NRC Generic Letter 1981-05: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 15: Line 15:
| page count = 9
| page count = 9
}}
}}
{{#Wiki_filter:.ALL LICENSEES  
{{#Wiki_filter:.
OF OPERATING  
                                        ALL LICENSEES OF OPERATING PLANTS AND APPLICANTS FOR OPERATING LICENSES
PLANTS AND APPLICANTS  
                                          AND HOLDERS OF CONSTRUCTION PERMITS
FOR OPERATING  
                                        SUBJECT:                       INFORMATION REGARDING THE PROGRAM FOR ENVIRONMENTAL
LICENSES AND HOLDERS OF CONSTRUCTION  
                                                                      QUALIFICATION OF SAFETY-RELATED ELECTRICAL EQUIPMENT
PERMITS SUBJECT: INFORMATION  
                                                                      (GENERIC LETTER 81-0)
REGARDING  
                                            Reference (a) - Order for Modification of License concerning the Environmental Qualification of Safety-Related Electrical Equipment, October 24, 1980
THE PROGRAM FOR ENVIRONMENTAL
                                          Reference (b)                                   - Commission Memorandum and Order of May 23, 1980 (80-CLI-21)
QUALIFICATION  
                                          Reference (c) - I&E Bulletin 79-OlB Supplement No. 3, October 24, 1980
OF SAFETY-RELATED  
                                          On October 24, 1980, the staff issued Orders [Reference (a)] to all power reactor licensees, which modified their Technical Specifications in accor- dance with the Commission-ordered Environmental Qualification Requirements
ELECTRICAL  
                                            [Reference (b)]. The purpose of this letter Is to provide information in response to licensee requests, regarding these Orders and the associated staff actions. The specific items to be addressed involve the environmental qualification (E-Q) requirements of the electrical equipment for the following: (1) equipment necessary to achieve a cold shutdown, (2) replace- ment parts,                                       (3) Three Mile Island (TMI) Action Plan (NUREG-0737)
EQUIPMENT (GENERIC LETTER 81-0)Reference (a) -Order for Modification of License concerning the Environmental Qualification of Safety-Related Electrical Equipment, October 24, 1980 Reference (b) -Commission Memorandum and Order of May 23, 1980 (80-CLI-21)
                                          equipment and (4) the June 30, 1982 deadline of Ref. (a).
Reference (c) -I&E Bulletin 79-OlB Supplement No. 3, October 24, 1980 On October 24, 1980, the staff issued Orders [Reference (a)] to all power reactor licensees, which modified their Technical Specifications in accor-dance with the Commission-ordered Environmental Qualification Requirements
                                          (1) Cold Shutdown - Reference (c) requires licensees to submit E-Q
[Reference (b)]. The purpose of this letter Is to provide information in response to licensee requests, regarding these Orders and the associated staff actions. The specific items to be addressed involve the environmental qualification (E-Q) requirements of the electrical equipment for the following:  
                                                      information for the equipment necessary to achieve and maintain a cold shutdown condition. This Bulletin requirement was not intended to invoke a change in the licensing basis of the plant.
(1) equipment necessary to achieve a cold shutdown, (2) replace-ment parts, (3) Three Mile Island (TMI) Action Plan (NUREG-0737)
equipment and (4) the June 30, 1982 deadline of Ref. (a).(1) Cold Shutdown -Reference (c) requires licensees to submit E-Q information for the equipment necessary to achieve and maintain a cold shutdown condition.


This Bulletin requirement was not intended to invoke a change in the licensing basis of the plant.Plants licensed to a hot "safe shutdown" condition are only required by Reference (a) to qualify the equipment necessary to achieve a hot shutdown (i.e., plant specific safety-related equipment).  
Plants licensed to a hot "safe shutdown" condition are only required by Reference (a) to qualify the equipment necessary to achieve a hot shutdown (i.e., plant specific safety-related equipment). However, the Bulletin (Reference c) does require that the licensee submit the presently available information for one path to achieve the cold shutdown conditions. The Referihce (c)
However, the Bulletin (Reference c) does require that the licensee submit the presently available information for one path to achieve the cold shutdown conditions.
                                                      position represents an enveloping staff position to be implemented on a case-by-case basis. Regulatory Guide 1.139 contains the implementation plans for the cold shutdown requirements, of which E-Q is a part. Staff reviews are in progress on this issue.


The Referihce (c)position represents an enveloping staff position to be implemented on a case-by-case basis. Regulatory Guide 1.139 contains the implementation plans for the cold shutdown requirements, of which E-Q is a part. Staff reviews are in progress on this issue.(2) Replacement Parts -We note that this requirement is set forth in reference (b) it not explicitly in the ordering clauses of reference,, (a). In this regard, the E-Q requirements for replacement parts are,`3 ...-.. .\ ........3........;
(2) Replacement Parts - We note that this requirement is set forth in reference (b) it not explicitly in the ordering clauses of reference,,
.SURNAM4~.AI .. ..........  
                                                      (a). In this regard, the E-Q requirements for replacement parts are,`
........ ..........  
                                                                              3. . . -                     ..   \                  . 3........;          . .......             .
.............  
  SURNAM4~
.............
  . AI ..........
,,..,,, .,,..................
          ..                                 ........             ..........                 .............           .............           ,,..,,, .,,
,...........  
                  ..................
............  
                    .............
.. ...........
                              ......... ,,.......... ,...........           ............                       E...
E... .........,,..........
I NRC FORM 318 410/801 NRCM 0240                                                                                                                             -., USGPO: 1980-329-824 O FFICIA L RE CO R.D C OP Y
I NRC FORM 318 410/801 NRCM 0240 O FFICIA L RE CO R.D C OP Y-., USGPO: 1980-329-824 ALL LICENSEES
OF OPERATING
PLANTS AND APPLICANTS
FOR OPERATING,/LICENSES
AND HOLDERS OF CONSTRUCTION
PERMITS SUBJECT: INFORMATION
REGARDING
THE PROGRAM FOR ENVIRONMENTAL
QUALIFICATION
OF SAFETY-RELATED
ELECTRICAL
EQUI)*ENT Reference (a) -Order for Modification of License concp i1ng the Environmental Qualification of Safety-eRelated Electrical Equipment, October 24, 1980 Reference (b) -Commission Memorandum and Order of May 23, 1980 (80-CLI-21)
Reference (c) -I&E Bulletin 79-OlB Supplement, flo. 3, October 24, 1980 On October 24, 1980, the staff-issued Order$'[Reference (a)] to all power reactor licensees, which modified their Teghnical Specifications in accor-dance with the Commission-ordered Environsental Qualification Requirements
[Reference (b)]. The purpose of this letter is to provide information in response to licensee requests, regardin4 these Orders and the associated staff actions. The specific items tote addressed involve the environmental qualification (E-Q) requirements of )he electrical equipment for the following:
(1) equipment necessaryto achieve a cold shutdown, (2) replace-ment parts, and (3) Three Mile Isldnd (TMI) Action Plan (NUREG-0737)
equipment and (4) the June 30, l9jt deadline of Ref. (a).(1) Cold Shutdown -Reference
(4 requires licensees to submit E-Q information for the equipment necessary to achieve and maintain a cold shutdown conditiomf This Bulletin requirement was not intended to invoke a chaAge in the licensing basis of the plant.Plants licensed to a hqt "safe shutdown" condition are only required by Reference
2a) to qualify the equipment necessary to a achieve a hot shutdowi (i.e., plant specific safety-related J equpmn)
* the Bulletin (Reference c) does require that , the licensee submi thezavailable information for one path to achieve the cold shutdown conditions.


