ML19257B259: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 6: Line 6:
| number = ML19257B260
| number = ML19257B260
| issue date = 01/07/1980
| issue date = 01/07/1980
| title = Forwards LER 79-112/03L-0
| title = LER 79-112/03L-0:on 791219,during Normal Reactor Startup, Indication 3 in Tens Digit for Control Rod 42-07 Did Not Light from 30 to 39.Caused by Short to Ground in Position Indicating Probe.Problem Will Be Corrected at Next Outage
| author name = Tollison A
| author name = Tollison A
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.

Latest revision as of 16:36, 23 January 2020

Forwards LER 79-112/03L-0
Date released: 09/28/2019 Download: ML19257B259


LER 79-112/03L-0:on 791219,during Normal Reactor Startup, Indication 3 in Tens Digit for Control Rod 42-07 Did Not Light from 30 to 39.Caused by Short to Ground in Position Indicating Probe.Problem Will Be Corrected at Next Outage
ML19257B260
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/07/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257B260 (1)
Forwards LER 79-112/03L-0
ML19257B258
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/07/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257B258 (1)