ML19257B259

From kanterella
Jump to navigation Jump to search
Forwards LER 79-112/03L-0
Date released: 09/28/2019 Download: ML19257B259


LER 79-112/03L-0:on 791219,during Normal Reactor Startup, Indication 3 in Tens Digit for Control Rod 42-07 Did Not Light from 30 to 39.Caused by Short to Ground in Position Indicating Probe.Problem Will Be Corrected at Next Outage
ML19257B260
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/07/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257B260 (1)
Forwards LER 79-112/03L-0
ML19257B258
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/07/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19257B258 (1)