NRC Generic Letter 1989-05: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 14: Line 14:
| page count = 12
| page count = 12
}}
}}
{{#Wiki_filter:KJ~-s UNITED STATES NUCLEAR REGULATORY  
{{#Wiki_filter:KJ~
COMMISSION
          -s                         UNITED STATES
WASHINGTON, D. C. 20555 4' ,April 4, 1989 TO: LICENSEES  
                          NUCLEAR REGULATORY COMMISSION
OF ALL POWER REACTORS AND APPLICANTS-FOR  
                                  WASHINGTON, D. C. 20555
A REACTOR OPERATOR'S  
4'     ,April                             4, 1989 TO:         LICENSEES OF ALL POWER REACTORS AND APPLICANTS-FOR A REACTOR
LICENSE UNDER 10 CFR PART 55 SUBJECT: PILOT TESTING OF THE FUNDAMENTALS  
                OPERATOR'S LICENSE UNDER 10 CFR PART 55 SUBJECT:     PILOT TESTING OF THE FUNDAMENTALS EXAMINATION (Generic Letter 89- 05)
EXAMINATION (Generic Letter 89- 05)This letter is to inform facility licensees and potential applicants under 10 CFR Part 55 that the NRC is offering a second pilot test of the fundamentals examination for candidates for an NRC operator's license. During this pilot test, examinations will be administered to candidates-for a license to operate both Boiling Water Reactors (BWRs) and Pressurized Water Reactors (PWRs).The pilot test will be used to refine the development, administration, and grading process for the fundamentals examination.
  This letter is to inform facility licensees and potential applicants under
  10 CFR Part 55 that the NRC is offering a second pilot test of the fundamentals examination for candidates for an NRC operator's license. During this pilot test, examinations will be administered to candidates-for a license to operate both Boiling Water Reactors (BWRs) and Pressurized Water Reactors (PWRs).
  The pilot test will be used to refine the development, administration, and grading process for the fundamentals examination. Applicants who participate in this pilot test and achieve a passing grade of 70 percent or a higher percentage will receive a waiver under 10 CFR 55.47 of the applicable section of the written examination that is required by 10 CFR 55.41 or 55.43.


Applicants who participate in this pilot test and achieve a passing grade of 70 percent or a higher percentage will receive a waiver under 10 CFR 55.47 of the applicable section of the written examination that is required by 10 CFR 55.41 or 55.43.The sta~ff's review of the content of examinations prepared in accordance with.10 CFR Part 55 and the Examiner Standards
The sta~ff's review of the content of examinations prepared in accordance with.
301 and 401 of NUREG-1021, "Operator Licensing Examiner Standards," Revision 5, indicates that the subject matter presented in' s6me sections is generic to *all BWRs or all PWRs. The subject matter includes reactor' theory, heat transfer, thermodynamics, fluid flow, and component operations.


The staff's review of current training programs indicates that these topics are normally presented early in the operator and senior operator training programs.
10 CFR Part 55 and the Examiner Standards 301 and 401 of NUREG-1021, "Operator Licensing Examiner Standards," Revision 5, indicates that the subject matter presented in's6me sections is generic to *all BWRs or all PWRs. The subject matter includes reactor' theory, heat transfer, thermodynamics, fluid flow, and component operations. The staff's review of current training programs indicates that these topics are normally presented early in the operator and senior operator training programs. Mastery of this fundamentals subject matter is an important first step of training, which includes systems and plant characteristics, on-the-job training, and simulator training.


Mastery of this fundamentals subject matter is an important first step of training, which includes systems and plant characteristics, on-the-job training, and simulator training.In developing the fundamentals examination, the staff used subject matter contained in the 291000 through 293000 series of the "Knowledge and Abilities (K/A)Catalog for Nuclear Power Plant Operators:  
In developing the fundamentals examination, the staff used subject matter contained in the 291000 through 293000 series of the "Knowledge and Abilities (K/A)
Boiling Water Reactors" (NUREG-1123), and the 191000 through 193000 s'eries of the "Knowledge and Abilities (K/A) Catalog for Nuclear Power Plant Operators:  
    Catalog for Nuclear Power Plant Operators: Boiling Water Reactors" (NUREG-1123),
Pressurized Water Reactors" (NUREG-1122)._  
    and the 191000 through 193000 s'eries of the "Knowledge and Abilities (K/A) Catalog for Nuclear Power Plant Operators: Pressurized Water Reactors"
The K/As-provided the basis for-the testing objectives from which a bank of multiple choice questions has been developed and screened for use in this examination.
    (NUREG-1122)._ The K/As-provided the basis for-the testing objectives from which a bank of multiple choice questions has been developed and screened for use in this examination.    Each examination will contain approximately 50
    multiple choice questions and will require approximately 3 hours to complete. We plan to administer the pilot examinations at one central location in each region. As the examinations will be graded by machine, we expect to promulgate the test results within 10 days after the administration of the examination.


Each examination will contain approximately
Copies of the fundamentals examination test sheets will be returned to each volunteer and facility training department for comment. The NRC staff will summarize any comments received in a Commission paper. After reviewing this summary, the Commission will evaluate a policy to require passing the fundamentals examination as a prerequisite condition to applying for a license to operate a nuclear power plant under 10 CFR 55.31.
50 multiple choice questions and will require approximately
3 hours to complete.


We plan to administer the pilot examinations at one central location in each region. As the examinations will be graded by machine, we expect to promulgate the test results within 10 days after the administration of the examination.
6too,         6ZX;oAND'
      893


Copies of the fundamentals examination test sheets will be returned to each volunteer and facility training department for comment. The NRC staff will summarize any comments received in a Commission paper. After reviewing this summary, the Commission will evaluate a policy to require passing the fundamentals examination as a prerequisite condition to applying for a license to operate a nuclear power plant under 10 CFR 55.31.6too, 6ZX;oAND'893
-2- The following conditions will apply to pilot testing of the fundamentals examination:
-2-The following conditions will apply to pilot testing of the fundamentals examination:
  ° The Commission will waive the usual requirements under
° The Commission will waive the usual requirements under 10 CFR 55.31,"Subpart D -Applications." Therefore, Form NRC-398 does not need to be submitted.
                                                                10 CFR 55.31,
      "Subpart D - Applications." Therefore, Form NRC-398 does not need to be submitted.


o Volunteers should be enrolled in either a facility-sponsored reactor operator or senior reactor operator training course.o Volunteers who pass the fundamentals examination with a score'of 70 percent or a higher percentage will be granted a waiver under 10 CFR 55.47 of the appropriate-section
o Volunteers should be enrolled in either a facility-sponsored reactor operator or senior reactor operator training course.
(1 or 4) of the written examination.


o Volunteers who do not achieve a grade of 70 percent will subsequently be able to take the entire regularly scheduled written examination at the'site.
o   Volunteers who pass the fundamentals examination with a score'of 70 percent or a higher percentage will be granted a waiver under
                                                                10 CFR 55.47 of the appropriate-section (1 or 4) of the written examination.


