{{#Wiki_filter:0CAN080902 August 5, 2009 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001  
{{#Wiki_filter:Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4710 David B. Bice Acting Manager, Licensing Arkansas Nuclear One 0CAN080902 August 5, 2009 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001


==Subject:==
==Subject:==
Projected Operator Licensing Examination Schedules Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6  
Projected Operator Licensing Examination Schedules Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6


==Dear Sir or Madam:==
==Dear Sir or Madam:==
As requested by Regulatory Issue Summary 2009-11, enclosed are the projected operator licensing examination schedules for Arkansas Nuclear One, Units 1 and 2. The enclosure also lists the estimated number of applicants planning to take operator licensing examinations and


the NRCs generic fundamentals examinations. This correspondence contains no new commitments. Should you have any questions regarding this submittal, please contact me.
As requested by Regulatory Issue Summary 2009-11, enclosed are the projected operator licensing examination schedules for Arkansas Nuclear One, Units 1 and 2. The enclosure also lists the estimated number of applicants planning to take operator licensing examinations and the NRCs generic fundamentals examinations.
This correspondence contains no new commitments. Should you have any questions regarding this submittal, please contact me.
Sincerely, DBB/dsw
Sincerely, DBB/dsw


==Enclosure:==
==Enclosure:==
Projected Operator Licensing Examination Schedules Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR  72802 Tel 479-858-4710 David B. Bice Acting Manager, Licensing Arkansas Nuclear One 0CAN080902 Page 2 cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission
Projected Operator Licensing Examination Schedules


Region IV 612 Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U.S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8 B1 11555 Rockville Pike  
0CAN080902 Page 2 cc:    Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U.S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8 B1 11555 Rockville Pike Rockville, MD 20852


Rockville, MD 20852 Enclosure To0CAN080902 Projected Operator Licensing Examination Schedules For Arkansas Nuclear One, Units 1 and 2 OPERATOR LICENSING EXAMINATION DATANRC FORM 536(10-2008)U.S. NUCLEAR REGULATORY COMMISSION NRC REGIONA. PROPOSED EXAMINATION PREPARATION SCHEDULEFACILITYNRC FORM 536  (10-2008)PRINTED ON RECYCLED PAPEREstimated burden per response to comply with this voluntary informationcollection request: 1 hour. This information collection is used to plan budgetsand resources for operator examinations. Send comments regarding burdenestimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
Enclosure To 0CAN080902 Projected Operator Licensing Examination Schedules For Arkansas Nuclear One, Units 1 and 2
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Informationand Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management andBudget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, theinformation collection.
 
APPROVED BY OMB:  NO. 3150-0131EXPIRES:  10/31/2011 PROPOSED NUMBER CYESTIMATED NUMBER OFLICENSEE-PREPAREDEXAMINATIONSCY CY CY B. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBERNUMBER OF REACTOROPERATORSNUMBER OF SENIOR REACTOROPERATORS - INSTANTNUMBER OF SENIOR REACTOROPERATORS - UPGRADENUMBER OF SENIOR REACTOROPERATORS - LIMITEDPROPOSED DATES PRIMARY DATEALTERNATE DATEC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULEPROPOSED NUMBERESTIMATEDNUMBER OFCANDIDATESCY MARCH JUNECY CY CY CY CY SEPTEMBER DECEMBERESTIMATED NUMBER OFNRC-PREPAREDEXAMINATIONS MARCH JUNE SEPTEMBER DECEMBERArkansas Nuclear One, Unit 1 IV 2010201120122013 1101 0 000 2010 2011 2012 2013 11 12 12 3 00 2 88 0 0003/08/201008/29/201102/24/201320102011 12 OPERATOR LICENSING EXAMINATION DATANRC FORM 536(10-2008)U.S. NUCLEAR REGULATORY COMMISSION NRC REGIONA. PROPOSED EXAMINATION PREPARATION SCHEDULEFACILITYNRC FORM 536  (10-2008)PRINTED ON RECYCLED PAPEREstimated burden per response to comply with this voluntary informationcollection request: 1 hour. This information collection is used to plan budgetsand resources for operator examinations. Send comments regarding burdenestimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
  )RGPSWYVI XS '%2
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Informationand Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management andBudget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, theinformation collection.
4EKI  SJ 
APPROVED BY OMB:  NO. 3150-0131EXPIRES:  10/31/2011 PROPOSED NUMBER CYESTIMATED NUMBER OFLICENSEE-PREPAREDEXAMINATIONSCY CY CY B. INITIAL OPERATOR LICENSE EXAMINATIONSPROPOSED NUMBERNUMBER OF REACTOROPERATORSNUMBER OF SENIOR REACTOROPERATORS - INSTANTNUMBER OF SENIOR REACTOROPERATORS - UPGRADENUMBER OF SENIOR REACTOROPERATORS - LIMITEDPROPOSED DATES PRIMARY DATEALTERNATE DATEC. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULEPROPOSED NUMBERESTIMATEDNUMBER OFCANDIDATESCY MARCH JUNECY CY CY CY CY SEPTEMBER DECEMBERESTIMATED NUMBER OFNRC-PREPAREDEXAMINATIONS MARCH JUNE SEPTEMBER DECEMBERArkansas Nuclear One, Unit 2 IV 2010201120122013 0110 0 000 2010 2011 2012 2013 12 12 00 88 0001/31/201108/27/201220102011 12 12}}
NRC FORM 536               U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131                          EXPIRES: 10/31/2011 (10-2008)
Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
OPERATOR LICENSING                      Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA                        and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY                                                                                                        NRC REGION Arkansas Nuclear One, Unit 1 IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                     CY 2010            CY 2011                        CY 2012                          CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED                  1                        1                                0                              1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                          0                                0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY 2010            CY 2011                        CY 2012                          CY 2013 NUMBER OF REACTOR                      11                  12                                                              12 OPERATORS NUMBER OF SENIOR REACTOR                      3                    0                                                                0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE                      2                    8                                                                8 NUMBER OF SENIOR REACTOR 0                    0                                                                0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE                03/08/2010        08/29/2011                                                    02/24/2013 ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                    CY 2011 PROPOSED NUMBER MARCH      JUNE    SEPTEMBER DECEMBER          MARCH               JUNE           SEPTEMBER DECEMBER ESTIMATED NUMBER OF                                    12 CANDIDATES NRC FORM 536 (10-2008)                                                                                           PRINTED ON RECYCLED PAPER
 