The Reference (c) position represents an enviloping staff position to be implemented on a case-by-case bas s. Regulatory Guide 1.139 contains the imple-mentation plans or the cold shutdown requirements, of which E-Q is a part. S fff reviews are in progress on this issue.(2) Replacement P~rts -We note that this requirement is set forth in reference
ALL LICENSEES OF OPERATING PLANTS AND APPLICANTS FOR OPERATING,/LICENSES
(4tx but not explicitly in the ordering clauses of reference (a). In thWs regard, the E-Q requirements for replacement parts are OFI~ ... ....................
                              AND HOLDERS OF CONSTRUCTION PERMITS
................................
                          SUBJECT:             INFORMATION REGARDING THE PROGRAM FOR ENVIRONMENTAL
.....................
                                                QUALIFICATION OF SAFETY-RELATED ELECTRICAL EQUI)*ENT
.....................
                          Reference (a) - Order for Modification of License concpi1ng the Environmental Qualification of Safety-eRelated Electrical Equipment, October 24, 1980
....................
                          Reference (b)                     -     Commission Memorandum and Order of May 23, 1980 (80-CLI-21)
...........
                          Reference (c)                     -     I&E Bulletin 79-OlB Supplement,flo. 3, October 24, 1980
....................
                          On October 24, 1980, the staff-issued Order$'[Reference (a)] to all power reactor licensees, which modified their Teghnical Specifications in accor- dance with the Commission-ordered Environsental Qualification Requirements
...........
                          [Reference (b)]. The purpose of this letter is to provide information in response to licensee requests, regardin4 these Orders and the associated staff actions. The specific items tote addressed involve the environmental qualification (E-Q) requirements of )he electrical equipment for the following: (1) equipment necessaryto achieve a cold shutdown, (2) replace- ment parts, and (3) Three Mile Isldnd (TMI) Action Plan (NUREG-0737)
....................
                          equipment and (4) the June 30, l9jt deadline of Ref. (a).
..........
                          (1) Cold Shutdown - Reference (4 requires licensees to submit E-Q
SU RNAM I DDA__T_ __E_ _ _ _ _ _ _ _ _ __ 1= __NR IF R ............
                                  information for the equipment necessary to achieve and maintain a cold shutdown conditiomf This Bulletin requirement was not intended to invoke a chaAge in the licensing basis of the plant.
0...8.........
I.R........02.I..0..........
I..............
....8......3.I.9.......
...NRC FORM 318 410/801 NRCM 0240 OFFICIAL RECORD COPY* USGPO: 1980-329-824
0 ,4 0 U W _- a-ALL LICENSEES  
OF OPERATING  
PLANTS AND APPLICANTS  
FOR OPE NING LICENSES AND HOLDERS OF CONSTRUCTION  
PERMITS /SUBJECT: INFORMATION  
REGARDING  
THE PROGRAM FOR ENV IONMENTAL QUALIFICATION  
OF SAFETY-RELATED  
ELECTRIC EQUIPMENT Reference (a) -Order for Modification of Licens concerning the Environmental Qualification of afety-Rtlated Electrical Equipment, October 24, 1980.Reference (b) -Commission Memorandum and Or er of May 23, 1980 (80-CLI-21)
Reference (c) -I&E Bulletin 79-018 Suppl ent No. 3, October 24, 1880 On October 24, 1980, the staff-issued  
0 ders [Reference (a)] to all power reactor licensees, which modified theiy Technical Specifications in accordance with the Commission-approVqd Environmental Qualification Require-ments [Reference (b)]. The purpose 9T this letter is to provide informa-tion in response to licensee requests, regarding these Orders and the associ-ated staff actions. The specific iems to be addressed involve the environ-mental qualification (E-Q) require ents of the electrical equipment for the following:  
(1) equipment necessary to achieve a cold shutdown, (2) replace-ment parts, and (3) Three Mile I and (TMI) Action Plan (NUREG-0737)  
equip-ment. In addition, the method fbr implementation of the E-Q safety evalua-tion results will be presented./
(1) Cold Shutdown -Referenc /(c) requires licensees to submit E-Q informa-tion for the equipment nessary to achieve and maintain a cold shut-down condition.


This Byletin requirement was not intended to invoke a change in the licensi*g basis of the plant. Plants licensed to a hot'safe shutdown'
Plants licensed to a hqt "safe shutdown" condition are only required by Reference 2a) to qualify the equipment necessary to a        achieve a hot shutdowi (i.e., plant specific safety-related equpmn)
condit on are only required by Reference (a) to qualify the equipment necessa'y to achieve a hot shutdown (i.e., plant specific safety -related equ Went). However, the Bulletin does require that the licensee submit ghe available information.
                                  J                                       
* the Bulletin (Reference c) does require that
                                , the licensee submi thezavailable information for one path to achieve the cold shutdown conditions. The Reference (c) position represents an enviloping staff position to be implemented on a case-by-case bas s. Regulatory Guide 1.139 contains the imple- mentation plans or the cold shutdown requirements, of which E-Q
                                  is a part. S fff reviews are in progress on this issue.


The Reference (c) posi-tion represents an envelop1ng staff position to be implemented on a case-bf-case basis./ Regulatory Guide 1.139 contains the implementation plans for the cold/shutdown requirements, of which E-Q is a part. Staff reviews are in pr ess on this issue.(2) Replacement Parts -The E-Q requirements for Replacement parts are clearly presented in Supplement No. 2 to IEB 79-OlB (September
(2) Replacement P~rts - We note that this requirement is set forth in reference (4txbut not explicitly in the ordering clauses of reference (a).       In thWs regard, the E-Q requirements for replacement parts are SURNAMOFI~... ....................      ................................  .....................    .....................    ....................    ...........
30, 1980).It is the licen~ee's responsibility to justify deviation from the Cateogry I column of NUREG-0588 in an auditible manner. "Sound reasons*for such deviation are plant/equipment specific.
                                                                                                                                                        ....................
                                                                                                                                                                            I....................
                                                                                                                                                                              ...........                ...
  DDA__T_                                                    __E_                              _ _        _              _ _        _            _ _            __        1=          __
    NRRIF    ............
                      0...8......... I.R........02.I..0.......... I.............. ....
NRC FORM 318 410/801 NRCM 0240
                                                                                                                                                                                                  8......
                                                                                                                                                                                                    ...
                                                                                OFFICIAL RECORD COPY                                                                       
* USGPO: 1980-329-824


Examples such as availability or system incompatibility, are a matter of degree and will be Judged accordingly.
0                        ,4                        0                                      U
                                                                                                                                                      W            _-a- ALL LICENSEES OF OPERATING PLANTS AND APPLICANTS FOR OPE NING LICENSES
                              AND HOLDERS OF CONSTRUCTION PERMITS                                                                      /
                        SUBJECT:              INFORMATION REGARDING THE PROGRAM FOR ENV IONMENTAL
                                              QUALIFICATION OF SAFETY-RELATED ELECTRIC EQUIPMENT
                        Reference (a) - Order for Modification of Licens concerning the Environmental Qualification of afety-Rtlated Electrical Equipment, October 24, 1980.


The subjective aspect of this requirement is necessary and will be addressed on a case-by-case basis.OFFICE~SU N M O ...................
Reference (b) - Commission Memorandum and Or er of May 23, 1980 (80-CLI-21)
.....................
                        Reference (c) - I&E Bulletin 79-018 Suppl                                                ent No. 3, October 24, 1880
.....................
                        On October 24, 1980, the staff-issued 0 ders [Reference (a)] to all power reactor licensees, which modified theiy Technical Specifications in accordance with the Commission-approVqd Environmental Qualification Require- ments [Reference (b)]. The purpose 9T this letter is to provide informa- tion in response to licensee requests, regarding these Orders and the associ- ated staff actions. The specific iems to be addressed involve the environ- mental qualification (E-Q) require ents of the electrical equipment for the following: (1) equipment necessary to achieve a cold shutdown, (2) replace- ment parts, and (3) Three Mile I and (TMI) Action Plan (NUREG-0737) equip- ment. In addition, the method fbr implementation of the E-Q safety evalua- tion results will be presented./
.................
                          (1) Cold Shutdown - Referenc /(c) requires licensees to submit E-Q informa- tion for the equipment nessary to achieve and maintain a cold shut- down condition. This Byletin requirement was not intended to invoke a change in the licensi*g basis of the plant. Plants licensed to a hot
.. .....................
                                  'safe shutdown' condit on are only required by Reference (a) to qualify the equipment necessa'y to achieve a hot shutdown (i.e., plant specific safety -related equ                                      However, the Bulletin does require that Went).
.....................
                                  the licensee submit ghe available information. The Reference (c) posi- tion represents an envelop1ng staff position to be implemented on a case-bf-case basis./ Regulatory Guide 1.139 contains the implementation plans for the cold/shutdown requirements, of which E-Q is a part. Staff reviews are in pr                            ess on this issue.
................
..I. I NRC FORM 318 410/80) NRCM 0240 O FFICIA L R EC O RD C OPY*t USGPO: 1980329-824 A' 9 9 9 I 0 -a (3) NUREG-0737 Enuipment
-The qualification requirements f9/ this equipment are specifically addressed In Appendix E to ,te NUREG. The schedule for submitting the information to the NRC i;/contained in Reference (c). Contingencies for equipment unavailpbility are addressed in the NUREG. If the licensee's position on any of this equipment is that it is not safety-related that p sition should be justified in the submittal.


Staff judgements ip this regard will be made in a Supplement to the original Safety Ev luation.Safety Evaluation Implementation
(2)    Replacement Parts - The E-Q requirements for Replacement parts are clearly presented in Supplement No. 2 to IEB 79-OlB (September 30, 1980).
-Reference (b) /equires the staff to issue Safety Evaluations by February 1, 1981. T ese Safety Evaluations will be issued with a request for licensee res p6nse under the provisions of 10 CFR 50.54(f).  
                                  It is the licen~ee's responsibility to justify deviation from the Cateogry I column of NUREG-0588 in an auditible manner. "Sound reasons*
Subsequent to the staff view of that response, the staff will issue Confirmatory and/or Show Ca~ e Orders which provide the opportunity for a hearing to implement the 7pecific requirements applicable to that facility.
                                  for such deviation are plant/equipment specific. Examples such as availability or system incompatibility, are a matter of degree and will be Judged accordingly. The subjective aspect of this requirement is necessary and will be addressed on a case-by-case basis.


