{{#Wiki_filter:Changes to Section 1.8 of the SHNPP PSAR 83051702285 830509 OCZ 05000~00 '
{{#Wiki_filter:Changes to Section 1.8 of the SHNPP PSAR 83051702 OCZ 05000~00 '
PDR Ql
285 830509 PDR Ql


              ~
~ ~
            ~
\\
          \
t
t   l
(
(
f I,
l f
J
I,J
: 1) The second sentence   on page 1.8-1 of the PSAR should be revised to read, "This plan will not be affected by the decision to delay inservice operation of the Harris Units until 1986 and 1990."
 
: 2) At the end of Item 2 on page 1.8-1i of the PSAR add the following, "This procedure has been replaced by CPAL's Corporate Quality Assurance Department procedure CQAD-80-1 titled 'Procedure for Corporate QA Audits'", which   became effective January   19, 1982.
1)
: 3) Paragraph 3a and 3b on pages 1.8-1), 1.8-1k, and 1.8-11 should be replaced with the following:
The second sentence on page 1.8-1 of the PSAR should be revised to read, "This plan will not be affected by the decision to delay inservice operation of the Harris Units until 1986 and 1990."
2)
At the end of Item 2 on page 1.8-1i of the PSAR add the following, "This procedure has been replaced by CPAL's Corporate Quality Assurance Department procedure CQAD-80-1 titled 'Procedure for Corporate QA Audits'", which became effective January 19, 1982.
3)
Paragraph 3a and 3b on pages 1.8-1),
1.8-1k, and 1.8-11 should be replaced with the following:
Qualit Assurance Services Section Procedures - Listed below are the subject procedures.
Qualit Assurance Services Section Procedures - Listed below are the subject procedures.
t
t a.
: a. Engineering QA and Vendor   Surveillance Units Procedures:
Engineering QA and Vendor Surveillance Units Procedures:
AQAS-1     Quality Assurance   Document Control                 29,44,49 AQAS-2    Initiation,   Revision, and Withdrawal of               QS1-38 Procedures AQAS-3   Contractor and Vendor Evaluations AQAS-4    Quality Assurance Records AQAS-5   Handling Reportable Items Under 10CFR50.55(e)
AQAS-1 AQAS-2 Quality Assurance Document Control Initiation, Revision, and Withdrawal of Procedures 29,44,49 QS1-38 AQAS-3 AQAS-4 Contractor and Vendor Evaluations Quality Assurance Records AQAS-5 Handling Reportable Items Under 10CFR50.55(e)
AQAS-9   Training and Qualification of Engineering       QA and Vendor Surveillance Personnel EQA-1     Review of Documents for Quality Assurance Requirements VQA<<2    Vendor Shop Surveillance VQA-5    Preparation and Maintenance of Approved Suppliers       List Listed below is   a cross   reference of the   10CFR50 Appendix B Criteria to the procedures covering the criteria.
AQAS-9 Training and Qualification of Engineering QA and Vendor Surveillance Personnel EQA-1 VQA<<2 VQA-5 Review of Documents for Quality Assurance Requirements Vendor Shop Surveillance Preparation and Maintenance of Approved Suppliers List Listed below is a cross reference of the 10CFR50 Appendix B Criteria to the procedures covering the criteria.
QA Section Procedures NRC  Criteria                          Coveri   Qualit Assurance Criteria Criterion   II                           AQAS-1, AQAS-2, AQAS-3, AQAS-4, AQAS-5, AQAS-9, EQA-1, VQA-2, VQA-5 Criterion   III                         EQA-1 Criterion IV                              EQA-1, VQA-5, AQAS-3 Criterion VI                              AQAS-1, AQAS-2
NRC Criteria QA Section Procedures Coveri Qualit Assurance Criteria Criterion II AQAS-1, AQAS-2, AQAS-3, AQAS-4, AQAS-5, AQAS-9, EQA-1, VQA-2, VQA-5 Criterion III Criterion IV Criterion VI EQA-1 EQA-1, VQA-5, AQAS-3 AQAS-1, AQAS-2


              ~ t r
~t r
PI 0   e
PI 0
          \
e
\\
f H
f H


0 Criterion VII                             VQA-2, VQA-5, AQAS-3 Criterion XVII                            AQAS-4
0 Criterion VII Criterion XVII VQA-2, VQA-5, AQAS-3 AQAS-4 b.
: b. Site Qualit Assurance/Qualit Control Unit Procedures - The following is a list of procedures included in the Site QA/QC Procedures.
Site Qualit Assurance/Qualit Control Unit Procedures - The following is a list of procedures included in the Site QA/QC Procedures.
CQA         General Section CQA        Appendix A Quality Assurance Forms CQA-1      Personnel Training and Qualification CQA-4      QA Records CQA-24      Procument Control CQA-27      System/Structure Turnover CQA-28      QA Surveillance CQC-1      Tool and Measuring Device Control CQC-2      Nonconformance Control CQC-6      Receiving Inspection CQC-7      Marking and Tagging CQC-10      Cleanliness Control of Fluid Systems and Components CQC-13      Concrete Control CQC-15      Cadweld Control CQC-19      Weld Control CQC-20      Post Weld Heat Treatment Nondestructive Examination Procedures contained in the following sections of the Corporate Nondestructive Examination Manual:
CQA CQA CQA-1 CQA-4 CQA-24 CQA-27 CQA-28 CQC-1 CQC-2 CQC-6 CQC-7 CQC-10 CQC-13 CQC-15 CQC-19 CQC-20 General Section Appendix A Quality Assurance Forms Personnel Training and Qualification QA Records Procument Control System/Structure Turnover QA Surveillance Tool and Measuring Device Control Nonconformance Control Receiving Inspection Marking and Tagging Cleanliness Control of Fluid Systems and Components Concrete Control Cadweld Control Weld Control Post Weld Heat Treatment Nondestructive Examination Procedures contained in the following sections of the Corporate Nondestructive Examination Manual:
Section   1   -  General Section   II     Training, Qualification   and Certification of NDE Personnel Section IV       Examination Procedures,   100 Series (Radiographic Method) 200 Series (Penetrant Method) 300 Series (Magnetic Particle Method) 400 Series (Ultrasonic Method) 600 Series (Visual Method)
Section 1
The following is   a cross reference of the 10CFR50 Appendix B Criteria to the procedure covering     the Criteria.
General Section II Training, Qualification and Certification of NDE Personnel Section IV Examination Procedures, 100 Series (Radiographic Method) 200 Series (Penetrant Method) 300 Series (Magnetic Particle Method) 400 Series (Ultrasonic Method) 600 Series (Visual Method)
Site QA/QC Procedure NRC  Criteria                          Coverin   Qualit Assurance Criteria Criterion   I                             CQA General Section Criterion  II                            CQA General Section, CQA-1 Criterion IV                              CQA-24 Criterion VI                              CQA-28
The following is a cross reference of the 10CFR50 Appendix B Criteria to the procedure covering the Criteria.
NRC Criteria Site QA/QC Procedure Coverin Qualit Assurance Criteria Criterion I Criterion II Criterion IV Criterion VI CQA General Section CQA General Section, CQA-1 CQA-24 CQA-28


be 0
be 0
Sb       II I I
Sb II I I
                                          ~ I' l
~ I' l
0 r               0 I                     , 0
0 r
  )f Ii                           I "II0~
0 I )f Ii
* I' I'I bh'0   I ~   I ~ r     I   b
, 0 I
"II0~
I' I'I bh'0 I
~
I
~ r I
b


