No
K/A Number and Importance: 261000A2.10 3.1/3.2 Suggested Testing Environment:
                  ; Perform             SRO Only: Yes           ; No Time Critical:     Yes         ;No Estimated Time to Complete:       15 minutes     Actual Time Used: _______minutes
Simulator Actual Testing Environment:  
;Simulator Plant Control Room Testing Method: Simulate Alternate Path: ; Yes No  
; Perform SRO Only: Yes  
; No Time Critical:
Yes  
;No Estimated Time to Complete:
15 minutes Actual Time Used: _______minutes  


==References:==
==References:==
Line 1,063: Line 1,117:


==SUMMARY==
==SUMMARY==
Were all the Critical Elements performed satisfactorily?     Yes           No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory               Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:
Satisfactory Unsatisfactory Comments:
Evaluators Name: ____________________________
Evaluators Name: ____________________________
(Print)
(Print)
Evaluators Signature: ___________________________ Date: _________
Evaluators Signature: ___________________________ Date: _________  
S-N-g                                                                              Page 78 of 11


Job Performance Measure (JPM)
Job Performance Measure (JPM)
INITIAL CONDITIONS
Page 79 of 11 INITIAL CONDITIONS
: 1. 2/3B SBGT train is operable and 2/3A SBGT train is in day 2 of a 7 day LCO per TS 3.6.4.3 Condition A.
: 1. 2/3B SBGT train is operable and 2/3A SBGT train is in day 2 of a 7 day LCO per TS 3.6.4.3 Condition A.
: 2. The minor maintenance has been completed on the 2/3 A SBGT train and the train is back in service.
: 2. The minor maintenance has been completed on the 2/3 A SBGT train and the train is back in service.
Line 1,078: Line 1,133:
INITIATING CUE
INITIATING CUE
: 1. The Unit 2 Supervisor has directed you to perform DOS 7500-02 for the 2/3A SBGT train.
: 1. The Unit 2 Supervisor has directed you to perform DOS 7500-02 for the 2/3A SBGT train.
: 2. Notify the Unit 2 Supervisor when the task is complete up to step I.12.
: 2. Notify the Unit 2 Supervisor when the task is complete up to step I.12.}}
Page 79 of 11}}

Latest revision as of 11:48, 15 January 2025

As-Submitted Simulator Jpms for the Dresden Initial Examination - February 2006
ML060800150
Person / Time
Site: Dresden  
(DPR-019, DPR-025)
Issue date: 02/06/2006
From: Charles Phillips
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co, Exelon Nuclear
References
50-237/06-301, 50-249/06-301
Download: ML060800150 (79)


Text

Page 1 of 79 Exelon Nuclear Job Performance Measure Control Rod Exercise JPM Number: S-N-a Revision Number: 00 Date: 10/05 Developed By:

Instructor Date Approved By:

Training Department Date

Job Performance Measure (JPM)

Page 2 of 79 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, or simulator)
4. Initial setup conditions are identified.
5. Initiating and terminating cues are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev.

Date

9. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
10. If the JPM cannot be performed as written with proper responses, then revise the JPM.
11. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date

Job Performance Measure (JPM)

Page 3 of 79 Revision Record (Summary)

From Bank: JPM S-0300-04

Job Performance Measure (JPM)

Page 4 of 79 SIMULATOR SETUP INSTRUCTIONS

1. Reset the simulator to any IC with control rod C-13 at position 48.
2. Verify NO Control Rods are selected.

NOTE:

It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

3. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
4. This completes the setup for this JPM.

DOCUMENT PREPARATION Markup a copy of DOS 0300-01 as follows:

o Mark ALL Prerequisites complete EXCEPT for enabling the ROD EXERCISE function of the Rod Worth Minimizer.

o Mark Unit as 2 on Checklist 1.

o Mark NO for Stall Flows and Drive Water Pressure required on Checklist 1.

o Mark all rods Except C-13 N/A on Checklist 1.

o Print out 2 copies of a Control Rod position scan after the simulator has been setup.

Designate one as the before exercising copy and the other as the after exercising copy.

Job Performance Measure (JPM)

Page 5 of 79 INITIAL CONDITIONS

1. The CRD System engineer has requested exercising Control Rod C-13.

INITIATING CUE

1. The Unit Supervisor has directed you to perform DOS 0300-01, Control Rod Exercise, for Control Rod C-13 ONLY.
2. The prerequisites are completed except for enabling the ROD EXERCISE function of the Rod Worth Minimizer.
3. Stall flow and drive pressure are NOT required.
4. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information for Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

If a CRITICAL step has more than one part, then:

  • (filled bullet) indicates a CRITICAL part of the step.

o (open bullet) indicates a NON-CRITICAL part of the step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

Page 6 of 79 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

Note: Provide the Examinee the included copies of DOS 0300-01 and DOP 0400-

02.

Selects Special Modes on RWM.

Selects Rod Exercise on RWM.

Note: Although not a procedure step a second verifier is required.

Second Verifier Duties:

3/4 Proper rod selected 3/4 Insert and Withdraw limits understood.

3/4 Verifies RWM is in exercise mode, has no errors and has blocks enabled.

3/4 Check off each control rod movement on the CRD Exercise Checklist.

2. Request a second verifier VERIFIES second verifier available.

Cue:

Inform examinee that you will perform duties of second verifier.

3. Obtain initial Control Rod position information.

At any NSO Process Computer Display, navigate to and print the Rod Monitoring display.

Job Performance Measure (JPM)

Page 7 of 79 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

Cue:

When the examinee has located a control rod position screen, provide the examinee with the before exercise copy of the rod position print out.

Note:

If inserted past position 46, performs DOA 0300-12.

Evaluator will have to determine if proper steps are followed based on current conditions.

Depresses Select Pushbutton for Control Rod C-13.

  • 5. Insert Control Rod C-13 to notch 46 and verify latched.

Momentarily places Rod Movement Control switch to Rod In.

o Verifies Control Rod C-13 latches at position 46.

6. Verify indicated control rod position changes during movement.

Monitors rod position changes to 46 on Four Rod and/or Full Core display.

  • 7. While returning the control rod to position 48, perform the following:

3/4 Apply continuous withdraw signal utilizing the Rod Out Notch Override switch.