This procedure may make 'existing hearing/extension requests based on Reference (a), unnecess/ry.
I
  OFFICE~
      MN
    SU O ...................
NRC FORM 318 410/80) NRCM 0240
                                I.  .....................        .....................      .................
                                                                      O FFICIA L R EC O RD C OPY
                                                                                                                    .. ..................... .....................  ................  ..
                                                                                                                                                                    *t USGPO: 1980329-824


Licensees with such requests should review this matter and afvise the NRC of their intents as soon as possible.
9                          9                  I
    A'                                                          9                                                                                      0 -                a
                  (3) NUREG-0737 Enuipment - The qualification requirements f9/ this equipment are specifically addressed InAppendix E to ,te NUREG. The schedule for submitting the information to the NRC i;/contained in Reference (c). Contingencies for equipment unavailpbility are addressed in the NUREG. If the licensee's position on any of this equipment is that it is not safety-related that p sition should be justified in the submittal. Staff judgements ip this regard will be made in a Supplement to the original Safety Ev luation.


Formal notification s necessary to change existing requests.SI Darrell G. Elsenhut, Director Division of Licensing (4I (K.i D*SEE PREVIOUS WHITE FOR CONCURRENCE
Safety Evaluation Implementation - Reference (b) /equires the staff to issue Safety Evaluations by February 1, 1981. T ese Safety Evaluations will be issued with a request for licensee res p6nse under the provisions of 10 CFR 50.54(f). Subsequent to the staff view of that response, the staff will issue Confirmatory and/or Show Ca~e Orders which provide the opportunity for a hearing to implement the 7pecific requirements applicable to that facility. This procedure may make 'existing hearing/extension requests based on Reference (a), unnecess/ry. Licensees with such requests should review this matter and afvise the NRC of their intents as soon as possible. Formal notification s necessary to change existing requests.
OFFICEO ORB #2 ORB #2 AD:OR E J OELD DD:DL D:DL.................
......................
...........
......................
..... ...*-f-1 ........ .....................
............................
.............
..............
SURNAMEo *MWllijams:!
f ... *T .oito TNoyak .er SSohinki ....RPurpl.e.....
DEisenhut DATEO 12/24/80 12/24/80 / / /II / 1A/ /..................
.....................
.....................
.... ..... ....... .....................
.... ................
....................
NRC FORM 318 110/801 NRCM 0240 O FFICIA L R EC O RD C OPY* SGPO: 1980-329-824 ALL LICENSEES
OF OPERATING
PLANTS AND APPLICANTS
FOR OPERATJ G LICENSES AND HOLDERS OF CONSTRUCTION
PERMITS /SUBJECT: INFORMATION
REGARDING
THE PROGRAM FOR ENVIRO 4 ENTAL QUALIFICATION
OF SAFETY-RELATED
ELECTRICAL
EQUIPMENT Reference (a) -Order for Modification of License c ncerning the Environmental Qualification of Safety-Related El ctrical Equipment, October 24, 1980.Reference (b) -Commission Memorandum and Order/of May 23, 1980 (80-CLI-21)
Reference (c) -I&E Bulletin 79-OlB Supplemeny No. 3, October 24, 1980 On October 24, 1980, the staff-issued Orders,/(Reference (a)I to all power reactor licensees, which modified their Technical Specifications In accordance with the Commission-approved Enyironmental Qualification Require-ments [Reference (b)]. The purpose of this letter is to provide Information, in response to licensee requests, regard 7ng these Orders and the associated staff actions. The specific items to b 'addressed involve the environmental qualification (E-Q) requirements of th electrical equipment for the following:
1) equipment necessary to achieve a cold shutdown, (2) replace-ment parts, 3) equipment in mild env ronments, and (4) Three Mile Island (TMI)Action Plan NUREG-0737)
equipment.


n addition, the method for implementation of the E-Q safety evaluation results will be presented.
SI
                                                                              Darrell G. Elsenhut, Director Division of Licensing
                                                                                                                                                            (4I (
                                                                                                                                              K.i D
                  *SEE PREVIOUS WHITE FOR CONCURRENCE
  OFFICEO
SURNAMEo ORB
          *MWllijams:!
                      #2              ORB #2
                              ......................
              .................
                              f ...*T .oito AD:OR
                                                      ......................
                                                      ...........
                                                          TNoyak        .er
                                                                              ...... E             J      OELD
                                                                                            ..*-f-1.....................
                                                                                        . .......
                                                                                                        SSohinki ....
                                                                                                                              DD:DL
                                                                                                                          ............................
                                                                                                                            RPurpl.e..... DEisenhut D:DL .............
                                                                                                                                                        .............
  DATEO    12/24/80 .....................
          ..................
                                                            / /
                                      12/24/80 .....................                    /II /      1A/                                                      /
                                                                            . ... ..... ....... ..................... .... ................ ....................
NRC FORM 318110/801 NRCM 0240                                                                                                                          *  SGPO: 1980-329-824 O FFICIA L R EC O RD C OPY


(1) Cold Shutdown -Reference (c) requires licensees to submit E-Q information for the equipment necessary tq achieve and maintain a cold shutdown condition.
ALL LICENSEES OF OPERATING PLANTS AND APPLICANTS FOR OPERATJ                                                                  G LICENSES
                            AND HOLDERS OF CONSTRUCTION PERMITS                                                                          /
                      SUBJECT:                INFORMATION REGARDING THE PROGRAM FOR ENVIRO                                            4 ENTAL              QUALIFICATION
                                              OF SAFETY-RELATED ELECTRICAL EQUIPMENT
                        Reference (a) - Order for Modification of License c ncerning the Environmental Qualification of Safety-Related El ctrical Equipment, October 24, 1980.


This Bulletin requ irement was not intended to invoke a change In the licensing basis of thA plant. Plants licensed to a hot "safe shut-down' condition are only required by Reference (a) to qualify the equip-ment necessary to achieve a/hot shutdown (i.e., plant specific safety-related equipment).  
Reference (b) - Commission Memorandum and Order/of May 23, 1980 (80-CLI-21)
Howevfr, the bulletin does require that the licensee submit the available info mation. The Reference (t) position represents an enveloping staff posi on to be implemented on a case-by-case basis.Regulatory Guide 1.139 cpntains the implementation plans for the cold ct shutdown requirements, ,f which E-Q is a part. Staff reviews are in progress on this Issue/(2) Replacemtnt Parts -Toe E-Q requirements for replacement parts are clearly presented in Suppleme/t No. 2 to IEB 79-OlB (September
                      Reference (c) - I&E Bulletin 79-OlB Supplemeny No. 3, October 24, 1980
30, 1980). It is the licensee's responsibility to justify deviation from the Category I column of NUREG-0588/in an auditible manner. "Sound reasons" for such deviation are plant/equipment specific.
                      On October 24, 1980, the staff-issued Orders,/(Reference (a)I to all power reactor licensees, which modified their Technical Specifications In accordance with the Commission-approved Enyironmental Qualification Require- ments [Reference (b)]. The purpose of this letter is to provide Information, in response to licensee requests, regard                                            7ng    these Orders and the associated staff actions. The specific items to b 'addressed involve the environmental qualification (E-Q) requirements of th electrical equipment for the following:                  1) equipment necessary to achieve a cold shutdown, (2) replace- ment parts, 3) equipment in mild env ronments, and (4) Three Mile Island (TMI)
                      Action Plan NUREG-0737) equipment.                                             n addition, the method for implementation of the E-Q safety evaluation results will be presented.


Examples such as availability or system incompat1bility, are a matter of degree and will be Judged OFFICEO ..,....................
(1) Cold Shutdown - Reference (c) requires licensees to submit E-Q information for the equipment necessary tq achieve and maintain a cold shutdown condition. This Bulletin requ irement was not intended to invoke a change In the licensing basis of thA plant. Plants licensed to a hot "safe shut- down' condition are only required by Reference (a) to qualify the equip- ment necessary to achieve a/hot shutdown (i.e., plant specific safety- related equipment). Howevfr, the bulletin does require that the licensee submit the available info mation. The Reference (t) position represents an enveloping staff posi on to be implemented on a case-by-case basis.
..........
......................
..................
.....................
...........
...................
..........
.............................
....................
SURNAMtE.SU N M O ...................
..........
...........
..........
...........
.....................
..........
................
..........
................
...................
.... .DATE 1. _ _.__ __ .1 .__ __ __ __....RC..... ..ORM. ................
NRCM.. 0240.........
OFFICIAL..........RECORD.