Criterion VII                           CQC-6 Criterion VIII                          CQC-7 Criterion IX                            CQC-19, 20, NDE Procedure   Manual Criterion  X                          CQA 28~ CQC 1 ~ 6~ 7~ 10~ 13~
Criterion VII Criterion VIII Criterion IX Criterion X CQC-6 CQC-7 CQC-19, 20, NDE Procedure Manual CQA 28~
20,      Procedure Manual 15'9, NDE Criter ion XI                           CQA 28, CQC 13, 15, 19, 20,   NDE Procedure Manual Criterion XII                           CQA-28, CQC-1 Criterion XIII                          CQA-28, CQC-10 Criterion  XIV                        CQC-9, CQC-19 Criterion  XV                          CQC-2 Criterion  XVI                        CQC-2 Criterion XVII                          CQA-4
CQC 1 ~
: 4) Last paragraph, seventh and eighth lines from the bottom of page 1.8-1m of the PSAR should read ". . . the CP&L Manager Engineering Harris Plant Section and the Director-Quality Assurance/Quality Control Harris Plant.
6~
: 5) In the first and second paragraphs on page 1.8-1n of the PSAR the     title of the CP&L Manager - Engineering & Construction Quality Assurance has been changed to the CP&L Manager Quality Assurance/Quality Control-Harris Plant. The responsibilities outlined in the third paragraph on pages 1.8-1n to the Manager - Engineering & Construction Quality Assurance have been transferred to the CP&L Manager - QA Services Section. Also, reference to "Power Plant Engineering" in the second paragraph should be changed to "Harris Plant Engineering."
7~
: 6) Paragraphs   a, b, and c on page 1.8-2 of the PSAR should be replaced 'with the following:
10~
a)   Quality Assurance and Inspection The component manufacturers   and/or CP&L, as applicable is responsible for providing appropriate quality control procedures, systems, and inspection personnel for assuring and demonstrating that the end product has the specified degree of quality as defined in the appropriate specifications, drawings and/or purchase documents. The actual quality control effort will be executed by the equipment manufacturer. Quality Assurance/Quality Control activities are the responsibility of the CP&L Harris Plant Quality Assurance/Quality Control Section 'of the Corporate Quality Assurance Department. The inspection of construction activities is shared
13~
15'9, 20, NDE Procedure Manual Criter ion XI CQA 28, CQC 13, 15, 19, 20, NDE Procedure Manual Criterion XII Criterion XIII Criterion XIV Criterion XV Criterion XVI Criterion XVII CQA-28, CQC-1 CQA-28, CQC-10 CQC-9, CQC-19 CQC-2 CQC-2 CQA-4 4)
Last paragraph, seventh and eighth lines from the bottom of page 1.8-1m of the PSAR should read ".
. the CP&L Manager Engineering Harris Plant Section and the Director-Quality Assurance/Quality Control Harris Plant.
5)
In the first and second paragraphs on page 1.8-1n of the PSAR the title of the CP&L Manager - Engineering
& Construction Quality Assurance has been changed to the CP&L Manager Quality Assurance/Quality Control-Harris Plant.
The responsibilities outlined in the third paragraph on pages 1.8-1n to the Manager - Engineering
& Construction Quality Assurance have been transferred to the CP&L Manager - QA Services Section.
Also, reference to "Power Plant Engineering" in the second paragraph should be changed to "Harris Plant Engineering."
6)
Paragraphs a,
b, and c on page 1.8-2 of the PSAR should be replaced 'with the following:
a)
Quality Assurance and Inspection The component manufacturers and/or CP&L, as applicable is responsible for providing appropriate quality control procedures,
: systems, and inspection personnel for assuring and demonstrating that the end product has the specified degree of quality as defined in the appropriate specifications, drawings and/or purchase documents.
The actual quality control effort will be executed by the equipment manufacturer.
Quality Assurance/Quality Control activities are the responsibility of the CP&L Harris Plant Quality Assurance/Quality Control Section 'of the Corporate Quality Assurance Department.
The inspection of construction activities is shared


H H
H P
Al P
A Al H m
A               m A F',
A F',
c
c
                        'A 'I F   ~
'A
l' H                                ~
'I F
s q rc
~
                                              ~ '
H l'
cq H .
~
s q
rc
~
cq H.


between the Harris Plant Quality Assurance/Quality Control Section and the Harris Site Management Section.       Carolina Power 5 Light Company's   Corporate Quality Assurance   Program reflects this sharing of responsibilities. The Harris project procedures delineate the activities and responsibilities for each section. At the present time, the following summarizes the QC inspection activities performed by the Harris Site Management Section.
between the Harris Plant Quality Assurance/Quality Control Section and the Harris Site Management Section.
: a. Soils   all
Carolina Power 5 Light Company's Corporate Quality Assurance Program reflects this sharing of responsibilities.
: b. Concrete - all,   except production testing
The Harris project procedures delineate the activities and responsibilities for each section.
: c. Reinforcing Steel and   Embedded Items   Installation - all, except cadweld inspection
At the present time, the following summarizes the QC inspection activities performed by the Harris Site Management Section.
: d. Structural Steel   all, except welding and   NDE
a.
: e. Structural Steel   - all, except welding and   NDE
Soils all b.
: f. Electrical Items Installation     all
Concrete - all, except production testing c.
: g. Instrumentation Installation - all
Reinforcing Steel and Embedded Items Installation - all, except cadweld inspection d.
: h. Protective Coatings all Lifting Equipment - all, except NDE All other   QC inspections of construction activities are the responsibility of the Harris Plant QA/QC section.
Structural Steel all, except welding and NDE e.
The Harris Plant   QA/QC Section will be responsible for inspection of assembly/disassembly     of ASME Section III Class 1, 2, and 3 pressure boundary items.
Structural Steel - all, except welding and NDE f.
b)   Quality Assurance Surveillance The CPEL   Quality Assurance Services Section and Ebasco Material Engineering and Quality Assurance Department personnel will have surveillance responsibility on the quality control systems, procedures, and efforts of component manufacturers and service contractors, in accordance with their respective endeavors.
Electrical Items Installation all g.
Instrumentation Installation - all h.
Protective Coatings all Lifting Equipment - all, except NDE All other QC inspections of construction activities are the responsibility of the Harris Plant QA/QC section.
The Harris Plant QA/QC Section will be responsible for inspection of assembly/disassembly of ASME Section III Class 1, 2, and 3 pressure boundary items.
b)
Quality Assurance Surveillance The CPEL Quality Assurance Services Section and Ebasco Material Engineering and Quality Assurance Department personnel will have surveillance responsibility on the quality control systems, procedures, and efforts of component manufacturers and service contractors, in accordance with their respective endeavors.
Surveillance of construction contractors will be the responsibility of the CPAL Harris Plant Quality Assurance/Quality Control Section.
Surveillance of construction contractors will be the responsibility of the CPAL Harris Plant Quality Assurance/Quality Control Section.
Two major functions are accomplished by these personnel. The first is during the design phase where the various specifications and procurement documents are reviewed for proper inclusion of applicable code and quality control requirements. The second function occurs during the actual fabrication and construction operations. During this phase the component manufacturer's and construction quality control procedures and programs are reviewed as meeting the requirement of the specification and/or procurement
Two major functions are accomplished by these personnel.
    . documents, and a physical surveillance action is performed to ensure that the quality requirements are in fact being met.
The first is during the design phase where the various specifications and procurement documents are reviewed for proper inclusion of applicable code and quality control requirements.
The second function occurs during the actual fabrication and construction operations.
During this phase the component manufacturer's and construction quality control procedures and programs are reviewed as meeting the requirement of the specification and/or procurement
. documents, and a physical surveillance action is performed to ensure that the quality requirements are in fact being met.


I>>
I>>
Il h
Ilh
                                                                                <<C I C C
<<C C
                                                                                                  <<f I hl JV                                  I' a    hI I, ~
I C
                  ~ '>>f=   I'                                                 ~
<<f JV a
f   v       =
h I I hl I'
I                         ~ IC hr
I, ~
                                    , rc                   C<<
~
f>>                   F I   F D C I
'>>f=
C   'l
I'
                                                                      ~ I<<
~
I     '
f v
f<<V                                 Af f<<         I
=
(<<      r r  I V C<<    I        ~    I V)f
I
~ IC hr
, rc C<< f>>
F I
F D C I
C 'l
~ I<<
I f<<V Af f<<


The Harris Plant QA/QC Section is responsible for performing surveillance only in those areas where the section has no responsibility for the QC inspections. The QC inspections performed by the Harris Site Management Section are subject to surveillance by the Harris Plant QA/QC Section. This eliminates the dual QA/QC functions for a given activity being performed by any one QA supervisor.
I
(<<
r r I V
C<<
I
~
I V)f
 
