ML062570497: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:SAFEGUARDS INFORMATION UNITED STATES | {{#Wiki_filter:SAFEGUARDS INFORMATION UNITED STATES N U C L E A R REGULATORY C 0 M M I S S I O N REGION I V 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 7601 1-4005 September 13, 2006 John S. Keenan Senior Vice President - Generation and Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 770000 Mail Code B32 San Francisco, CA 94177-0001 | ||
==SUBJECT:== | ==SUBJECT:== | ||
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000275/2006014 AND 05000323/2006014 | DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000275/2006014 AND 05000323/2006014 | ||
==Dear Mr. Keenan:== | ==Dear Mr. Keenan:== | ||
On August 2, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Diablo Canyon Power Plant, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on August 2, 2006, with Mr. Mike Meko, Site Services Director, and other members of your staff. The inspection examined activities conducted under your license as they relate to security and compliance with the | |||
On August 2, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Diablo Canyon Power Plant, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on August 2, 2006, with Mr. Mike Meko, Site Services Director, and other members of your staff. | |||
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. | |||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
No findings of significance were identified. | No findings of significance were identified. | ||
In accordance with 10 CFR 2.390 and the | In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.aov/readina-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. | ||
ADAMS is accessible from the NRC Website at http://www.nrc.aov/readina-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this | |||
Enclosure Contains Safeguards Information. | Enclosure Contains Safeguards Information. | ||
When Separated from enclosure, this cover document is DECONTROLLED SAFEGUARDS INFORMATION SAFEGUARDS INFORMATION J. In accordance with 10 CFR 2.39O(b)(l)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the | When Separated from enclosure, this cover document is DECONTROLLED SAFEGUARDS INFORMATION | ||
DPR-80, DPR-82 | |||
SAFEGUARDS INFORMATION J. S. Keenan In accordance with 10 CFR 2.39O(b)(l)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. | |||
Gregory \BGrerner, Chief Project Branch B Division of Reactor Projects Dockets: 50-275, 50-323 Licenses: DPR-80, DPR-82 | |||
==Enclosure:== | ==Enclosure:== | ||
NRC Inspection Report 05000275/2006014 and 05000323/2006014 (SAFEGUARDS INFORMATION) cc | |||
If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Sincerely, //?A/ on actual signature page Gregory E. Werner, Chief Project Branch B Division of Reactor Projects Dockets: 50-275, 50-323 Licenses: DPR-80, DPR-82 | NRC Inspection Report 05000275/2006014 and 05000323/2006014 (SAFEGUARDS INFORMATION) cc wifhoufSafeguards Information enclosure: | ||
Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant P.O.Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 SAFEGUARDS INFOR | |||
SAFEGUARDS INFORMATION J. S. Keenan In accordance with 10 CFR 2.39O(b)(l)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. | |||
Sincerely, | |||
//?A/on actual signature page Gregory E. Werner, Chief Project Branch B Division of Reactor Projects Dockets: 50-275, 50-323 Licenses: DPR-80, DPR-82 | |||
==Enclosure:== | ==Enclosure:== | ||
NRC Inspection Report 05000275/2006014 and 05000323/2006014 (SAFEGUARDS INFORMATION) cc | NRC Inspection Report 05000275/2006014 and 05000323/2006014 (SAFEGUARDS INFORMATION) cc wifhoufSafeguards Information enclosure: | ||
Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Internal Electronic Distribution without SGI enclosure: | Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Internal Electronic Distribution without SGI enclosure: | ||
