Non-SGI Cover Letter to IR 05000275;323/2006014; Diablo Canyon Power Plant
ML062570497
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/13/2006
From: Greg Werner
Division of Nuclear Materials Safety IV
To: Keenan J
Pacific Gas & Electric Co
References
IR-06-014
Download: ML062570497 (4)


Text

SAFEGUARDS INFORMATION UNITED STATES N U C L E A R REGULATORY C 0 M M I S S I O N REGION I V 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 7601 1-4005 September 13, 2006 John S. Keenan Senior Vice President - Generation and Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 770000 Mail Code B32 San Francisco, CA 94177-0001

SUBJECT:

DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC INSPECTION REPORT 05000275/2006014 AND 05000323/2006014

Dear Mr. Keenan:

On August 2, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Diablo Canyon Power Plant, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on August 2, 2006, with Mr. Mike Meko, Site Services Director, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.aov/readina-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Enclosure Contains Safeguards Information.

When Separated from enclosure, this cover document is DECONTROLLED SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION J. S. Keenan In accordance with 10 CFR 2.39O(b)(l)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Gregory \BGrerner, Chief Project Branch B Division of Reactor Projects Dockets: 50-275, 50-323 Licenses: DPR-80, DPR-82

Enclosure:

NRC Inspection Report 05000275/2006014 and 05000323/2006014 (SAFEGUARDS INFORMATION) cc wifhoufSafeguards Information enclosure:

Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant P.O.Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 SAFEGUARDS INFOR

SAFEGUARDS INFORMATION J. S. Keenan In accordance with 10 CFR 2.39O(b)(l)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Sincerely,

//?A/on actual signature page Gregory E. Werner, Chief Project Branch B Division of Reactor Projects Dockets: 50-275, 50-323 Licenses: DPR-80, DPR-82

Enclosure:

NRC Inspection Report 05000275/2006014 and 05000323/2006014 (SAFEGUARDS INFORMATION) cc wifhoufSafeguards Information enclosure:

Donna Jacobs Vice President, Nuclear Services Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and Station Director, Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Internal Electronic Distribution without SGI enclosure:

B. Mallett, RA T. Gwynn, DRA D. Chamberlain, DRS A. Howell, DRP Internal Hard-Copv Distribution with SGI enclosure:

H. Crouch, DRP T. Jackson, DRP Senior Resident Inspector B. Westreich, NSlR B. Clayton, NRR SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION J. S. Keenan FOR NON-SGI LETTER ALONE:

SUNS1 Review Completed: ?6 ADAMS: Initials:

Publicly Available 17 Non-Publicly Available Sensitive Non-Sensitive FOR LETTER WITH SGI ENCLOSURE:

SUNS1 Review Completed: ADAMS: w e s p N o 0 Publicly Available Non-Publicly Available Sensitive Non-Sensitive 1-1 Region IV 1 DATE 1 9/13 /06 OFFICIAL RECORD COPY SAFEGUARDS INFORMATION