Simultaneously holds Rod Movement Control Switch to Rod Notch Out Rod Out Notch Override Switch to Notch Out Override

8. 3/4 Verify indicated control rod position changes during movement.

o Monitors rod position changes to 48 on Four Rod and/or Full Core display.

9. 3/4 Verify control rod does not go to the overtravel position.

o Verifies NO loss of position indication on Four Rod display or double red dashes on Full Core display.

Job Performance Measure (JPM)

Page 8 of 79 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

  • 10. Removes continuous withdraw signal.

Releases:

Rod Movement Control Switch Rod Out Notch Override Switch

11. Checks off C-13 control rod move on the CRD exercise checklist.

CRD checklist marked for C-13 control rod move.

12. Place RWM in desired mode.

Selects EXIT function on RWM.

Cue: If asked as the Unit Supervisor, respond:

return the RWM to the Primary screen.

13. Obtain an edit of final Control Rod positions.

At any NSO Process Computer Display, navigate to and print the Rod Monitoring display.

Cue:

When the examinee has located a control rod position screen, provide the examinee with the after exercise copy of the rod position print out.

14. Verify all Control Rods are at their initial positions.

VERIFIES all Control Rods are at their initial positions.

Job Performance Measure (JPM)

Page 9 of 79 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

15. Inform Unit Supervisor that Control Rod C-13 exercising is complete and second verification and Unit Supervisor verification is required.

Informs Unit Supervisor that Control Rod C-13 exercising is complete and second verification and Unit Supervisor verification is required.

Cue: Acknowledge the report as the Unit Supervisor END JPM Stop Time:_________

Job Performance Measure (JPM)

Page 10 of 79 Operators Name: ___________________________________

Job

Title:

RO SRO; JPM

Title:

Control Rod Exercise JPM Number: S-N-a Revision Number:

00 Task Number and

Title:

201L006, Perform daily/weekly CRD exercise.

K/A Number and Importance: 201003A4.02 3.5 /3.5 Suggested Testing Environment:

Simulator Actual Testing Environment:

Simulator Plant Control Room Testing Method
Simulate Alternate Path: Yes
No
Perform SRO Only
Yes
No Time Critical

Yes

No Estimated Time to Complete

5 minutes Actual Time Used: _______minutes

References:

DOS 0300-01, R41, Control Rod Exercise DOP 0400-02, R20, Rod Worth Minimizer EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

Page 11 of 1 INITIAL CONDITIONS

1. The CRD System engineer has requested exercising Control Rod C-13.

INITIATING CUE

1. The Unit Supervisor has directed you to perform DOS 0300-01, Control Rod Exercise, for Control Rod C-13 ONLY.
2. The prerequisites are completed except for enabling the ROD EXERCISE function of the Rod Worth Minimizer.
3. Stall flow and drive pressure are NOT required.
4. Inform the Unit Supervisor when the task is complete.

Job Performance Measure (JPM)

Page 12 of 1

Job Performance Measure (JPM)

Page 13 of 1 Exelon Nuclear Job Performance Measure Perform Core Spray Pump Test With Torus Available JPM Number: S-N-b Revision Number: 00 Date: 10/05 Developed By:

Instructor Date Approved By:

Training Department Date

Job Performance Measure (JPM)

Page 14 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

12. Task description and number, JPM description and number are identified.
13. Knowledge and Abilities (K/A) references are included.
14. Performance location specified. (in-plant, control room, or simulator)
15. Initial setup conditions are identified.
16. Initiating and terminating cues are properly identified.
17. Task standards identified and verified by SME review.
18. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
19. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

20. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
21. If the JPM cannot be performed as written with proper responses, then revise the JPM.
22. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date

Job Performance Measure (JPM)

Page 15 of 10 Revision Record (Summary)

From Bank: S-1400-04

Job Performance Measure (JPM)

Page 16 of 10 SIMULATOR SETUP INSTRUCTIONS

1. Core Spray pump operability surveillance can be performed from any IC with Core Spray in the normal standby lineup.

NOTE:

It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

2. Start the LPCI/CS room cooler fans.
3. Enter the following Expert commands to set up an automatic trigger to trip the Core Spray pump after the test valve is opened.

NOTE:

The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs.

  1. Event Trigger 1 Activates when MO 1402-4B OPEN light turns ON.
  1. After 10 sec, inserts a 2B Core Spray pump trip.

Enter the following Expert commands:

  • trgset 1 "cslop4b"
  • imf csppbflt (1 10)

DOCUMENT PREPARATION Markup a copy of DOS 1400-05 as complete up through Step I.6. (Ready to start 2B Core Spray Pump per step I.7)

Job Performance Measure (JPM)

Page 17 of 10 INITIAL CONDITIONS

1. The Unit 2 Core Spray operability surveillance is due.
2. The operability surveillance for the 2A Core Spray pump has already been completed (system is filled and vented).
3. Required valve operability surveillance has been completed.
4. Unit 2 NLO is standing by in the corner room.
5. LPCI/Core Spray Room Coolers are running.
6. DOS 1400-05 is complete up to point of starting 2B Core Spray pump.

INITIATING CUE

1. The Unit Supervisor directs you to perform DOS 1400-05 step I.7 for the 2B Core Spray pump.
2. All applicable Prerequisites have been met.
3. Your Pre-Job Brief has been completed.
4. Notify the Unit Supervisor upon completion of step I.7.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information for Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

If a CRITICAL step has more than one part, then:

  • (filled bullet) indicates a CRITICAL part of the step.

o (open bullet) indicates a NON-CRITICAL part of the step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of

Job Performance Measure (JPM)

Page 18 of 10 the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM.

It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The time clock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

Page 19 of 10 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

Note Provide the Examinee the provided copy of DOS 1400-05

1. Verify the following valve line up.

MO 2-1402-4B Closed MO 2-1402-38B Open 2-1402-6B Open MO 2-1402-25B Closed MO 2-1402-3B Open 2-1402-40B-SV Closed Verifies the following:

Green Closed light On Green Open light On Green Open light On Green Closed light On Green Open light On Directs NLO to Verify 2-1402-40B SV Closed.

CUE 2-1402-40B, INST SV is closed.