'As a formal application under 10 CFR 55.31 is not required, the provisions of 10 CFR 55.35, "Re-applications," will not apply.* Pilot testing of these examinations is planned for June 28, 1989. You will be informed of the exact time, and location of the examinations within 60 days after the date of this generic letter.Candidates interested in participating in this program are requested to submit the enclosed application to Mr. Kenneth E. Perkins, Chief, Operator Licensing Branch, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, with a copy to the appropriate Regional Administrator.
o  Volunteers who do not achieve a grade of 70 percent will subsequently be able to take the entire regularly scheduled written examination at the'site. 'As a formal application under 10 CFR 55.31 is not required, the provisions of
      10 CFR 55.35, "Re-applications," will not apply.
 
* Pilot testing of these examinations is planned for June
                                                                  28, 1989.   You will be informed of the exact time, and location of the examinations within
      60 days after the date of this generic letter.
 
Candidates interested in participating in this program are requested to submit the enclosed application to Mr. Kenneth E. Perkins, Chief, Operator Licensing Branch, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, D.C.     20555, with a copy to the appropriate Regional Administrator.


These applications must be received by April 21, 1989, to ensure participation in these pilot tests. We appreciate your cooperation.
These applications must be received by April 21, 1989, to ensure participation in these pilot tests. We appreciate your cooperation.


If you have any questions concerning this generic letter, please call Mr. Perkins at (301)492-1031.This request is covered by Office of Management and Budget Clearance Number 3150-0090  
If you have any questions concerning this generic letter, please call Mr. Perkins at (301)
which expires January 31, 1992. The estimated average burden is 2 hours per response.
492-1031.
 
This request is covered by Office of Management and Budget Clearance Number
3150-0090 which expires January 31, 1992.       The estimated average burden is 2 hours per response.       Comments on the accuracy of this estimate and suggestions reduce the burden may be directed to the Office of Management                          to and Budget, Paperwork Reduction Project (3150-0090), Room 3208, New Executive Office Building, Washington, D.C.      20503, and the U.S. Nuclear Regulatory Commission, Records and Reports Management Branch, Office of Information Resources Management, Washington, D.C. 20555.
 
Sin eely, A.#Ag ,
                                  Associate Director  \  Projects Office of Nuclear Reactor Regulation Enclosure:
Application for Pilot Testing of Fundamentals Examination
 
IK)
                                            -.                    Enclosure (CL 89-05)
  I,__                              ,employed  at the (Name)                                          (Station Name)
    50-                request participation in the Pilot Test Program of.
 
(Facility Docket Number)
the Fundamentals Examination for an operator or a senior operator license. -I
agree to the conditions outlined in GL-89-(05).
                              Applicant:
                                                              -    'Date Approved:
                                        Training Department Manager      Date
 
LIST OF RECENTLY ISSUED GENERIC LETTERS
                        Generic                                  Date of Letter No. SubJect                        Issuance      Issued To
                        89-04      GUIDANCE ON DEVELOPING        4/3/89        ALL HOLDERS OF LIGHT
                                  ACCEPTABLE INSERVICE                          WATER  REACTOR OPERATING
                                  TESTING PROGRAMS                              LICENSES ANDCONSTRUCTION
                                                                                PERMITS
                        89-03      OPERATOR  LICENSING NATIONAL  3/24/89        ALL POWER  REACTOR
                                  EXAMINATION SCHEDULE                          LICENSEES AND
                                                                                APPLICANTS FORAN
                                                                                OPERATING LICENSE
                        89-02      ACTIONS TO IMPROVE TH4E        3/21/89        ALL HOLDERS  OF
                                  DETECTION OF COUNTERFEIT                      OPERATING LICENSES
                                  AND FRAUDULENTLY MARKETED                    AND CONSTRUCTION
                                  PRODUCTS                                      PERMITS FORNUCLEAR
                                                                                  POWER  REACTORS
                        89-01      IMPLEMENTATION OF              1/31/89        ALL LICENSEES HOLDING
                                  PROGRAMMATIC CONTROLS                        OPERATING LICENSES
                                  FORRADIOLOGICAL EFFLUENT                      AND CONSTRUCTION
                                  TECHNICAL SPECIFICATIONS                      PERMITS FORNUCLEAR
                                  IN THE AD0INISTRATIVE                          POWER  REACTOR FACILITIES.
 
CONTROLS SECTION OF THE
                                  TECHNICAL SPECIFICATIONS
                                  ANDTHE RELOCATION OF
                                  PROCEDURAL  DETAILS OF
                                  RETS TO THE OFFSITE DOSE
                                  CALCULATION MANUAL  OR TO
                                  THE PROCESS  CONTROL PROGRAM.
 
88-20      INDIVIDUAL PLANT              11/23/88      ALL LICENSEES HOLDING
                                    EXAMINATION FORSEVERE                        OPERATING LICENSES
                                    ACCIDENT VULNERABILITIES -                    AND CONSTRUCTION
                                    10 CFR 50.54(f)                              PERMITS FORNUCLEAR
                                                                                  POWER  REACTOR FACILITIES
                        88-19      USE OF DEADLY FORCEBY          10/28/88      ALL FUEL CYCLE FACILITY
                                    LICENSEE GUARDS  TO PREVENT                  LICENSEES WHO  POSSESS.
 
THEFT OF SPECIAL NUCLEAR                      USE. IMPORT, EXPORT,
                                    MATEPIAL                                      ORTRANSPORT FORMUILA
                                                                                  QUANTITIES OF STRATEGIC
                                                                                  SPECIAL' NUCLEAR MATERIAL
                        88-18      PLANT RECORD  STORAGE ON      10/20/88      ALL LICENSEES OF
                                    OPTICAL DISKS                                OPERATING REACTORS
                                                                                  ANDHOLDERS OF
                                                                                  CONSTRUCTION PERMITS
          UNITED STATES
NUCLEAR REGULATORY COMMISSION                                                                                  FIRST CLASS MAIL
                                                                                                            POSTAGE b FEES PAID
      WASHINGTON, D.C. 20555                                                                                        USNRC
                                                                                                                PERMIT No G67 OFFICIAL BUSINESS
    PENALTY FOR PRIVATE USE, $300
 
v)
    Distribution and concurrence for PM letter RE: GL-89-05    dated  April 4, 1989.
 
