ML20002B909: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:#   .-
{{#Wiki_filter:#
6 O
6 O
c        -  . e:
e:
September 17, 1980         '
c dU September 17, 1980 Mr. James P. O'Reilly, Director Serial No.
dU Mr. James P. O'Reilly, Director                       Serial No. ll71A Office of Inspection and Enforcement                 N0/JRH:sim U. S. Nuclear Regulatory Commission                   Docket Nos. 50-338 Region II                       _
ll71A Office of Inspection and Enforcement N0/JRH:sim U. S. Nuclear Regulatory Commission Docket Nos.
50-339 101 Marietta Street, Suite 3100                       License Nos. NPF-4 Atlanta, Georgia   30303                                           NPF-7
50-338 50-339 Region II License Nos. NPF-4 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 NPF-7


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==
 
In reference to the follow up inspection of your audit no. 50-338/79-47 conducted at North Anna Power Station by Mr. Nick Economos on September 11 through September 12, 1980, we offer the following explanation. See attachmen t.
In reference to the follow up inspection of your audit no. 50-338/79-47 conducted at North Anna Power Station by Mr. Nick Economos on September 11 through September 12, 1980, we offer the following explanation. See               ,
Very truly yours, f lA B. R.kylvia Manager-Nuclear Operations and Maintenance Attachment cc:
attachmen t .
Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3 I
Very truly yours, fR.kylvia B. lA _
Division of Licensing Mr. B. Joe Youngblooda Chief License Branch No.1-l Division of Licensing r
Manager-Nuclear Operations and Maintenance Attachment cc:   Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3 I               Division of Licensing Mr. B. Joe Youngblooda Chief License Branch No.1-l               Division of Licensing r
I l
I l
OFFICIAL COPY l
OFFICIAL COPY 81010i20}07 l
l 81010i20}07                                                                   -
l l
l t
t


a . ., .
a..,.
a s.
a s.
                                                        -- Response to Notice of Violation Items Reported in IE Inspection Report 50-338/79-47
-- Response to Notice of Violation Items Reported in IE Inspection Report 50-338/79-47
                    ,A.       NRC Comment
,A.
        ,      ,          ,  : As required by' Criterion V of Appendix lB.to 10.CFR     G 50 and implemented                                                   - .
NRC Comment
                              .by Vepco Topical Report VEP-1-A ' Section '17, paragraph 17.2.5 specifies in part, 'that ' activities affecting quality are accomplished in accordance
: As required by' Criterion V of Appendix lB.to 10.CFR 50 and implemented G
                              .ith w    instructions procedures, and drawings. ~ General Welding Procedure a
.by Vepco Topical Report VEP-1-A ' Section '17, paragraph 17.2.5 specifies in part, 'that ' activities affecting quality are accomplished in accordance General Welding Procedure
W-1.'0 Rev.1 invokes ASME Section IX -(74.W76) which under paragraph OW-2013, requires that each welding. process or- procedure be qualifled either separately or in combination with other processes or procedures
.ith instructions procedures, and drawings. ~
                              ....for the deposited weld metal thickness range for each of the processes
w a
                                                                                                                                                                ~
W-1.'0 Rev.1 invokes ASME Section IX -(74.W76) which under paragraph OW-2013, requires that each welding. process or-procedure be qualifled either separately or in combination with other processes or procedures
or procedures.. . paragraph QW-351 of'the same code requires that the limit of thickness of the weld he deposits with each welding process.
....for the deposited weld metal thickness range for each of the processes
                      .        Contrary ' to the above, on November 16,~1979a procedure qualiflcation
~
                              ^ records of weld process -specifications and welder performance qualifi-cations involving combination processes 'did not indicate the weld metal
or procedures... paragraph QW-351 of'the same code requires that the limit of thickness of the weld he deposits with each welding process.
                                                                                                      ~
Contrary ' to the above, on November 16,~1979a procedure qualiflcation
^ records of weld process -specifications and welder performance qualifi-cations involving combination processes 'did not indicate the weld metal
~
thickness deposited with each welding process.
thickness deposited with each welding process.
                                              ~                               -
~
This is an infraction.
This is an infraction.