.....COPY.....  
Regulatory Guide 1.139 cpntains the implementation plans for the cold ct shutdown requirements, ,f                              which E-Q is a part.                  Staff reviews are in progress on this Issue/
... S..............80-39.............
                      (2) Replacemtnt Parts - Toe E-Q requirements for replacement parts are clearly presented in Suppleme/t No. 2 to IEB 79-OlB (September 30, 1980). It is the licensee's responsibility to justify deviation from the Category I
NRC FORM 318 (10/80) NRCM 0240 O FFICIA L R EC O RD C OP Y* USGPO: 1980-329-824 u b ~* 4-2-accordingly.
                              column of NUREG-0588/in an auditible manner. "Sound reasons" for such deviation are plant/equipment specific. Examples such as availability or system incompat1bility, are a matter of degree and will be Judged OFFICEO .    . ,.................... ..........
                                          ......................    ..................      .....................      ...........  ................... ..........  .............................
                                                                                                                                                                                            ....................
    SU
      MNO ...................          .......... ........... .......... ...........        .....................      .......... ................      .......... ................      ...................                 ...
          1.


The subjective aspect of this requ Iement is necessary and will be addressed on a case-by-case basis.(3) Mild Environments
SURNAMtE.
-It is apparent that, in soe cases, the staff's view of the scope of this task differs signif cantly from the licensee~s view. The requirements are contained in thD.O.. Guidelines and NUREG-0588.


Programs are required to addre s aging. Equipment should be qualified for the environmental extremeF associated with loss of its non-redundant HVAC for the time it is requ red to operate plus margin.Throughout the Guidelines, the licensee n y, as an alternative, provide contingencies to maintain environmental parameters within the equipment specifications or provide the necessary/standard of reliability.
DATE            _          _.__                                    __                  .1          .__                    __                                __                                  __
    ....  ................
          RC.....        .. ORM.


In the case of mild environments, such altern'tives are much more feasible due '., to the accessibility of the components!.  
NRCM.. 0240.........                  OFFICIAL..........RECORD. .....COPY.....                                                          ...                      S..............80-39.............
Licensees should proceed with their mild environment program based fn the existing requirements.
NRC FORM 318 (10/80) NRCM 0240                                                                                                                                                           
* USGPO: 1980-329-824 O FFICIA L R EC O RD C OP Y


More detailed information regarding the mild environment NRC review will be provided next March. /(4) NUREG-0737 Equipment
u  b    ~*    4
-The qualification requirements for this equipment are specifically addressed in AppF ndix B to the HUREG. The schedule for submitting the information to th NRC is contained in Reference Wc).Contingencies for equipment unav ilability are addressed in the NUREG.If the licensee's position on a of this equipment is that it is not safety-related that position s uld be justified in the submittal.
                                                                                  -2- accordingly. The subjective aspect of this requ Iement is necessary and will be addressed on a case-by-case basis.


Staff judgements in this regar will be made in a Supplement to the original Safety Evaluation.
(3) Mild Environments - It is apparent that, in soe cases, the staff's view of the scope of this task differs signif cantly from the licensee~s view. The requirements are contained in thD.O.. Guidelines and NUREG-0588. Programs are required to addre s aging. Equipment should be qualified for the environmental extremeF associated with loss of its non-redundant HVAC for the time it is requ red to operate plus margin.


(5) Safety Evaluation Implementation
Throughout the Guidelines, the licensee n y, as an alternative, provide contingencies to maintain environmental parameters within the equipment specifications or provide the necessary/standard of reliability. In the case of mild environments, such altern'tives are much more feasible due '.,
-Reference (b) requires the staff to issue Safety Evaluations by/February
                          to the accessibility of the components!. Licensees should proceed with their mild environment program based fn the existing requirements.
1, 1981. These Safety Evaluations will be issued with a requ t for licensee response under the provisions of 10 CFR 50.54(f).  
Subsejuent to the staff review of that response, the staff will issue Confirma bry and/or Show Cause Orders which provide the opportunity for a hearing/to implement the specific requirements appli-cable to that facility.


this procedure may make existing:hearing/extension request based on Referqhce (a), unnecessary.
More detailed information regarding the mild environment NRC review will be provided next March.                                        /
                    (4) NUREG-0737 Equipment - The qualification requirements for this equipment are specifically addressed in AppF ndix B to the HUREG. The schedule for submitting the information to th NRC is contained in Reference Wc).
                          Contingencies for equipment unav ilability are addressed in the NUREG.


Licensees with such requests should review this matter and advise the NRC of their intents as soon as possible.
If the licensee's position on a of this equipment is that it is not safety-related that position s uld be justified in the submittal.


F rmal notification Is necessary to change existing requests.Darrell G. Elsenhut, Director Division of Licensing DE Rosz t ocjY i~ryoJ OFFICEI0 ORB #2# AD:DL DE OELD.... .. DDP;&....
Staff judgements in this regar will be made in a Supplement to the original Safety Evaluation.
......I RB #.2 ..... ................
.. ..............
.. ...........
.......k...i...SURNAMt MW s :kfTI k T TNovak RVollmer SSohinki RPurple DEisenh' .. ............
...... .............
...... .....................
........ .................
........ .............
....... ..... ...................
DATEI 1/ /to 1 2/4 j9 12/ / 12/ / j 12/ / 12/ / 12/ /........ .....................
.........
............
.....................
.... .................
....................
.................
..NRC FORM 318 (i1080) NRCM 0240 O FFICIA L R EC O RD C OPY-.- US;PO: 1980-329-824 ALL LICENSEES
OF OPERATING
PLANTS AND APPLICANTS
F OPERATING
LICENSES AND HOLDERS OF CONSTRUCTION
PERMITS 7 SUBJECT: INFORMATION
REGARDING
THE PROGRAM FOR. tNVIRONMENTAL
QUALIFICATION
OF SAFETY-RELATED
ELE9TRICAL
EQUIPMENT Reference (a) -Order for Modification of License concerning the Environmental Qual1ficati owof Safety-Related Electrical Equipment, October 24, 1980 Reference (b) -Commission Memorandum aqd Order of May 23, 1980 (80-CLI-21)
Reference (c) -I&E Bulletin 79-018 Supplement No. 3, October 24, 1980.On October 24, 1980, the staff-issued Orders [Reference (a)] to all power reactor licensees, which modified their Technical Specifications in accor-dance with the Commission-approved tnvironmental Qualification Requirements
[Reference (b)]. The purpose of tfis letter is to provide information in response to licensee requests, refarding these Orders and the associated staff actions. The specific iteus to be addressed involve the environmental qualification (E-Q) requirements of the electrical equipment for the following:
(1) equipment necessary to achieve a cold shutdown (2) replacement parts, and (3) Three Mile Islnd (TMI) Action Plan (NUREG-07371 equipment and (4) the June 30, 1982 deadline of Ref. (a).(1) Cold Shutdown -Refereffce (c) requires licensees to submit E-Q information for the e4uipment necessary to achieve and maintain a cold shutdown conditfon.


This Bulletin requirement was not intended to invoke a change lb the licensing basis of the plant. Plants licensed to a hot '¶iafe shutdown" condition are only required by Reference (a) to q9alify the equipment necessary to achieve a hot shutdown (i.e., plant specific safety-related equipment).  
(5) Safety Evaluation Implementation - Reference (b) requires the staff to issue Safety Evaluations by/February 1, 1981. These Safety Evaluations will be issued with a requ t for licensee response under the provisions of 10 CFR 50.54(f). Subsejuent to the staff review of that response, the staff will issue Confirma bry and/or Show Cause Orders which provide the opportunity for a hearing/to implement the specific requirements appli- cable to that facility. this procedure may make existing:hearing/extension request based on Referqhce (a), unnecessary. Licensees with such requests should review this matter and advise the NRC of their intents as soon as possible. F rmal notification Is necessary to change existing requests.
However, the Bulletin doei require that the licensee submit the available information.


Thb Reference (c) position represents an enveloping staff positionkto be implemented on a case-by-case basis. Regulatory Guide 1.139 cofitains the implementation plans for the cold shutdown requirements, of which E-Q is a part. Staff reviews are in progress on this issug.(2) RQPiacementj'Parts
Darrell G. Elsenhut, Director Division of Licensing DE Rosz t ocjY i~ryoJ
-We note that this requirement is set forth in reference
  OFFICEI0        ORB  #.2 RB #2#                      I     ..... AD:DL................ .. DE ..............           OELD.... .. .......
1b) Eti not explicitly in the ordering clauses of reference (a). In Ohis regard, the E-Q requirements for replacement parts are clearly presented in Supplement No. 2 to IEB 79-OlB (September
                                                                                                        .. ...........                   DDP;&.... ......       k...i...
30, 1980). / is the licensee's responsibility to justify deviation from./I.1 OFFIC~t O FC O ...................  
SURNAMt    MW        s :kfTI  k            T                    TNovak                RVollmer                  SSohinki            RPurple        DEisenh
..........
                                  ......
......................  
                          ............         .     ........................... ........ ......................... ............. ....... .....
......................
                                                  ..........                                                                                           ...................
............  
  DATEI
................  
          '..
.....................  
              1/      /to              1 2/4    j9          12/ /                  12/ /              j    12/ /                  12/      /        12/ /
...........  
                      ........ ..................... ......... ............ ..................... .... ................. .................... ................. ..
.....................  
                                                                                                                                                    -.-US;PO: 1980-329-824 NRC FORM 318 (i1080) NRCM 0240                                 O FFICIA L R EC O RD C OPY
...........  
...............
SURNAMEtI SUR AMEO ........ ..........
...................  
.....................
..........  
..............................
.....................  
..........
...................  
.. ...................  
.....................ATI. 1. _ _ __ __ .1 __ __ __ __NRC FORM 318 (1O8O .N C .............  
OFF.....CIAL...  
REC O RD........  
COPY...........P...........  
.. .............
NRC FORM 318 (lO/80) NRCM 0240 O FFICIA L R EC O RD C OPY., USGPO: 1980-329-824
-2 -the Category I column of NUREG-0588 In an auditible manner. "Sound reasons" for such deviation are plant/equipment specific.