DISTRIBUTION
    Central Files OLB RF
    PVDoyle LAWiens RACooley KEPerkins JZwolinski JWRoe SAVarga FJMiraglia JHSniezek/TEMurley DW4:PMCOVER.DOC                                  90SIt~
OFC    :OLB:DLYQ      :OLB:DLPQ   
* OLB  LPQ      DIR:DtPQ        :ADT:      ---
NAME                  :AWiens APVoyle:pd  :              : JWR                        ia DATE  : 03/.22/89    :  33/X7.7189  : 03/.2z/89    : 03/    /89      : 03/L.&89 OFC    : ADP:N:::
NAME  :      a DATE            8 9-
                  9*
                                                            tc
 
' >
        Distribution and concurrence for Second Pilot Generic Letter dated                      April 4,.1989 DISTRIBUTION:
        OLBRFI
        Central Files PVDoyle LAWiens TLSzymanski RACooley KEPerkins JAZwolinski JWRoe SAVarga FJMiraglia JHSniezek/TEMurley CHBerlinger P    ~r          p-D
                    Me'ct                . ti      of COG        eevwt"    5e0ft out      58t>wA      I &/lsaq
                    /lcw        rtlve5An    Wtv~e,  C
          DOYLE - 1 OFC  : OLB:DLPQk              OL :DLPQ          OLB:DLPQ   
* TECH EDITOR            D :DLPQ          :      &  / j
                                                                --------
NAME :        e:pd            L Wiens        : KEPerki              alure        : JW                  : CHBerlinger DATE :C22/0/89              : P-//d/89        :>/1-/89      l  2 1/2?/89                  : 9/                89 OFC  : ADT:NR              : ADP:NRR
NAME : FJMiraglia          :    Va                          :
DATE :    /289            :      7  89      *
                                                OFFICIAL FILE COPY
                                                                                  '--n3          jgLi8 j~@
 
Document Name:\_                              K_>
DOYLE - 1 Requestor's ID:
CARTER
Author's Name:
DOYLE
Document Comments:
Gen Lttr for Second Pilot of Generic Fundamentals Exam 06/89


Comments on the accuracy of this estimate and suggestions to reduce the burden may be directed to the Office of Management and Budget, Paperwork Reduction Project (3150-0090), Room 3208, New Executive Office Building, Washington, D.C. 20503, and the U.S. Nuclear Regulatory Commission, Records and Reports Management Branch, Office of Information Resources Management, Washington, D.C. 20555.Sin eely, A. #Ag , Associate Director \ Projects Office of Nuclear Reactor Regulation Enclosure:
J          UNITED STATES        -
Application for Pilot Testing of Fundamentals Examination IK)-.Enclosure (CL 89-05)I,__ ,employed at the (Name) (Station Name)50- request participation in the Pilot Test Program of.(Facility Docket Number)the Fundamentals Examination for an operator or a senior operator license. -I agree to the conditions outlined in GL-89-(05).
                        NUCLEAR REGULATORY COMMISSION
Applicant:
                              WASHINGTON, D. C. 20555 MAR 1 6 1983 MEMORANDUM FOR:  Edward Jordan, Director Office for Analysis and Evaluation of Operational Data i
-'Date Training Department Manager Date Approved:
FROM:            James H. Sniezek, Deputy Director Office of Nuclear Reactor Regulation SUBJECT:         WAIVER OF CRGR REVIEW OF GENERIC LETTER TO INFORM PWR AND BWR
LIST OF RECENTLY ISSUED GENERIC LETTERS Generic Letter No.89-04 89-03 89-02 89-01 88-20 88-19 88-18 SubJect GUIDANCE ON DEVELOPING
                  LICENSEES AND APPLICANTS FOR OPERATOR LICENSES OF A PILOT
ACCEPTABLE
                  TESTING PROGRAM FOR THE FUNDAMENTALS EXAMINATION SECTION
INSERVICE TESTING PROGRAMS OPERATOR LICENSING
Enclosed is a generic letter to be sent to all Pressurized-Water Reactor and Boiling-Water Reactor licensees and applicants for Operator licenses informing them of a pilot program for the administration of a generic fundamentals section of the written examinations conducted in accordance with 10 CFR 55.41 and 55.43.
NATIONAL EXAMINATION
SCHEDULE ACTIONS TO IMPROVE TH4E DETECTION
OF COUNTERFEIT
AND FRAUDULENTLY
MARKETED PRODUCTS IMPLEMENTATION
OF PROGRAMMATIC
CONTROLS FOR RADIOLOGICAL
EFFLUENT TECHNICAL
SPECIFICATIONS
IN THE AD0INISTRATIVE
CONTROLS SECTION OF THE TECHNICAL
SPECIFICATIONS
AND THE RELOCATION
OF PROCEDURAL
DETAILS OF RETS TO THE OFFSITE DOSE CALCULATION
MANUAL OR TO THE PROCESS CONTROL PROGRAM.INDIVIDUAL
PLANT EXAMINATION
FOR SEVERE ACCIDENT VULNERABILITIES
-10 CFR 50.54(f)USE OF DEADLY FORCE BY LICENSEE GUARDS TO PREVENT THEFT OF SPECIAL NUCLEAR MATEPIAL PLANT RECORD STORAGE ON OPTICAL DISKS Date of Issuance Issued To 4/3/89 ALL HOLDERS OF LIGHT WATER REACTOR OPERATING LICENSES AND CONSTRUCTION
PERMITS 3/24/89 ALL POWER REACTOR LICENSEES
AND APPLICANTS
FOR AN OPERATING
LICENSE 3/21/89 ALL HOLDERS OF OPERATING
LICENSES AND CONSTRUCTION
PERMITS FOR NUCLEAR POWER REACTORS 1/31/89 ALL LICENSEES
HOLDING OPERATING
LICENSES AND CONSTRUCTION
PERMITS FOR NUCLEAR POWER REACTOR FACILITIES.


