ML052370018: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 2: | Line 2: | ||
| number = ML052370018 | | number = ML052370018 | ||
| issue date = 08/18/2005 | | issue date = 08/18/2005 | ||
| title = Technical Specifications, Deletion of Vacuum Flow Requirements from ABGTS SRs | | title = Technical Specifications, Deletion of Vacuum Flow Requirements from ABGTS SRs | ||
| author name = Pickett D | | author name = Pickett D | ||
| author affiliation = NRC/NRR/DLPM/LPD2 | | author affiliation = NRC/NRR/DLPM/LPD2 |
Latest revision as of 19:37, 23 March 2020
ML052370018 | |
Person / Time | |
---|---|
Site: | Sequoyah |
Issue date: | 08/18/2005 |
From: | Pickett D NRC/NRR/DLPM/LPD2 |
To: | Singer K Tennessee Valley Authority |
Pickett D, NRR/DLPM, 415-1364 | |
Shared Package | |
ML052360495 | List: |
References | |
TAC MC4197, TAC MC4198 | |
Download: ML052370018 (1) | |
Text
PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
- c. After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation by verifying within 31 days after removal that a laboratory analysis of representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, shows the methyl iodide penetration less than 2.5% when tested in accordance with ASTM D3803-1989 at a temperature of 30OC (860 F) and a relative humidity of 70%.
- d. At least once per 18 months by:
- 1. Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber banks is less than 3 inches Water Gauge while operating the filter train at a flow rate of 9000 cfm +/- 10%.
- 2. Verifying that the filter trains start on a Containment Phase A Isolation test signal.
- 3. Verifying that the system maintains the spent fuel storage area and the ESF pump rooms at a pressure equal to or more negative than minus 1/4 inch water gauge relative the outside atmosphere while maintaining a total system flow of 9000 cfm l 10%.
- 4. Verifying that the heaters dissipate 32 +/- 3.2 kw when tested in accordance with ANSI N510-1975.
- e. After each complete or partial replacement of a HEPA filter bank by verifying that the HEPA filter banks remove greater than or equal to 99.95% of the DOP when they are tested in-place in accordance with ANSI N510-1975 while operating the system at a flow rate of 9000 cfm +/-
10%.
- f. After each complete or partial replacement of a charcoal adsorber bank by verifying that the charcoal adsorbers remove greater than or equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in-place in accordance with ANSI N510-1975 while operating the system at a flow rate of 9000 cfm +/- 10%.
SEQUOYAH - UNIT 2 3/4 7-20 Amendment No. 77,111, 254,293