Examples such as availability or system incompatability,,are a matter of degree and will be judged accordingly.
ALL LICENSEES OF OPERATING PLANTS AND APPLICANTS F
                              AND HOLDERS OF CONSTRUCTION PERMITS                                                                                                              7              OPERATING LICENSES
                          SUBJECT:                    INFORMATION REGARDING THE PROGRAM FOR.tNVIRONMENTAL
                                                      QUALIFICATION OF SAFETY-RELATED ELE9TRICAL EQUIPMENT
                          Reference (a) - Order for Modification of License concerning the Environmental Qual1ficati owof Safety-Related Electrical Equipment, October 24, 1980
                          Reference (b) - Commission Memorandum aqd Order of May 23, 1980 (80-CLI-21)
                          Reference (c) - I&E Bulletin 79-018 Supplement No. 3, October 24, 1980.


/(3) NUREG-0737 Equipment
On October 24, 1980, the staff-issued Orders [Reference (a)] to all power reactor licensees, which modified their Technical Specifications in accor- dance with the Commission-approved tnvironmental Qualification Requirements
-The qualification re4 irements for this equipment are specifically addressed in Apendix 8 to the HUREG.The kciedule for submitting the inforMattn to the NRC is contained in Reference (c). Contingencies for equipment unavailability are addressed in the NUREG. If the licensee's position on any of this equipment is that it is not safety-reited within the meaning of reference
                          [Reference (b)]. The purpose of tfis letter is to provide information in response to licensee requests, refarding these Orders and the associated staff actions. The specific iteus to be addressed involve the environmental qualification (E-Q) requirements of the electrical equipment for the following: (1) equipment necessary to achieve a cold shutdown (2) replacement parts, and (3) Three Mile Islnd (TMI) Action Plan (NUREG-07371 equipment and (4) the June 30, 1982 deadline of Ref. (a).
(2), that position should justified In the submittal.
                            (1) Cold Shutdown - Refereffce (c) requires licensees to submit E-Q
                                          information for the e4uipment necessary to achieve and maintain a cold shutdown conditfon. This Bulletin requirement was not intended to invoke a change lb the licensing basis of the plant. Plants licensed to a hot '¶iafe shutdown" condition are only required by Reference (a) to q9alify the equipment necessary to achieve a hot shutdown (i.e., plant specific safety-related equipment). However, the Bulletin doei require that the licensee submit the available information. Thb Reference (c) position represents an enveloping staff positionkto be implemented on a case-by-case basis. Regulatory Guide 1.139 cofitains the implementation plans for the cold shutdown requirements, of which E-Q is a part. Staff reviews are in progress on this issug.


Staff judgments in this regard will Je made In a Supplement to the original Safety Evaluation.
(2)            RQPiacementj'Parts - We note that this requirement is set forth in reference 1b) Eti not explicitly in the ordering clauses of reference (a).            In Ohis regard, the E-Q requirements for replacement parts are clearly presented in Supplement No. 2 to IEB 79-OlB (September 30,
                                          1980). /                        is the licensee's responsibility to justify deviation from
                                                            ./
  OFFIC~t SURNAMEtI
      OFC            I.1 O ...................                ..........          ...................... ......................                          ............        ................
                                                                                                                                                                            ..................... .......... ...................... ...........          ..............
                    (1O8O          N    .C............. OFF.....CIAL...                                                                    REC              O  RD........
                                                                                                                                                                        COPY.. . . . . P. . . . . . ...............
                                                                                                                                                                                                                                      ....................
      NRC  318 FORM
SUR AMEO ...................
          ........            ..........    .....................                        ..........                                    .....................
                                                                                                                ..............................                              ..........
                                                                                                                                                                                  ...................        .. ...................
  .ATI. 1. _                            _              __                                          __                              .1              __                                  __                              __                    __
NRC FORM 318 (lO/80) NRCM 0240                                                                                                                                                                                                        ., USGPO: 1980-329-824 O FFICIA L R EC O RD C OPY


t (4) June 30, 1982 Deadline -Some licensees have indicated that the new E-Q requirements have resulted ii saturation of the test/production capabilities of the industry, aqk violations of the deadline may occur. Licensees should note that the Ref. (a) orders implemented a Commission imposed deadline ZTRef. (b)] and the staff is unable to grant relief from this deadli1 9.Some licensees have submitted eitier a hearing request or a request for an extension of the time to requert a hearing In regard to Ref. (a).Others have submitted letters of concern regarding specific requirements.
-2- the Category I column of NUREG-0588 In an auditible manner. "Sound reasons" for such deviation are plant/equipment specific. Examples such as availability or system incompatability,,are a matter of degree and will be judged accordingly.                                          /
                  (3) NUREG-0737 Equipment - The qualification re4 irements for this equipment are specifically addressed in Apendix 8 to the HUREG.
 
The kciedule for submitting the inforMattn to the NRC is contained in Reference (c). Contingencies for equipment unavailability are addressed in the NUREG. If the licensee's position on any of this equipment is that it is not safety-reited within the meaning of reference (2), that position should                                      justified In the submittal.
 
Staff judgments in this regard will Je made In a Supplement to the original Safety Evaluation.                                      t
                  (4)     June 30, 1982 Deadline - Some licensees have indicated that the new E-Q requirements have resulted ii saturation of the test/production capabilities of the industry, aqk violations of the deadline may occur. Licensees should note that the Ref. (a) orders implemented a Commission imposed deadline ZTRef. (b)] and the staff is unable to grant relief from this deadli19 .
                  Some licensees have submitted eitier a hearing request or a request for an extension of the time to requert a hearing In regard to Ref. (a).
                  Others have submitted letters of concern regarding specific requirements.


The former will be addressed on n individual basis. This letter responds to the generic concerns of both/groups.
The former will be addressed on n individual basis. This letter responds to the generic concerns of both/groups.


/ Sincerely,-? Darrell G. Elsenhut, Director/ Division of Licensing i I*See attached file co~/ for previous concurrences
/     Sincerely,
/I OFFIC OR E OI&E OELD OV DL:DD DL:D....... .........  
                                                                    -?       Darrell G. Elsenhut, Director
............  
                                                                    /         Division of Licensing I
.........  
                                                                        i
.................  
                    *See attached file co~/ for previous concurrences
.........  
                                /I
.................  
  OFFIC
.........  
              .......OR                                    OELD OV
.................  
                                    E OI&E ......... .................                                           DL:D.........
.........  
                                                                                        DL:DD ......... .................               ................. ......... ....................
.................  
SURNAMEO        I.ovak
.........  
                      ......... ............
....................
          T...................   EJordan
SURNAMEO T I.ovak EJordan SSohinki RPurple DGEisenhut I...................  
                                  ....................
....................  
                                                        SSohinki
.....................  
                                                                      .........   .................
.....................  
                                                                                    RPurple                DGEisenhut
.........................................
                                                      ..................... ..................... .........................................
DATE_ _ 1 /8 1 1/ /81 l/ 81 1/ /81 1/ /81.3 ...........  
                                                                                                                                                                    I
................
  DATE_ 1
R.... L..........  
    _
.....................  
          . 3
..........
                    / 81           1/ /81 R.... ................
2...............................  
                    ...........
....................
                                                          l/ 81                    1/
NRC FORM 318 410/80) NRCM 0240 OFFICIAL RECORD COPY* US;PO: 1980-329-824
                                                                              L..........
-2-clearly presented in Supplement No. 2 to IEB 79-OIB (September
                                                                                                /81
30, 1980). It is the licensee's responsibility to Justify deviation from the Category I column of NUREG-0588 in an auditible manner. "Sound reasons" for such deviation are plant/equipment specific.
                                                                                  .....................
                                                                                                              1/ /81
                                                                                                          ..........                                               ....................
                                                                                                                                                                                        2...
 
* US;PO: 1980-329-824 NRC FORM 318 410/80) NRCM 0240                           OFFICIAL RECORD COPY


Examples such as availability or system incompatability, are a matter of degree and will be judged accordingly.
-2- clearly presented in Supplement No. 2 to IEB 79-OIB (September 30,
                        1980).    It is the licensee's responsibility to Justify deviation from the Category I column of NUREG-0588 in an auditible manner. "Sound reasons" for such deviation are plant/equipment specific. Examples such as availability or system incompatability, are a matter of degree and will be judged accordingly.