2. Verify 2B CORE SPRAY MOTOR has adequate lubrication.

Contacts NLO to verify 2B CS Motor oil level +0 to -1/8 inch of the Oil Sightglass Standstill Line.

CUE 2B Core Spray motor oil level is normal (within +0 to

-1/8 inch band).

3. Verify 2B LPCI/CS Room Cooler is operating properly.

Contacts NLO to verify proper room cooler operation.

CUE 2B LPCI/CS room cooler is operating normally.

4. Direct NLO to open 2-1402-40B-SV and report pressure.

Directs SV 2-1402-40B Open.

CUE 2-1402-40B Inst SV is Open. Pressure is 7 psig.

5. Record suction pressure provided by NLO.

Pressure of 7 psig recorded on Data Sheet 1.

Job Performance Measure (JPM)

Page 20 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

6. Calculate 2-1402-8B initial closed DP.

DP Calculated:

2-1450-1B ________ psig Minus 2-1402-40B ________psig

  • 7. Close PP DISCH VLV, MO 2-1402-24B Rotates MO 2-1402-24B C/S CCW to Close.

Only the Red Closed light illuminated.

Rotates 2B Core Spray Pump C/S CW Only the Red On light illuminated Note 2B Core Spray Pump overcurrent trip malfunction is automatically inserted 10 seconds after the 2-1402-4B valve has dual indication

  • 9. Open FLOW TEST VLV MO 2-1402-4B.

Rotates and holds MO 2-1402-4B Control switch CW to Open.

BEGIN ALTERNATE PATH

10. Acknowledge and report alarm for 2B CS pump trip.

Acknowledges alarm and makes report.

CUE Acknowledge report.

  • 11. Immediately Close 2-1402-4B.

Rotates and holds MO 2-1402-4B Control switch CCW to Close until only Green Closed light is illuminated.

12. Enters DAN for Core Spray pump trip.

Enters DAN 902-3-B-5.

Job Performance Measure (JPM)

Page 21 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

13. May dispatch operator to check the pump and switch gear.

NLO dispatched to pump.

NLO dispatched to Bus 24-1 CUE Acknowledge requests.

14. May enter DOA 6500-10, for 4kV breaker trip.

States procedure should be entered.

CUE If examinee enters DOA 6500-10, respond that the assist NSO will execute that procedure.

CUE If examinee terminates, or requests permission to terminate the surveillance OR If examinee references the DAN for pump trip and has at least considered the actions to take, then cue:

Terminate the surveillance.

Leave the system in the current lineup. Someone else will be assigned to verify the system is restored to normal.

15. Notify Unit Supervisor of task completion.

Unit Supervisor notified of task completion.

CUE Acknowledge report of task completion.

END JPM Stop Time:_________

Job Performance Measure (JPM)

Page 22 of 10 Operators Name: ___________________________________

Job

Title:

RO

SRO JPM

Title:

Perform Core Spray Pump Test With Torus Available JPM Number: S-N-b Revision Number: 00 Task Number and

Title:

209L004 K/A Number and Importance: 209001A4.01 3.8/3.6 Suggested Testing Environment:

Simulator Actual Testing Environment:

Simulator Plant Control Room Testing Method
Simulate Alternate Path: ; Yes No
Perform SRO Only
Yes
No Time Critical

Yes

No Estimated Time to Complete

_ 20 minutes Actual Time Used:

_______minutes

References:

DOS 1400-05, R31, Core Spray System Pump Test With Torus Available DOP 040-01, Station Motor Operated Valves DAN 902-3 B-5, Core Spray PP Trip EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Job Performance Measure (JPM)

Page 23 of 10 Evaluators Signature: ___________________________ Date: _________

INITIAL CONDITIONS

1. The Unit 2 Core Spray operability surveillance is due.
2. The operability surveillance for the 2A Core Spray pump has already been completed (system is filled and vented).
3. Required valve operability surveillance has been completed.
4. Unit 2 NLO is standing by in the corner room.
5. LPCI/Core Spray Room Coolers are running.
6. DOS 1400-05 is complete up to point of starting 2B Core Spray pump.

INITIATING CUE

1. The Unit Supervisor directs you to perform DOS 1400-05 step I.7 for the 2B Core Spray pump.
2. All applicable Prerequisites have been met.
3. Your Pre-Job Brief has been completed.
4. Notify the Unit Supervisor upon completion of step I.7.

Job Performance Measure (JPM)

Page 24 of 10 Exelon Nuclear Job Performance Measure Manually Operate the Isolation Condenser JPM Number: S-N-c Revision Number: 00 Date: 10/05 Developed By:

Instructor Date Approved By:

Training Department Date

Job Performance Measure (JPM)

Page 25 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

23. Task description and number, JPM description and number are identified.
24. Knowledge and Abilities (K/A) references are included.
25. Performance location specified. (in-plant, control room, or simulator)
26. Initial setup conditions are identified.
27. Initiating and terminating cues are properly identified.
28. Task standards identified and verified by SME review.
29. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
30. Verify the procedure referenced by this JPM matches the most current revision of that procedure: DOP 1300-03 Procedure Rev. _____ Date _____________
31. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
32. If the JPM cannot be performed as written with proper responses, then revise the JPM.
33. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date

Job Performance Measure (JPM)

Page 26 of 10 Revision Record (Summary)

From Bank: S-1300-01

Job Performance Measure (JPM)

Page 27 of 10 SIMULATOR SETUP INSTRUCTIONS:

1. JPM can be conducted with any IC/setup where reactor pressure is greater than 150 psig, but less than the Isolation condenser auto initiation setpoint.
2. Close the Isolation Condenser 2-1301-17 and 2-1301-20 Vent Valves as Initial Conditions for this JPM state that Unit 2 has a Group I Isolation condition.
3. Verify Hardcard for Isolation Condenser Manual Operation erased and at its proper location.

REMOTES/ALARMS REQUIRED None MALFUNCTIONS REQUIRED None

Job Performance Measure (JPM)

Page 28 of 10 INITIAL CONDITIONS

1. A transient has occurred on Unit 2 resulting in a Group I Isolation.
2. Due to the transient, Emergency Depressurization is required.
3. The Isolation Condenser has NOT auto-initiated.