11/23/88 ALL LICENSEES
The pilot program for administration of this section, separate from the site-specific written examination, is a change in the normal practice for administration of operator licensing written examinations, which is designed to simplify the training of licensed operators and reduce the burden on operator licensing examiners. The revised sequence of examination administration does not present any new staff positions and does not constitute a new requirement; therefore we believe that CRGR review is not necessary. This will be the second pilot test of this process. The first pilot test for BWR applicants was conducted on September 21, 1988. Volunteers for this pilot test are being requested in the enclosed GL-89-xx.
HOLDING OPERATING
LICENSES AND CONSTRUCTION
PERMITS FOR NUCLEAR POWER REACTOR FACILITIES
10/28/88 ALL FUEL CYCLE FACILITY LICENSEES
WHO POSSESS.USE. IMPORT, EXPORT, OR TRANSPORT
FORMUILA QUANTITIES
OF STRATEGIC SPECIAL' NUCLEAR MATERIAL 10/20/88 ALL LICENSEES
OF OPERATING
REACTORS AND HOLDERS OF CONSTRUCTION
PERMITS UNITED STATES NUCLEAR REGULATORY
COMMISSION
WASHINGTON, D.C. 20555 OFFICIAL BUSINESS PENALTY FOR PRIVATE USE, $300 FIRST CLASS MAIL POSTAGE b FEES PAID USNRC PERMIT No G67 v)Distribution and concurrence for PM letter RE: GL-89-05 dated April 4, 1989.DISTRIBUTION
Central Files OLB RF PVDoyle LAWiens RACooley KEPerkins JZwolinski JWRoe SAVarga FJMiraglia JHSniezek/TEMurley DW4:PMCOVER.DOC
90SIt~OFC :OLB:DLYQ
:OLB:DLPQ
* OLB LPQ DIR:DtPQ :ADT: ---NAME APVoyle:pd
:AWiens : : JWR ia DATE : 03/.22/89
: 33/X7.7189
: 03/.2z/89
: 03/ /89 : 03/L.&89 OFC : ADP:N::: NAME : a DATE 8 9- 9*tc
' >Distribution and concurrence for Second Pilot Generic Letter dated April 4,.1989 DISTRIBUTION:
OLBRFI Central Files PVDoyle LAWiens TLSzymanski RACooley KEPerkins JAZwolinski JWRoe SAVarga FJMiraglia JHSniezek/TEMurley CHBerlinger P ~r p-D Me'ct .ti of COG eevwt" 5e0ft out/lcw rtlve5An Wtv~e, C 58t>wA I &/ lsaq DOYLE -1 OFC : OLB:DLPQk OL :DLPQ OLB:DLPQ
* TECH EDITOR D :DLPQ : & / j--------NAME : e:pd L Wiens : KEPerki alure : JW : CHBerlinger DATE :C22/0/89
: P-//d/89 :>/1-/89 l 2 1/2?/89 : 9/ 89 OFC : ADT:NR : ADP:NRR NAME : FJMiraglia
: Va : DATE : /289 : 7 89 *OFFICIAL FILE COPY j~@ '--n3 jgLi8 Document Name:\_ K_>DOYLE -1 Requestor's ID: CARTER Author's Name: DOYLE Document Comments: Gen Lttr for Second Pilot of Generic Fundamentals Exam 06/89 J UNITED STATES -NUCLEAR REGULATORY
COMMISSION
WASHINGTON, D. C. 20555 MAR 1 6 1983 MEMORANDUM
FOR: FROM: SUBJECT: Edward Jordan, Director Office for Analysis and Evaluation of Operational Data James H. Sniezek, Deputy Director Office of Nuclear Reactor Regulation WAIVER OF CRGR REVIEW OF GENERIC LETTER TO INFORM PWR AND BWR LICENSEES
AND APPLICANTS
FOR OPERATOR LICENSES OF A PILOT TESTING PROGRAM FOR THE FUNDAMENTALS
EXAMINATION
SECTION i Enclosed is a generic letter to be sent to all Pressurized-Water Reactor and Boiling-Water Reactor licensees and applicants for Operator licenses informing them of a pilot program for the administration of a generic fundamentals section of the written examinations conducted in accordance with 10 CFR 55.41 and 55.43.The pilot program for administration of this section, separate from the site-specific written examination, is a change in the normal practice for administration of operator licensing written examinations, which is designed to simplify the training of licensed operators and reduce the burden on operator licensing examiners.


The revised sequence of examination administration does not present any new staff positions and does not constitute a new requirement;
We plan to issue the enclosed generic letter shortly. Therefore, any comments concerning waiver of CRGR review are requested asfoon as possible.
therefore we believe that CRGR review is not necessary.


This will be the second pilot test of this process. The first pilot test for BWR applicants was conducted on September
Enclosure:
21, 1988. Volunteers for this pilot test are being requested in the enclosed GL-89-xx.We plan to concerning issue the enclosed generic letter shortly. Therefore, any comments waiver of CRGR review are requested asfoon as possible.Enclosure:
As Stated  
As Stated  


==CONTACT==
==CONTACT==
: Kenneth E.X21031 Perkins, NRR  
:
UNITED STATES NUCLEAR REGULATORY  
Kenneth E. Perkins, NRR
COMMISSION
X21031
W ~WASHINGTON, D. C. 20555 TO LICENSEES  
 
OF ALL POWER REACTORS AND APPLICANTS  
UNITED STATES
FOR A REACTOR OPERATOR'S
                        NUCLEAR REGULATORY COMMISSION
LICENSE UNDER 10 CFR PART 55 SUBJECT: PILOT TESTING OF THE FUNDAMENTALS  
    ~WASHINGTON,
EXAMINATION (Generic Letter 89-xx )This letter is to inform facility licensees and potential applicants under 10 CFR Part 55 that the NRC is offering a second pilot test of the fundamentals examination for candidates for an NRC operator's license. During this pilot test, examinations will be administered to candidates for a license to operate both Boiling Water Reactors (BWRs) and Pressurized Water Reactors (PWRs).The pilot test will be used to refine the development, administration, and grading process for the fundamentals examination.
    W                                    D. C.20555 TO LICENSEES OF ALL POWER REACTORS AND APPLICANTS FOR A REACTOR OPERATOR'S
LICENSE UNDER 10 CFR PART 55 SUBJECT:   PILOT TESTING OF THE FUNDAMENTALS EXAMINATION (Generic Letter 89-xx )
This letter is to inform facility licensees and potential applicants under
10 CFR Part 55 that the NRC is offering a second pilot test of the fundamentals examination for candidates for an NRC operator's license. During this pilot test, examinations will be administered to candidates for a license to operate both Boiling Water Reactors (BWRs) and Pressurized Water Reactors (PWRs).
The pilot test will be used to refine the development, administration, and grading process for the fundamentals examination. Applicants who participate in this pilot test and achieve a-passing grade of 70 percent or a higher percentage will receive a waiver under 10 CFR 55.47 of the applicable section of the written examination that is required by 10 CFR 55.41 or 55.43.


Applicants who participate in this pilot test and achieve a-passing grade of 70 percent or a higher percentage will receive a waiver under 10 CFR 55.47 of the applicable section of the written examination that is required by 10 CFR 55.41 or 55.43.The staff's review of the content of examinations prepared in accordance with 10 CFR Part 55 and the Examiner Standards  
The staff's review of the content of examinations prepared in accordance with
301 and 401 of NUREG-1021, "Operator Licensing Examiner Standards,'  
10 CFR Part 55 and the Examiner Standards 301 and 401 of NUREG-1021, "Operator Licensing Examiner Standards,' Revision 5, indicates that the subject matter presented in some sections is generic to all BWRs or all PWRs. The subject matter includes reactor theory, heat transfer, thermodynamics, fluid flow, and component operations. The staff's review of current training programs indicates that these topics are normally presented early in the operator and senior operator training programs. Mastery of this fundamentals subject matter is an important first step of training, which includes systems and plant characteristics, on-the-job training, and simulator training.
Revision 5, indicates that the subject matter presented in some sections is generic to all BWRs or all PWRs. The subject matter includes reactor theory, heat transfer, thermodynamics, fluid flow, and component operations.


