ML17332A571: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ATTACHMENT 1 TO AEP:NRC:1182A MARKED-UP TECHNICAL SPECIFICATION PAGES 9502150154 S'50210 PDR ADOCK 05000315 PDR
{{#Wiki_filter:ATTACHMENT 1 TO AEP:NRC:1182A MARKED-UP TECHNICAL SPECIFICATION PAGES 9502150154 S'50210 PDR ADOCK 05000315 PDR


CO     0 OV       Coh   0 E
CO 0
                                                                                                        ~ M'4 )
OV Coh 0
                                                      ~l;rJl wd'       (i4~+~ro         P c.lto~Q red m~scJ:r~iam~4   'Pg;~~
LI NG COND ON FOR OP ON
LI      NG COND      ON FOR OP      . ON 3.1.3.1   All full length         (shutdown and control) rods       shall be OPERABLE aad-of their   group step counter   demand   position~     O.s %0olls~
~M E
GL&ctc     kc'+
'4)
~l;rJl wd' (i4~+~ro P
'Pg;~~
c.lto~Q red m~scJ:r~iam~4 3.1.3.1 All full length (shutdown and control) rods shall be OPERABLE aad-of their group step counter demand position~
O.s %0olls~
GL&ctc kc'+
~CTEOR:
~CTEOR:
a ~   With~one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requi.re-ment of Specification 3.1.1.1 is sati.sfied within 1 hour and, be in HOT   STANDBY'ithin 6 hours.
a ~
: b. With more than one         full length   rod inoperable or misaligned from the
With~one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requi.re-ment of Specification 3.1.1.1 is sati.sfied within 1 hour and, be in HOT STANDBY'ithin 6 hours.
                                                                                          +I                 I be in HOT STANDBY   wi.thin 6 hours.
b.
            ~ 4u Q red     mimosa.iiJenync~t~
C ~
C ~    With one. full length       rod inoperable due to causes other than addressed by ACTION a, above, or misaligned from               its   group step counter demand position by more than +
With more than one full length rod inoperable or misaligned from the
+I I
be in HOT STANDBY wi.thin 6 hours.
~ 4u Q red mimosa.iiJenync~t~
With one. full length rod inoperable due to causes other than addressed by ACTION a,
: above, or misaligned from its group step counter demand position by more than +
hour either:
hour either:
The   affected rod is restored to OPERABLE status within the above alignment requirements, . or 7ff@nrdh PyaER /encl rj ~ed~ red c r qua( W g5'/,'A7N,puf'gg)SlL /o>Pg 7jy'Z wilalIn~<<>+
2.
: 2. The affected rod i.s declared inoperable and th'e SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied. POWER OPERATION may then continue provided that:
The affected rod is restored to OPERABLE status within the above alignment requirements,
a) A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions, and b) The   SHUTDOWN MARGIN     requirement of Specification 3.1.1.1 is determined     at least   once per 12 hours, and
. or 7ff@nrdh PyaER
-"See Special Test Exceptions 3.10.2 and 3.10.4 r                          piers. +o p ~ g4'-t'7 D. C. COOK- UNIT 1                                3/4 1-18                    AMENDMENT NO.         g$ gg, 12'
/encl rj ~ed~ red c r qua( W g5'/,'A7N,puf'gg)SlL /o>Pg 7jy'Z wilalIn~<<>+
The affected rod i.s declared inoperable and th'e SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied.
POWER OPERATION may then continue provided that:
a) A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions, and b) The SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is determined at least once per 12 hours, and
-"See Special D. C. COOK-UNIT 1 3/4 1-18 r
Test Exceptions 3.10.2 and 3.10.4 piers. +o p ~ g4'-t'7 AMENDMENT NO. g$
gg, 12'


o for THERMAL POWER less than or equal to 85X of RATED THERMAL POWER, the allowed rod misalignment is ~lS steps, and o for THERMAL POWER greater than 85X of RATED THERMAL POWER, the allowed rod misalignment is ~12 steps or as determined from Figure 3.1-4. Figure 3.1-4 permits ~   an allowed rod misalignment from 413 steps (for APL equal to 101X) to ~18 steps (for APL greater or equal to 106X) provided the value of R (defined in Figure 3.1-4) is greater than or equal to 1.04.
o for THERMAL POWER less than or equal to 85X of RATED THERMAL POWER, the allowed rod misalignment is ~lS steps, and o
for THERMAL POWER greater than 85X of RATED THERMAL POWER, the allowed rod misalignment is ~12 steps or as determined from Figure 3.1-4.
Figure 3.1-4 permits ~ an allowed rod misalignment from 413 steps (for APL equal to 101X) to ~18 steps (for APL greater or equal to 106X) provided the value of R (defined in Figure 3.1-4) is greater than or equal to 1.04.