INITIATING CUE

1. The Unit Supervisor has directed you to initiate the Isolation Condenser to maximum flow.
2. Use Hardcards.
3. Notify the Unit Supervisor upon task completion.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information for Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

If a CRITICAL step has more than one part, then:

  • (filled bullet) indicates a CRITICAL part of the step.

o (open bullet) indicates a NON-CRITICAL part of the step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Job Performance Measure (JPM)

Page 29 of 10 Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The time clock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

Page 30 of 10 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

1. Obtain Hardcard for Isolation Condenser Manual Operation.

Obtains Hardcard for Isolation Condenser Manual Operation from 902-3 panel book rack.

Note The 2-1301-17 & 2-1301-20 valves will already be Closed due to Group I Isolation.

2. Close the 2-1301-17 and 2-1301-20 valves.

Determines 2-1301-17 & 1301-20 Red Closed lights illuminated.

  • 3. Rotate HAND/RESET to HAND position and release.

Rotates HAND/RESET to HAND (CW) and releases.

4. Acknowledge annunciator 902(3)-3 B-4, ISOL CONDR VLVS OFF NORMAL, alarms.

Acknowledges annunciator 902(3)-3 B-4, ISOL CONDR VLVS OFF NORMAL, alarms.

  • 5. Open the 2-1301-3 valve.

Places 2-1301-3 valve C/S to the Open position.

o Only the Red OPEN light is illuminated.

  • 6. Open the 2-4399-74 valve.

Places 2-4399-74 valve C/S to Open position.

o Only Red OPEN light is illuminated.

Job Performance Measure (JPM)

Page 31 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

  • 7. Start one ISOL CNDR M-U PP from 923-1 panel.

Places 2/3A or 2/3B ISOL CNDR M-U PP C/S to Close.

o Amber TRIP light illuminates and then extinguishes.

o Red ON light is illuminated.

o 923-1 A-6 ISO CONDR DEMIN WTR M-U TROUBLE annunciator illuminated - alarm acknowledged.

Note Examinee may report IC initiated to max flow prior to monitoring level.

8. Open/Close 2-4399-74 valve as needed to maintain level
9. Notify Unit Supervisor of task completion.

Unit Supervisor notified of task completion.

CUE Acknowledge report of task completion.

END JPM Stop Time:_________

Job Performance Measure (JPM)

Page 32 of 10 Operators Name: ___________________________________

Job

Title:

RO

SRO JPM

Title:

Manually Operate the Isolation Condenser JPM Number: S-N-c Revision Number: 00 Task Number and

Title:

207L003, Manually Operate the Isolation Condenser K/A Number and Importance: 207000A4.07 4.2/4.3 Suggested Testing Environment:

Simulator Actual Testing Environment:

Simulator Plant Control Room Testing Method
Simulate Alternate Path: Yes
No
Perform SRO Only
Yes
No Time Critical

Yes

No Estimated Time to Complete

_ 5__minutes Actual Time Used: _______minutes

References:

DOP 1300-03, R23, Manual Operation of the Isolation Condenser EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

RSatisfactory RUnsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

Page 33 of 9 INITIAL CONDITIONS

1. A transient has occurred on Unit 2 resulting in a Group I Isolation.
2. Due to the transient, Emergency Depressurization is required.
4. The Isolation Condenser has NOT auto-initiated.

INITIATING CUE

1. The Unit Supervisor has directed you to initiate the Isolation Condenser to maximum flow.
2. Use Hardcards.
3. Notify the Unit Supervisor upon task completion.

Job Performance Measure (JPM)

Page 34 of 9

Job Performance Measure (JPM)

Page 35 of 9 Exelon Nuclear Job Performance Measure Verify Spurious Group 3 Isolation - Incomplete JPM Number: S-N-d Revision Number: 00 Date: 10/05 Developed By:

Instructor Date Approved By:

Training Department Date

Job Performance Measure (JPM)

Page 36 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

34. Task description and number, JPM description and number are identified.
35. Knowledge and Abilities (K/A) references are included.
36. Performance location specified. (in-plant, control room, or simulator)
37. Initial setup conditions are identified.
38. Initiating and terminating cues are properly identified.
39. Task standards identified and verified by SME review.
40. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
41. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev.

Date

42. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
43. If the JPM cannot be performed as written with proper responses, then revise the JPM.
44. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date

Job Performance Measure (JPM)

Page 37 of 9 Revision Record (Summary)

Previously used JPM S-1200-03 (ILT 03-1 Cert Exam)

Job Performance Measure (JPM)

Page 38 of 9 SIMULATOR SETUP INSTRUCTIONS

5. Reset the simulator to any IC with RWCU operating with a RWCU Recirc PP operating.

NOTE:

It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

6. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
7. Enter the following Expert commands:
  • IMF CIRWCUAP (RWCU incomplete inboard isolation)
  • IMF CIRWCUBP (RWCU incomplete outboard isolation)
  • IMF CIRWCUI (Spurious RWCU Isolation Circuit Failure - above malfuctions must be entered prior to this one being entered)
  • IMF SER0957 ON (Group 3 Isolation Initiated alarm - relay 595-105A)
  • IMF SER1054 ON (Group 3 Isolation Initiated alarm - relay 595-105B)
8. Acknowledge alarms.
9. Verify MO 2-1201-1 & 2 remained open.
10. This completes the setup for this JPM.

Job Performance Measure (JPM)

Page 39 of 9 INITIAL CONDITIONS

2. A spurious Group 3 isolation has occurred.

INITIATING CUE

5. The Unit 2 Unit Supervisor has directed you to verify the Group 3 isolation is complete.
6. Inform the Unit Supervisor when the task is complete.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information for Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

If a CRITICAL step has more than one part, then:

  • (filled bullet) indicates a CRITICAL part of the step.

o (open bullet) indicates a NON-CRITICAL part of the step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

Page 40 of 9 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

1. Examinee acquires DAN 902-5 D-5, GROUP 3 ISOLATION INITIATED or Hard Card.

Examinee acquires DAN 902-5 D-5, GROUP 3 ISOLATION INITIATED hard card or DAN.

2. Examinee verifies closed:

RWCU Valves MO 2-1201-1A MO 2-1201-3 MO 2-1201-7 MO 2-1201-1 MO 2-1201-2 Verifies RWCU valves closed by checking each valves OPEN light OFF and CLOSED light LIT.

