ML19317E572: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
Created page by program invented by StriderTol
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:-
              .
UNIT ocon7n Unit 2 DATE 04/09/76 DOCKET NO. 50-270 C)                                                            PREPARED BY    E. D. Blakeman OPERATING STATUS
                                    .,
* UNIT ocon7n Unit 2 DATE 04/09/76 DOCKET NO. 50-270 C)                                                            PREPARED BY    E. D. Blakeman OPERATING STATUS
: 1. REPORTING PERIOD:        March 1          THROUGH        March 31, 1976 GROSS HOURS IN REPORTING PERIOD:            744.00
: 1. REPORTING PERIOD:        March 1          THROUGH        March 31, 1976 GROSS HOURS IN REPORTING PERIOD:            744.00
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):                  871                                                                  -
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):                  871                                                                  -
Line 27: Line 25:
This Month        Year to Date        Cumt.lative
This Month        Year to Date        Cumt.lative
: 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL                                      744.0          1946.1              10505.2
: 5. NUMBER OF HOURS THE REACTOR WAS CRITICAL                                      744.0          1946.1              10505.2
                                                                                                    -
: 6. REACTOR RESERVE SHUTDOWN HOURS                  -                -
: 6. REACTOR RESERVE SHUTDOWN HOURS                  -                -
: 7. HOURS GENERATOR ON-LINE                        744.0          1916.3              10195.7
: 7. HOURS GENERATOR ON-LINE                        744.0          1916.3              10195.7
                                                                                                    -
: 8. UNIT RESERVE SHUTDOWN HOURS
: 8. UNIT RESERVE SHUTDOWN HOURS
                                                            -                -
: 9. GROSS THERMAL ENERGY GENERATED (MWH) 1755743                  4624626            24297054
: 9. GROSS THERMAL ENERGY GENERATED (MWH) 1755743                  4624626            24297054
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                          598960        1574400              8274956
: 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                          598960        1574400              8274956
Line 50: Line 45:
(
(
PERIOD UNIT FORCED OUTACE RATE + FoncrD 00 TACE HOURS                    .
PERIOD UNIT FORCED OUTACE RATE + FoncrD 00 TACE HOURS                    .
                                                                                                 -- X 100
                                                                                                 -- X 100 HOURS GENERATOR ON I.INE + FORCED CUT      H 79121            'ft
                                                                                                  "
HOURS GENERATOR ON I.INE + FORCED CUT      H 79121            'ft


.
  .
DOCKET NO. 50-270 UNIT oconee Unie 2 -
DOCKET NO. 50-270 UNIT oconee Unie 2 -
DATE 04/09/76 AVERAGE DAILY UNIT POWER LEVEL MONTH          March 1976 AVERAGE DAILY POWER LEVEL                            AVERAGE DAILY POWER LEVEL DAY                  (MWe-net)                    DAY                  (MWe-net)          .
DATE 04/09/76 AVERAGE DAILY UNIT POWER LEVEL MONTH          March 1976 AVERAGE DAILY POWER LEVEL                            AVERAGE DAILY POWER LEVEL DAY                  (MWe-net)                    DAY                  (MWe-net)          .
      ,
17                    833 1                      601 692                        18                    835 2
17                    833 1                      601 692                        18                    835 2
819                        19                    834 3
819                        19                    834 3
Line 67: Line 57:
831                        24                    830 8
831                        24                    830 8
830                        25                    829 g
830                        25                    829 g
                      '
                                                               #              743 10                      830                        26 828                        27                    608 11 829                        28                    616 12 831                        29                    614 13 833                        30                    616 14 814                        31                    616 15 16                      811 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe net for each day m the reporting month.
                                                               #              743 10                      830                        26 828                        27                    608 11 829                        28                    616 12 831                        29                    614 13 833                        30                    616 14 814                        31                    616 15 16                      811 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe net for each day m the reporting month.
Compute to the nearest whole megawatt.
Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month. Note that by usini, maximum dependable cap; city for the net electrical rating of the unit. there may be measions when the daily average power level exceeds the 1007o line (or the restricted power lesel line). In such c.ises the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
These figures will be used to plot a graph for each reporting month. Note that by usini, maximum dependable cap; city for the net electrical rating of the unit. there may be measions when the daily average power level exceeds the 1007o line (or the restricted power lesel line). In such c.ises the average daily unit power output sheet should be footnoted to explain the apparent anomaly.


                                                                                                                                                                                                                .
D CKET NO. 50-270 UNIT SHUTDOWNS                              UNIT NAMii Oconee Unit 2 DATli 04/09/76 REPORT MONTil      March 1976 TYPE                                  METHOD OF F-FORCED  DURATION                  SHUTTING DOWN NO. DATE    S SCHEDULED  (HOURS)  REASON (1)      THE REACTOR 12)          CORRECTIVE ACTIONS / COMMENTS (1) REASON                          (2) METilOD A-EQUIPMENT F AILURE IEXPLAIN)      1-MANUAL B- MAINT. OR TEST.                2-MANUAL C- REI'ULLING                          SCRAM D-RLGULATORY RESTRICTION            3 - AUTOMATIC E-OPER ATOR TRAINING AND              SCRAM LICLNSE EXAMINATION                          '
D CKET NO. 50-270 UNIT SHUTDOWNS                              UNIT NAMii Oconee Unit 2
* DATli 04/09/76 REPORT MONTil      March 1976 TYPE                                  METHOD OF F-FORCED  DURATION                  SHUTTING DOWN NO. DATE    S SCHEDULED  (HOURS)  REASON (1)      THE REACTOR 12)          CORRECTIVE ACTIONS / COMMENTS
                                                                                                                                                                                                          .
(1) REASON                          (2) METilOD A-EQUIPMENT F AILURE IEXPLAIN)      1-MANUAL B- MAINT. OR TEST.                2-MANUAL C- REI'ULLING                          SCRAM D-RLGULATORY RESTRICTION            3 - AUTOMATIC E-OPER ATOR TRAINING AND              SCRAM LICLNSE EXAMINATION                          '
F-ADMINISTRATIVE G-OPLR ATIONAL LRROR (LXPLAIN)
F-ADMINISTRATIVE G-OPLR ATIONAL LRROR (LXPLAIN)
Il-OlllLR (EXPLAIN)
Il-OlllLR (EXPLAIN)
                                                                                                                                                                    .