REACTIVITY CO       OL SYSTEMS 3N.1   3   MOVABLE CO     OL ASSEMBLIES.
REACTIVITY CO OL SYSTEMS 3N.1 3
GROUP   HEIGHT                                       ~~pl dt pnd'~~d*J   i4 ~fcA M I'o'4"~s w  4' ~~ o le>4 LIMITING CONDITION    FOR OPERATIO 3.1.3.1     All full length   (shutdown and   control) rods shall be           OPERABLE and demand   positiony a5 +sto~~.
MOVABLE CO OL ASSEMBLIES.
                                            'inc'~~   +8~A +~+
GROUP HEIGHT LIMITING CONDITION FOR OPERATIO
MODES 1+ and 2*                                       'PPLICABILITY:
~~pl dt pnd'~~d*J i4 ~fcA M I'o'4"~s w4'
~~ o le>4 3.1.3.1 All full length (shutdown and control) rods shall be OPERABLE and demand positiony a5 +sto~~.
'inc'~~ +8~A +~+
'PPLICABILITY:
MODES 1+ and 2*
ACTION'L
ACTION'L
        ~   With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN require-ment of Specification 3.1.1.1 is satisfied within 1 hour and be in HOT STANDBY within 6 hours.
~
: b. With more than   one   full length   rod inoperable or misaligned from the c ~
With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN require-ment of Specification 3.1.1.1 is satisfied within 1 hour and be in HOT STANDBY within 6 hours.
b.
c ~
With more than one full length rod inoperable or misaligned from the
(
(
cJ(o~
be in HOT STANDBY within 6 hours.
With one
cJ(o~ ~ ~isa.lip~~
                      ~full~isa.lip~~ be in  HOT STANDBY
~
                                                ~
With one full length rod inoperable due to causes other than addressed by ACTION a,
within  6  hours.
: above, or. misaligned from its group step counter demand position by more than POWER OPERATION may continue provided that within one J
length rod inoperable due to causes other than addressed by ACTION a, above, or. misaligned from its group step counter demand position by more than POWER OPERATION may continue provided that within one                 J hour either:
hour either:
The affected rod is restore/ to OPERABLE status within the above                     I alignment requirements, or fiVEIV~HL Po&ER k~e/ sg Yeku48c( 7S ASS 85'/ Andes fffEambL ~>~EH pw wd mrs'n/gP ~&r6 /n5 Ws, 7're+e/
2.
: 2. The affected rod le.declared dnoperahle and the SHUTDO'drHARGIN                 o>
The affected rod is restore/
requirement of Specification 3.1.1.1 is satisfied. POWER OPERATION may then continue provided that:                                             s+,
to OPERABLE status within the above I
OV a) A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents rhmain valid for the duration of operation under these conditions, and b) The SHUTDOWN MARGIN requirement of Specification'3.1.1.1 is determined at least once per 12 hours, and
alignment requirements, or fiVEIV~HL Po&ER k~e/
                                                    ~@~   m   PACING 9/4- [-lg
sg Yeku48c(
::See  Special Test Exceptions 3. 10. 2 and 3. 10. 3 D. C. COOK '- UNIT 2                         3/4 1-18                     AMENDMENT NO. JSp 107
7S ASS 85'/
Andes fffEambL ~>~EH pw wd - mrs'n/gP ~&r6
/n5 Ws, The affected rod le.declared dnoperahle and the SHUTDO'drHARGIN o> +e/
requirement of Specification 3.1.1.1 is satisfied.
POWER 7're s+,
OPERATION may then continue provided that:
OV a) A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents rhmain valid for the duration of operation under these conditions, and
::See Special b) The SHUTDOWN MARGIN requirement of Specification'3.1.1.1 is determined at least once per 12 hours, and
~@~ m PACING 9/4- [-lg Test Exceptions
: 3. 10. 2 and 3. 10. 3 D. C.
COOK '- UNIT 2 3/4 1-18 AMENDMENT NO. JSp 107


