ML19256G524: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:a OPERATING DATA REPORT DOCKET NO. 50-366 DATE 9-10-19 CONIPLETED isY   P. B. Allen TELErilONE 912-367-7781 OPERATING STATUS Hatch 2                                            Note 5
{{#Wiki_filter:a OPERATING DATA REPORT DOCKET NO. 50-366 DATE 9-10-19 CONIPLETED isY P. B. Allen TELErilONE 912-367-7781 OPERATING STATUS
: 1. Unit Name:
: 1. Unit Name:
: 2. Reporting Period:       Aucust   1979
Hatch 2 Note 5
: 3. Licensed Thermal Power Olbt): 2436 MWe
: 2. Reporting Period:
: 4. Nameplate Rating (Gross alwe): 817.0 Gross MWe
Aucust 1979
: 5. Design Electrical Rating (Net 31We):     784.0 fiet fNe
: 3. Licensed Thermal Power Olbt): 2436 MWe 817.0 Gross MWe
: 4. Nameplate Rating (Gross alwe):
: 5. Design Electrical Rating (Net 31We):
784.0 fiet fNe
: 6. Staximum Dependable Capacity (Gross StWe): 782.O Gross Kle
: 6. Staximum Dependable Capacity (Gross StWe): 782.O Gross Kle
: 7. Sfaximum Dependable Capacity (Net 31We):     749.0 Net MWe
: 7. Sfaximum Dependable Capacity (Net 31We):
749.0 Net MWe
: 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Gise Reasons:
: 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Gise Reasons:
: 9. Power Lesel To hhich Restricted if Any (Net SIWE):
: 9. Power Lesel To hhich Restricted if Any (Net SIWE):
: 10. Reasons For Restrictions.lf Any:
: 10. Reasons For Restrictions.lf Any:
This alonth           Yr..to Date         Cumulatise
This alonth Yr..to Date Cumulatise
: 11. Ilours In Repor ing Period                               744                 5831               10248
: 11. Ilours In Repor ing Period 744 5831 10248
: 12. Number Of Houts Reactor Was Critical                     701.7               2269.0               4901.5
: 12. Number Of Houts Reactor Was Critical 701.7 2269.0 4901.5
: 13. Reactor Resene Shutdown Hours                               0.0                   0.0                 0.0
: 13. Reactor Resene Shutdown Hours 0.0 0.0 0.0
: 14. Hours Generator On Line                                 682.4               1675.0               3061.6
: 14. Hours Generator On Line 682.4 1675.0 3061.6
: 15. Unit Resene Shutdown Hours                                   0.0                   0.0                 0.0
: 15. Unit Resene Shutdown Hours 0.0 0.0 0.0
: 16. Gross Thermal Energy Generated (StWH)             1349724               3144206               5150147
: 16. Gross Thermal Energy Generated (StWH) 1349724 3144206 5150147
: 17. Gross Electrical Energy Generated (5 thin             423830               023a70             la65070
: 17. Gross Electrical Energy Generated (5 thin 423830 023a70 la65070
: 18. Net Electrical Energy Generated (SIWH)               406025               861466             1354998
: 18. Net Electrical Energy Generated (SIWH) 406025 861466 1354998
: 19. Unir Senice Factor                                       N/A                   N/A                 N/A
: 19. Unir Senice Factor N/A N/A N/A
: 20. Unit Availability Factor                                 N/A                   N/A                 N/A
: 20. Unit Availability Factor N/A N/A N/A
: 21. Unit Capacity Factor (Using .\tDC Nett .                 N/A                   N/A                 N/A
: 21. Unit Capacity Factor (Using.\\tDC Nett.
: 22. Unit Capacity Factor IU>ing DER Neti                     N/A                   N/A                 N/A
N/A N/A N/A
: 23. Unit Forced Outage Rate                                 N/A                   N/A                 N/A
: 22. Unit Capacity Factor IU>ing DER Neti N/A N/A N/A
: 23. Unit Forced Outage Rate N/A N/A N/A
: 24. Shutdowns Seliedn:cd Oscr Nest 6 31onths t!>pe.Date.and Duration of Each 3:
: 24. Shutdowns Seliedn:cd Oscr Nest 6 31onths t!>pe.Date.and Duration of Each 3:
: 25. If Shnt Down At Enti Of iteport Period. Estimated Date of Startup:
: 25. If Shnt Down At Enti Of iteport Period. Estimated Date of Startup:
: 26. Units in rest Status iPrior to Commercial Operationi:                       Forecast           Achiesed INITIAL. CRIriCAtt rY                                                       7-4-78 INI TI \ L ELI:C TRICI TY                           '
: 26. Units in rest Status iPrior to Commercial Operationi:
9-22-78         ..
Forecast Achiesed INITIAL. CRIriCAtt rY 7-4-78 INI TI \\ L ELI:C TRICI TY 9-22-78 CO\\l%1ERCIAL Ol'I.It ATiON 9-5-79 0008 Oglgg 1657 155
CO\l%1ERCIAL Ol'I.It ATiON                                                 9-5-79 0008 Oglgg                                           1657 155                                               ,,,g,,
,,,g,,
7912810                 H33}}
7912810 H33}}