Examinee recognizes that MO 2-1201-1 & 2-1201-2 did not close.

  • 3. Close RWCU Valve MO 2-1201-1 Momentarily places RWCU Valve MO 2-1201-1 control switch to the CLOSE position.

o Verifies CLOSE light turns ON immediately.

o Verifies OPEN light turns OFF when valve full closes.

  • 4. Close RWCU Valve MO 2-1201-2 Momentarily places RWCU Valve MO 2-1201-2 control switch to the CLOSE position.

o Verifies CLOSE light turns ON immediately.

o Verifies OPEN light turns OFF when valve full closes.

Job Performance Measure (JPM)

Page 41 of 9 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

5. Examinee verifies closed:

SDC Valves MO 2-1001-1A MO 2-1001-1B MO 2-1001-2A MO 2-1001-2B MO 2-1001-2C MO 2-1001-4A MO 2-1001-4B MO 2-1001-4C MO 2-1001-5A MO 2-1001-5B Verifies SDC valves closed by checking each valves OPEN light OFF and CLOSED light LIT.

6. Informs the Unit Supervisor Group 3 isolation has been verified complete.

Report Group 3 isolation complete and MO 2-1201-1 and MO 2-1201-2 failed to close automatically.

CUE Respond as US when examinee informs the US the task is complete.

END JPM Stop Time:_________

Job Performance Measure (JPM)

Page 42 of 9 Operators Name: ___________________________________

Job

Title:

RO SRO; JPM

Title:

Verify Spurious Group 3 Isolation - Incomplete JPM Number: S-N-d Revision Number:

00 Task Number and

Title:

295L022, Initiate/Verify automatic actuations of Emergency Systems.

K/A Number and Importance: 223002A4.01 3.6 /3.5 Suggested Testing Environment:

Simulator Actual Testing Environment:

Simulator Plant Control Room Testing Method
Simulate Alternate Path: ; Yes No
Perform SRO Only
Yes
No Time Critical

Yes

No Estimated Time to Complete

5 minutes Actual Time Used: _______minutes

References:

DAN 902(3)-5 D-5 (hardcard), Rev. 12 EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

Page 43 of 10 INITIAL CONDITIONS

1. A spurious Group 3 isolation has occurred.

INITIATING CUE

1. The Unit 2 Unit Supervisor has directed you to verify the Group 3 isolation is complete.
2. Inform the Unit Supervisor when the task is complete.

Job Performance Measure (JPM)

Page 44 of 10

Job Performance Measure (JPM)

Page 45 of 10 Exelon Nuclear Job Performance Measure Transfer Auxiliary Power to TR-21 from TR-22 JPM Number: S-N-e Revision Number: 00 Date: 10/05 Developed By:

Instructor Date Approved By:

Training Department Date

Job Performance Measure (JPM)

Page 46 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

45. Task description and number, JPM description and number are identified.
46. Knowledge and Abilities (K/A) references are included.
47. Performance location specified. (in-plant, control room, or simulator)
48. Initial setup conditions are identified.
49. Initiating and terminating cues are properly identified.
50. Task standards identified and verified by SME review.
51. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
52. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

53. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
54. If the JPM cannot be performed as written with proper responses, then revise the JPM.
55. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date

Job Performance Measure (JPM)

Page 47 of 10 Revision Record (Summary)

New JPM

Job Performance Measure (JPM)

Page 48 of 10 SIMULATOR SETUP INSTRUCTIONS:

1. Initialize in IC 10 OR an IC where the following conditions exist:
  • Recirc pumps at minimum speed.
  • ONLY 1 RFP and 2 Condensate pumps running.
  • Generator on line with normal TR-21 and TR-22 lineup.

Job Performance Measure (JPM)

Page 49 of 10 INITIAL CONDITIONS

1. Unit 2 is performing a special test procedure for the electric plant.
2. The next step is to transfer Auxiliary Power to TR-21.
3. Another operator will verify TR-21 loading remains below the restrictions of the procedure.

INITIATING CUE The Unit Supervisor has directed you to transfer Auxiliary Power from TR-22 to TR-21 in accordance with DOP 6500-01.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information for Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

If a CRITICAL step has more than one part, then:

  • (filled bullet) indicates a CRITICAL part of the step.

o (open bullet) indicates a NON-CRITICAL part of the step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

Page 50 of 10 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

NOTE: This JPM has two parts, which can be done in any order. Go to the appropriate section based on the examinees actions.

Note Provide the examinee the included copy of DOS 7500-02.

Transfer Bus 22 to TR-21

  • 1. Position appropriate synchroscope selector switch to On.

Rotates TR-21 to Bus 22 Synchroscope selector switch CW to ON.

o Verify incoming and running voltages ~ equal.

o Verify Synchronizing meter at 12 oclock position and not rotating.

o Verify Synchronizing meter lights not glowing.

  • 2. Position appropriate breaker control switch to Close.

Rotates TR-21 to Bus 22 ACB control switch CW to Close.

o Verify Synchronizing meter at 12 oclock.

o TR-21 to Bus 22 ACB red closed light illuminated.

o Annunciator 902-8 D-2 is in alarm

Job Performance Measure (JPM)

Page 51 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

  • 3. Open breaker of power source being removed.

Rotates TR-22 to Bus 22 ACB CCW to Trip.

o TR-22 to Bus 22 ACB Green Open light illuminated.

o Annunciator 902-8 D-2 resets.

4. Return appropriate Synchroscope switch to Off.

Rotates TR-21 to Bus 22 Synchroscope selector switch CCW to Off.

5. Verify normal Bus 22 indications.

Verifies Bus 22 amps and volts normal.

Transfer Bus 24 to TR-21

  • 6. Position appropriate synchroscope selector switch to On.

Rotates TR-21 to Bus 24 Synchroscope selector switch CW to ON.

o Verify incoming and running voltages ~ equal.

o Verify Synchronizing meter at 12 oclock position and not rotating.

o Verify Synchronizing meter lights not glowing.

Job Performance Measure (JPM)

Page 52 of 10 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

  • 7. Position appropriate breaker control switch to Close.

