ML19242A689: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19242A690
| number = ML19242A690
| issue date = 07/31/1979
| issue date = 07/31/1979
| title = Forwards LER 79-054/03L-0
| title = LER 79-054/03L on 790702:during Periodic Testing, B21-LIS-NO17 C Switch 1 Was Out of Tolerance Low.Caused by Instrument Drift.Instrument Recalibr & Returned to Svc
| author name = Tollison A
| author name = Tollison A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 22:20, 23 January 2020

Forwards LER 79-054/03L-0
Date released: 09/13/2019 Download: ML19242A689


LER 79-054/03L on 790702:during Periodic Testing, B21-LIS-NO17 C Switch 1 Was Out of Tolerance Low.Caused by Instrument Drift.Instrument Recalibr & Returned to Svc
ML19242A690
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/31/1979
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19242A690 (1)
Forwards LER 79-054/03L-0
ML19242A688
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/31/1979
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19242A688 (1)