4 OPERATING DATA REPORT DOCKET NO.
50-366 DATE 10-24 7.9
,,405tPLETED BY _G...L. Johnson TELEPHONE 012 367 7781 OPERATING STATUS
- 1. Unit Name:
Hatch 2 Notes
- 2. Reporting Period:
SeDtember 1979 Unit 2 was deCIared Commer-
- 4. Nameplate Rating (Gross 31We): 817.0 Gross Kle September 5, 1979.
- 5. Design Electrical Rating (Net 31We):
784.0 Net M4e
- 6. Slaximum Dependable Capacity (Gross.ilwe): 782.0 Gross M4e
- 1. Slaximum Dependable Capacity (Net 31We):
749.O Net Mie
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
a
- 9. Power Level To hhich Restricted,if Any (Net Slwe):.'
- 10. Reasons For Restrictions. If Any:
This Month Yr..to.Date Cumulative
!!. Hours in Reporting Period 720 6551 10968
- 12. Number Of Houn Reactor Was Critical 641.8 2910.3 5443.3
- 13. Reac'or Reserve Shutdown Fours 0.0
(,, 0 0.o
- 14. Hours Generator On-Line 515.9 2190.9
' 3577.5 -
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 16-. Gross Thermal Energy Generated (MwH) 1056275 4200481 6206422
- 17. Gross Electrical Energy Generated (31WH) 340620 1269090 1805690
- 18. Net Electrical Energy Generated (31WH) 323398 1184864 1678396
- 19. Unit Service Factor 71.6 69.8 69.8
- 20. Unit Avadability Factor 71.6 69.8 69.8
- 21. Unit Capacity Factor (Using alDC Net) 60.0 59.3 59.3
- 22. Unit Capacity Factor (Using DER Net) 57.3 56.7 56.7
- 23. Unit Forced Outage Rate 24.0 25.3 25.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Statu: (Prior to Commercial Operation):
Forecast Achieved INil 2AL CRITICALITY INITIAL ELECTRICITY COMNtERCIA L OPERATION (9/77) 7912310 q3q