The Harris Plant QA/QC Section is responsible for performing surveillance only in those areas where the section has no responsibility for the QC inspections.
The QC inspections performed by the Harris Site Management Section are subject to surveillance by the Harris Plant QA/QC Section.
This eliminates the dual QA/QC functions for a given activity being performed by any one QA supervisor.
Quality Assurance Audit J
Quality Assurance Audit J
To ensure that the CP&L Quality Assurance Program is functioning as planned, periodic audits are performed by the CP&L Quality Assurance Services Section, Performance Evaluation Unit and/or its authorized consultants. The quality assurance activities of manufacturers and contractors are audited to ascertain       if they are actually functioning as required.
To ensure that the CP&L Quality Assurance Program is functioning as planned, periodic audits are performed by the CP&L Quality Assurance Services Section, Performance Evaluation Unit and/or its authorized consultants.
It should be noted that the changes reflected in the above paragraphs a) and b) regarding the division of responsibility between the   site QA/QC organization and the Harris Site Management was previously accepted by the NRC by letter to CP&L dated February 25, 1981.
The quality assurance activities of manufacturers and contractors are audited to ascertain if they are actually functioning as required.
References   on page 1.8-3 and 1.8-4 of the PSAR for CP&L's Power Plant Engineering, Technical Services and Power Plant Construction Departments should be revised to reflect CP&L's Nuclear Plant Engineering, Corporate +ality Assurance and Nuclear Plant Construction Departments respectively. Also, the first sentence of paragraph 1.8.3.1.3 should be revised to read as follows, "The Manager Corporate Quality Assurance has overall responsibility for quality Assurance activities during the engineering, design, procurement, construction, and testing phases as delegated through the Manager QA Services Section and the Manager QA/QC Harris Plant. Also, reference to the Engineering & Construction Quality Assurance Section on pages 1.8-3, 1.8-4, and 1.8-4a should read QA Services Section and the Harris Plant QA/QC Section.
It should be noted that the changes reflected in the above paragraphs a) and b) regarding the division of responsibility between the site QA/QC organization and the Harris Site Management was previously accepted by the NRC by letter to CP&L dated February 25, 1981.
The paragraph   just above section   1.8.3.1.4 on page 1.8-4 of the PSAR should be revised as follows:
References on page 1.8-3 and 1.8-4 of the PSAR for CP&L's Power Plant Engineering, Technical Services and Power Plant Construction Departments should be revised to reflect CP&L's Nuclear Plant Engineering, Corporate +ality Assurance and Nuclear Plant Construction Departments respectively.
"The CP&L Site Quality Assurance/Quality Control personnel report directly to the   Manager   +ality   Assurance/Quality Control Harris Plant. The Manager     QA/QC   Harris Plant is responsible for direction of Construction Quality Assurance/+ality Control through the CP&L Director Harris QA/QC Unit. The Director Harris QA/QC will work closely with Ebasco regarding Ebasco purchased equipment. The Principal NDE Specialist at the Harris Site is responsible for providing the necessary NDE support and reports directly to the Manager QA/QC Harris Plant."
Also, the first sentence of paragraph 1.8.3.1.3 should be revised to read as follows, "The Manager Corporate Quality Assurance has overall responsibility for quality Assurance activities during the engineering,
Reference   to the System Planning and (bordination Department at the start of section 1.8.3.1.4     on page 1.8-4 of the PSAR should be deleted and the   first four lines   at the start of section 1.8.3.1.4 should read as follows:     "The Principal QA Specialist of the
: design, procurement, construction, and testing phases as delegated through the Manager QA Services Section and the Manager QA/QC Harris Plant.
Also, reference to the Engineering
& Construction Quality Assurance Section on pages 1.8-3, 1.8-4, and 1.8-4a should read QA Services Section and the Harris Plant QA/QC Section.
The paragraph just above section 1.8.3.1.4 on page 1.8-4 of the PSAR should be revised as follows:
"The CP&L Site Quality Assurance/Quality Control personnel report directly to the Manager
+ality Assurance/Quality Control Harris Plant.
The Manager QA/QC Harris Plant is responsible for direction of Construction Quality Assurance/+ality Control through the CP&L Director Harris QA/QC Unit.
The Director Harris QA/QC will work closely with Ebasco regarding Ebasco purchased equipment.
The Principal NDE Specialist at the Harris Site is responsible for providing the necessary NDE support and reports directly to the Manager QA/QC Harris Plant."
Reference to the System Planning and (bordination Department at the start of section 1.8.3.1.4 on page 1.8-4 of the PSAR should be deleted and the first four lines at the start of section 1.8.3.1.4 should read as follows:
"The Principal QA Specialist of the


Performance Evaluation Unit which is part of the QA Services Section of the Corporate Quality Assurance Department is responsible for conducting quality assurance audits and is responsible for ( 1) establishing   .
Performance Evaluation Unit which is part of the QA Services Section of the Corporate Quality Assurance Department is responsible for conducting quality assurance audits and is responsible for ( 1) establishing 10)
: 10) Reference in the first paragraph of page 1.8-4a of the PSAR to the Company Chairman/Chief Executive Officer, Executive Vice-President and Chief Operating Officer should be changed to read "Company Chairman/President and Executive Vice President, Power Supply and Engineering and Construction." Also the last sentence in this paragraph should be revised to read "As shown by figure 1.8-1, the Performance Evaluation Unit of the QA Services Section is independent from the Departments responsible for the Engineering &
Reference in the first paragraph of page 1.8-4a of the PSAR to the Company Chairman/Chief Executive Officer, Executive Vice-President and Chief Operating Officer should be changed to read "Company Chairman/President and Executive Vice President, Power Supply and Engineering and Construction."
Construction of the plant.
Also the last sentence in this paragraph should be revised to read "As shown by figure 1.8-1, the Performance Evaluation Unit of the QA Services Section is independent from the Departments responsible for the Engineering Construction of the plant.
: 11) Reference in paragraph 1.8.3.2.5 on page 1.8-8 to the Ebasco Site Quality Assurance Coordinator should be deleted. These activities will be performed by off-site Ebasco QA personnel and on-site CP&L QA personnel.
11)
: 12) Reference in the third paragraph on page 1.8-15a to the CP&L Site Manager should be changed to the CP&L Project General Manager-Harris Plant.
Reference in paragraph 1.8.3.2.5 on page 1.8-8 to the Ebasco Site Quality Assurance Coordinator should be deleted.
: 13) Page 1.8-20   of the PSAR should be revised as follows:
These activities will be performed by off-site Ebasco QA personnel and on-site CP&L QA personnel.
    "1.8.3.4.1   Harris Plant Quality Assurance/Quality Control Section The Manager   - Quality Assurance/Quality Control - Harris Plant is responsible for:
12)
: 1)   Surveillance   and direction of construction site QA program
Reference in the third paragraph on page 1.8-15a to the CP&L Site Manager should be changed to the CP&L Project General Manager-Harris Plant.
: 2)   Surveillance of site construction activities
13)
: 3)   Preparation and implementation of Quality Assurance/Quality Control procedures for Site     QA/QC Assuring all persons concerned that the site QA program is being performed as per the Corporate Quality Assurance Program and   Quality Assurance Procedures
Page 1.8-20 of the PSAR should be revised as follows:
: 5)   Providing inspectors and quality assurance services requir ed by the site quality assurance program. As discussed in paragraph 1.8.2(a), the Harris Site Management Section is also responsible for providing construction inspection.
"1.8.3.4.1 Harris Plant Quality Assurance/Quality Control Section The Manager - Quality Assurance/Quality Control - Harris Plant is responsible for:
The Manager Quality Assurance/Quality Control Harris     Plant will be responsible for staffing and directing the quality
1)
    .assurance/quality   control functions at the site. He will be directly accountable to the CP&L Manager of the Corporate Quality Assurance Department in the implementation of this Quality Assurance Program.
Surveillance and direction of construction site QA program 2)
Surveillance of site construction activities 3)
Preparation and implementation of Quality Assurance/Quality Control procedures for Site QA/QC Assuring all persons concerned that the site QA program is being performed as per the Corporate Quality Assurance Program and Quality Assurance Procedures 5)
Providing inspectors and quality assurance services requir ed by the site quality assurance program.
As discussed in paragraph 1.8.2(a),
the Harris Site Management Section is also responsible for providing construction inspection.
The Manager Quality Assurance/Quality Control Harris Plant will be responsible for staffing and directing the quality
.assurance/quality control functions at the site.
He will be directly accountable to the CP&L Manager of the Corporate Quality Assurance Department in the implementation of this Quality Assurance Program.


m mt ~
m mt ~
e, le ~I ~
e, le
I 'll I,'
~I ~
Ih
IhI
~ 0 t F I         e n
'll I,'
~
0 t
F I
e n
e
e
        +r     m m'hthl m m
+r m
              'mes h
m'hthl m
r m                   I'
m h r m
            ~
I'
m Q
~
'mes m
Q