(3) NUREG-0737 Equipment  
(3) NUREG-0737 Equipment - The qualification requirements for this equipment are described in Appendix B to the NUREG. The schedule for submitting the information to the NRC is contained in Reference tc). Contingencies for equipment unavailability are addressed in the NUREG. If the licensee's position on any of this equipment is that it is not safety-related within the meaning of reference (a),
-The qualification requirements for this equipment are described in Appendix B to the NUREG. The schedule for submitting the information to the NRC is contained in Reference tc). Contingencies for equipment unavailability are addressed in the NUREG. If the licensee's position on any of this equipment is that it is not safety-related within the meaning of reference (a), that position should be justified in the submittal.
                        that position should be justified in the submittal. Staff Judgments in this regard will be made in a Supplement to the original Safety Evaluation.


Staff Judgments in this regard will be made in a Supplement to the original Safety Evaluation.
(4) June 30, 1982 Deadline - Some licensees have indicated that the new E-Q requirements have resulted in saturation of the test/production capabilities of the industry, and violations of the deadline may occur. Licensees should note that the Ref. (a) orders implemented a Commission imposed deadline [Ref. Ib)J and the staff is not authorized to grant relief from this deadline.


(4) June 30, 1982 Deadline -Some licensees have indicated that the new E-Q requirements have resulted in saturation of the test/production capabilities of the industry, and violations of the deadline may occur. Licensees should note that the Ref. (a) orders implemented a Commission imposed deadline [Ref. Ib)J and the staff is not authorized to grant relief from this deadline.Some licensees have submitted either a hearing request or a request for an extension of the time to request a hearing in regard to Ref. (a). Others have submitted letters of concern regarding specific requirements.
Some licensees have submitted either a hearing request or a request for an extension of the time to request a hearing in regard to Ref. (a). Others have submitted letters of concern regarding specific requirements. The former will be addressed on an individual basis. This letter responds to the generic concerns of both groups.


The former will be addressed on an individual basis. This letter responds to the generic concerns of both groups.Sincerely, Darrell G. Eisenhut, Director Division of Licensing*See previous file copi S ncur ces OFFICEO Dl OELDj DL:DD SURNAMEO s :m va EJor SSohinki 4 k RPurple D nhut DATEF 1 1/- /8 1\/8i j 1/ / 8T 1 1 j.........
Sincerely, Darrell G. Eisenhut, Director Division of Licensing
..................  
                *See previous file copi S                     ncur         ces OFFICEO   Dl                                                           OELDj                         DL:DD
... ....................  
SURNAMEO
......................  
  DATEF    1 s:m
..... ................  
          ..................
....................  
                                    va
....................
                                1/- /8 EJor
NRC FORM 318 110/801 NRCM 0240 OFFICI1AL  
                                                  1\/8i SSohinki
PRECRDn~ COPYV USGP0: 1980-329-824
                                                                                  / j11/
_ * * * *x__
                                                                                        4 k
* s _ __ * ^ _ __ ..}}
                                          ... .................... . .....................
                                                                                                8T1 RPurple j.........
                                                                                                                        D          nhut
                                                                                                ..... ................ .................... ....................
NRC FORM 318 110/801 NRCM 0240                   OFFICI1AL PRECRDn~
                                                  _ * *   * *x__ * s _ __   * ^   _
                                                                                            COPYV
                                                                                            __   .   .
                                                                                                                                              USGP0:  1980-329-824}}


{{GL-Nav}}
{{GL-Nav}}

Latest revision as of 03:15, 24 November 2019

NRC Generic Letter 1981-005: Qualification of Safety-Related Electrical Equipment
ML031080497
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Sterling, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000514, 05000363, 05000000, 05000515, Zimmer, 05000471, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Bailly, Allens Creek, Atlantic Nuclear Power Plant, Perkins, Cherokee, Clinch River, Skagit, Marble Hill, Black Fox, Hartsville, Phipps Bend, Yellow Creek, Crane
Issue date: 01/19/1981
From: Eisenhut D
Office of Nuclear Reactor Regulation
To:
References
80-CLI-21, BL-79-01B, Suppl 3 GL-81-005, NUDOCS 8103190387
Download: ML031080497 (9)


.

ALL LICENSEES OF OPERATING PLANTS AND APPLICANTS FOR OPERATING LICENSES

AND HOLDERS OF CONSTRUCTION PERMITS

SUBJECT: INFORMATION REGARDING THE PROGRAM FOR ENVIRONMENTAL

QUALIFICATION OF SAFETY-RELATED ELECTRICAL EQUIPMENT

(GENERIC LETTER 81-0)

Reference (a) - Order for Modification of License concerning the Environmental Qualification of Safety-Related Electrical Equipment, October 24, 1980

Reference (b) - Commission Memorandum and Order of May 23, 1980 (80-CLI-21)

Reference (c) - I&E Bulletin 79-OlB Supplement No. 3, October 24, 1980

On October 24, 1980, the staff issued Orders [Reference (a)] to all power reactor licensees, which modified their Technical Specifications in accor- dance with the Commission-ordered Environmental Qualification Requirements

[Reference (b)]. The purpose of this letter Is to provide information in response to licensee requests, regarding these Orders and the associated staff actions. The specific items to be addressed involve the environmental qualification (E-Q) requirements of the electrical equipment for the following: (1) equipment necessary to achieve a cold shutdown, (2) replace- ment parts, (3) Three Mile Island (TMI) Action Plan (NUREG-0737)

equipment and (4) the June 30, 1982 deadline of Ref. (a).

(1) Cold Shutdown - Reference (c) requires licensees to submit E-Q

information for the equipment necessary to achieve and maintain a cold shutdown condition. This Bulletin requirement was not intended to invoke a change in the licensing basis of the plant.

Plants licensed to a hot "safe shutdown" condition are only required by Reference (a) to qualify the equipment necessary to achieve a hot shutdown (i.e., plant specific safety-related equipment). However, the Bulletin (Reference c) does require that the licensee submit the presently available information for one path to achieve the cold shutdown conditions. The Referihce (c)

position represents an enveloping staff position to be implemented on a case-by-case basis. Regulatory Guide 1.139 contains the implementation plans for the cold shutdown requirements, of which E-Q is a part. Staff reviews are in progress on this issue.

(2) Replacement Parts - We note that this requirement is set forth in reference (b) it not explicitly in the ordering clauses of reference,,

(a). In this regard, the E-Q requirements for replacement parts are,`

3. . . - .. \ . 3........; . ....... .

SURNAM4~

. AI ..........

.. ........ .......... ............. ............. ,,..,,, .,,

..................

.............

......... ,,.......... ,........... ............ E...

I NRC FORM 318 410/801 NRCM 0240 -., USGPO: 1980-329-824 O FFICIA L RE CO R.D C OP Y

ALL LICENSEES OF OPERATING PLANTS AND APPLICANTS FOR OPERATING,/LICENSES

AND HOLDERS OF CONSTRUCTION PERMITS

SUBJECT: INFORMATION REGARDING THE PROGRAM FOR ENVIRONMENTAL

QUALIFICATION OF SAFETY-RELATED ELECTRICAL EQUI)*ENT

Reference (a) - Order for Modification of License concpi1ng the Environmental Qualification of Safety-eRelated Electrical Equipment, October 24, 1980

Reference (b) - Commission Memorandum and Order of May 23, 1980 (80-CLI-21)

Reference (c) - I&E Bulletin 79-OlB Supplement,flo. 3, October 24, 1980

On October 24, 1980, the staff-issued Order$'[Reference (a)] to all power reactor licensees, which modified their Teghnical Specifications in accor- dance with the Commission-ordered Environsental Qualification Requirements

[Reference (b)]. The purpose of this letter is to provide information in response to licensee requests, regardin4 these Orders and the associated staff actions. The specific items tote addressed involve the environmental qualification (E-Q) requirements of )he electrical equipment for the following: (1) equipment necessaryto achieve a cold shutdown, (2) replace- ment parts, and (3) Three Mile Isldnd (TMI) Action Plan (NUREG-0737)

equipment and (4) the June 30, l9jt deadline of Ref. (a).

(1) Cold Shutdown - Reference (4 requires licensees to submit E-Q

information for the equipment necessary to achieve and maintain a cold shutdown conditiomf This Bulletin requirement was not intended to invoke a chaAge in the licensing basis of the plant.

Plants licensed to a hqt "safe shutdown" condition are only required by Reference 2a) to qualify the equipment necessary to a achieve a hot shutdowi (i.e., plant specific safety-related equpmn)

J

  • the Bulletin (Reference c) does require that

, the licensee submi thezavailable information for one path to achieve the cold shutdown conditions. The Reference (c) position represents an enviloping staff position to be implemented on a case-by-case bas s. Regulatory Guide 1.139 contains the imple- mentation plans or the cold shutdown requirements, of which E-Q

is a part. S fff reviews are in progress on this issue.