B. Mallett, RA T. Gwynn, DRA D. Chamberlain, DRS A. Howell, DRP Internal Hard-Copv Distribution with SGI enclosure: | B. Mallett, RA T. Gwynn, DRA D. Chamberlain, DRS A. Howell, DRP Internal Hard-Copv Distribution with SGI enclosure: | ||
H. Crouch, DRP T. Jackson, DRP Senior Resident Inspector B. Westreich, NSlR B. Clayton, NRR SAFEGUARDS INFORMATION J. S. Keenan | H. Crouch, DRP T. Jackson, DRP Senior Resident Inspector B. Westreich, NSlR B. Clayton, NRR SAFEGUARDS INFORMATION | ||
?6 ADAMS: Initials: Publicly Available 17 Non-Publicly Available Sensitive Non-Sensitive FOR LETTER WITH SGI ENCLOSURE: | |||
SUNS1 Review Completed: | SAFEGUARDS INFORMATION J. S. Keenan FOR NON-SGI LETTER ALONE: | ||
ADAMS: | SUNS1 Review Completed: ?6 ADAMS: Initials: | ||
Publicly Available 17 Non-Publicly Available Sensitive Non-Sensitive FOR LETTER WITH SGI ENCLOSURE: | |||
SUNS1 Review Completed: ADAMS: w e s p N o 0 Publicly Available Non-Publicly Available Sensitive Non-Sensitive 1-1 Region IV 1 DATE 1 9/13 /06 OFFICIAL RECORD COPY SAFEGUARDS INFORMATION}} | |||
Revision as of 14:06, 23 November 2019
| ML062570497 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 09/13/2006 |
| From: | Greg Werner Division of Nuclear Materials Safety IV |
| To: | Keenan J Pacific Gas & Electric Co |
| References | |
| IR-06-014 | |
| Download: ML062570497 (4) | |
Text
SAFEGUARDS INFORMATION UNITED STATES N U C L E A R REGULATORY C 0 M M I S S I O N REGION I V 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 7601 1-4005 September 13, 2006 John S. Keenan Senior Vice President - Generation and Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 770000 Mail Code B32 San Francisco, CA 94177-0001
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000275/2006014 AND 05000323/2006014
Dear Mr. Keenan:
On August 2, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Diablo Canyon Power Plant, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on August 2, 2006, with Mr. Mike Meko, Site Services Director, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings of significance were identified.
In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.aov/readina-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Enclosure Contains Safeguards Information.
When Separated from enclosure, this cover document is DECONTROLLED SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION J. S. Keenan In accordance with 10 CFR 2.39O(b)(l)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
Gregory \BGrerner, Chief Project Branch B Division of Reactor Projects Dockets: 50-275, 50-323 Licenses: DPR-80, DPR-82
Enclosure:
NRC Inspection Report 05000275/2006014 and 05000323/2006014 (SAFEGUARDS INFORMATION) cc wifhoufSafeguards Information enclosure:
Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant P.O.Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 SAFEGUARDS INFOR
SAFEGUARDS INFORMATION J. S. Keenan In accordance with 10 CFR 2.39O(b)(l)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.
Sincerely,
//?A/on actual signature page Gregory E. Werner, Chief Project Branch B Division of Reactor Projects Dockets: 50-275, 50-323 Licenses: DPR-80, DPR-82
Enclosure:
NRC Inspection Report 05000275/2006014 and 05000323/2006014 (SAFEGUARDS INFORMATION) cc wifhoufSafeguards Information enclosure:
Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Internal Electronic Distribution without SGI enclosure:
B. Mallett, RA T. Gwynn, DRA D. Chamberlain, DRS A. Howell, DRP Internal Hard-Copv Distribution with SGI enclosure:
H. Crouch, DRP T. Jackson, DRP Senior Resident Inspector B. Westreich, NSlR B. Clayton, NRR SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION J. S. Keenan FOR NON-SGI LETTER ALONE:
SUNS1 Review Completed: ?6 ADAMS: Initials:
Publicly Available 17 Non-Publicly Available Sensitive Non-Sensitive FOR LETTER WITH SGI ENCLOSURE:
SUNS1 Review Completed: ADAMS: w e s p N o 0 Publicly Available Non-Publicly Available Sensitive Non-Sensitive 1-1 Region IV 1 DATE 1 9/13 /06 OFFICIAL RECORD COPY SAFEGUARDS INFORMATION