The staff's review of current training programs indicates that these topics are normally presented early in the operator and senior operator training programs.
In developing the fundamentals examination, the staff used subject matter contained in the 291000 through 293000 series of the 'Knowledge and Abilities (K/A)
Catalog for Nuclear Power Plant Operators: Boiling Water Reactors" (NUREG-1123),
and the 191000 through 193000 series of the "Knowledge and Abilities (K/A) Catalog for Nuclear Power Plant Operators: Pressurized Water Reactors"
  NUREG-1122). The K/As provided the basis for the testing objectives from which a bank of multiple choice questions has been developed and screened for use in this examination. Each examination will contain approximately 50
multiple choice questions and will require approximately 3 hours to complete. We plan to administer the pilot examinations at one central location in each region. As the examinations will be graded by machine, we expect to promulgate the test results within 10 days after the administration of the examination.


Mastery of this fundamentals subject matter is an important first step of training, which includes systems and plant characteristics, on-the-job training, and simulator training.In developing the fundamentals examination, the staff used subject matter contained in the 291000 through 293000 series of the 'Knowledge and Abilities (K/A)Catalog for Nuclear Power Plant Operators:
Copies of the fundamentals examination test sheets will be returned to each volunteer and facility training department for comment. The NRC staff will summarize any comments received in a Commission paper. After reviewing this summary, the Commission will evaluate a policy to require passing the fundamentals examination as a prerequisite condition to applying for a license to operate a nuclear power plant under 10 CFR 55.31.
Boiling Water Reactors" (NUREG-1123), and the 191000 through 193000 series of the "Knowledge and Abilities (K/A) Catalog for Nuclear Power Plant Operators:
Pressurized Water Reactors" NUREG-1122).  
The K/As provided the basis for the testing objectives from which a bank of multiple choice questions has been developed and screened for use in this examination.


Each examination will contain approximately
"I4                                                      1\t The following conditions will apply to pilot testing of the fundamentals examination:
50 multiple choice questions and will require approximately
    0 The Commission will waive the usual requirements under 10 CFR 55.31,
3 hours to complete.
      "Subpart D - Applications." Therefore, Form NRC-398 does not need to be submitted.


We plan to administer the pilot examinations at one central location in each region. As the examinations will be graded by machine, we expect to promulgate the test results within 10 days after the administration of the examination.
V
      Volunteers  should be enrolled in either a facility-sponsored reactor operator or senior reactor operator training course.


Copies of the fundamentals examination test sheets will be returned to each volunteer and facility training department for comment. The NRC staff will summarize any comments received in a Commission paper. After reviewing this summary, the Commission will evaluate a policy to require passing the fundamentals examination as a prerequisite condition to applying for a license to operate a nuclear power plant under 10 CFR 55.31.
Volunteers who pass the fundamentals examination with a score of 70 percent V
      or a higher percentage will be granted a waiver under 10 CFR 55.47 of the appropriate section (1 or 4) of the written examination.
 
O Volunteers who do not achieve a grade of 70 percent will subsequently be able to take the entire regularly scheduled written examination at the site. As a formal application under 10 CFR 55.31 is not required, the provisions of
      10 CFR 55.35, "Re-applications," will not apply.
 
° Pilot testing of these examinations is planned for June 28, 1989. You will be informed of the exact time, and location of the examinations within
      60 days after the date of this generic letter.


"I4 1\t The following conditions will apply to pilot testing of the fundamentals examination:
Candidates interested in participating in this program are requested to submit the enclosed application to Mr. Kenneth E. Perkins, Chief, Operator Licensing Branch, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, with a-copy to the appropriate Regional Administrator.
0 The Commission will waive the usual requirements under 10 CFR 55.31,"Subpart D -Applications." Therefore, Form NRC-398 does not need to be submitted.


V Volunteers should be enrolled in either a facility-sponsored reactor operator or senior reactor operator training course.V Volunteers who pass the fundamentals examination with a score of 70 percent or a higher percentage will be granted a waiver under 10 CFR 55.47 of the appropriate section (1 or 4) of the written examination.
These applications must be received by April 14, 1989, to ensure participation in these pilot tests. We appreciate your cooperation. If you have any questions concerning this generic letter, please call Mr. Perkins at (301)
    492-1031.


O Volunteers who do not achieve a grade of 70 percent will subsequently be able to take the entire regularly scheduled written examination at the site. As a formal application under 10 CFR 55.31 is not required, the provisions of 10 CFR 55.35, "Re-applications," will not apply.° Pilot testing of these examinations is planned for June 28, 1989. You will be informed of the exact time, and location of the examinations within 60 days after the date of this generic letter.Candidates interested in participating in this program are requested to submit the enclosed application to Mr. Kenneth E. Perkins, Chief, Operator Licensing Branch, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, with a-copy to the appropriate Regional Administrator.
This request is covered by Office of Management and Budget Clearance Number
    3150-0090 which expires January 31, 1992. The estimated average burden is 2 hours per response. Comments on the accuracy of this estimate and suggestions to reduce the burden may be directed to the Office of Management and Budget, Paperwork Reduction Project (3150-0090), Room 3208, New Executive Office Building, Washington, D.C. 20503, and the U.S. Nuclear Regulatory Commission, Records and Reports Management Branch, Office of Information Resources Management, Washington, D.C. 20555.


These applications must be received by April 14, 1989, to ensure participation in these pilot tests. We appreciate your cooperation.
Sincerely, Steven A. Varga, Acting Associate Director for Projects Office of Nuclear Reactor Regulation Enclosure:
    Application for Pilot Testing of Fundamentals Examination


If you have any questions concerning this generic letter, please call Mr. Perkins at (301)492-1031.This request is covered by Office of Management and Budget Clearance Number 3150-0090
Enclosure (GL 89-xx)
which expires January 31, 1992. The estimated average burden is 2 hours per response.
I,                                   , employed at the (Name)                                           (Station Name)
    50-                 request participation in the Pilot Test Progran ot (Facility Docket Number)
the Fundamentals Examination for an operator or a senior operator license.     I
agree to the conditions outlined in GL-89-(    ).
                              Applicant:
                                                                          Date Approved:
                                        Training Department Manager      Date