(2) Replacement P~rts - We note that this requirement is set forth in reference (4txbut not explicitly in the ordering clauses of reference (a). In thWs regard, the E-Q requirements for replacement parts are SURNAMOFI~... .................... ................................ ..................... ..................... .................... ...........

....................

I....................

........... ...

DDA__T_ __E_ _ _ _ _ _ _ _ _ __ 1= __

NRRIF ............

0...8......... I.R........02.I..0.......... I.............. ....

NRC FORM 318 410/801 NRCM 0240

8......

...

OFFICIAL RECORD COPY

  • USGPO: 1980-329-824

0 ,4 0 U

W _-a- ALL LICENSEES OF OPERATING PLANTS AND APPLICANTS FOR OPE NING LICENSES

AND HOLDERS OF CONSTRUCTION PERMITS /

SUBJECT: INFORMATION REGARDING THE PROGRAM FOR ENV IONMENTAL

QUALIFICATION OF SAFETY-RELATED ELECTRIC EQUIPMENT

Reference (a) - Order for Modification of Licens concerning the Environmental Qualification of afety-Rtlated Electrical Equipment, October 24, 1980.

Reference (b) - Commission Memorandum and Or er of May 23, 1980 (80-CLI-21)

Reference (c) - I&E Bulletin 79-018 Suppl ent No. 3, October 24, 1880

On October 24, 1980, the staff-issued 0 ders [Reference (a)] to all power reactor licensees, which modified theiy Technical Specifications in accordance with the Commission-approVqd Environmental Qualification Require- ments [Reference (b)]. The purpose 9T this letter is to provide informa- tion in response to licensee requests, regarding these Orders and the associ- ated staff actions. The specific iems to be addressed involve the environ- mental qualification (E-Q) require ents of the electrical equipment for the following: (1) equipment necessary to achieve a cold shutdown, (2) replace- ment parts, and (3) Three Mile I and (TMI) Action Plan (NUREG-0737) equip- ment. In addition, the method fbr implementation of the E-Q safety evalua- tion results will be presented./

(1) Cold Shutdown - Referenc /(c) requires licensees to submit E-Q informa- tion for the equipment nessary to achieve and maintain a cold shut- down condition. This Byletin requirement was not intended to invoke a change in the licensi*g basis of the plant. Plants licensed to a hot

'safe shutdown' condit on are only required by Reference (a) to qualify the equipment necessa'y to achieve a hot shutdown (i.e., plant specific safety -related equ However, the Bulletin does require that Went).

the licensee submit ghe available information. The Reference (c) posi- tion represents an envelop1ng staff position to be implemented on a case-bf-case basis./ Regulatory Guide 1.139 contains the implementation plans for the cold/shutdown requirements, of which E-Q is a part. Staff reviews are in pr ess on this issue.

(2) Replacement Parts - The E-Q requirements for Replacement parts are clearly presented in Supplement No. 2 to IEB 79-OlB (September 30, 1980).

It is the licen~ee's responsibility to justify deviation from the Cateogry I column of NUREG-0588 in an auditible manner. "Sound reasons*

for such deviation are plant/equipment specific. Examples such as availability or system incompatibility, are a matter of degree and will be Judged accordingly. The subjective aspect of this requirement is necessary and will be addressed on a case-by-case basis.

I

OFFICE~

MN

SU O ...................

NRC FORM 318 410/80) NRCM 0240

I. ..................... ..................... .................

O FFICIA L R EC O RD C OPY

.. ..................... ..................... ................ ..

  • t USGPO: 1980329-824

9 9 I

A' 9 0 - a

(3) NUREG-0737 Enuipment - The qualification requirements f9/ this equipment are specifically addressed InAppendix E to ,te NUREG. The schedule for submitting the information to the NRC i;/contained in Reference (c). Contingencies for equipment unavailpbility are addressed in the NUREG. If the licensee's position on any of this equipment is that it is not safety-related that p sition should be justified in the submittal. Staff judgements ip this regard will be made in a Supplement to the original Safety Ev luation.

Safety Evaluation Implementation - Reference (b) /equires the staff to issue Safety Evaluations by February 1, 1981. T ese Safety Evaluations will be issued with a request for licensee res p6nse under the provisions of 10 CFR 50.54(f). Subsequent to the staff view of that response, the staff will issue Confirmatory and/or Show Ca~e Orders which provide the opportunity for a hearing to implement the 7pecific requirements applicable to that facility. This procedure may make 'existing hearing/extension requests based on Reference (a), unnecess/ry. Licensees with such requests should review this matter and afvise the NRC of their intents as soon as possible. Formal notification s necessary to change existing requests.

SI

Darrell G. Elsenhut, Director Division of Licensing

(4I (

K.i D

  • SEE PREVIOUS WHITE FOR CONCURRENCE

OFFICEO

SURNAMEo ORB

  • MWllijams:!
  1. 2 ORB #2

......................

.................

f ...*T .oito AD:OR

......................

...........

TNoyak .er

...... E J OELD

..*-f-1.....................

. .......

SSohinki ....

DD:DL

............................

RPurpl.e..... DEisenhut D:DL .............

.............

DATEO 12/24/80 .....................

..................

/ /

12/24/80 ..................... /II / 1A/ /

. ... ..... ....... ..................... .... ................ ....................

NRC FORM 318110/801 NRCM 0240 * SGPO: 1980-329-824 O FFICIA L R EC O RD C OPY

ALL LICENSEES OF OPERATING PLANTS AND APPLICANTS FOR OPERATJ G LICENSES

AND HOLDERS OF CONSTRUCTION PERMITS /

SUBJECT: INFORMATION REGARDING THE PROGRAM FOR ENVIRO 4 ENTAL QUALIFICATION

OF SAFETY-RELATED ELECTRICAL EQUIPMENT

Reference (a) - Order for Modification of License c ncerning the Environmental Qualification of Safety-Related El ctrical Equipment, October 24, 1980.

Reference (b) - Commission Memorandum and Order/of May 23, 1980 (80-CLI-21)

Reference (c) - I&E Bulletin 79-OlB Supplemeny No. 3, October 24, 1980

On October 24, 1980, the staff-issued Orders,/(Reference (a)I to all power reactor licensees, which modified their Technical Specifications In accordance with the Commission-approved Enyironmental Qualification Require- ments [Reference (b)]. The purpose of this letter is to provide Information, in response to licensee requests, regard 7ng these Orders and the associated staff actions. The specific items to b 'addressed involve the environmental qualification (E-Q) requirements of th electrical equipment for the following: 1) equipment necessary to achieve a cold shutdown, (2) replace- ment parts, 3) equipment in mild env ronments, and (4) Three Mile Island (TMI)

Action Plan NUREG-0737) equipment. n addition, the method for implementation of the E-Q safety evaluation results will be presented.

(1) Cold Shutdown - Reference (c) requires licensees to submit E-Q information for the equipment necessary tq achieve and maintain a cold shutdown condition. This Bulletin requ irement was not intended to invoke a change In the licensing basis of thA plant. Plants licensed to a hot "safe shut- down' condition are only required by Reference (a) to qualify the equip- ment necessary to achieve a/hot shutdown (i.e., plant specific safety- related equipment). Howevfr, the bulletin does require that the licensee submit the available info mation. The Reference (t) position represents an enveloping staff posi on to be implemented on a case-by-case basis.

Regulatory Guide 1.139 cpntains the implementation plans for the cold ct shutdown requirements, ,f which E-Q is a part. Staff reviews are in progress on this Issue/

(2) Replacemtnt Parts - Toe E-Q requirements for replacement parts are clearly presented in Suppleme/t No. 2 to IEB 79-OlB (September 30, 1980). It is the licensee's responsibility to justify deviation from the Category I

column of NUREG-0588/in an auditible manner. "Sound reasons" for such deviation are plant/equipment specific. Examples such as availability or system incompat1bility, are a matter of degree and will be Judged OFFICEO . . ,.................... ..........

...................... .................. ..................... ........... ................... .......... .............................

....................

SU

MNO ................... .......... ........... .......... ........... ..................... .......... ................ .......... ................ ................... ...

1.

SURNAMtE.

DATE _ _.__ __ .1 .__ __ __ __

.... ................

RC..... .. ORM.

NRCM.. 0240......... OFFICIAL..........RECORD. .....COPY..... ... S..............80-39.............

NRC FORM 318 (10/80) NRCM 0240

  • USGPO: 1980-329-824 O FFICIA L R EC O RD C OP Y

u b ~* 4

-2- accordingly. The subjective aspect of this requ Iement is necessary and will be addressed on a case-by-case basis.

(3) Mild Environments - It is apparent that, in soe cases, the staff's view of the scope of this task differs signif cantly from the licensee~s view. The requirements are contained in thD.O.. Guidelines and NUREG-0588. Programs are required to addre s aging. Equipment should be qualified for the environmental extremeF associated with loss of its non-redundant HVAC for the time it is requ red to operate plus margin.