                  ~   'he Harris Quality Assurance/Quality Control Unit reports to the Manager - Quality Assurance/Quality Control - Harris Plant. They will work closely with the Ebasco regarding Ebasco supplied equipment. The CP&L Director Harris QA/QC Unit has authority to stop any phase of construction work where he finds quality or procedures are questionable.     Deficiencies noted by the site Quality Assurance/Quality Control personnel are reported to the Manager-Quality Assurance/Quality Control - Harris Plant.
~
1.8.3.0.2           Field The Harris Quality Assurance/Quality Control Unit is supervised by the Director   - Harris QA/QC Unit, who reports directly to the Manager Quality Assurance/Quality Control - Harris Plant.
'he Harris Quality Assurance/Quality Control Unit reports to the Manager - Quality Assurance/Quality Control - Harris Plant.
Administ'ratively, he will report to the Project General Manager-Harris Plant at the site for scheduling, coordination and administrative services. Carolina Power & Light Company's Harris Plant Quality Assurance/Quality Control Section is responsible for surveillance of the construction quality assurance program.
They will work closely with the Ebasco regarding Ebasco supplied equipment.
The CP&L Director Harris QA/QC Unit has authority to stop any phase of construction work where he finds quality or procedures are questionable.
Deficiencies noted by the site Quality Assurance/Quality Control personnel are reported to the Manager-Quality Assurance/Quality Control - Harris Plant.
1.8.3.0.2 Field The Harris Quality Assurance/Quality Control Unit is supervised by the Director - Harris QA/QC Unit, who reports directly to the Manager Quality Assurance/Quality Control - Harris Plant.
Administ'ratively, he will report to the Project General Manager-Harris Plant at the site for scheduling, coordination and administrative services.
Carolina Power
& Light Company's Harris Plant Quality Assurance/Quality Control Section is responsible for surveillance of the construction quality assurance program.
Quality Assurance/Quality Control Inspectors shall be assigned to various phases of the project as directed by the Director - Harris QA/QC Unit.
Quality Assurance/Quality Control Inspectors shall be assigned to various phases of the project as directed by the Director - Harris QA/QC Unit.
Quality Assurance/Quality Control personnel will be qualified in accordance with the Harris Plant Quality Assurance/Quality Control procedure requirements.
Quality Assurance/Quality Control personnel will be qualified in accordance with the Harris Plant Quality Assurance/Quality Control procedure requirements.
The Director - Harris     QA/QC Unit shall:
The Director - Harris QA/QC Unit shall:
a)   Work cooperatively with and set up definite lines of communication with the Westinghouse NSSS Site Representative and Ebasco for routine flow of information and for special problems."
a)
: 14) Reference   in paragraph f on page 1.8-21 to Engineering and Construction Quality Assurance Procedures should be changed to Harris Plant QA/QC Section procedures.
Work cooperatively with and set up definite lines of communication with the Westinghouse NSSS Site Representative and Ebasco for routine flow of information and for special problems."
: 15) Paragraph g on page 1.8-21 should be revised to read "Any differences of opinion between the Director Harris QA/QC Unit and the Project General Manager - Harris Plant shall be referred to the Vice President of Nuclear Plant Construction and the Manager Harris Plant   QA/QC   Section."
14)
: 16) All reference to CP&L's Manager - Engineering & Construction Quality Assurance on page 1.8-23a should be changed to indicate CP&L's, Manager - QA Services Section and CP&L's Manager Harris Plant QA/QC Section. Reference to CP&L Manager - Project Engineering in the second paragraph should be changed to CP&L's Manager-Engineering, Harris Plant. The first line in the third paragraph on this page should read "The Harris Plant Quality Assurance/Quality Control Section and the Harris Site Management will be responsible for . . ." The fifth paragraph on this page should read
Reference in paragraph f on page 1.8-21 to Engineering and Construction Quality Assurance Procedures should be changed to Harris Plant QA/QC Section procedures.
15)
Paragraph g on page 1.8-21 should be revised to read "Any differences of opinion between the Director Harris QA/QC Unit and the Project General Manager - Harris Plant shall be referred to the Vice President of Nuclear Plant Construction and the Manager Harris Plant QA/QC Section."
16)
All reference to CP&L's Manager - Engineering
& Construction Quality Assurance on page 1.8-23a should be changed to indicate CP&L's, Manager -
QA Services Section and CP&L's Manager Harris Plant QA/QC Section.
Reference to CP&L Manager - Project Engineering in the second paragraph should be changed to CP&L's Manager-Engineering, Harris Plant.
The first line in the third paragraph on this page should read "The Harris Plant Quality Assurance/Quality Control Section and the Harris Site Management will be responsible for.
The fifth paragraph on this page should read


n%
,, n%
                                                                    ,h 4 r                                                           hf                                    ~ ~
,h 4 r V
V I V  I 4
I 4
r "f v 4
hf r "f v
V'I   I I' P h
~ ~
f 4 I
V I
                                                                                        'l
4 V'I I
                                                                                                                          \
I' P
I           4 Ifl,,
f h
4 h                                          l*     ~
4 I
4
'l
(               I" I                       h P i               ., ~
\\
I        ~P P ~              I 4 fl''                                        I Vhl       I   4     4'll l                 V, I" I         thl =
I 4
                                                                              ~4 P
4 h
                                                            ~ 44
Ifl,, l*
                                                                                                ~       4 II h "Ib   4   ~
~
) 4   4   h h,
4 I
4   4
~P P
~
(
I" I I
4 fl''
h P
i
., ~
I Vhl I 4 4'll l
V, I" I
thl =
~ 4 P
~44
~
4 II h "Ib 4
~
)
4 4
h h,
4 4


    "Ebasco/CPEL quality assurance representatives spot check quality assurance records of selected Westinghouse safety related components." The first line in the eighth paragraph on this page should read "CPAL also reviews the applicable portion of Ebasco's quality .
"Ebasco/CPEL quality assurance representatives spot check quality assurance records of selected Westinghouse safety related components."
: 17) Reference to CPAL's Engineering and Construction Quality Assurance Section in the sixth paragraph on page 1.8-23a should be changed to CPAL QA Services Section.
The first line in the eighth paragraph on this page should read "CPAL also reviews the applicable portion of Ebasco's quality.
: 18) The first line in the third prargraph on page 1.8-23d should be revised to read Mhe Harris Plant Quality Assurance/Quality Control Section and Harris Site Management will prepare .
17)
: 19) All references to CPAL's Engineering 5 Construction Quality Assurance Section on pages 1.8-23h and 1.8-23i should be changed     to CP&L's Harris Plant Quality Assurance/Quality Control Section.
Reference to CPAL's Engineering and Construction Quality Assurance Section in the sixth paragraph on page 1.8-23a should be changed to CPAL QA Services Section.
: 20) The existing figures 1.8-1 and 1.8-2 should be replaced with the   new attached figures. Also figure 1.8-4 should   be deleted.
18) 19)
: 21) The existing Table 1.8-4 should be replaced with the new attached table.
The first line in the third prargraph on page 1.8-23d should be revised to read Mhe Harris Plant Quality Assurance/Quality Control Section and Harris Site Management will prepare All references to CPAL's Engineering 5 Construction Quality Assurance Section on pages 1.8-23h and 1.8-23i should be changed to CP&L's Harris Plant Quality Assurance/Quality Control Section.
20)
The existing figures 1.8-1 and 1.8-2 should be replaced with the new attached figures.
Also figure 1.8-4 should be deleted.
21)
The existing Table 1.8-4 should be replaced with the new attached table.


I I
I It I*
I d It I*
I I d I
I                                    1                           d'I f ft) d- ~
1 d'I f
of                   I                             '/I I d
ft) d-
r dt                           d       I                                         d .
~
I'               it,'I           I'i 1 I                 , tl'
of I
                                                  ~,g,',diA)dd     '        d   ft Ii'          C',                          dd ddd                          1 d'
'/I I
0        ~  I I                   Il, C
d r
dt d
I d.
I' it,'I I'i 1 I
, tl' Ii' C',
ddd 1
dd
~,g,',diA)dd d
ft 0
~ I d'
I Il, C


Table 1.8-4 Carolina Power & Light Company Quality Assurance/Quality Control Personnel Personnel   Assigned*
Table 1.8-4 Carolina Power
Full-Time                                    Functions
& Light Company Quality Assurance/Quality Control Personnel Personnel Full-Time Assigned*
Functions
: 1. Harris Plant
: 1. Harris Plant
  ~l a) Management                                 Formal Education Manages the CP&L and/or Experience Harris Plant Quality Assurance/Quality Control Program b) Engineering Unit
~l a)
: 1) Principal   QA                           Formal Education Supervise QA Engineer                                and/or Experience Engineering Activites
Management Formal Education Manages the CP&L and/or Experience Harris Plant Quality Assurance/Quality Control Program b) Engineering Unit
: 2) Project   QA                             Formal Education Coordinate Project Engineer                                and/or Experience QA Engineering Activities; Review Specifications, Procedures for   QA Requirements c) Harris QA/QC Unit
: 1) Principal QA Engineer Formal Education and/or Experience Supervise QA Engineering Activites
: 1) Director                                 Formal Education  Supervise  QA/QC Harris QA/QC                             and/or Experience Activities
: 2) Project QA Engineer Formal Education and/or Experience Coordinate Project QA Engineering Activities; Review Specifications, Procedures for QA Requirements c) Harris QA/QC Unit
: 2) QA/QC                                   Formal Education Supervise Superintendents                        and/or Experience Construction/
: 1) Director Harris QA/QC Formal Education and/or Experience Supervise QA/QC Activities 2)
Operations QA/QC Surveillance/
QA/QC Superintendents Formal Education and/or Experience Supervise Construction/
Inspection Activities
Operations QA/QC Surveillance/
: 3) QA/QC               70                 Formal Education Perform QA/QC Supervisors                            and/or Experience Inspections and Specialists                                              Tests and Assist Inspectors/                                              Other QA Personnel Technicians d) NDE Unit
Inspection Activities 3)
: 1) Principal   QA                         Formal Education Supervise NDE Unit Specialist  NDE                        and/or Experience Activities
QA/QC Supervisors Specialists Inspectors/
Technicians 70 Formal Education and/or Experience Perform QA/QC Inspections and Tests and Assist Other QA Personnel d)
NDE Unit
: 1) Principal QA Specialist NDE Formal Education Supervise NDE Unit and/or Experience Activities


~ ~
~
Personnel As signed*
~
Full-Time Part-Time     ualifications       Functions NDE Unit (Cont'd)
 