Rotates TR-21 to Bus 24 ACB control switch CW to Close.

o Verify Synchronizing meter at 12 oclock.

o TR-21 to Bus 24 ACB red closed light illuminated.

o Annunciator 902-8 B-5 in alarm.

  • 8. Open breaker of power source being removed.

Rotates TR-22 to Bus 24 ACB CCW to Trip.

o TR-22 to Bus 24 ACB Green Open light illuminated.

o Annunciator 902-8 B-5 resets.

9. Return appropriate Synchroscope switch to Off.

Rotates TR-21 to Bus 24 Synchronization Switch CCW to Off.

10. Verify normal Bus 23 indications.

Verifies Bus 24 amps and volts normal.

END JPM Stop Time:_________

Job Performance Measure (JPM)

Page 53 of 10 Operators Name: ___________________________________

Job

Title:

RO SRO; JPM

Title:

Transfer Auxiliary Power to TR-21 from TR-22 JPM Number: S-N-e Revision Number: 00 Task Number and

Title:

262L024, Transfer a 4160 volt bus between power supplies.

K/A Number and Importance: 262001A4.04 3.6/3.7 Suggested Testing Environment:

Simulator Actual Testing Environment:

Simulator Plant Control Room Testing Method
Simulate Alternate Path: Yes
No
Perform SRO Only
Yes
No Time Critical

RYes

No Estimated Time to Complete

_ 14__minutes Actual Time Used: _______minutes

References:

DOP 6500-01, R08, Transfer of 4160 Volt Bus Power Supply EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

Page 54 of 12 INITIAL CONDITIONS

1. Unit 2 is performing a special test procedure for the electric plant.
2. The next step is to transfer Auxiliary Power to TR-21.
3. Another operator will verify TR-21 loading remains below the restrictions of the procedure.

INITIATING CUE The Unit Supervisor has directed you to transfer Auxiliary Power from TR-22 to TR-21 in accordance with DOP 6500-01.

Job Performance Measure (JPM)

Page 55 of 12

Job Performance Measure (JPM)

Page 56 of 12 Exelon Nuclear Job Performance Measure Driving Tip Detectors To The Isolation Test Position JPM Number: S-N-f Revision Number: 00 Date: 10/05 Developed By:

Instructor Date Approved By:

Training Department Date

Job Performance Measure (JPM)

Page 57 of 12 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

56. Task description and number, JPM description and number are identified.
57. Knowledge and Abilities (K/A) references are included.
58. Performance location specified. (in-plant, control room, or simulator)
59. Initial setup conditions are identified.
60. Initiating and terminating cues are properly identified.
61. Task standards identified and verified by SME review.
62. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
63. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev.

Date

64. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
65. If the JPM cannot be performed as written with proper responses, then revise the JPM.
66. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date

Job Performance Measure (JPM)

Page 58 of 12 Revision Record (Summary)

New JPM

Job Performance Measure (JPM)

Page 59 of 12 SIMULATOR SETUP INSTRUCTIONS

11. Reset the simulator to any IC with the Group 2 Isolation reset.

NOTE:

It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

12. Enter the following Expert command:
  • SET NIRK11R = FALSE (changes the TIP Group 2 Isolation relay status to the NOT reset state)
13. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs using the JPM Validation Checklist.
14. This completes the setup for this JPM.

Job Performance Measure (JPM)

Page 60 of 12 INITIAL CONDITIONS

3. Post Maintenance Testing is required on the 2A TIP machine.
4. A Group 2 Isolation occurred several minutes ago and was reset on the 902-5 panel.

INITIATING CUE The Unit Supervisor has directed you to drive the 2A TIP Detector in 20 to 25 digits from its current position by using step G.3 of DOP 0700-06, Traversing Incore Probe (TIP) System Operation.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information for Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

If a CRITICAL step has more than one part, then:

  • (filled bullet) indicates a CRITICAL part of the step.

o (open bullet) indicates a NON-CRITICAL part of the step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

Page 61 of 12 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

Note: Provide the examinee the included copy of DOS 7500-02.

1. Verify all BALL VALVES closed at Panel 902-13 Verifies CLOSED light lit for ALL BALL VALVES at Panel 902-13.
2. IF a Group 2 Isolation has occurred, THEN reset the TIP System by performing Step G.4.

Since a Group 2 Isolation has occurred, verifies that Group 2 TIP Isolation reset light is NOT lit.

Proceeds to Step G.4.

BEGIN ALTERNATE PATH

3. Verify the Group 2 Isolation has been reset.

Condition met from initiating cue. Examinee still may verify the Group 2 Isolation has been reset at the 902-5 panel by verifying alarm window 902-5 E-5 is NOT lit.

4. Verify MANUAL switches in OFF:

o Drive Control Ch A o

Drive Control Ch B o

Drive Control Ch C o

Drive Control Ch D o Drive Control Ch E Verifies MANUAL switches in OFF for:

o Drive Control Ch A o

Drive Control Ch B o

Drive Control Ch C o

Drive Control Ch D o Drive Control Ch E

Job Performance Measure (JPM)

Page 62 of 12 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

5. Verify all BALL VALVES closed:

o Vlv Control Ch 1 o

Vlv Control Ch 2 o

Vlv Control Ch 3 o

Vlv Control Ch 4 o Vlv Control Ch 5 Verifies all BALL VALVES closed for:

o Vlv Control Ch 1 o

Vlv Control Ch 2 o

Vlv Control Ch 3 o

Vlv Control Ch 4 o Vlv Control Ch 5

6. Verify MAN. VALVE CONTROL switches in CLOSE:

o Drive Control Ch A o

Drive Control Ch B o

Drive Control Ch C o

Drive Control Ch D o Drive Control Ch E Verifies MAN. VALVE CONTROL switches in CLOSE for:

o Drive Control Ch A o

Drive Control Ch B o

Drive Control Ch C o

Drive Control Ch D o Drive Control Ch E

  • 7. Momentarily depress GROUP 2 TIP ISOLATION RESET pushbutton;
AND, Verify the green indicator light comes on.

Momentarily depresses GROUP 2 TIP ISOLATION RESET pushbutton;

AND, o

Verifies the green indicator light comes on.

8. Verify NO TIP Detector movement occurs.

Verifies NO TIP Detector movement occurs.