,o for THERMAL POWEB. less than or equal to 85X of RATED THERMAL P04~,
,o for THERMAL POWEB. less than or equal to 85X of RATED THERMAL P04~,
the allowed rod misalignment is ~18 steps, and o for THERMAL POVER greater than 85X of RATED THERMAL POVER, the allowed rod misalignment is J12 steps or as determined from Figure 3.1-4. Figure 3.1-4 permits   ~   an allowed rod misalignment from
the allowed rod misalignment is ~18 steps, and o
  ~13 steps (for APL equal to 101X) to ~18 steps (for APL greater or equal to 106X) provided the value of R (defined in Figure 3.1-4) is greater than or equal to 1.04.
for THERMAL POVER greater than 85X of RATED THERMAL POVER, the allowed rod misalignment is J12 steps or as determined from Figure 3.1-4.
Figure 3.1-4 permits ~ an allowed rod misalignment from
~13 steps (for APL equal to 101X) to ~18 steps (for APL greater or equal to 106X) provided the value of R (defined in Figure 3.1-4) is greater than or equal to 1.04.


ATTACHMENT 2 TO AEP:NRC:1182A PROPOSED TECHNICAL SPECIFICAITON PAGES
ATTACHMENT 2 TO AEP:NRC:1182A PROPOSED TECHNICAL SPECIFICAITON PAGES


REACTIVITY CONTROL SYSTEMS j
REACTIVITY CONTROL SYSTEMS j
3 4.1 3 MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION   FOR OPERATION 3.1.3.1 All full length     (shutdown and control) rods shall be OPERABLE with all individual indicated   rod positions within the allowed rod misalignment of their   group step counter demand position as follows:
3 4.1 3 MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION FOR OPERATION 3.1.3.1 All full length (shutdown and control) rods shall be OPERABLE with all individual indicated rod positions within the allowed rod misalignment of their group step counter demand position as follows:
for THERMAL POWER less than or equal to 85X of   RATED THERMAL POWER, the allowed rod misalignment is zl8 steps, and for THERMAL POWER greater than 85X of RATED THERMAL POWER, the allowed rod misalignment is ~12 steps or as determined from Figure 3.1-4. Figure 3.1-4 permits an allowed rod misalignment from F13 steps (for APL equal to 101X) to z18 steps (for APL greater or equal to 106X) provided the value of R (defined in Figure 3.1-4) is greater than or equal to 1.04.
for THERMAL POWER less than or equal to 85X of RATED THERMAL POWER, the allowed rod misalignment is zl8 steps, and for THERMAL POWER greater than 85X of RATED THERMAL POWER, the allowed rod misalignment is ~12 steps or as determined from Figure 3.1-4.
Figure 3.1-4 permits an allowed rod misalignment from F13 steps (for APL equal to 101X) to z18 steps (for APL greater or equal to 106X) provided the value of R (defined in Figure 3.1-4) is greater than or equal to 1.04.
ACTION:
ACTION:
: a. With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied within 1 hour and be in HOT STANDBY within 6 hours.
a.
: b. With more than one full length rod inoperable or misaligned from the group step counter demand position by more than the allowed rod misalignment, be in HOT STANDBY within 6 hours.
With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied within 1 hour and be in HOT STANDBY within 6 hours.
: c. With one full length rod inoperable due to causes other than addressed by ACTION a, above, or misaligned from its group step counter demand position by more than the allowed rod misalignment, POWER OPERATION may continue provided that within one hour either:
b.
: 1. The affected rod is restored   to OPERABLE status within the above alignment requirements,   or THERMAL POWER level is reduced to less than or equal to 85X of RATED THERMAL POWER   for rod misalignments less than or equal to z18 steps, or
With more than one full length rod inoperable or misaligned from the group step counter demand position by more than the allowed rod misalignment, be in HOT STANDBY within 6 hours.
: 2. The affected rod is declared inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied. POWER OPERATION may then continue provided that:
c.
a) A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions, and
With one full length rod inoperable due to causes other than addressed by ACTION a,
*See Special Test Exceptions 3.10.2 and 3.10.4 COOK NUCLEAR PLANT   - UNIT 1           3/4 1-18     AMENDMENT NO. k5, Q8, IRAN
: above, or misaligned from its group step counter demand position by more than the allowed rod misalignment, POWER OPERATION may continue provided that within one hour either:
1.
The affected rod is restored to OPERABLE status within the above alignment requirements, or THERMAL POWER level is reduced to less than or equal to 85X of RATED THERMAL POWER for rod misalignments less than or equal to z18 steps, or 2.
The affected rod is declared inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied.
POWER OPERATION may then continue provided that:
a)
A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions, and
*See Special Test Exceptions 3.10.2 and 3.10.4 COOK NUCLEAR PLANT - UNIT 1 3/4 1-18 AMENDMENT NO. k5, Q8, IRAN