Comments on the accuracy of this estimate and suggestions to reduce the burden may be directed to the Office of Management and Budget, Paperwork Reduction Project (3150-0090), Room 3208, New Executive Office Building, Washington, D.C. 20503, and the U.S. Nuclear Regulatory Commission, Records and Reports Management Branch, Office of Information Resources Management, Washington, D.C. 20555.Sincerely, Steven A. Varga, Acting Associate Director for Projects Office of Nuclear Reactor Regulation Enclosure:
Distribution and concurrence for memo to Edward Jordan dated                                           MA1R I B 19 ?
Application for Pilot Testing of Fundamentals Examination Enclosure (GL 89-xx)I, , employed at the (Name) (Station Name)50- request participation in the Pilot Test Progran ot (Facility Docket Number)the Fundamentals Examination for an operator or a senior operator license. I agree to the conditions outlined in GL-89-( ).Applicant:
              DISTRIBUTION
Date Approved: Training Department Manager Date Distribution and concurrence for memo to Edward Jordan dated DISTRIBUTION
              Central Files OLB RF
Central Files OLB RF PVDoyle LAWiens RACooley TLSzymanski KEPerkins JZwolinski JWRoe FJMiraglia JHSniezek/TEMurley DOYLE -2 2 MA1R I B 19 ?.b OFC : OLB p4 : OLB-DLPQ : OLB:DLP J : DIR:DLPQ : AD R ' : DDIR RR______ .... --- --- -'--- ---- -----CA -- -------: -- 7-+ e-<NAME : PVDoyle:pd  
              PVDoyle LAWiens RACooley TLSzymanski KEPerkins JZwolinski JWRoe FJMiraglia JHSniezek/TEMurley
:LA1iens : KEPerk~is'  
                                                                                                                      .b DOYLE -22 OFC       : OLB p4                     : OLB-DLPQ           : OLB:DLP           J     : DIR:DLPQ           : AD         R     '   : DDIR RR
: JW e : aglia : zek______-----  
  ______          -        -- ....   - --           -'---   ----     ----- CA     -- -------             : --   7-+         e-<
--------------
NAME     : PVDoyle:pd                 :LA1iens             : KEPerk~is'               : JW       e         :         aglia       :         zek
_ _________
    ______-----                     _  _________            __________*-----____
__________*-----____
                                                                --------------                                 --------------         A-t_       _
--------------
DATE      : o:/q/89                   :       /:                   /ID/89           *       j/:/89 OFC       :   RN:
A-t_ _DATE : o:/q/89 : /: /ID/89
NAME: 7RfQVQyrlinger                                         :
* j/:/89 OFC : RN: NAME: 7RfQVQyrlinger  
                ---   ---- --     --     -   --   ----         ---     --   -- --   --     - - - - - -   -   - -   - - - -     -   - - - - -
:--- -- -- -- -- --- ---- --- -- -- -- -- -------------------DATE: XKX4B : 2/J9/89 OFFICIAL FILE COPY}}
DATE: XKX4B                           : 2/J9/89 OFFICIAL FILE COPY}}


{{GL-Nav}}
{{GL-Nav}}

Latest revision as of 02:49, 24 November 2019

NRC Generic Letter 1989-005: Pilot Testing Fundamentals Examination
ML031150279
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Clinch River, Crane
Issue date: 04/04/1989
From: Varga S
Office of Nuclear Reactor Regulation
To:
References
GL-89-005, NUDOCS 8903300106
Download: ML031150279 (12)


KJ~

-s UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555

4' ,April 4, 1989 TO: LICENSEES OF ALL POWER REACTORS AND APPLICANTS-FOR A REACTOR

OPERATOR'S LICENSE UNDER 10 CFR PART 55 SUBJECT: PILOT TESTING OF THE FUNDAMENTALS EXAMINATION (Generic Letter 89- 05)

This letter is to inform facility licensees and potential applicants under

10 CFR Part 55 that the NRC is offering a second pilot test of the fundamentals examination for candidates for an NRC operator's license. During this pilot test, examinations will be administered to candidates-for a license to operate both Boiling Water Reactors (BWRs) and Pressurized Water Reactors (PWRs).

The pilot test will be used to refine the development, administration, and grading process for the fundamentals examination. Applicants who participate in this pilot test and achieve a passing grade of 70 percent or a higher percentage will receive a waiver under 10 CFR 55.47 of the applicable section of the written examination that is required by 10 CFR 55.41 or 55.43.

The sta~ff's review of the content of examinations prepared in accordance with.

10 CFR Part 55 and the Examiner Standards 301 and 401 of NUREG-1021, "Operator Licensing Examiner Standards," Revision 5, indicates that the subject matter presented in's6me sections is generic to *all BWRs or all PWRs. The subject matter includes reactor' theory, heat transfer, thermodynamics, fluid flow, and component operations. The staff's review of current training programs indicates that these topics are normally presented early in the operator and senior operator training programs. Mastery of this fundamentals subject matter is an important first step of training, which includes systems and plant characteristics, on-the-job training, and simulator training.

In developing the fundamentals examination, the staff used subject matter contained in the 291000 through 293000 series of the "Knowledge and Abilities (K/A)

Catalog for Nuclear Power Plant Operators: Boiling Water Reactors" (NUREG-1123),

and the 191000 through 193000 s'eries of the "Knowledge and Abilities (K/A) Catalog for Nuclear Power Plant Operators: Pressurized Water Reactors"

(NUREG-1122)._ The K/As-provided the basis for-the testing objectives from which a bank of multiple choice questions has been developed and screened for use in this examination. Each examination will contain approximately 50

multiple choice questions and will require approximately 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> to complete. We plan to administer the pilot examinations at one central location in each region. As the examinations will be graded by machine, we expect to promulgate the test results within 10 days after the administration of the examination.

Copies of the fundamentals examination test sheets will be returned to each volunteer and facility training department for comment. The NRC staff will summarize any comments received in a Commission paper. After reviewing this summary, the Commission will evaluate a policy to require passing the fundamentals examination as a prerequisite condition to applying for a license to operate a nuclear power plant under 10 CFR 55.31.

6too, 6ZX;oAND'

893

-2- The following conditions will apply to pilot testing of the fundamentals examination:

° The Commission will waive the usual requirements under

10 CFR 55.31,

"Subpart D - Applications." Therefore, Form NRC-398 does not need to be submitted.

o Volunteers should be enrolled in either a facility-sponsored reactor operator or senior reactor operator training course.

o Volunteers who pass the fundamentals examination with a score'of 70 percent or a higher percentage will be granted a waiver under

10 CFR 55.47 of the appropriate-section (1 or 4) of the written examination.

o Volunteers who do not achieve a grade of 70 percent will subsequently be able to take the entire regularly scheduled written examination at the'site. 'As a formal application under 10 CFR 55.31 is not required, the provisions of

10 CFR 55.35, "Re-applications," will not apply.

  • Pilot testing of these examinations is planned for June

28, 1989. You will be informed of the exact time, and location of the examinations within

60 days after the date of this generic letter.

Candidates interested in participating in this program are requested to submit the enclosed application to Mr. Kenneth E. Perkins, Chief, Operator Licensing Branch, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, with a copy to the appropriate Regional Administrator.

These applications must be received by April 21, 1989, to ensure participation in these pilot tests. We appreciate your cooperation.

