PLANT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
- c.
After every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> of charcoal adsorber operation by verifying within 31 days after removal that a laboratory analysis of representative carbon sample obtained in accordance with Regulatory Position C.6.b of Regulatory Guide 1.52, Revision 2, March 1978, shows the methyl iodide penetration less than 2.5% when tested in accordance with ASTM D3803-1989 at a temperature of 30OC (860 F) and a relative humidity of 70%.
- d.
At least once per 18 months by:
- 1.
Verifying that the pressure drop across the combined HEPA filters and charcoal adsorber banks is less than 3 inches Water Gauge while operating the filter train at a flow rate of 9000 cfm +/- 10%.
- 2.
Verifying that the filter trains start on a Containment Phase A Isolation test signal.
- 3.
Verifying that the system maintains the spent fuel storage area and the ESF pump rooms at a pressure equal to or more negative than minus 1/4 inch water gauge relative the outside atmosphere while maintaining a total system flow of 9000 cfm l
10%.
- 4.
Verifying that the heaters dissipate 32 +/- 3.2 kw when tested in accordance with ANSI N510-1975.
- e.
After each complete or partial replacement of a HEPA filter bank by verifying that the HEPA filter banks remove greater than or equal to 99.95% of the DOP when they are tested in-place in accordance with ANSI N510-1975 while operating the system at a flow rate of 9000 cfm +/-
10%.
- f.
After each complete or partial replacement of a charcoal adsorber bank by verifying that the charcoal adsorbers remove greater than or equal to 99.95% of a halogenated hydrocarbon refrigerant test gas when they are tested in-place in accordance with ANSI N510-1975 while operating the system at a flow rate of 9000 cfm +/- 10%.
SEQUOYAH - UNIT 2 3/4 7-20 Amendment No. 77,111, 254,293