: 2) Project QA                         Formal Education   Coordinate/Supervise Specialist  NDE                    and/or Experience NDE Support Activites for   SHNPP and Other CP&L Facilities
Personnel Full-Time As signed*
: 3) QA Specialist                     Formal Education   Supervisor of NDE NDE                                and/or Experience Technicians Performing SHNPP Construction Site NDE Activities O) QA/QC                         17   Formal Education   Perform   NDE Technicians                        and/or Experience Activities
Part-Time ualifications Functions NDE Unit (Cont'd)
: 2. QA Services Section a) Management                             Formal Education   Manages   the CPRL and/or Experience QA Services Section b) Engineering Unit
: 2) Project QA Specialist NDE Formal Education and/or Experience Coordinate/Supervise NDE Support Activites for SHNPP and Other CP&L Facilities 3)
: 1) Principal QA                       Formal Education   Supervise Engineer                            and/or Experi'ence Engineering   QA Activities
QA Specialist NDE Formal Education and/or Experience Supervisor of NDE Technicians Performing SHNPP Construction Site NDE Activities O)
: 2) Project QA                         Formal Education   Coordinate Project Engineer                            and/or Experience Engineering QA Activities
QA/QC Technicians 17 Formal Education Perform NDE and/or Experience Activities 2.
: 3) Engineers                           Formal Education   Perform Engineering and/or Experience Audits and Review Specifications for QA Requirements c) Vendor Surveillance Unit
QA Services Section a)
: 1) Principal VS                       Formal Education   Supervise Vendor Specialist                          and/or Experience Surveillance Activities
Management Formal Education Manages the CPRL and/or Experience QA Services Section b) Engineering Unit
: 2) Project VS                         Formal Education   Participate in   and Specialist                          and/or Experience Review Vendor Surveillance Activities
: 1) Principal QA Engineer Formal Education and/or Experi'ence Supervise Engineering QA Activities
: 2) Project QA Engineer Formal Education Coordinate Project and/or Experience Engineering QA Activities
: 3) Engineers Formal Education Perform Engineering and/or Experience Audits and Review Specifications for QA Requirements c) Vendor Surveillance Unit
: 1) Principal VS Specialist Formal Education and/or Experience Supervise Vendor Surveillance Activities
: 2) Project VS Specialist Formal Education Participate in and and/or Experience Review Vendor Surveillance Activities


Personnel   As signed*
Personnel Full-Time As signed*
Full-Time                                      Functions Vendor Surveillance Unit (Cont'd)
Functions Vendor Surveillance Unit (Cont'd)
: 3) Specialists                           Formal Education   Participate in and and/or Experience Review Vendor Surveillance Activities d) Performance Evaluation Unit
: 3) Specialists Formal Education Participate in and and/or Experience Review Vendor Surveillance Activities d) Performance Evaluation Unit
: 1) Principal QA                         Formal Education   Supervise the CPGL Specialists                          and/or Experience Corporate Audit Program
: 1) Principal QA Specialists Formal Education and/or Experience Supervise the CPGL Corporate Audit Program
: 2) Project QA                             Formal Education Coordinate Audit Specialists                            and/or Experience Activities
: 2) Project QA Specialists Formal Education and/or Experience Coordinate Audit Activities
: 3) Specialists                             Formal Education Perform Audits in and/or Experience Accordance with approved procedures
: 3) Specialists Formal Education Perform Audits in and/or Experience Accordance with approved procedures
* Additional personnel   will be assigned as needed NOTE:   All QA personnel are full-time QA personnel; however, the personnel indicated as part-time work on other power plant projects as well as SHNPP.
* Additional personnel will be assigned as needed NOTE:
All QA personnel are full-time QA personnel;
: however, the personnel indicated as part-time work on other power plant projects as well as SHNPP.
(6 7 24 JDKpgp)
(6 7 24 JDKpgp)


  ~ ~ ~
~
~ ~
M
M


EBASCO                                                                       COL                                                                 DANIEL EXECUTIVE VICE.PRESIDENT                                                     CHAIRMAN/ PRESIDENT OPERATIONS SENIOR VICE PRESIDENT             SENIOR VICE PRESIDENT PROJECTS                         ENGINEERING AND                              AND PROCUREMENT                       CONSTRUCTION                                                                                                    GENERAL MANAGER EXECUTIVE VICE PRESIDENT POWER SUPPLY AND VICE PRESIDENT                   VICE PRESIDENT                     VICE PRESIDENT                       ENG'G AND CONSTRUCTION PROJECTS                          ENGINEERING MATERIALS ENGINEERING 8r QUALITYASSURANCE MANAGER                                                                               MANAGER OF                             CHIEF           SENIOR VICE PRESIDENT                                         SENIOR VICE PRESIDENT PROJECTS                        ENGINEERS                                                      I'ORPORATE POWER SUPPLY            QUAIJTY ASSURANCE               ENG'G AND CONSTRUCTION GROUP                  DEPARTMENT                            GROUP CHIEF QUALITY             CHIEF VENDOR ASSURANCE              QUALITYASSURANCE                         PROJECT                                                                                                                         VICE ENGINEER              REPRESENTATIVE                          MANAGER                                 MANAGER                             VICE PRESIDENT             VICE PRESIDENT       PRESIDENT TECHNICAL SERVICES                        IIUCLEAR PLANT              NUCLEAR PLANT I ENGINEERING            CONSTRUCTION       CONSTRUCTION DEPARTMENT                              ,"    DEPARTMENT          DEPARTMENT WESTINGHOUSE WESTINGHOUSE PROJECT                                 MANAGER                        MANAGER MANAGER                           LICENSING & PERMITS               QA SERVICES SECTION                       SECTION PROJECT MANAGER MANAGER QA /QC HARRIS PLANT DIRECTOR                       MANAGER        PROJECT GENERAL QA / QC UNIT             'NGINEERING                 MANAGER HARRIS PLANT              IHARRIS PLANT             HARRIS PLANT SECTION LEGEND:
EBASCO COL DANIEL EXECUTIVEVICE.PRESIDENT OPERATIONS CHAIRMAN/ PRESIDENT VICE PRESIDENT MATERIALS ENGINEERING 8r QUALITYASSURANCE SENIOR VICE PRESIDENT PROJECTS AND PROCUREMENT VICE PRESIDENT PROJECTS SENIOR VICE PRESIDENT ENGINEERING AND CONSTRUCTION VICE PRESIDENT ENGINEERING EXECUTIVEVICE PRESIDENT POWER SUPPLY AND ENG'G ANDCONSTRUCTION GENERAL MANAGER MANAGER OF PROJECTS CHIEF ENGINEERS SENIOR VICE PRESIDENT POWER SUPPLY GROUP MANAGER I'ORPORATE QUAIJTY ASSURANCE DEPARTMENT SENIOR VICE PRESIDENT ENG'G ANDCONSTRUCTION GROUP CHIEF QUALITY ASSURANCE ENGINEER CHIEF VENDOR QUALITYASSURANCE REPRESENTATIVE PROJECT MANAGER MANAGER TECHNICALSERVICES DEPARTMENT VICE PRESIDENT IIUCLEARPLANT I ENGINEERING
COMPANY ORGANIZATION             I INTERCOMPANY COMMUNICATION                              CAROLINA POWER 8E LIGHT COMPANY SHEARON HARRIS NUCLEAR PLANT INTERCOMPANY BOUNDARIES                                            UNITS1,2,3&4 NOTE: INFORMALCOMMUNICATIONAND COORDINATION CHANNELS ARE NOT SHOWN                                                         QUALITYASSURANCE ORGANIZAT'QhI
," DEPARTMENT VICE PRESIDENT NUCLEAR PLANT CONSTRUCTION DEPARTMENT VICE PRESIDENT CONSTRUCTION WESTINGHOUSE WESTINGHOUSE PROJECT MANAGER MANAGER LICENSING & PERMITS SECTION MANAGER QA SERVICES SECTION MANAGER QA /QC HARRIS PLANT PROJECT MANAGER DIRECTOR QA / QC UNIT HARRIS PLANT MANAGER
                                                                                                                                                                                                    ).8 1
'NGINEERING IHARRIS PLANT SECTION PROJECT GENERAL MANAGER HARRIS PLANT LEGEND:
COMPANY ORGANIZATION I
INTERCOMPANYCOMMUNICATION INTERCOMPANYBOUNDARIES CAROLINA POWER 8E LIGHT COMPANY SHEARON HARRIS NUCLEAR PLANT UNITS1,2,3&4 NOTE: INFORMALCOMMUNICATIONAND COORDINATIONCHANNELS ARE NOT SHOWN QUALITYASSURANCE ORGANIZAT'QhI
).8 1


  ~     ~ ~         W la 8~
~
1~
~
I t ~ y           ~ I   e   la
~
W la 8 ~
1 ~
I t
~ y
~ I e
la