Throughout the Guidelines, the licensee n y, as an alternative, provide contingencies to maintain environmental parameters within the equipment specifications or provide the necessary/standard of reliability. In the case of mild environments, such altern'tives are much more feasible due '.,

to the accessibility of the components!. Licensees should proceed with their mild environment program based fn the existing requirements.

More detailed information regarding the mild environment NRC review will be provided next March. /

(4) NUREG-0737 Equipment - The qualification requirements for this equipment are specifically addressed in AppF ndix B to the HUREG. The schedule for submitting the information to th NRC is contained in Reference Wc).

Contingencies for equipment unav ilability are addressed in the NUREG.

If the licensee's position on a of this equipment is that it is not safety-related that position s uld be justified in the submittal.

Staff judgements in this regar will be made in a Supplement to the original Safety Evaluation.

(5) Safety Evaluation Implementation - Reference (b) requires the staff to issue Safety Evaluations by/February 1, 1981. These Safety Evaluations will be issued with a requ t for licensee response under the provisions of 10 CFR 50.54(f). Subsejuent to the staff review of that response, the staff will issue Confirma bry and/or Show Cause Orders which provide the opportunity for a hearing/to implement the specific requirements appli- cable to that facility. this procedure may make existing:hearing/extension request based on Referqhce (a), unnecessary. Licensees with such requests should review this matter and advise the NRC of their intents as soon as possible. F rmal notification Is necessary to change existing requests.

Darrell G. Elsenhut, Director Division of Licensing DE Rosz t ocjY i~ryoJ

OFFICEI0 ORB #.2 RB #2# I ..... AD:DL................ .. DE .............. OELD.... .. .......

.. ........... DDP;&.... ...... k...i...

SURNAMt MW s :kfTI k T TNovak RVollmer SSohinki RPurple DEisenh

......

............ . ........................... ........ ......................... ............. ....... .....

.......... ...................

DATEI

'..

1/ /to 1 2/4 j9 12/ / 12/ / j 12/ / 12/ / 12/ /

........ ..................... ......... ............ ..................... .... ................. .................... ................. ..

-.-US;PO: 1980-329-824 NRC FORM 318 (i1080) NRCM 0240 O FFICIA L R EC O RD C OPY

ALL LICENSEES OF OPERATING PLANTS AND APPLICANTS F

AND HOLDERS OF CONSTRUCTION PERMITS 7 OPERATING LICENSES

SUBJECT: INFORMATION REGARDING THE PROGRAM FOR.tNVIRONMENTAL

QUALIFICATION OF SAFETY-RELATED ELE9TRICAL EQUIPMENT

Reference (a) - Order for Modification of License concerning the Environmental Qual1ficati owof Safety-Related Electrical Equipment, October 24, 1980

Reference (b) - Commission Memorandum aqd Order of May 23, 1980 (80-CLI-21)

Reference (c) - I&E Bulletin 79-018 Supplement No. 3, October 24, 1980.

On October 24, 1980, the staff-issued Orders [Reference (a)] to all power reactor licensees, which modified their Technical Specifications in accor- dance with the Commission-approved tnvironmental Qualification Requirements

[Reference (b)]. The purpose of tfis letter is to provide information in response to licensee requests, refarding these Orders and the associated staff actions. The specific iteus to be addressed involve the environmental qualification (E-Q) requirements of the electrical equipment for the following: (1) equipment necessary to achieve a cold shutdown (2) replacement parts, and (3) Three Mile Islnd (TMI) Action Plan (NUREG-07371 equipment and (4) the June 30, 1982 deadline of Ref. (a).

(1) Cold Shutdown - Refereffce (c) requires licensees to submit E-Q

information for the e4uipment necessary to achieve and maintain a cold shutdown conditfon. This Bulletin requirement was not intended to invoke a change lb the licensing basis of the plant. Plants licensed to a hot '¶iafe shutdown" condition are only required by Reference (a) to q9alify the equipment necessary to achieve a hot shutdown (i.e., plant specific safety-related equipment). However, the Bulletin doei require that the licensee submit the available information. Thb Reference (c) position represents an enveloping staff positionkto be implemented on a case-by-case basis. Regulatory Guide 1.139 cofitains the implementation plans for the cold shutdown requirements, of which E-Q is a part. Staff reviews are in progress on this issug.

(2) RQPiacementj'Parts - We note that this requirement is set forth in reference 1b) Eti not explicitly in the ordering clauses of reference (a). In Ohis regard, the E-Q requirements for replacement parts are clearly presented in Supplement No. 2 to IEB 79-OlB (September 30,

1980). / is the licensee's responsibility to justify deviation from

./

OFFIC~t SURNAMEtI

OFC I.1 O ................... .......... ...................... ...................... ............ ................

..................... .......... ...................... ........... ..............

(1O8O N .C............. OFF.....CIAL... REC O RD........

COPY.. . . . . P. . . . . . ...............

....................

NRC 318 FORM

SUR AMEO ...................

........ .......... ..................... .......... .....................

.............................. ..........

................... .. ...................

.ATI. 1. _ _ __ __ .1 __ __ __ __

NRC FORM 318 (lO/80) NRCM 0240 ., USGPO: 1980-329-824 O FFICIA L R EC O RD C OPY

-2- the Category I column of NUREG-0588 In an auditible manner. "Sound reasons" for such deviation are plant/equipment specific. Examples such as availability or system incompatability,,are a matter of degree and will be judged accordingly. /

(3) NUREG-0737 Equipment - The qualification re4 irements for this equipment are specifically addressed in Apendix 8 to the HUREG.

The kciedule for submitting the inforMattn to the NRC is contained in Reference (c). Contingencies for equipment unavailability are addressed in the NUREG. If the licensee's position on any of this equipment is that it is not safety-reited within the meaning of reference (2), that position should justified In the submittal.

Staff judgments in this regard will Je made In a Supplement to the original Safety Evaluation. t

(4) June 30, 1982 Deadline - Some licensees have indicated that the new E-Q requirements have resulted ii saturation of the test/production capabilities of the industry, aqk violations of the deadline may occur. Licensees should note that the Ref. (a) orders implemented a Commission imposed deadline ZTRef. (b)] and the staff is unable to grant relief from this deadli19 .

Some licensees have submitted eitier a hearing request or a request for an extension of the time to requert a hearing In regard to Ref. (a).

Others have submitted letters of concern regarding specific requirements.

The former will be addressed on n individual basis. This letter responds to the generic concerns of both/groups.

/ Sincerely,

-? Darrell G. Elsenhut, Director

/ Division of Licensing I

i

  • See attached file co~/ for previous concurrences

/I

OFFIC

.......OR OELD OV

E OI&E ......... ................. DL:D.........

DL:DD ......... ................. ................. ......... ....................

SURNAMEO I.ovak

......... ............

T................... EJordan

....................

SSohinki

......... .................

RPurple DGEisenhut

..................... ..................... .........................................

I

DATE_ 1

_

. 3

/ 81 1/ /81 R.... ................

...........

l/ 81 1/

L..........

/81

.....................

1/ /81

.......... ....................

2...

  • US;PO: 1980-329-824 NRC FORM 318 410/80) NRCM 0240 OFFICIAL RECORD COPY

-2- clearly presented in Supplement No. 2 to IEB 79-OIB (September 30,

1980). It is the licensee's responsibility to Justify deviation from the Category I column of NUREG-0588 in an auditible manner. "Sound reasons" for such deviation are plant/equipment specific. Examples such as availability or system incompatability, are a matter of degree and will be judged accordingly.

(3) NUREG-0737 Equipment - The qualification requirements for this equipment are described in Appendix B to the NUREG. The schedule for submitting the information to the NRC is contained in Reference tc). Contingencies for equipment unavailability are addressed in the NUREG. If the licensee's position on any of this equipment is that it is not safety-related within the meaning of reference (a),

that position should be justified in the submittal. Staff Judgments in this regard will be made in a Supplement to the original Safety Evaluation.

(4) June 30, 1982 Deadline - Some licensees have indicated that the new E-Q requirements have resulted in saturation of the test/production capabilities of the industry, and violations of the deadline may occur. Licensees should note that the Ref. (a) orders implemented a Commission imposed deadline [Ref. Ib)J and the staff is not authorized to grant relief from this deadline.

Some licensees have submitted either a hearing request or a request for an extension of the time to request a hearing in regard to Ref. (a). Others have submitted letters of concern regarding specific requirements. The former will be addressed on an individual basis. This letter responds to the generic concerns of both groups.

Sincerely, Darrell G. Eisenhut, Director Division of Licensing

  • See previous file copi S ncur ces OFFICEO Dl OELDj DL:DD

SURNAMEO

DATEF 1 s:m

..................

va

1/- /8 EJor

1\/8i SSohinki

/ j11/

4 k

... .................... . .....................

8T1 RPurple j.........

D nhut

..... ................ .................... ....................

NRC FORM 318 110/801 NRCM 0240 OFFICI1AL PRECRDn~

_ * * * *x__ * s _ __ * ^ _

COPYV

__ . .

USGP0: 1980-329-824

Template:GL-Nav