ML19326B615

From kanterella
Jump to navigation Jump to search
Responds to 721204 Bulletin 72-3 Limitorque Valve Operator Failures. 73 Operators SMB-00 or SMB-000 May Be Affected. Corrective Action Program Not Yet Finalized
ML19326B615
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/27/1972
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19326B616 List:
References
IEB-72-03, IEB-72-3, NUDOCS 8004160392
Download: ML19326B615 (2)


Text

.

3 a

MAY 21 B73 Documents for Public Document Room:

Arkansas Power and Light Company Docket No. 50-313 Arkansas Nuclear One, Unit 1 Regulatory Operations Bulletin 72-3 1.

Letter from Arkansas Power and Light company, J. D. Phillips, dated December 27, 1972.

2.

Letter from Arkansas Power and Light Company, J. D. Phillips, dated January 23, 1973.

3.

Letter from Arkansas Power and Light Company, J. D. Phillips, dated March 14, 1973.

+

ENCIDSURE A O

m 8 0 0 416 039 R f

m w,

-sy.

-- g g

y..

-,y-.,__,_,._,..,.3.,.,p

.,m,,,

-m

^

[mh

,b'..

E netponc ousto annansas

\\

[;

V ARK ANS AS POWER & LIGHT COMPANY ecember 27, 1972 Mr. John G. Davis, Director Directorate of Regulatory Operations, Region II United States Atomic Energy Commission 230 Peachtree Street, Northwes., Suite 818 Atlanta, Georgia 30303

Reference:

RO: II: 50-313 DRO Bulletin No. 72-3 Limitorque Valve Operat.or Failures

Dear Mr. Davis:

The following constitutes an interim report regarding DRO Bulletin No. 72-3, "Limtorque Valve Operator Failures", dated December 4, 1972.

Within thirty days of this date we will submit an additional report-providing complete details of our investigation now in progress.

N.j Our investigation indicates that there are seventy-three (73) operators which may fall in this category. These operators are models SMB-00 or SMB-000 and may have been manufactured between 1969 and 1971.

A complete program of corrective action is not finalized at this time. The program definitely will include investigation of all model SMB-00 and SMB-000 Limitorque operators and replacement of defective torque switches.

The schedule of this program will be set in a fashion that the investigation and replacement, if required, will be finalized before the conclusion of preoperational testing.

Very truly yours, qf fj' ' b 79.,'v; fy.. n, C

'J. D. Phillips Vice President and Chief Engineer

)