MANAGER Ill O
O Ill ~
        ~                                                                     CORPORATE QUAUTY ASSURANCE DEPT.
C} 0
C} 0I
~ Ixz cy+
  ~
Z Z 'll
cy+xz Z Z 'll
~> O v) (/) 5 "Zm PCp
~>
~rr 0
v)
P Q mx gO z
O 5
PRINCIPALQA ENGR.
MANAGER QA SERVICES MANAGER QA/QC ROBINSON AND
ENGINEERING QA UNIT MANAGER QA SERVICES SECTION PRINCIPAL QA SPECIALIST VENDOR SURVEILLANCE UNIT MANAGER CORPORATE QUAUTY ASSURANCE DEPT.
(/)
MANAGERQA/QC ROBINSON AND BRUNSWICK PLANTS PRINCIPAL QA SPECIALIST PERFORMANCE EVALUATION UNIT PRINCIPAL C}A SPECIALIST TRAINING& ADMINISTRATION UNIT GENERAL OFFICE O0 Om hC vP I I Ol 0 Z~ V) z O
"Zm                             SECTION                                                                              BRUNSWICK PLANTS PCp
PRINCIPALOA ENGR.
~rr0 Q
ENGINEERING OA UNIT PROJECT aa ENGINEERS MANAGER QA/QC HARRIS PLANT DIRECTOR QA/QC HARRIS PLANT QA SUPERINTENDENT QC SUPERINTENDENT SITE PRINCIPAL QA SPECIALIST NDE PROJECT QA SPECIALIST NDE QA SUPERVISORS SPECIALISTS QC SUPERVISORS SPECIALISTS QA SPECIALISTS NDE QA/QC INSPECTORS/TECHNICIANS QA INSPECTORS/
P mx     PRINCIPAL QA ENGR.                 PRINCIPAL QA SPECIALIST ENGINEERING                      VENDOR SURVEILLANCE gO            QA UNIT                               UNIT z
TECHNICIANS (CIVII MECHANICAl ELECTRICAI WELDING.
PRINCIPAL QA SPECIALIST         PRINCIPAL C}A SPECIALIST PERFORMANCE EVALUATION          TRAINING & ADMINISTRATION UNIT                            UNIT GENERAL OFFICE O
RECEIVING & RECORDS)
0 SITE MANAGER QA/QC HARRIS PLANT Om vP hC I  I                                                                        DIRECTOR QA/QC PRINCIPAL OA ENGR.                                HARRIS PLANT Ol  0                        ENGINEERING OA                                                                              PRINCIPAL QA Z                                  UNIT                                                                                SPECIALIST NDE
QC INSPECTORS/
  ~    V)
TECHNICIANS (CIVII MECHANICAI ELECTRICAL, WELDING, RECEIVING & RECORDS)
PROJECT aa                                                                                PROJECT QA z                          ENGINEERS                      QA SUPERINTENDENT        QC SUPERINTENDENT              SPECIALIST NDE O
QA SPECIALISTS NDE QA SUPERVISORS            QC SUPERVISORS SPECIALISTS             SPECIALISTS QA/QC INSPECTORS/TECHNICIANS QA INSPECTORS/           QC INSPECTORS/
TECHNICIANS              TECHNICIANS (CIVII MECHANICAl      (CIVII MECHANICAI ELECTRICAI WELDING. ELECTRICAL, WELDING, RECEIVING & RECORDS)    RECEIVING & RECORDS)


  ~o i
~o i
i}}
i}}

Latest revision as of 05:23, 7 January 2025

Changes to Section 1.8 (QA Program) of PSAR
ML18018A536
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 05/09/1983
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18018A533 List:
References
NUDOCS 8305170285
Download: ML18018A536 (27)


Text

Changes to Section 1.8 of the SHNPP PSAR 83051702 OCZ 05000~00 '

285 830509 PDR Ql

~ ~

\\

t

(

l f

I,J

1)

The second sentence on page 1.8-1 of the PSAR should be revised to read, "This plan will not be affected by the decision to delay inservice operation of the Harris Units until 1986 and 1990."

2)

At the end of Item 2 on page 1.8-1i of the PSAR add the following, "This procedure has been replaced by CPAL's Corporate Quality Assurance Department procedure CQAD-80-1 titled 'Procedure for Corporate QA Audits'", which became effective January 19, 1982.

3)

Paragraph 3a and 3b on pages 1.8-1),

1.8-1k, and 1.8-11 should be replaced with the following:

Qualit Assurance Services Section Procedures - Listed below are the subject procedures.

t a.

Engineering QA and Vendor Surveillance Units Procedures:

AQAS-1 AQAS-2 Quality Assurance Document Control Initiation, Revision, and Withdrawal of Procedures 29,44,49 QS1-38 AQAS-3 AQAS-4 Contractor and Vendor Evaluations Quality Assurance Records AQAS-5 Handling Reportable Items Under 10CFR50.55(e)

AQAS-9 Training and Qualification of Engineering QA and Vendor Surveillance Personnel EQA-1 VQA<<2 VQA-5 Review of Documents for Quality Assurance Requirements Vendor Shop Surveillance Preparation and Maintenance of Approved Suppliers List Listed below is a cross reference of the 10CFR50 Appendix B Criteria to the procedures covering the criteria.

NRC Criteria QA Section Procedures Coveri Qualit Assurance Criteria Criterion II AQAS-1, AQAS-2, AQAS-3, AQAS-4, AQAS-5, AQAS-9, EQA-1, VQA-2, VQA-5 Criterion III Criterion IV Criterion VI EQA-1 EQA-1, VQA-5, AQAS-3 AQAS-1, AQAS-2

~t r

PI 0

e

\\

f H

0 Criterion VII Criterion XVII VQA-2, VQA-5, AQAS-3 AQAS-4 b.

Site Qualit Assurance/Qualit Control Unit Procedures - The following is a list of procedures included in the Site QA/QC Procedures.

CQA CQA CQA-1 CQA-4 CQA-24 CQA-27 CQA-28 CQC-1 CQC-2 CQC-6 CQC-7 CQC-10 CQC-13 CQC-15 CQC-19 CQC-20 General Section Appendix A Quality Assurance Forms Personnel Training and Qualification QA Records Procument Control System/Structure Turnover QA Surveillance Tool and Measuring Device Control Nonconformance Control Receiving Inspection Marking and Tagging Cleanliness Control of Fluid Systems and Components Concrete Control Cadweld Control Weld Control Post Weld Heat Treatment Nondestructive Examination Procedures contained in the following sections of the Corporate Nondestructive Examination Manual:

Section 1

General Section II Training, Qualification and Certification of NDE Personnel Section IV Examination Procedures, 100 Series (Radiographic Method) 200 Series (Penetrant Method) 300 Series (Magnetic Particle Method) 400 Series (Ultrasonic Method) 600 Series (Visual Method)

The following is a cross reference of the 10CFR50 Appendix B Criteria to the procedure covering the Criteria.

NRC Criteria Site QA/QC Procedure Coverin Qualit Assurance Criteria Criterion I Criterion II Criterion IV Criterion VI CQA General Section CQA General Section, CQA-1 CQA-24 CQA-28

be 0

Sb II I I

~ I' l

0 r

0 I )f Ii

, 0 I

"II0~

I' I'I bh'0 I

~

I

~ r I

b

Criterion VII Criterion VIII Criterion IX Criterion X CQC-6 CQC-7 CQC-19, 20, NDE Procedure Manual CQA 28~

CQC 1 ~

6~

7~

10~

13~

15'9, 20, NDE Procedure Manual Criter ion XI CQA 28, CQC 13, 15, 19, 20, NDE Procedure Manual Criterion XII Criterion XIII Criterion XIV Criterion XV Criterion XVI Criterion XVII CQA-28, CQC-1 CQA-28, CQC-10 CQC-9, CQC-19 CQC-2 CQC-2 CQA-4 4)

Last paragraph, seventh and eighth lines from the bottom of page 1.8-1m of the PSAR should read ".

. the CP&L Manager Engineering Harris Plant Section and the Director-Quality Assurance/Quality Control Harris Plant.

5)

In the first and second paragraphs on page 1.8-1n of the PSAR the title of the CP&L Manager - Engineering

& Construction Quality Assurance has been changed to the CP&L Manager Quality Assurance/Quality Control-Harris Plant.

The responsibilities outlined in the third paragraph on pages 1.8-1n to the Manager - Engineering

& Construction Quality Assurance have been transferred to the CP&L Manager - QA Services Section.

Also, reference to "Power Plant Engineering" in the second paragraph should be changed to "Harris Plant Engineering."

6)

Paragraphs a,

b, and c on page 1.8-2 of the PSAR should be replaced 'with the following:

a)

Quality Assurance and Inspection The component manufacturers and/or CP&L, as applicable is responsible for providing appropriate quality control procedures,

systems, and inspection personnel for assuring and demonstrating that the end product has the specified degree of quality as defined in the appropriate specifications, drawings and/or purchase documents.