If you have any questions concerning this generic letter, please call Mr. Perkins at (301)

492-1031.

This request is covered by Office of Management and Budget Clearance Number

3150-0090 which expires January 31, 1992. The estimated average burden is 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per response. Comments on the accuracy of this estimate and suggestions reduce the burden may be directed to the Office of Management to and Budget, Paperwork Reduction Project (3150-0090), Room 3208, New Executive Office Building, Washington, D.C. 20503, and the U.S. Nuclear Regulatory Commission, Records and Reports Management Branch, Office of Information Resources Management, Washington, D.C. 20555.

Sin eely, A.#Ag ,

Associate Director \ Projects Office of Nuclear Reactor Regulation Enclosure:

Application for Pilot Testing of Fundamentals Examination

IK)

-. Enclosure (CL 89-05)

I,__ ,employed at the (Name) (Station Name)

50- request participation in the Pilot Test Program of.

(Facility Docket Number)

the Fundamentals Examination for an operator or a senior operator license. -I

agree to the conditions outlined in GL-89-(05).

Applicant:

- 'Date Approved:

Training Department Manager Date

LIST OF RECENTLY ISSUED GENERIC LETTERS

Generic Date of Letter No. SubJect Issuance Issued To

89-04 GUIDANCE ON DEVELOPING 4/3/89 ALL HOLDERS OF LIGHT

ACCEPTABLE INSERVICE WATER REACTOR OPERATING

TESTING PROGRAMS LICENSES ANDCONSTRUCTION

PERMITS

89-03 OPERATOR LICENSING NATIONAL 3/24/89 ALL POWER REACTOR

EXAMINATION SCHEDULE LICENSEES AND

APPLICANTS FORAN

OPERATING LICENSE

89-02 ACTIONS TO IMPROVE TH4E 3/21/89 ALL HOLDERS OF

DETECTION OF COUNTERFEIT OPERATING LICENSES

AND FRAUDULENTLY MARKETED AND CONSTRUCTION

PRODUCTS PERMITS FORNUCLEAR

POWER REACTORS

89-01 IMPLEMENTATION OF 1/31/89 ALL LICENSEES HOLDING

PROGRAMMATIC CONTROLS OPERATING LICENSES

FORRADIOLOGICAL EFFLUENT AND CONSTRUCTION

TECHNICAL SPECIFICATIONS PERMITS FORNUCLEAR

IN THE AD0INISTRATIVE POWER REACTOR FACILITIES.

CONTROLS SECTION OF THE

TECHNICAL SPECIFICATIONS

ANDTHE RELOCATION OF

PROCEDURAL DETAILS OF

RETS TO THE OFFSITE DOSE

CALCULATION MANUAL OR TO

THE PROCESS CONTROL PROGRAM.

88-20 INDIVIDUAL PLANT 11/23/88 ALL LICENSEES HOLDING

EXAMINATION FORSEVERE OPERATING LICENSES

ACCIDENT VULNERABILITIES - AND CONSTRUCTION

10 CFR 50.54(f) PERMITS FORNUCLEAR

POWER REACTOR FACILITIES

88-19 USE OF DEADLY FORCEBY 10/28/88 ALL FUEL CYCLE FACILITY

LICENSEE GUARDS TO PREVENT LICENSEES WHO POSSESS.

THEFT OF SPECIAL NUCLEAR USE. IMPORT, EXPORT,

MATEPIAL ORTRANSPORT FORMUILA

QUANTITIES OF STRATEGIC

SPECIAL' NUCLEAR MATERIAL

88-18 PLANT RECORD STORAGE ON 10/20/88 ALL LICENSEES OF

OPTICAL DISKS OPERATING REACTORS

ANDHOLDERS OF

CONSTRUCTION PERMITS

UNITED STATES

NUCLEAR REGULATORY COMMISSION FIRST CLASS MAIL

POSTAGE b FEES PAID

WASHINGTON, D.C. 20555 USNRC

PERMIT No G67 OFFICIAL BUSINESS

PENALTY FOR PRIVATE USE, $300

v)

Distribution and concurrence for PM letter RE: GL-89-05 dated April 4, 1989.

DISTRIBUTION

Central Files OLB RF

PVDoyle LAWiens RACooley KEPerkins JZwolinski JWRoe SAVarga FJMiraglia JHSniezek/TEMurley DW4:PMCOVER.DOC 90SIt~

OFC :OLB:DLYQ :OLB:DLPQ

  • OLB LPQ DIR:DtPQ :ADT: ---

NAME :AWiens APVoyle:pd  :  : JWR ia DATE  : 03/.22/89  : 33/X7.7189  : 03/.2z/89  : 03/ /89  : 03/L.&89 OFC  : ADP:N:::

NAME  : a DATE 8 9-

9*

tc

' >

Distribution and concurrence for Second Pilot Generic Letter dated April 4,.1989 DISTRIBUTION:

OLBRFI

Central Files PVDoyle LAWiens TLSzymanski RACooley KEPerkins JAZwolinski JWRoe SAVarga FJMiraglia JHSniezek/TEMurley CHBerlinger P ~r p-D

Me'ct . ti of COG eevwt" 5e0ft out 58t>wA I &/lsaq

/lcw rtlve5An Wtv~e, C

DOYLE - 1 OFC  : OLB:DLPQk OL :DLPQ OLB:DLPQ

  • TECH EDITOR D :DLPQ  : & / j

NAME : e:pd L Wiens  : KEPerki alure  : JW  : CHBerlinger DATE :C22/0/89  : P-//d/89  :>/1-/89 l 2 1/2?/89  : 9/ 89 OFC  : ADT:NR  : ADP:NRR

NAME : FJMiraglia  : Va  :

DATE : /289  : 7 89 *

OFFICIAL FILE COPY

'--n3 jgLi8 j~@

Document Name:\_ K_>

DOYLE - 1 Requestor's ID:

CARTER

Author's Name:

DOYLE

Document Comments:

Gen Lttr for Second Pilot of Generic Fundamentals Exam 06/89

J UNITED STATES -

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555 MAR 1 6 1983 MEMORANDUM FOR: Edward Jordan, Director Office for Analysis and Evaluation of Operational Data i

FROM: James H. Sniezek, Deputy Director Office of Nuclear Reactor Regulation SUBJECT: WAIVER OF CRGR REVIEW OF GENERIC LETTER TO INFORM PWR AND BWR

LICENSEES AND APPLICANTS FOR OPERATOR LICENSES OF A PILOT

TESTING PROGRAM FOR THE FUNDAMENTALS EXAMINATION SECTION

Enclosed is a generic letter to be sent to all Pressurized-Water Reactor and Boiling-Water Reactor licensees and applicants for Operator licenses informing them of a pilot program for the administration of a generic fundamentals section of the written examinations conducted in accordance with 10 CFR 55.41 and 55.43.