==SUMMARY==
==SUMMARY==
:
                                                                                       -No outages this montli. Unit operated at reduced power level (3 RCP operation) during latter part of month due to low oil level in RCP motor.
                                                                                       -No outages this montli. Unit operated at reduced power level (3 RCP operation) during latter part of month due to low oil level in RCP motor.
* _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -}}
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -}}

Revision as of 07:11, 1 February 2020

Monthly Operating Rept for Mar 1976
ML19317E572
Person / Time
Site: Oconee  
Issue date: 04/09/1976
From: Blakeman E
DUKE POWER CO.
To:
Shared Package
ML19317E562 List:
References
NUDOCS 7912180785
Download: ML19317E572 (3)


Text

-

UNIT ocon7n Unit 2 DATE 04/09/76 DOCKET NO. 50-270 C) PREPARED BY E. D. Blakeman OPERATING STATUS

1. REPORTING PERIOD: March 1 THROUGH March 31, 1976 GROSS HOURS IN REPORTING PERIOD: 744.00
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net): 871 -
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) NONE
4. REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumt.lative

5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 744.0 1946.1 10505.2
6. REACTOR RESERVE SHUTDOWN HOURS - -
7. HOURS GENERATOR ON-LINE 744.0 1916.3 10195.7
8. UNIT RESERVE SHUTDOWN HOURS
9. GROSS THERMAL ENERGY GENERATED (MWH) 1755743 4624626 24297054
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 598960 1574400 8274956
11. NET ELECTRICAL ENERGY GENERATED (MWH) 572700 1501397 7856548
12. REACTOR SERVICE FACTOR 100.0 89.1 76.8
13. REACTOR AVAILABILITY FACTOR 100.0 88.1 75.1
14. UNIT SERVICE FACTOR 100.0 87.7 74.5
15. UNIT AVAILABILITY FACTOR 100.0 87.7 74.5
16. UNIT CAPACITY FACTOR (Using Net 88.4 78.9 65.9 Capability)
17. UNIT CAPACITY FACTOR (Using Design Mwe) 86.8 77.5 ~64.7
18. UNIT FORCED OUTAGE RATE - 12.2 22.9
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)
20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAT. X 100 UOURS IN REPORTING PERIOD '

REACIOR AVAIIABILITY FACTOR = HOURS _REACTCR UAS_ AVAIIAril.E TO CPERATE X 100 110VRS IN REFORTING PER10J UNIT SERVICE TACT 0" = HOITS CD:ERATOR ON LINF.

X 100 HOURS IN REPORTING PERIOD UNIT AVAIIABILITY FACTOR = UOUR.S t!NTT WAS A"ATI AP,l.C TO CIP."ERATE X 130 HOURS IN REPuhTING PERIOD UNIT CAPACITY FACTOR = NET ELECTRICAL P0hER CT.NERATED V (Not Capability or Design (h:-Net).1 X HOUiG LN El'Uh liNC' CO

(

PERIOD UNIT FORCED OUTACE RATE + FoncrD 00 TACE HOURS .

-- X 100 HOURS GENERATOR ON I.INE + FORCED CUT H 79121 'ft

DOCKET NO. 50-270 UNIT oconee Unie 2 -

DATE 04/09/76 AVERAGE DAILY UNIT POWER LEVEL MONTH March 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) .

17 833 1 601 692 18 835 2

819 19 834 3

823 20 831 4

817 21 830 5

662 22 831 6

686 23 829 7

831 24 830 8

830 25 829 g

  1. 743 10 830 26 828 27 608 11 829 28 616 12 831 29 614 13 833 30 616 14 814 31 616 15 16 811 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe net for each day m the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by usini, maximum dependable cap; city for the net electrical rating of the unit. there may be measions when the daily average power level exceeds the 1007o line (or the restricted power lesel line). In such c.ises the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

D CKET NO. 50-270 UNIT SHUTDOWNS UNIT NAMii Oconee Unit 2 DATli 04/09/76 REPORT MONTil March 1976 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) REASON (1) THE REACTOR 12) CORRECTIVE ACTIONS / COMMENTS (1) REASON (2) METilOD A-EQUIPMENT F AILURE IEXPLAIN) 1-MANUAL B- MAINT. OR TEST. 2-MANUAL C- REI'ULLING SCRAM D-RLGULATORY RESTRICTION 3 - AUTOMATIC E-OPER ATOR TRAINING AND SCRAM LICLNSE EXAMINATION '

F-ADMINISTRATIVE G-OPLR ATIONAL LRROR (LXPLAIN)

Il-OlllLR (EXPLAIN)

SUMMARY

-No outages this montli. Unit operated at reduced power level (3 RCP operation) during latter part of month due to low oil level in RCP motor.

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -