ML19317G245: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. __ - ._ -. _ __ - _ - _ | {{#Wiki_filter:. __ - ._ -. _ __ - _ - _ | ||
O ..*{. ~c :"Fe | O ..*{. ~c :"Fe | ||
[ c gect ' | [ c gect ' | ||
LC(QL Cl | LC(QL Cl | ||
*b"sc.eCW | *b"sc.eCW | ||
. c Florida 9 May 1978 | . c Florida 9 May 1978 3-0-3-a-2 Poo==no.wer coa CS-78-112 Mr. J. P. O'Reilly, Director Docket No. 50-302 Office of Inspection & Enforcement Licensee No. DPR-72 U.S. Nuclear Regulatory Commission Ref: RII-WHB 230 Peachtree St. N.W., Suite 818 50-302/78-08 Atlanta, GA 30303 | ||
3-0-3-a-2 Poo==no.wer coa CS-78-112 | |||
Mr. J. P. O'Reilly, Director Docket No. 50-302 Office of Inspection & Enforcement Licensee No. DPR-72 U.S. Nuclear Regulatory Commission Ref: RII-WHB 230 Peachtree St. N.W., Suite 818 50-302/78-08 Atlanta, GA 30303 | |||
==Dear Mr. O'Reilly:== | ==Dear Mr. O'Reilly:== | ||
| Line 57: | Line 51: | ||
o, B. DJ6 / w l | o, B. DJ6 / w l | ||
W. P. Stewart f | W. P. Stewart f | ||
' Director, Power Production j JCire | ' Director, Power Production j JCire l | ||
Nuc1 ar D nt Manager l | |||
l | l | ||
\ | \ | ||
4 | 4 | ||
_ _ . _ _ . . _ . _ . . _ - . _ . . _ , , _ _ _ __ ,-}} | _ _ . _ _ . . _ . _ . . _ - . _ . . _ , , _ _ _ __ ,-}} | ||
Revision as of 07:49, 1 February 2020
| ML19317G245 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/09/1978 |
| From: | Stewart W FLORIDA POWER CORP. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19317G235 | List: |
| References | |
| CS-78-112, NUDOCS 8002280875 | |
| Download: ML19317G245 (2) | |
Text
. __ - ._ -. _ __ - _ - _
O ..*{. ~c :"Fe
[ c gect '
LC(QL Cl
- b"sc.eCW
. c Florida 9 May 1978 3-0-3-a-2 Poo==no.wer coa CS-78-112 Mr. J. P. O'Reilly, Director Docket No. 50-302 Office of Inspection & Enforcement Licensee No. DPR-72 U.S. Nuclear Regulatory Commission Ref: RII-WHB 230 Peachtree St. N.W., Suite 818 50-302/78-08 Atlanta, GA 30303
Dear Mr. O'Reilly:
We offer the following responses to the apparent Items of Noncompliance in the referenced Inspection Report.
NOTICE OF VIOLATION A. Criterion XVII of Appendix B to 10 CFR 50 as implemented by Section 1.76 (Florida Power Corporation Quality Manual, approved by the NRC on May 31, 1977) of the FSAR, requires that completed Quality Assur-ance records be retained and stored in adequate facilities in accord-ance with ANSI N45.2.9 - 1974 which states in part that " permanent and temporary record storage facilities shall be so constructed to protect the contents from possible destruction by fire and should be afforded the equivalent protection of a NFPA Class A, four (4) hour rated facility."
Contrary to the above, on April 4, 1978, certain QA records which consisted of all plant operating records for 1977 and a portion of the plant operating records for 1978 were stored in a temporary record storage vault which had two (2) doors which had fire ratings of 1 1/2 hour each.
A. Response:
A request for Engineering Information (REI) has been submitted to FPC Production Engineering requesting a modification (MAR) be genera-ted to modify the three (3) doors involved in the permanent and tempor-ary record storage vaults to comply with the four (4) hour rating requirement of ANSI N45.2.9 - 1974.
' Full compliance will be achieved by 30 September 1978.
8002 28n DC
J. P. O'Railly ,
REF: RII-WHB-50-304/78-08 Page 2 Notice of Violation Cont'd B. Technical Specification 6.8.1 requires that written procedures shell be established, implemented and maintained covering the activities referenced in Appendix "A" to Regulatory Guide 1.33, ,
November 1972. Appendix "A" to Regulatory Guide 1.33, Section 9(e) requires that procedures exist for the control of modifica-
.= tion work.
Contrary to the above, Compliance Procedure 114 (Procedure for Control of Permanent Modifications, Temporary Modifications and Deviations - CP-ll4) was not fully implemented or followed in that:
- 1. Certain safety-related modifications did not have a safety evaluation performed on them. Examples include: MAR 77-1-24, 77-2-30, 77-2-10.
- 2. Drawings were not always updated following safety-related modifications. Examples include:
Drawing No. FD-302-082 (MAR 77-11-04)
Drawing No. FD-302-681 (MAR 77-10-06) :
B. Response: _
- l. By letter of 9 May 1978 from the Technical Services Superintendent to the Maintenance Superintendent, all Maintenance Supervisors, Technical Support Engineer, and all Plant Review Committee Mem- :
bers have been instructed to ensure that safety evaluations l have been performed on all safety-rela'ted plant modifications.
Full compliance has been achieved as of this date.
- 2. By letter of 9 May 1978 from the Technical Services Superintendent to the Technical Support Engineer the instruction was given to review the safety-related modifications and update the drawings j as required. Full compliance will be achieved by 1 July 1978. :
l If there are further questions, please contact us.
o, B. DJ6 / w l
W. P. Stewart f
' Director, Power Production j JCire l
Nuc1 ar D nt Manager l
l
\
4
_ _ . _ _ . . _ . _ . . _ - . _ . . _ , , _ _ _ __ ,-