The pilot program for administration of this section, separate from the site-specific written examination, is a change in the normal practice for administration of operator licensing written examinations, which is designed to simplify the training of licensed operators and reduce the burden on operator licensing examiners. The revised sequence of examination administration does not present any new staff positions and does not constitute a new requirement; therefore we believe that CRGR review is not necessary. This will be the second pilot test of this process. The first pilot test for BWR applicants was conducted on September 21, 1988. Volunteers for this pilot test are being requested in the enclosed GL-89-xx.

We plan to issue the enclosed generic letter shortly. Therefore, any comments concerning waiver of CRGR review are requested asfoon as possible.

Enclosure:

As Stated

CONTACT

Kenneth E. Perkins, NRR

X21031

UNITED STATES

NUCLEAR REGULATORY COMMISSION

~WASHINGTON,

W D. C.20555 TO LICENSEES OF ALL POWER REACTORS AND APPLICANTS FOR A REACTOR OPERATOR'S

LICENSE UNDER 10 CFR PART 55 SUBJECT: PILOT TESTING OF THE FUNDAMENTALS EXAMINATION (Generic Letter 89-xx )

This letter is to inform facility licensees and potential applicants under

10 CFR Part 55 that the NRC is offering a second pilot test of the fundamentals examination for candidates for an NRC operator's license. During this pilot test, examinations will be administered to candidates for a license to operate both Boiling Water Reactors (BWRs) and Pressurized Water Reactors (PWRs).

The pilot test will be used to refine the development, administration, and grading process for the fundamentals examination. Applicants who participate in this pilot test and achieve a-passing grade of 70 percent or a higher percentage will receive a waiver under 10 CFR 55.47 of the applicable section of the written examination that is required by 10 CFR 55.41 or 55.43.

The staff's review of the content of examinations prepared in accordance with

10 CFR Part 55 and the Examiner Standards 301 and 401 of NUREG-1021, "Operator Licensing Examiner Standards,' Revision 5, indicates that the subject matter presented in some sections is generic to all BWRs or all PWRs. The subject matter includes reactor theory, heat transfer, thermodynamics, fluid flow, and component operations. The staff's review of current training programs indicates that these topics are normally presented early in the operator and senior operator training programs. Mastery of this fundamentals subject matter is an important first step of training, which includes systems and plant characteristics, on-the-job training, and simulator training.

In developing the fundamentals examination, the staff used subject matter contained in the 291000 through 293000 series of the 'Knowledge and Abilities (K/A)

Catalog for Nuclear Power Plant Operators: Boiling Water Reactors" (NUREG-1123),

and the 191000 through 193000 series of the "Knowledge and Abilities (K/A) Catalog for Nuclear Power Plant Operators: Pressurized Water Reactors"

NUREG-1122). The K/As provided the basis for the testing objectives from which a bank of multiple choice questions has been developed and screened for use in this examination. Each examination will contain approximately 50

multiple choice questions and will require approximately 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> to complete. We plan to administer the pilot examinations at one central location in each region. As the examinations will be graded by machine, we expect to promulgate the test results within 10 days after the administration of the examination.

Copies of the fundamentals examination test sheets will be returned to each volunteer and facility training department for comment. The NRC staff will summarize any comments received in a Commission paper. After reviewing this summary, the Commission will evaluate a policy to require passing the fundamentals examination as a prerequisite condition to applying for a license to operate a nuclear power plant under 10 CFR 55.31.

"I4 1\t The following conditions will apply to pilot testing of the fundamentals examination:

0 The Commission will waive the usual requirements under 10 CFR 55.31,

"Subpart D - Applications." Therefore, Form NRC-398 does not need to be submitted.

V

Volunteers should be enrolled in either a facility-sponsored reactor operator or senior reactor operator training course.

Volunteers who pass the fundamentals examination with a score of 70 percent V

or a higher percentage will be granted a waiver under 10 CFR 55.47 of the appropriate section (1 or 4) of the written examination.

O Volunteers who do not achieve a grade of 70 percent will subsequently be able to take the entire regularly scheduled written examination at the site. As a formal application under 10 CFR 55.31 is not required, the provisions of

10 CFR 55.35, "Re-applications," will not apply.

° Pilot testing of these examinations is planned for June 28, 1989. You will be informed of the exact time, and location of the examinations within

60 days after the date of this generic letter.

Candidates interested in participating in this program are requested to submit the enclosed application to Mr. Kenneth E. Perkins, Chief, Operator Licensing Branch, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, with a-copy to the appropriate Regional Administrator.

These applications must be received by April 14, 1989, to ensure participation in these pilot tests. We appreciate your cooperation. If you have any questions concerning this generic letter, please call Mr. Perkins at (301)

492-1031.

This request is covered by Office of Management and Budget Clearance Number

3150-0090 which expires January 31, 1992. The estimated average burden is 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> per response. Comments on the accuracy of this estimate and suggestions to reduce the burden may be directed to the Office of Management and Budget, Paperwork Reduction Project (3150-0090), Room 3208, New Executive Office Building, Washington, D.C. 20503, and the U.S. Nuclear Regulatory Commission, Records and Reports Management Branch, Office of Information Resources Management, Washington, D.C. 20555.

Sincerely, Steven A. Varga, Acting Associate Director for Projects Office of Nuclear Reactor Regulation Enclosure:

Application for Pilot Testing of Fundamentals Examination

Enclosure (GL 89-xx)

I, , employed at the (Name) (Station Name)

50- request participation in the Pilot Test Progran ot (Facility Docket Number)

the Fundamentals Examination for an operator or a senior operator license. I

agree to the conditions outlined in GL-89-( ).

Applicant:

Date Approved:

Training Department Manager Date

Distribution and concurrence for memo to Edward Jordan dated MA1R I B 19 ?

DISTRIBUTION

Central Files OLB RF

PVDoyle LAWiens RACooley TLSzymanski KEPerkins JZwolinski JWRoe FJMiraglia JHSniezek/TEMurley

.b DOYLE -22 OFC  : OLB p4  : OLB-DLPQ  : OLB:DLP J  : DIR:DLPQ  : AD R '  : DDIR RR

______ - -- .... - -- -'--- ---- ----- CA -- -------  : -- 7-+ e-<

NAME  : PVDoyle:pd :LA1iens  : KEPerk~is'  : JW e  : aglia  : zek

______----- _ _________ __________*-----____


-------------- A-t_ _

DATE  : o:/q/89  : /: /ID/89 * j/:/89 OFC  : RN:

NAME: 7RfQVQyrlinger  :

--- ---- -- -- - -- ---- --- -- -- -- -- - - - - - - - - - - - - - - - - - - -

DATE: XKX4B  : 2/J9/89 OFFICIAL FILE COPY

Template:GL-Nav