The actual quality control effort will be executed by the equipment manufacturer.

Quality Assurance/Quality Control activities are the responsibility of the CP&L Harris Plant Quality Assurance/Quality Control Section 'of the Corporate Quality Assurance Department.

The inspection of construction activities is shared

H P

A Al H m

A F',

c

'A

'I F

~

H l'

~

s q

rc

~

cq H.

between the Harris Plant Quality Assurance/Quality Control Section and the Harris Site Management Section.

Carolina Power 5 Light Company's Corporate Quality Assurance Program reflects this sharing of responsibilities.

The Harris project procedures delineate the activities and responsibilities for each section.

At the present time, the following summarizes the QC inspection activities performed by the Harris Site Management Section.

a.

Soils all b.

Concrete - all, except production testing c.

Reinforcing Steel and Embedded Items Installation - all, except cadweld inspection d.

Structural Steel all, except welding and NDE e.

Structural Steel - all, except welding and NDE f.

Electrical Items Installation all g.

Instrumentation Installation - all h.

Protective Coatings all Lifting Equipment - all, except NDE All other QC inspections of construction activities are the responsibility of the Harris Plant QA/QC section.

The Harris Plant QA/QC Section will be responsible for inspection of assembly/disassembly of ASME Section III Class 1, 2, and 3 pressure boundary items.

b)

Quality Assurance Surveillance The CPEL Quality Assurance Services Section and Ebasco Material Engineering and Quality Assurance Department personnel will have surveillance responsibility on the quality control systems, procedures, and efforts of component manufacturers and service contractors, in accordance with their respective endeavors.

Surveillance of construction contractors will be the responsibility of the CPAL Harris Plant Quality Assurance/Quality Control Section.

Two major functions are accomplished by these personnel.

The first is during the design phase where the various specifications and procurement documents are reviewed for proper inclusion of applicable code and quality control requirements.

The second function occurs during the actual fabrication and construction operations.

During this phase the component manufacturer's and construction quality control procedures and programs are reviewed as meeting the requirement of the specification and/or procurement

. documents, and a physical surveillance action is performed to ensure that the quality requirements are in fact being met.

I>>

Ilh

<<C C

I C

<<f JV a

h I I hl I'

I, ~

~

'>>f=

I'

~

f v

=

I

~ IC hr

, rc C<< f>>

F I

F D C I

C 'l

~ I<<

I f<<V Af f<<

I

(<<

r r I V

C<<

I

~

I V)f

The Harris Plant QA/QC Section is responsible for performing surveillance only in those areas where the section has no responsibility for the QC inspections.

The QC inspections performed by the Harris Site Management Section are subject to surveillance by the Harris Plant QA/QC Section.

This eliminates the dual QA/QC functions for a given activity being performed by any one QA supervisor.

Quality Assurance Audit J

To ensure that the CP&L Quality Assurance Program is functioning as planned, periodic audits are performed by the CP&L Quality Assurance Services Section, Performance Evaluation Unit and/or its authorized consultants.

The quality assurance activities of manufacturers and contractors are audited to ascertain if they are actually functioning as required.

It should be noted that the changes reflected in the above paragraphs a) and b) regarding the division of responsibility between the site QA/QC organization and the Harris Site Management was previously accepted by the NRC by letter to CP&L dated February 25, 1981.

References on page 1.8-3 and 1.8-4 of the PSAR for CP&L's Power Plant Engineering, Technical Services and Power Plant Construction Departments should be revised to reflect CP&L's Nuclear Plant Engineering, Corporate +ality Assurance and Nuclear Plant Construction Departments respectively.

Also, the first sentence of paragraph 1.8.3.1.3 should be revised to read as follows, "The Manager Corporate Quality Assurance has overall responsibility for quality Assurance activities during the engineering,

design, procurement, construction, and testing phases as delegated through the Manager QA Services Section and the Manager QA/QC Harris Plant.

Also, reference to the Engineering

& Construction Quality Assurance Section on pages 1.8-3, 1.8-4, and 1.8-4a should read QA Services Section and the Harris Plant QA/QC Section.

The paragraph just above section 1.8.3.1.4 on page 1.8-4 of the PSAR should be revised as follows:

"The CP&L Site Quality Assurance/Quality Control personnel report directly to the Manager

+ality Assurance/Quality Control Harris Plant.

The Manager QA/QC Harris Plant is responsible for direction of Construction Quality Assurance/+ality Control through the CP&L Director Harris QA/QC Unit.

The Director Harris QA/QC will work closely with Ebasco regarding Ebasco purchased equipment.

The Principal NDE Specialist at the Harris Site is responsible for providing the necessary NDE support and reports directly to the Manager QA/QC Harris Plant."

Reference to the System Planning and (bordination Department at the start of section 1.8.3.1.4 on page 1.8-4 of the PSAR should be deleted and the first four lines at the start of section 1.8.3.1.4 should read as follows:

"The Principal QA Specialist of the

Performance Evaluation Unit which is part of the QA Services Section of the Corporate Quality Assurance Department is responsible for conducting quality assurance audits and is responsible for ( 1) establishing 10)

Reference in the first paragraph of page 1.8-4a of the PSAR to the Company Chairman/Chief Executive Officer, Executive Vice-President and Chief Operating Officer should be changed to read "Company Chairman/President and Executive Vice President, Power Supply and Engineering and Construction."

Also the last sentence in this paragraph should be revised to read "As shown by figure 1.8-1, the Performance Evaluation Unit of the QA Services Section is independent from the Departments responsible for the Engineering Construction of the plant.

11)

Reference in paragraph 1.8.3.2.5 on page 1.8-8 to the Ebasco Site Quality Assurance Coordinator should be deleted.

These activities will be performed by off-site Ebasco QA personnel and on-site CP&L QA personnel.

12)

Reference in the third paragraph on page 1.8-15a to the CP&L Site Manager should be changed to the CP&L Project General Manager-Harris Plant.

13)

Page 1.8-20 of the PSAR should be revised as follows:

"1.8.3.4.1 Harris Plant Quality Assurance/Quality Control Section The Manager - Quality Assurance/Quality Control - Harris Plant is responsible for:

1)

Surveillance and direction of construction site QA program 2)

Surveillance of site construction activities 3)

Preparation and implementation of Quality Assurance/Quality Control procedures for Site QA/QC Assuring all persons concerned that the site QA program is being performed as per the Corporate Quality Assurance Program and Quality Assurance Procedures 5)

Providing inspectors and quality assurance services requir ed by the site quality assurance program.

As discussed in paragraph 1.8.2(a),

the Harris Site Management Section is also responsible for providing construction inspection.

The Manager Quality Assurance/Quality Control Harris Plant will be responsible for staffing and directing the quality

.assurance/quality control functions at the site.

He will be directly accountable to the CP&L Manager of the Corporate Quality Assurance Department in the implementation of this Quality Assurance Program.

m mt ~

e, le

~I ~

IhI

'll I,'

~

0 t

F I

e n

e

+r m

m'hthl m

m h r m

I'

~

'mes m

Q

~

'he Harris Quality Assurance/Quality Control Unit reports to the Manager - Quality Assurance/Quality Control - Harris Plant.

They will work closely with the Ebasco regarding Ebasco supplied equipment.

The CP&L Director Harris QA/QC Unit has authority to stop any phase of construction work where he finds quality or procedures are questionable.

Deficiencies noted by the site Quality Assurance/Quality Control personnel are reported to the Manager-Quality Assurance/Quality Control - Harris Plant.

1.8.3.0.2 Field The Harris Quality Assurance/Quality Control Unit is supervised by the Director - Harris QA/QC Unit, who reports directly to the Manager Quality Assurance/Quality Control - Harris Plant.

Administ'ratively, he will report to the Project General Manager-Harris Plant at the site for scheduling, coordination and administrative services.

Carolina Power

& Light Company's Harris Plant Quality Assurance/Quality Control Section is responsible for surveillance of the construction quality assurance program.

Quality Assurance/Quality Control Inspectors shall be assigned to various phases of the project as directed by the Director - Harris QA/QC Unit.

Quality Assurance/Quality Control personnel will be qualified in accordance with the Harris Plant Quality Assurance/Quality Control procedure requirements.

The Director - Harris QA/QC Unit shall:

a)

Work cooperatively with and set up definite lines of communication with the Westinghouse NSSS Site Representative and Ebasco for routine flow of information and for special problems."

14)

Reference in paragraph f on page 1.8-21 to Engineering and Construction Quality Assurance Procedures should be changed to Harris Plant QA/QC Section procedures.

15)

Paragraph g on page 1.8-21 should be revised to read "Any differences of opinion between the Director Harris QA/QC Unit and the Project General Manager - Harris Plant shall be referred to the Vice President of Nuclear Plant Construction and the Manager Harris Plant QA/QC Section."