END ALTERNATE PATH

  • 9. Select DRIVE CONTROL CH A to insert detector.

Locates DRIVE CONTROL CH A.

Job Performance Measure (JPM)

Page 63 of 12 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

  • 10. Place MODE switch in MAN.

Turns MODE switch CW from OFF to MAN.

  • 11. Place MAN. VALVE CONTROL in OPEN.

Turns MAN. VALVE CONTROL CW from CLOSED to OPEN.

Note: NO unwanted light indications will be present.

Therefore, the next step is not necessary. However, the examinee may still cycle the MODE switch to ensure the machine is operating properly.

12. IF necessary, THEN cycle MODE switch to AUTO AND back to MAN.

May turn the MODE switch CW from MAN to AUTO, then CCW back to MAN.

13. Place MANUAL switch in REV.

Turns MANUAL switch CCW from OFF to REV.

14. Place MANUAL switch in OFF.

Turns MANUAL switch CW from REV to OFF.

15. Verify READY light LIT.

Verifies READY light LIT.

16. Place CORE LIMIT selector in TOP.

Turns CORE LIMIT selector CW from BOTTOM to TOP.

Job Performance Measure (JPM)

Page 64 of 12 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

17. Verify CORE LIMIT display produces a digit symbol in each digit window.

Verifies CORE LIMIT display produces a digit symbol in each digit window.

18. Place CORE LIMIT selector in BOTTOM.

Turns CORE LIMIT selector CCW from TOP to BOTTOM.

19. Verify CORE LIMIT display produces a digit symbol in each digit window.

Verifies CORE LIMIT display produces a digit symbol in each digit window.

20. Verify CORE LIMIT switch in BOTTOM position.

Verifies CORE LIMIT switch in BOTTOM position.

  • 21. At DRIVE CONTROL CH A, place MANUAL switch in FWD to start TIP detector insertion.

At DRIVE CONTROL CH A, turns MANUAL switch CW from OFF to FWD to start TIP detector insertion.

22 Verify DETECTOR POSITION rises from the IN-SHIELD position toward 0000 in slow speed.

Verifies DETECTOR POSITION rises from the IN-SHIELD position toward 0000 in slow speed.

  • 23. WHEN DETECTOR POSITION has counted 20 to 25 digits, THEN place MANUAL switch in OFF.

WHEN DETECTOR POSITION has counted 20 to 25 digits, THEN turns MANUAL switch CCW from FWD to OFF.

24. Verify the IN-SHIELD light is off at the applicable Drive Unit.

Verifies the IN-SHIELD light is off at the applicable Drive Unit.

Job Performance Measure (JPM)

Page 65 of 12 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

25. Inform the Unit Supervisor that 2A TIP Detector is at the isolation test position.

Informs the Unit Supervisor that 2A TIP Detector is at the isolation test position.

Cue: Acknowledge report.

END JPM Stop Time:_________

Job Performance Measure (JPM)

Page 66 of 12 Operators Name: ___________________________________

Job

Title:

RO SRO; JPM

Title:

Driving Tip Detectors to the Isolation Test Position JPM Number: S-N-f Revision Number:

00 Task Number and

Title:

215L032, Manually drive the TIPs Detectors to the Isolation Test Position.

K/A Number and Importance: 215001A4.03 3.0 /3.1 Suggested Testing Environment:

Simulator Actual Testing Environment:

Simulator Plant Control Room Testing Method
Simulate Alternate Path: ; Yes No
Perform SRO Only
Yes
No Time Critical

Yes

No Estimated Time to Complete

5 minutes Actual Time Used: _______minutes

References:

DOP 0700-06, Traversing Incore Probe (TIP) System Operation EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

S-N-g Page 67 of 11 INITIAL CONDITIONS

1. Post Maintenance Testing is required on the 2A TIP machine.
2. A Group 2 Isolation occurred several minutes ago and was reset on the 902-5 panel.

INITIATING CUE The Unit Supervisor has directed you to drive the 2A TIP Detector in 20 to 25 digits from its current position by using step G.3 of DOP 0700-06, Traversing Incore Probe (TIP) System Operation.

Job Performance Measure (JPM)

S-N-g Page 68 of 11

Job Performance Measure (JPM)

S-N-g Page 69 of 11 Exelon Nuclear Job Performance Measure SBGT Post Maintenance Testing with receipt of an Auto Initiation Signal JPM Number: S-N-g Revision Number: 00 Date: 10/05 Developed By:

Instructor Date Approved By:

Facility Representative Date

Job Performance Measure (JPM)

S-N-g Page 70 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation. Prior to JPM usage, revalidate JPM using steps 8 through 11 below.

67. Task description and number, JPM description and number are identified.
68. Knowledge and Abilities (K/A) references are included.
69. Performance location specified. (in-plant, control room, or simulator)
70. Initial setup conditions are identified.
71. Initiating and terminating cues are properly identified.
72. Task standards identified and verified by SME review.
73. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
74. Verify the procedure referenced by this JPM matches the most current revision of that procedure:

Procedure Rev. _____ Date _____________

75. Pilot test the JPM:
a. verify cues both verbal and visual are free of conflict, and
b. ensure performance time is accurate.
76. If the JPM cannot be performed as written with proper responses, then revise the JPM.
77. When JPM is revalidated, SME or Instructor sign and date JPM cover page.

SME/Instructor Date SME/Instructor Date SME/Instructor Date

Job Performance Measure (JPM)

S-N-g Page 71 of 11 Revision Record (Summary)

Previously used JPM S-7500-03. (ILT 03-1 NRC Exam)

Job Performance Measure (JPM)

S-N-g Page 72 of 11 SIMULATOR SETUP INSTRUCTIONS

15. Reset the simulator to any IC with Reactor Building Ventilation operating in a normal lineup.

NOTE:

It is okay to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.

16. Place the 2/3A SBGT train in STBY and the 2/3B SBGT train in PRI.
17. Place control switches for Unit 2 and 3 DW and Torus Purge fans in PTL on 923-5 panel.
18. Have the following malfunction ready to automatically insert when the 2/3A SBGT Control Switch is placed to start.

NOTE:

The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs.

  1. Event Trigger 1 Activates when 2/3A SBGT switch is placed to START.
  1. After 60 sec, inserts a spurious Group II isolation.