Latest revision as of 22:31, 3 January 2025

Revised Monthly Operating Rept for Aug 1979
ML19256G524
Person / Time
Site: Hatch 
Issue date: 08/08/1979
From: Allen P
GEORGIA POWER CO.
To:
Shared Package
ML19256G523 List:
References
NUDOCS 7912310433
Download: ML19256G524 (1)


Text

a OPERATING DATA REPORT DOCKET NO. 50-366 DATE 9-10-19 CONIPLETED isY P. B. Allen TELErilONE 912-367-7781 OPERATING STATUS

1. Unit Name:

Hatch 2 Note 5

2. Reporting Period:

Aucust 1979

3. Licensed Thermal Power Olbt): 2436 MWe 817.0 Gross MWe
4. Nameplate Rating (Gross alwe):
5. Design Electrical Rating (Net 31We):

784.0 fiet fNe

6. Staximum Dependable Capacity (Gross StWe): 782.O Gross Kle
7. Sfaximum Dependable Capacity (Net 31We):

749.0 Net MWe

8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Gise Reasons:
9. Power Lesel To hhich Restricted if Any (Net SIWE):
10. Reasons For Restrictions.lf Any:

This alonth Yr..to Date Cumulatise

11. Ilours In Repor ing Period 744 5831 10248
12. Number Of Houts Reactor Was Critical 701.7 2269.0 4901.5
13. Reactor Resene Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On Line 682.4 1675.0 3061.6
15. Unit Resene Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (StWH) 1349724 3144206 5150147
17. Gross Electrical Energy Generated (5 thin 423830 023a70 la65070
18. Net Electrical Energy Generated (SIWH) 406025 861466 1354998
19. Unir Senice Factor N/A N/A N/A
20. Unit Availability Factor N/A N/A N/A
21. Unit Capacity Factor (Using.\\tDC Nett.

N/A N/A N/A

22. Unit Capacity Factor IU>ing DER Neti N/A N/A N/A
23. Unit Forced Outage Rate N/A N/A N/A
24. Shutdowns Seliedn:cd Oscr Nest 6 31onths t!>pe.Date.and Duration of Each 3:
25. If Shnt Down At Enti Of iteport Period. Estimated Date of Startup:
26. Units in rest Status iPrior to Commercial Operationi:

Forecast Achiesed INITIAL. CRIriCAtt rY 7-4-78 INI TI \\ L ELI:C TRICI TY 9-22-78 CO\\l%1ERCIAL Ol'I.It ATiON 9-5-79 0008 Oglgg 1657 155

,,,g,,

7912810 H33