ML19326B617

From kanterella
Jump to navigation Jump to search
Provides Second Interim Rept Re 721204 Bulletin 72-3.Rept to Be Submitted within 60 Days Indicating Number of Subj Valves & Sys & Description & Schedule of Corrective Action
ML19326B617
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/23/1973
From: Phillips J
ARKANSAS POWER & LIGHT CO.
To: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19326B616 List:
References
IEB-72-03, IEB-72-3, NUDOCS 8004160393
Download: ML19326B617 (1)


Text

__ _________ _ -___ _ _________________ - __.___

. ,r ,,

[5 '

{ \

H ELPIN G BUILO ARKANSAS

~

ARK ANS AS POW ER & LIGHT COMPANY STM AVENUE ANo PINE STHEET

  • PINE BLUFF. ARKANSAS 71Boi e (5 11534-1330 January 23, 1973 Mr. John G. Davis, Director Directorate of Regulatory Operations - Region II United "tates Atomic Energy Coomission 230 Peachtree Street, N.W. - Suite 818 -

Atlanta, Georgia 30303

REFERENCE:

RO:II 50-313 DRO Bulleti.t No. 72-3 Limitorque Valve Operator Failure

Dear Mr. Davis:

The following constitutes a second inter report regarding DRO p) i Bulletin No. 72-3, "Limitorque Valve Operato: . allures", dated December 4, 1972. Within sixty days of this date, we will submit a report indicating U ~

the number of valves equipped with Limitorque valve operators falling in the category described by Bulletin 72-3, the system in which these valves are installed, a description of corrective action, and the scheduled com-pletion date of corrective action.

We are presently gathering information relating to each of our Limitorque valve operators, and with the assistance of the Limitorque Corporation, will identify all operators manufactured within the speci-fied time period and finalize our program for replacement of defective torque switches.

Yours truly, g .<

1),[0.f, .

k J. D. Phillips Vice President & Chief Engineer ,

JDP: NAM:mb .

p .- ... ..

V 8004160313

. . . . . , ~ o. , N . . . . o. N . o Gb m e ... -,oo,.. .o mrN er, . ,.. . . ..