REACTIVITY CONTROL SYSTEMS 3 4.1   3 MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION     FOR OPERATION 3.1.3.1   All full length   (shutdown and control) rods   shall be OPERABLE   with all individual indicated     rod positions within the allowed rod misalignment of their   group step counter demand position as follows:
REACTIVITY CONTROL SYSTEMS 3 4.1 3 MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION FOR OPERATION 3.1.3.1 All full length (shutdown and control) rods shall be OPERABLE with all individual indicated rod positions within the allowed rod misalignment of their group step counter demand position as follows:
for THERMAL POWER less than or equal to 85X of   RATED THERMAL POWER, the allowed rod misalignment is z18 steps, and for THERMAL POWER greater than 85X of RATED THERMAL POWER, the allowed rod misalignment is ~12 steps or as determined from Figure 3.1-4. Figure 3.1-4 permits an allowed rod misalignment from zl3 steps (for APL equal to 101X) to ~18 steps (for APL greater or equal to 106%) provided the value of R (defined in Figure 3.1-4) is greater than or equal to 1.04.
for THERMAL POWER less than or equal to 85X of RATED THERMAL POWER, the allowed rod misalignment is z18 steps, and for THERMAL POWER greater than 85X of RATED THERMAL POWER, the allowed rod misalignment is ~12 steps or as determined from Figure 3.1-4.
APPLICABILITY:     MODES 1* and 2*
Figure 3.1-4 permits an allowed rod misalignment from zl3 steps (for APL equal to 101X) to ~18 steps (for APL greater or equal to 106%) provided the value of R (defined in Figure 3.1-4) is greater than or equal to 1.04.
APPLICABILITY:
MODES 1* and 2*
ACTION:
ACTION:
: a. With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied within 1 hour and be in HOT STANDBY within 6 hours.
a.
: b. With more than one full length rod inoperable or misaligned from the group step counter demand position by more than the allowed rod misalignment, be in HOT STANDBY within 6 hours.
With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied within 1 hour and be in HOT STANDBY within 6 hours.
: c. With one   full length rod inoperable due to causes other than addressed by ACTION a, above, or misaligned from its group step counter demand position by more than the allowed rod misalignment, POWER OPERATION may continue provided that within one hour either:
b.
: 1. The affected rod is restored   to OPERABLE status within the above alignment requirements,   or THERMAL POWER level is reduced to less than or equal to 85X of RATED THERMAL POWER for rod misalignments less than or equal to z18 steps, or
With more than one full length rod inoperable or misaligned from the group step counter demand position by more than the allowed rod misalignment, be in HOT STANDBY within 6 hours.
: 2. The affected rod is declared inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied. POWER OPERATION may then continue provided that:
c.
a) A reevaluation of each accident analysis of Table 3   '-1   is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions, and
With one full length rod inoperable due to causes other than addressed by ACTION a,
*See Special Test Exceptions 3.10.2 and 3.10.3 COOK NUCLEAR PLANT     - UNIT 2           3/4 1-18         AMENDMENT NO. 40,}}
: above, or misaligned from its group step counter demand position by more than the allowed rod misalignment, POWER OPERATION may continue provided that within one hour either:
1.
The affected rod is restored to OPERABLE status within the above alignment requirements, or THERMAL POWER level is reduced to less than or equal to 85X of RATED THERMAL POWER for rod misalignments less than or equal to z18 steps, or 2.
The affected rod is declared inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied.
POWER OPERATION may then continue provided that:
a)
A reevaluation of each accident analysis of Table 3 '-1 is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions, and
*See Special Test Exceptions 3.10.2 and 3.10.3 COOK NUCLEAR PLANT - UNIT 2 3/4 1-18 AMENDMENT NO. 40,}}