===Response===
===Response===
                              ; Procedure' qualification records of weld process _ specifications and
~
                                                                                ~
; Procedure' qualification records of weld process _ specifications and welder performance qualification records involving combination' processes
welder performance qualification records involving combination' processes
~
  ~     ~~
~~
                          -~~ do not indicate the weld metal thickness deposited by each process, as                                         -
-~~ do not indicate the weld metal thickness deposited by each process, as required by ASME Section IX, OW201.3 'and QW-351. ~
required by ASME Section IX, OW201.3 'and QW-351. ~
Due to misinterpretation of applicable codes and a misunderstanding of proper documentation, this item has not been resolved to date. _It has been and is' the contention that the' welder qualifications met acceptable criteria in that the alloted thickness ranges have been adhered to on the various processes but not individually documented on combination processes.
Due to misinterpretation of applicable codes and a misunderstanding of proper documentation, this item has not been resolved to date. _It has been and is' the contention that the' welder qualifications met acceptable                                                         :
criteria in that the alloted thickness ranges have been adhered to on the various processes but not individually documented on combination processes.
As a result of this finding, it is our intention to review past records to assure that the thickness ranges allated for the combined processes have not been violated.
As a result of this finding, it is our intention to review past records to assure that the thickness ranges allated for the combined processes have not been violated.
Pursuant to Section 2.201 of the NRC's " Rules of Practice", Part 2, Title                                     -
Pursuant to Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, the following information is ' submitted.
10, Code of Federal Regulations, the following information is ' submitted.
l.
                                                                                                                  ~
Corrective steps taken and results achieved:
('
~
: l. Corrective steps taken and results achieved:                         _
(
Welding procedures involving combination processes will'he amended as                                         _ ..
Welding procedures involving combination processes will'he amended as needed to include the.. weld metal thickness. range as deposited by each individual process. _ ~
needed to include the.. weld metal thickness . range as deposited by each
^
                                                                                          ^       ~                                                         -
~
individual process. _ ~                                                                      ,
1 I
2.
Corrective steps which will be taken to avoid further non-compliance:
Corrective steps which will be taken to avoid further non-compliance:
1                                                                    .
I 2.
We believe that no further corrective action is required.
We believe that no further corrective action is required.
e w
w e
                                                                -      e
e
                                                                                                  - _ , - _ - , , , , . . , , . _,  , - - - ,      --- - - , .}}
--- - -,.}}

Latest revision as of 15:46, 23 December 2024

Forwards Response to Violations Noted in IE Insp Rept 50-338/79-47.Corrective Action:Welding Procedures Involving Combination Processes Will Be Amended to Include Weld Metal Thickness Range as Deposited by Each Individual Process
ML20002B909
Person / Time
Site: North Anna Dominion icon.png
Issue date: 09/17/1980
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20002B906 List:
References
1171A, NUDOCS 8101070309
Download: ML20002B909 (2)


Text

6 O

e:

c dU September 17, 1980 Mr. James P. O'Reilly, Director Serial No.

ll71A Office of Inspection and Enforcement N0/JRH:sim U. S. Nuclear Regulatory Commission Docket Nos.

50-338 50-339 Region II License Nos. NPF-4 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 NPF-7

Dear Mr. O'Reilly:

In reference to the follow up inspection of your audit no. 50-338/79-47 conducted at North Anna Power Station by Mr. Nick Economos on September 11 through September 12, 1980, we offer the following explanation. See attachmen t.

Very truly yours, f lA B. R.kylvia Manager-Nuclear Operations and Maintenance Attachment cc:

Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3 I

Division of Licensing Mr. B. Joe Youngblooda Chief License Branch No.1-l Division of Licensing r

I l

OFFICIAL COPY 81010i20}07 l

l l

t

a..,.

a s.

-- Response to Notice of Violation Items Reported in IE Inspection Report 50-338/79-47

,A.

NRC Comment

As required by' Criterion V of Appendix lB.to 10.CFR 50 and implemented G

.by Vepco Topical Report VEP-1-A ' Section '17, paragraph 17.2.5 specifies in part, 'that ' activities affecting quality are accomplished in accordance General Welding Procedure

.ith instructions procedures, and drawings. ~

w a

W-1.'0 Rev.1 invokes ASME Section IX -(74.W76) which under paragraph OW-2013, requires that each welding. process or-procedure be qualifled either separately or in combination with other processes or procedures

....for the deposited weld metal thickness range for each of the processes

~

or procedures... paragraph QW-351 of'the same code requires that the limit of thickness of the weld he deposits with each welding process.

Contrary ' to the above, on November 16,~1979a procedure qualiflcation

^ records of weld process -specifications and welder performance qualifi-cations involving combination processes 'did not indicate the weld metal

~

thickness deposited with each welding process.

~

This is an infraction.

Response

~

Procedure' qualification records of weld process _ specifications and welder performance qualification records involving combination' processes

~

~~

-~~ do not indicate the weld metal thickness deposited by each process, as required by ASME Section IX, OW201.3 'and QW-351. ~

Due to misinterpretation of applicable codes and a misunderstanding of proper documentation, this item has not been resolved to date. _It has been and is' the contention that the' welder qualifications met acceptable criteria in that the alloted thickness ranges have been adhered to on the various processes but not individually documented on combination processes.

As a result of this finding, it is our intention to review past records to assure that the thickness ranges allated for the combined processes have not been violated.

Pursuant to Section 2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, the following information is ' submitted.

l.

Corrective steps taken and results achieved:

~

(

Welding procedures involving combination processes will'he amended as needed to include the.. weld metal thickness. range as deposited by each individual process. _ ~

^

~

1 I

2.

Corrective steps which will be taken to avoid further non-compliance:

We believe that no further corrective action is required.

w e

e

--- - -,.