16)

All reference to CP&L's Manager - Engineering

& Construction Quality Assurance on page 1.8-23a should be changed to indicate CP&L's, Manager -

QA Services Section and CP&L's Manager Harris Plant QA/QC Section.

Reference to CP&L Manager - Project Engineering in the second paragraph should be changed to CP&L's Manager-Engineering, Harris Plant.

The first line in the third paragraph on this page should read "The Harris Plant Quality Assurance/Quality Control Section and the Harris Site Management will be responsible for.

The fifth paragraph on this page should read

,, n%

,h 4 r V

I 4

hf r "f v

~ ~

V I

4 V'I I

I' P

f h

4 I

'l

\\

I 4

4 h

Ifl,, l*

~

4 I

~P P

~

(

I" I I

4 fl

h P

i

., ~

I Vhl I 4 4'll l

V, I" I

thl =

~ 4 P

~44

~

4 II h "Ib 4

~

)

4 4

h h,

4 4

"Ebasco/CPEL quality assurance representatives spot check quality assurance records of selected Westinghouse safety related components."

The first line in the eighth paragraph on this page should read "CPAL also reviews the applicable portion of Ebasco's quality.

17)

Reference to CPAL's Engineering and Construction Quality Assurance Section in the sixth paragraph on page 1.8-23a should be changed to CPAL QA Services Section.

18) 19)

The first line in the third prargraph on page 1.8-23d should be revised to read Mhe Harris Plant Quality Assurance/Quality Control Section and Harris Site Management will prepare All references to CPAL's Engineering 5 Construction Quality Assurance Section on pages 1.8-23h and 1.8-23i should be changed to CP&L's Harris Plant Quality Assurance/Quality Control Section.

20)

The existing figures 1.8-1 and 1.8-2 should be replaced with the new attached figures.

Also figure 1.8-4 should be deleted.

21)

The existing Table 1.8-4 should be replaced with the new attached table.

I It I*

I I d I

1 d'I f

ft) d-

~

of I

'/I I

d r

dt d

I d.

I' it,'I I'i 1 I

, tl' Ii' C',

ddd 1

dd

~,g,',diA)dd d

ft 0

~ I d'

I Il, C

Table 1.8-4 Carolina Power

& Light Company Quality Assurance/Quality Control Personnel Personnel Full-Time Assigned*

Functions

1. Harris Plant

~l a)

Management Formal Education Manages the CP&L and/or Experience Harris Plant Quality Assurance/Quality Control Program b) Engineering Unit

1) Principal QA Engineer Formal Education and/or Experience Supervise QA Engineering Activites
2) Project QA Engineer Formal Education and/or Experience Coordinate Project QA Engineering Activities; Review Specifications, Procedures for QA Requirements c) Harris QA/QC Unit
1) Director Harris QA/QC Formal Education and/or Experience Supervise QA/QC Activities 2)

QA/QC Superintendents Formal Education and/or Experience Supervise Construction/

Operations QA/QC Surveillance/

Inspection Activities 3)

QA/QC Supervisors Specialists Inspectors/

Technicians 70 Formal Education and/or Experience Perform QA/QC Inspections and Tests and Assist Other QA Personnel d)

NDE Unit

1) Principal QA Specialist NDE Formal Education Supervise NDE Unit and/or Experience Activities

~

~

Personnel Full-Time As signed*

Part-Time ualifications Functions NDE Unit (Cont'd)

2) Project QA Specialist NDE Formal Education and/or Experience Coordinate/Supervise NDE Support Activites for SHNPP and Other CP&L Facilities 3)

QA Specialist NDE Formal Education and/or Experience Supervisor of NDE Technicians Performing SHNPP Construction Site NDE Activities O)

QA/QC Technicians 17 Formal Education Perform NDE and/or Experience Activities 2.

QA Services Section a)

Management Formal Education Manages the CPRL and/or Experience QA Services Section b) Engineering Unit

1) Principal QA Engineer Formal Education and/or Experi'ence Supervise Engineering QA Activities
2) Project QA Engineer Formal Education Coordinate Project and/or Experience Engineering QA Activities
3) Engineers Formal Education Perform Engineering and/or Experience Audits and Review Specifications for QA Requirements c) Vendor Surveillance Unit
1) Principal VS Specialist Formal Education and/or Experience Supervise Vendor Surveillance Activities
2) Project VS Specialist Formal Education Participate in and and/or Experience Review Vendor Surveillance Activities

Personnel Full-Time As signed*

Functions Vendor Surveillance Unit (Cont'd)

3) Specialists Formal Education Participate in and and/or Experience Review Vendor Surveillance Activities d) Performance Evaluation Unit
1) Principal QA Specialists Formal Education and/or Experience Supervise the CPGL Corporate Audit Program
2) Project QA Specialists Formal Education and/or Experience Coordinate Audit Activities
3) Specialists Formal Education Perform Audits in and/or Experience Accordance with approved procedures
  • Additional personnel will be assigned as needed NOTE:

All QA personnel are full-time QA personnel;

however, the personnel indicated as part-time work on other power plant projects as well as SHNPP.

(6 7 24 JDKpgp)

~

~ ~

M

EBASCO COL DANIEL EXECUTIVEVICE.PRESIDENT OPERATIONS CHAIRMAN/ PRESIDENT VICE PRESIDENT MATERIALS ENGINEERING 8r QUALITYASSURANCE SENIOR VICE PRESIDENT PROJECTS AND PROCUREMENT VICE PRESIDENT PROJECTS SENIOR VICE PRESIDENT ENGINEERING AND CONSTRUCTION VICE PRESIDENT ENGINEERING EXECUTIVEVICE PRESIDENT POWER SUPPLY AND ENG'G ANDCONSTRUCTION GENERAL MANAGER MANAGER OF PROJECTS CHIEF ENGINEERS SENIOR VICE PRESIDENT POWER SUPPLY GROUP MANAGER I'ORPORATE QUAIJTY ASSURANCE DEPARTMENT SENIOR VICE PRESIDENT ENG'G ANDCONSTRUCTION GROUP CHIEF QUALITY ASSURANCE ENGINEER CHIEF VENDOR QUALITYASSURANCE REPRESENTATIVE PROJECT MANAGER MANAGER TECHNICALSERVICES DEPARTMENT VICE PRESIDENT IIUCLEARPLANT I ENGINEERING

," DEPARTMENT VICE PRESIDENT NUCLEAR PLANT CONSTRUCTION DEPARTMENT VICE PRESIDENT CONSTRUCTION WESTINGHOUSE WESTINGHOUSE PROJECT MANAGER MANAGER LICENSING & PERMITS SECTION MANAGER QA SERVICES SECTION MANAGER QA /QC HARRIS PLANT PROJECT MANAGER DIRECTOR QA / QC UNIT HARRIS PLANT MANAGER

'NGINEERING IHARRIS PLANT SECTION PROJECT GENERAL MANAGER HARRIS PLANT LEGEND:

COMPANY ORGANIZATION I

INTERCOMPANYCOMMUNICATION INTERCOMPANYBOUNDARIES CAROLINA POWER 8E LIGHT COMPANY SHEARON HARRIS NUCLEAR PLANT UNITS1,2,3&4 NOTE: INFORMALCOMMUNICATIONAND COORDINATIONCHANNELS ARE NOT SHOWN QUALITYASSURANCE ORGANIZAT'QhI

).8 1

~

~

~

W la 8 ~

1 ~

I t

~ y

~ I e

la

O Ill ~

C} 0

~ Ixz cy+

Z Z 'll

~> O v) (/) 5 "Zm PCp

~rr 0

P Q mx gO z

PRINCIPALQA ENGR.

ENGINEERING QA UNIT MANAGER QA SERVICES SECTION PRINCIPAL QA SPECIALIST VENDOR SURVEILLANCE UNIT MANAGER CORPORATE QUAUTY ASSURANCE DEPT.

MANAGERQA/QC ROBINSON AND BRUNSWICK PLANTS PRINCIPAL QA SPECIALIST PERFORMANCE EVALUATION UNIT PRINCIPAL C}A SPECIALIST TRAINING& ADMINISTRATION UNIT GENERAL OFFICE O0 Om hC vP I I Ol 0 Z~ V) z O

PRINCIPALOA ENGR.

ENGINEERING OA UNIT PROJECT aa ENGINEERS MANAGER QA/QC HARRIS PLANT DIRECTOR QA/QC HARRIS PLANT QA SUPERINTENDENT QC SUPERINTENDENT SITE PRINCIPAL QA SPECIALIST NDE PROJECT QA SPECIALIST NDE QA SUPERVISORS SPECIALISTS QC SUPERVISORS SPECIALISTS QA SPECIALISTS NDE QA/QC INSPECTORS/TECHNICIANS QA INSPECTORS/

TECHNICIANS (CIVII MECHANICAl ELECTRICAI WELDING.

RECEIVING & RECORDS)

QC INSPECTORS/

TECHNICIANS (CIVII MECHANICAI ELECTRICAL, WELDING, RECEIVING & RECORDS)

~o i

i