Responds to IE Bulletin 80-11.Adequacy of 60 Masonry Walls Has Been Confirmed by re-evaluation.Remaining 37 Walls Scheduled for re-evaluation Completion by Mar 1981
ML19341D030
Person / Time
Site: Turkey Point  
Issue date: 02/11/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-80-11, L-81-47, NUDOCS 8103040742
Download: ML19341D030 (1)


Text

,

l.:

a FLCAIDA POWER & LIGHT COMPANY

"-l7 A.y 3 j February 11, 1981 L-81-47 Mr. James P. O'Reilly, Director, Region II

/ ;i6 _M Office of Inspection and Enforcement t

U.S. Nuclear Regulatory Comission f

s

(

101 Marietta Street, Suite 3100

/sf Atlanta, Georgia 30303 3't 2

L 0 gg

Dear Mr. O'Reilly:

u,,

/

Re:

. R0

'3k'c 0-250A O

('

lf[

I ulletin 80-11 Florida Power & Light has completed tha re-evaluation of 60 of the 7 Turkey Point Units 3 & 4 masonry walls with mounted or adjacent safety related equipment in accordance with the above Bulletin. Two of the 99 wall, reported in our interim responses were determined to be non-safety related. Our results have confinned the adequacy of these walls such that these walls will have no adverse effect on the safe shutdown of the units. Our Architect Engineer has advised us that they are revising their analytical approach for the remaining 37 walls with a scheduled completion date for the re-evaluation of these walls of early March 1981.

We will review their report and provide our final response to the Bulletin by March 20, 1981.

Very truly yours,

.d A N f

Robert E. Uhrig Vice President Advanced Systems & Technology REU/PLP/mbd cc: