UNIT Ocznt, Unit 1 DATE 04/09/76 O

nocxzt "o.

50-269 PREPARED BY E. D. Blakeman OPERATING STATUS 1.

REPORTING PERIOD: March 1 THROUGH

% v, h '41 - 1976 GROSS HOURS IN REPORTING PERIOD:

744.00 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2568 NET CAPABILITY (MWe-Net):

871 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net)

NONE 4.

REASONS FOR RESTRICTION (IF ANY)

This Month Year to Date Cumulative 5.

NUMBER OF HOURS THE REACTOR WAS CRITICAL 9.8 903.0 17675.1 6.

REACr0R RESERVE SHUTDOWN HOURS 7.

HOURS GENERATOR ON-LINE 828.9 1759.6 8.

UNIT RESERVE SHUTDOWN HOURS 9.

GRGSS THERMAL ENERGY GENERATED (MWH) 2084465 36308607 10.

GROSS ELECTRICAL ENERGY GENERATED (sm) 712180 12606900 11.

NET ELECTRICAL ENERGY GENERATED (mm)

(-)4969 671195 11909844 12.

REACTOR SERVICE FACTOR 1.3 41.4 74.4 13.

REACTOR AVAILABILITY FACTOR 41.7 67.7 14.

UNIT SERVICE FACTOR 38.0 66.3 15.

UNIT AVAILABILITY FACTOR 38.0 66.5 16.

UNIT CAPACITY FACTOR (Using Net 35.3 57.6 Capability) 17.

UNIT CAPACITY FACTOR (Using Design Mwe) 34.7 56.6 18.

UNIT FORCED OUTAGE RATE 9.0 16.4 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

Unit became critical on March 31. 1976.

REACTOR SERVICE FACTOR = HOURS REACTOR WAS C3TTICAT, X 00 HOURS IN REPORTING PERIOD '

REACTOR AVAIIABILI'lY FACTOR = HOURS REACTOR UAS AVAILAnLE TO OPERATE X 100 Il0URS IN RLPORTING PER100 UNIT SERVICE !* ACTOR

= H0Ur4 CEME.AT09. ou T.1 NE X 100 HOURS LU REPORTING PERIOD UNIT AVAII.\\11ILITY FACTOR = 1:0URS UNIT WAS A'.'Allrl.E TO GENERATE X 100 HOURS IN REPukII';G PERIOD UNIT CAPACITY FACTOR

= NET ELECTRICAL P0hER Gr.NERATED 100 (N..t C.tpattility or Desir,n (Mw-Net).1 X HOUlu, IN REW4.GL i

PERIOD UNIT FORCED OUTACE RATE - FORCED OUTACE HOURS X 100 HOURS GENERATOR ON LINE + 70RCED OUTAGE HOURS 7 912180 7N

DOCKET NO. 50-269 UNIT oconee Unie 1 DATE 04/09/76 AVERAGE DAILY UNIT POWER LEVEL MONTH March 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 1 17 2

18 3

19 20 4

21 5

6 22 23 7

8 24 9

25 10 26 11 27 12 28 13 29 14 30 15 31 16 DAILY UNrr POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each dcy in the reporting month.

Compute to the nearest whole :negawatt.

These tigures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be eceasions when the daily average power level exceeds the 100Te line (or the restricted power level hne). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

l

DdCKET NO. 50-269 UNIT SHUTDOWNS UNIT NAMii Oconee Unit I DATli 04/09/76 REPORT MONTil March 1976 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.

DATE S SCHEDULED (HOURS)

REASON {1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS 3

2 760301 S

744 C

1 Continuation of previous outage (1) REASON (2) MEnlOD A -LQUIPMENT F AILURE (EXPLAIN) 1-MANUAL B - MAINT. OR TEST.

2-MANUAL C-RLI ULLING SCRAM D-RLGULATORY RESTRICTION 3-AUTOM ATIC E-OPER ATOR TRAINING AND SCRAM LirLNSE EXAMINATION F-ADMINISTR AllVL G-OPLl2ATIONAL LRROM (LXPLAIN)

Il-OlllL R (LXPLAIN)

SUMMARY

Reactor remained shutdown for refueling.

Reactor made critical March 31, 1976.