FLCAIDA POWER & LIGHT COMPANY | a FLCAIDA POWER & LIGHT COMPANY | ||
''"-l7 A.y 3 j February 11, 1981 L-81-47 Mr. James P. O'Reilly, Director, Region II | |||
Office of Inspection and Enforcement U.S. Nuclear Regulatory Comission | / ;i6 _M Office of Inspection and Enforcement t | ||
101 Marietta Street, Suite 3100 | U.S. Nuclear Regulatory Comission f | ||
Atlanta, Georgia 30303 | s | ||
( | |||
101 Marietta Street, Suite 3100 | |||
/sf Atlanta, Georgia 30303 3't 2 | |||
L 0 gg | |||
==Dear Mr. O'Reilly:== | ==Dear Mr. O'Reilly:== | ||
u, , | u,, | ||
Re: | / | ||
0-250A | Re: | ||
(' | . R0 | ||
'3k'c 0-250A O | |||
(' | |||
lf[ | lf[ | ||
Florida Power & Light has completed tha re-evaluation of 60 of the 7 Turkey Point Units 3 & 4 masonry walls with mounted or adjacent safety related equipment in accordance with the above Bulletin. Two of the 99 wall , reported in our interim responses were determined to be non-safety related. Our results have confinned the adequacy of these walls such that these walls will have no adverse effect on the safe shutdown of the units. Our Architect Engineer has advised us that they are revising their analytical approach for the remaining 37 walls with a scheduled completion date for the re-evaluation of these walls of early March 1981. | I ulletin 80-11 Florida Power & Light has completed tha re-evaluation of 60 of the 7 Turkey Point Units 3 & 4 masonry walls with mounted or adjacent safety related equipment in accordance with the above Bulletin. Two of the 99 wall, reported in our interim responses were determined to be non-safety related. Our results have confinned the adequacy of these walls such that these walls will have no adverse effect on the safe shutdown of the units. Our Architect Engineer has advised us that they are revising their analytical approach for the remaining 37 walls with a scheduled completion date for the re-evaluation of these walls of early March 1981. | ||
We will review their report and provide our final response to the Bulletin by March 20, 1981. | We will review their report and provide our final response to the Bulletin by March 20, 1981. | ||
Very truly yours, | Very truly yours, | ||
.d A N f | |||
Robert E. Uhrig Vice President Advanced Systems & Technology REU/PLP/mbd cc: | Robert E. Uhrig Vice President Advanced Systems & Technology REU/PLP/mbd cc: | ||
82 o3 og g 7 | Director, Office of Inspection and Enforcement Harold F. Reis, Esquire i | ||
82 o3 og g 7 n}} | |||
Latest revision as of 17:29, 24 December 2024
| ML19341D030 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/11/1981 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-80-11, L-81-47, NUDOCS 8103040742 | |
| Download: ML19341D030 (1) | |
Text
,
l.:
a FLCAIDA POWER & LIGHT COMPANY
"-l7 A.y 3 j February 11, 1981 L-81-47 Mr. James P. O'Reilly, Director, Region II
/ ;i6 _M Office of Inspection and Enforcement t
U.S. Nuclear Regulatory Comission f
s
(
101 Marietta Street, Suite 3100
/sf Atlanta, Georgia 30303 3't 2
L 0 gg
Dear Mr. O'Reilly:
u,,
/
Re:
. R0
'3k'c 0-250A O
('
lf[
I ulletin 80-11 Florida Power & Light has completed tha re-evaluation of 60 of the 7 Turkey Point Units 3 & 4 masonry walls with mounted or adjacent safety related equipment in accordance with the above Bulletin. Two of the 99 wall, reported in our interim responses were determined to be non-safety related. Our results have confinned the adequacy of these walls such that these walls will have no adverse effect on the safe shutdown of the units. Our Architect Engineer has advised us that they are revising their analytical approach for the remaining 37 walls with a scheduled completion date for the re-evaluation of these walls of early March 1981.
We will review their report and provide our final response to the Bulletin by March 20, 1981.
Very truly yours,
.d A N f
Robert E. Uhrig Vice President Advanced Systems & Technology REU/PLP/mbd cc:
Director, Office of Inspection and Enforcement Harold F. Reis, Esquire i