Latest revision as of 14:10, 7 January 2025

Proposed Tech Specs 3/4.1.3 Re Rod Misalignment Requirement for Movable Control Assemblies
ML17332A571
Person / Time
Site: Cook  
Issue date: 02/10/1995
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17332A570 List:
References
NUDOCS 9502150154
Download: ML17332A571 (9)


Text

ATTACHMENT 1 TO AEP:NRC:1182A MARKED-UP TECHNICAL SPECIFICATION PAGES 9502150154 S'50210 PDR ADOCK 05000315 PDR

CO 0

OV Coh 0

LI NG COND ON FOR OP ON

~M E

'4)

~l;rJl wd' (i4~+~ro P

'Pg;~~

c.lto~Q red m~scJ:r~iam~4 3.1.3.1 All full length (shutdown and control) rods shall be OPERABLE aad-of their group step counter demand position~

O.s %0olls~

GL&ctc kc'+

~CTEOR:

a ~

With~one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requi.re-ment of Specification 3.1.1.1 is sati.sfied within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and, be in HOT STANDBY'ithin 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

C ~

With more than one full length rod inoperable or misaligned from the

+I I

be in HOT STANDBY wi.thin 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

~ 4u Q red mimosa.iiJenync~t~

With one. full length rod inoperable due to causes other than addressed by ACTION a,

above, or misaligned from its group step counter demand position by more than +

hour either:

2.

The affected rod is restored to OPERABLE status within the above alignment requirements,

. or 7ff@nrdh PyaER

/encl rj ~ed~ red c r qua( W g5'/,'A7N,puf'gg)SlL /o>Pg 7jy'Z wilalIn~<<>+

The affected rod i.s declared inoperable and th'e SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied.

POWER OPERATION may then continue provided that:

a) A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions, and b) The SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is determined at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and

-"See Special D. C. COOK-UNIT 1 3/4 1-18 r

Test Exceptions 3.10.2 and 3.10.4 piers. +o p ~ g4'-t'7 AMENDMENT NO. g$

gg, 12'

o for THERMAL POWER less than or equal to 85X of RATED THERMAL POWER, the allowed rod misalignment is ~lS steps, and o

for THERMAL POWER greater than 85X of RATED THERMAL POWER, the allowed rod misalignment is ~12 steps or as determined from Figure 3.1-4.

Figure 3.1-4 permits ~ an allowed rod misalignment from 413 steps (for APL equal to 101X) to ~18 steps (for APL greater or equal to 106X) provided the value of R (defined in Figure 3.1-4) is greater than or equal to 1.04.

REACTIVITY CO OL SYSTEMS 3N.1 3

MOVABLE CO OL ASSEMBLIES.

GROUP HEIGHT LIMITING CONDITION FOR OPERATIO

~~pl dt pnd'~~d*J i4 ~fcA M I'o'4"~s w4'

~~ o le>4 3.1.3.1 All full length (shutdown and control) rods shall be OPERABLE and demand positiony a5 +sto~~.

'inc'~~ +8~A +~+

'PPLICABILITY:

MODES 1+ and 2*

ACTION'L

~

With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN require-ment of Specification 3.1.1.1 is satisfied within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

c ~

With more than one full length rod inoperable or misaligned from the

(

be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

cJ(o~ ~ ~isa.lip~~

~

With one full length rod inoperable due to causes other than addressed by ACTION a,

above, or. misaligned from its group step counter demand position by more than POWER OPERATION may continue provided that within one J

hour either:

2.

The affected rod is restore/

to OPERABLE status within the above I

alignment requirements, or fiVEIV~HL Po&ER k~e/

sg Yeku48c(

7S ASS 85'/

Andes fffEambL ~>~EH pw wd - mrs'n/gP ~&r6

/n5 Ws, The affected rod le.declared dnoperahle and the SHUTDO'drHARGIN o> +e/

requirement of Specification 3.1.1.1 is satisfied.

POWER 7're s+,

OPERATION may then continue provided that:

OV a) A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents rhmain valid for the duration of operation under these conditions, and

See Special b) The SHUTDOWN MARGIN requirement of Specification'3.1.1.1 is determined at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, and

~@~ m PACING 9/4- [-lg Test Exceptions

3. 10. 2 and 3. 10. 3 D. C.

COOK '- UNIT 2 3/4 1-18 AMENDMENT NO. JSp 107

,o for THERMAL POWEB. less than or equal to 85X of RATED THERMAL P04~,

the allowed rod misalignment is ~18 steps, and o

for THERMAL POVER greater than 85X of RATED THERMAL POVER, the allowed rod misalignment is J12 steps or as determined from Figure 3.1-4.