Enter the following Expert commands:

  • trgset 1 "vgdstrta_drw"
  • imf cigp2i (1 60)

DOCUMENT PREPARATION Markup a copy of DOS 7500-02 as follows:

o Initial ALL Prerequisites as completed.

o Mark IST Testing steps N/A.

o Mark steps for testing 2/3B SBGT Train N/A.

o Enter a Cumulative Run Time on Checklist A.

Job Performance Measure (JPM)

S-N-g Page 73 of 11 INITIAL CONDITIONS

1. 2/3B SBGT train is operable and 2/3A SBGT train is in day 2 of a 7 day LCO per TS 3.6.4.3 Condition A.
2. Minor maintenance has been completed on the 2/3 A SBGT train and the train is back in service.
3. The prerequisites of DOS 7500-02 have been completed and IST testing is NOT required.
4. The Initial Cumulative Run Time has been recorded.
5. You are the Center Desk NSO.

INITIATING CUE

1. The Unit 2 Supervisor has directed you to perform DOS 7500-02 for the 2/3A SBGT train.
2. Notify the Unit 2 Supervisor when the task is complete up to step I.12.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information for Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes CRITICAL steps.

If a CRITICAL step has more than one part, then:

  • (filled bullet) indicates a CRITICAL part of the step.

o (open bullet) indicates a NON-CRITICAL part of the step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Job Performance Measure (JPM)

S-N-g Page 74 of 11 Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

Job Performance Measure (JPM)

S-N-g Page 75 of 11 JPM Start Time: _________

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

Note Provide the examinee the included copy of DOS 7500-02.

1. Ensures the following:

2/3 A and B AIR HEATERS are OFF.

2/3 A and B Fans are OFF.

The following Annunciators are not in alarm:

923-5 A-6, STBY GAS TRT SYS A TROUBLE 923-5 B-6, STBY GAS TRT SYS B TROUBLE Correctly verifies.

  • 2. Verify 2/3B SBGT SELECT switch in STBY position.

Turns 2/3 B SBGT SELECT switch CCW from PRI to STBY.

Note 60 sec. after the 2/3A SBGT control switch is placed to START, the following malfunction is inserted automatically: CIGP2I.

(Spurious Group II isolation)

  • 3. Place 2/3A SBGT SELECT switch to START position Turns 2/3A SBGT SELECT switch from STBY to START.

Note The Initial Run Time data has already been recorded.

(This was in the initial cues)

4. Records the Initial Run Time data for SBGT Train "A" on Checklist A.

Verifies the Initial Run Time data for SBGT Train "A" on Checklist A.

Job Performance Measure (JPM)

S-N-g Page 76 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

5. Verify the 2/3A SBGT train equipment aligned properly.

Begins to verify the 2/3A SBGT train equipment aligned properly.

6. Determine Group 2 Isolation has occurred.

Determines Group 2 Isolation has occurred.

Proceeds to the Limitation and Action section for required actions.

BEGIN ALTERNATE PATH

  • 7. Place the SELECT SWITCH for the non-running train to PRI.

Turns the SELECT SWITCH for 2/3B SBGT train CW from STBY to PRI.

  • 8. Place the control switch for the train under test to OFF.

Turns the SELECT SWITCH for 2/3A SBGT train CCW from START to OFF.

9. Verify train in PRI has sufficient flow AND the heater is operating.

Verifies flow of 3900 to 4700 cfm AND 2/3B SBGT heater is ON.

  • 10. Place the Train previously under test to STBY.

Turns the SELECT SWITCH for 2/3A SBGT train CW from OFF to STBY.

11. Verifies a Reactor Building Isolation has occurred on Panel 923-4.

Starts to take action to verify the Reactor Building Isolation.

Cue: When the examinee starts to take action to verify the Reactor Building Isolation, inform him as the Unit Supervisor that another operator will be assigned the verification.

Job Performance Measure (JPM)

S-N-g Page 77 of 11 PERFORMANCE CHECKLIST STANDARDS SAT UNSAT Comment #

12. Verify the control switches for U2 AND U3 DW & Torus Purge Fans in PULL TO LOCK at Panel 923-5.

Verifies the control switches for U2 AND U3 DW & Torus Purge Fans in PULL TO LOCK at Panel 923-5:

o 2-8605A, 2A DW &

TORUS PURGE FAN o

2-8605B, 2B DW &

TORUS PURGE FAN o

3-8605A, 3A DW &

TORUS PURGE FAN o

3-8605B, 3B DW &

TORUS PURGE FAN

13. Notify Unit Supervisor of the change in status of the surveillance.

Unit Supervisor notified.

Cue: Acknowledge report END JPM Stop Time:_________

Job Performance Measure (JPM)

S-N-g Page 78 of 11 Operators Name: ___________________________________

Job

Title:

RO SRO; JPM

Title:

SBGT Post Maintenance Testing with receipt of an Auto Initiation Signal JPM Number: S-N-g Revision Number:

00 Task Number and

Title:

261L002, Start the SBGT system.

K/A Number and Importance: 261000A2.10 3.1/3.2 Suggested Testing Environment:

Simulator Actual Testing Environment:

Simulator Plant Control Room Testing Method
Simulate Alternate Path: ; Yes No
Perform SRO Only
Yes
No Time Critical

Yes

No Estimated Time to Complete

15 minutes Actual Time Used: _______minutes

References:

DOS 7500-02, R35, SBGT System Surveillance and IST Test EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name: ____________________________

(Print)

Evaluators Signature: ___________________________ Date: _________

Job Performance Measure (JPM)

Page 79 of 11 INITIAL CONDITIONS

1. 2/3B SBGT train is operable and 2/3A SBGT train is in day 2 of a 7 day LCO per TS 3.6.4.3 Condition A.
2. The minor maintenance has been completed on the 2/3 A SBGT train and the train is back in service.
3. The prerequisites of DOS 7500-02 have been completed and IST testing is NOT required.
4. The Initial Cumulative Run Time has been recorded.
5. You are the Center Desk NSO.

INITIATING CUE

1. The Unit 2 Supervisor has directed you to perform DOS 7500-02 for the 2/3A SBGT train.
2. Notify the Unit 2 Supervisor when the task is complete up to step I.12.