ML19326B618: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
Created page by program invented by StriderTol
Line 19: Line 19:
{{#Wiki_filter:['-
{{#Wiki_filter:['-
_)
_)
  -
                                           ~
                                           ~
              .
     ,f" j
     ,f"
H GLPIN G BUILD ARKANSAS
    '
j H GLPIN G BUILD ARKANSAS
                                                                                                          <
             )
             )
J A R K AN S A S P OW E R & LIG HT C f'M P A NY STM Avenue ANo PINE STFleer
J A R K AN S A S P OW E R & LIG HT C f'M P A NY STM Avenue ANo PINE STFleer
* PINE BLUfEP, AAKANSAS 71601 (5013534-1330 March 14,1973                                            l
* PINE BLUfEP, AAKANSAS 71601 (5013534-1330 March 14,1973                                            l 1
                                                                                                          .
                                                                                                         -l Mr. John G. Davis, Director Directorate of Regulatory Operations - Region II United States Atomic Energy Commission 230 Peachtree Street, N.W. - Suite 818 1
1
Atlanta, Georgia 30303 7
                                                                                                         -l Mr. John G. Davis, Director Directorate of Regulatory Operations - Region II United States Atomic Energy Commission 230 Peachtree Street, N.W. - Suite 818
                                                                                                          <
1 Atlanta, Georgia 30303
                                                                                                          ,
7


==REFERENCE:==
==REFERENCE:==
Line 48: Line 39:
Some replacement switches have already been installed and other operators' will be examined for replacement as replacement switches are received and systems are turned over from Construction. All required operators will be examined and switches installed as necessary prior to the conclusion of pre-            .
Some replacement switches have already been installed and other operators' will be examined for replacement as replacement switches are received and systems are turned over from Construction. All required operators will be examined and switches installed as necessary prior to the conclusion of pre-            .
operational testing.                                                                    ,
operational testing.                                                                    ,
                                                                                                      -
Yours truly,        .
Yours truly,        .
                                                     *    /: ')f . /.
                                                     *    /: ')f . /.
                            -
                                                   ;)L{        .%sfj, 9 s        /
                                                   ;)L{        .%sfj, 9 s        /
('
('
Line 60: Line 49:
a                _
a                _


_ _ _ _ _ - -                  . _ .          __..
fb MAY 21 B73 Letter from Arkansas Power and Light Company dated 12/27/72.
      -
    '        '
                  .                  ..                                                          -
fb
            -
              , .
                                                    -
MAY 21 B73
                                                            .
Letter from Arkansas Power and Light Company dated 12/27/72.
Letter from Arkansas Power and Light Company dated 1/23/73.
Letter from Arkansas Power and Light Company dated 1/23/73.
                     ' Letter from Arkansas Power and Light Company dated 3/14/73.
                     ' Letter from Arkansas Power and Light Company dated 3/14/73.
Line 78: Line 57:
                       !!. D. Thornburg, RO HQ (4)
                       !!. D. Thornburg, RO HQ (4)
Diractorate of Licensing (4)
Diractorate of Licensing (4)
DR Central Files
DR Central Files PDR Local PDR NSIC OIS, OR
                                                                                                                                                              -
!
PDR Local PDR NSIC OIS, OR
,
                                                                                                                                                               ,e i
                                                                                                                                                               ,e i
                                                                                                                                                                  !
k WLp              &        W I                                                        g    g e
!
pg eh g      ,m - e es a *.,-
                                                                                                                                                    -
k
                                                          ..
WLp              &        W I                                                        g    g
                                                                                                                                                          ..
                                                                        .
_
e pg eh g      ,m - e es a *.,-
A k
A k
___ _  ,.                        , . .                    ._            __ .,_ _ . _ . . .,. -. .,_-.._,---__ .--___,
                                                                                                                                         --}}
                                                                                                                                         --}}

Revision as of 23:40, 31 January 2020

Responds to 721204 Bulletin 72-3.75 Operators in Various Sys Are Affected Models.Vendor Assisted in Identification & Replacement of Defective Switches
ML19326B618
Person / Time
Site: Arkansas Nuclear 
Issue date: 03/14/1973
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19326B616 List:
References
IEB-72-03, IEB-72-3, NUDOCS 8004160394
Download: ML19326B618 (2)


Text

['-

_)

~

,f" j

H GLPIN G BUILD ARKANSAS

)

J A R K AN S A S P OW E R & LIG HT C f'M P A NY STM Avenue ANo PINE STFleer

  • PINE BLUfEP, AAKANSAS 71601 (5013534-1330 March 14,1973 l 1

-l Mr. John G. Davis, Director Directorate of Regulatory Operations - Region II United States Atomic Energy Commission 230 Peachtree Street, N.W. - Suite 818 1

Atlanta, Georgia 30303 7

REFERENCE:

RO:II 50:313 l DRO Bulletin No. 72-3 Limitorque Valve Operator Failures i

Dear Mr. Davis:

The following information is submitted as requested in DRO Balletin s

No. 72-3, "Limitorque Valve Operator Failures", dated December 4,1972.

y/ Our investigation reveals that there are seventy-five (75) operators which are Limitorque models SMB-00 or SMB-000 and may have been manufactured between 1969 and mid-1971. These operators are associated with valves which are installed, or scheduled to be installed, in the following systems: In-termediate cooling water, circulating water, service water, reactor coolant, decay heat, emergency feedwater, main steam, makeup, sampling, reactor build-ing spray, core flood, and chemical addition.

We have corresponded with the Limitorque Corporation through our Architect Engineer and NSSS supplier and have received their cooperation in identifying operators that may contain defective torque switches and supplying the required replacement switches. In addition, Limitorque has provided a field representa-tive to instruct AP&L personnel involved in replacement activity.

Some replacement switches have already been installed and other operators' will be examined for replacement as replacement switches are received and systems are turned over from Construction. All required operators will be examined and switches installed as necessary prior to the conclusion of pre- .

operational testing. ,

Yours truly, .

  • /: ')f . /.
)L{ .%sfj, 9 s /

('

-m 'J. D. PEILLIPS Vice President & Chief Engineer

[ ')

'w/

JDP: NAM:mb 8{}u4iGOM ph, usuaan uiooLe sours umiries overeu ram ,~ . ,~,s.ron owneo l

a _

fb MAY 21 B73 Letter from Arkansas Power and Light Company dated 12/27/72.

Letter from Arkansas Power and Light Company dated 1/23/73.

' Letter from Arkansas Power and Light Company dated 3/14/73.

Regulatory Operatior.s Bulletin No. 72-3 e' l

DISTRIBUTION:

~

!!. D. Thornburg, RO HQ (4)

Diractorate of Licensing (4)

DR Central Files PDR Local PDR NSIC OIS, OR

,e i

k WLp & W I g g e

pg eh g ,m - e es a *.,-

A k

--