Figure 3.1-4 permits ~ an allowed rod misalignment from

~13 steps (for APL equal to 101X) to ~18 steps (for APL greater or equal to 106X) provided the value of R (defined in Figure 3.1-4) is greater than or equal to 1.04.

ATTACHMENT 2 TO AEP:NRC:1182A PROPOSED TECHNICAL SPECIFICAITON PAGES

REACTIVITY CONTROL SYSTEMS j

3 4.1 3 MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION FOR OPERATION 3.1.3.1 All full length (shutdown and control) rods shall be OPERABLE with all individual indicated rod positions within the allowed rod misalignment of their group step counter demand position as follows:

for THERMAL POWER less than or equal to 85X of RATED THERMAL POWER, the allowed rod misalignment is zl8 steps, and for THERMAL POWER greater than 85X of RATED THERMAL POWER, the allowed rod misalignment is ~12 steps or as determined from Figure 3.1-4.

Figure 3.1-4 permits an allowed rod misalignment from F13 steps (for APL equal to 101X) to z18 steps (for APL greater or equal to 106X) provided the value of R (defined in Figure 3.1-4) is greater than or equal to 1.04.

ACTION:

a.

With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

With more than one full length rod inoperable or misaligned from the group step counter demand position by more than the allowed rod misalignment, be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

c.

With one full length rod inoperable due to causes other than addressed by ACTION a,

above, or misaligned from its group step counter demand position by more than the allowed rod misalignment, POWER OPERATION may continue provided that within one hour either:

1.

The affected rod is restored to OPERABLE status within the above alignment requirements, or THERMAL POWER level is reduced to less than or equal to 85X of RATED THERMAL POWER for rod misalignments less than or equal to z18 steps, or 2.

The affected rod is declared inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied.

POWER OPERATION may then continue provided that:

a)

A reevaluation of each accident analysis of Table 3.1-1 is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions, and

  • See Special Test Exceptions 3.10.2 and 3.10.4 COOK NUCLEAR PLANT - UNIT 1 3/4 1-18 AMENDMENT NO. k5, Q8, IRAN

REACTIVITY CONTROL SYSTEMS 3 4.1 3 MOVABLE CONTROL ASSEMBLIES GROUP HEIGHT LIMITING CONDITION FOR OPERATION 3.1.3.1 All full length (shutdown and control) rods shall be OPERABLE with all individual indicated rod positions within the allowed rod misalignment of their group step counter demand position as follows:

for THERMAL POWER less than or equal to 85X of RATED THERMAL POWER, the allowed rod misalignment is z18 steps, and for THERMAL POWER greater than 85X of RATED THERMAL POWER, the allowed rod misalignment is ~12 steps or as determined from Figure 3.1-4.

Figure 3.1-4 permits an allowed rod misalignment from zl3 steps (for APL equal to 101X) to ~18 steps (for APL greater or equal to 106%) provided the value of R (defined in Figure 3.1-4) is greater than or equal to 1.04.

APPLICABILITY:

MODES 1* and 2*

ACTION:

a.

With one or more full length rods inoperable due to being immovable as a result of excessive friction or mechanical interference or known to be untrippable, determine that the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

With more than one full length rod inoperable or misaligned from the group step counter demand position by more than the allowed rod misalignment, be in HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

c.

With one full length rod inoperable due to causes other than addressed by ACTION a,

above, or misaligned from its group step counter demand position by more than the allowed rod misalignment, POWER OPERATION may continue provided that within one hour either:

1.

The affected rod is restored to OPERABLE status within the above alignment requirements, or THERMAL POWER level is reduced to less than or equal to 85X of RATED THERMAL POWER for rod misalignments less than or equal to z18 steps, or 2.

The affected rod is declared inoperable and the SHUTDOWN MARGIN requirement of Specification 3.1.1.1 is satisfied.

POWER OPERATION may then continue provided that:

a)

A reevaluation of each accident analysis of Table 3 '-1 is performed within 5 days; this reevaluation shall confirm that the previously analyzed results of these accidents remain valid for the duration of operation under these conditions, and

  • See Special Test Exceptions 3.10.2 and 3.10.3 COOK NUCLEAR PLANT - UNIT 2 3/4 1-18 AMENDMENT NO. 40,