)RGPSWYVI XS '%2
4EKI  SJ 
NRC FORM 536                U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131                          EXPIRES: 10/31/2011 (10-2008)
Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.
OPERATOR LICENSING                        Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA                        and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY                                                                                                        NRC REGION Arkansas Nuclear One, Unit 2 IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER                      CY 2010            CY 2011                       CY 2012                          CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED                  0                        1                                1                              0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED                    0                          0                                0                              0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER                      CY 2010            CY 2011                        CY 2012                          CY 2013 NUMBER OF REACTOR                                            12                              12 OPERATORS NUMBER OF SENIOR REACTOR                                            0                                0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 8                                8 NUMBER OF SENIOR REACTOR                                            0                                0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE                                    01/31/2011                    08/27/2012 ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010                                                    CY 2011 PROPOSED NUMBER MARCH        JUNE    SEPTEMBER DECEMBER          MARCH               JUNE           SEPTEMBER DECEMBER ESTIMATED NUMBER OF            12                                                                                       12 CANDIDATES NRC FORM 536 (10-2008)                                                                                            PRINTED ON RECYCLED PAPER}}

Latest revision as of 04:27, 14 November 2019

Units 1 & 2, Projected Operator Licensing Examination Schedules
ML092180269
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 08/05/2009
From: David Bice
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
0CAN080902
Download: ML092180269 (5)


Text

Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802 Tel 479-858-4710 David B. Bice Acting Manager, Licensing Arkansas Nuclear One 0CAN080902 August 5, 2009 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Projected Operator Licensing Examination Schedules Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6

Dear Sir or Madam:

As requested by Regulatory Issue Summary 2009-11, enclosed are the projected operator licensing examination schedules for Arkansas Nuclear One, Units 1 and 2. The enclosure also lists the estimated number of applicants planning to take operator licensing examinations and the NRCs generic fundamentals examinations.

This correspondence contains no new commitments. Should you have any questions regarding this submittal, please contact me.

Sincerely, DBB/dsw

Enclosure:

Projected Operator Licensing Examination Schedules

0CAN080902 Page 2 cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U.S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam MS O-8 B1 11555 Rockville Pike Rockville, MD 20852

Enclosure To 0CAN080902 Projected Operator Licensing Examination Schedules For Arkansas Nuclear One, Units 1 and 2

)RGPSWYVI XS '%2

4EKI  SJ 

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Arkansas Nuclear One, Unit 1 IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 NUMBER OF REACTOR 11 12 12 OPERATORS NUMBER OF SENIOR REACTOR 3 0 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 2 8 8 NUMBER OF SENIOR REACTOR 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 03/08/2010 08/29/2011 02/24/2013 ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER

)RGPSWYVI XS '%2

4EKI  SJ 

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2011 (10-2008)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Arkansas Nuclear One, Unit 2 IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2010 CY 2011 CY 2012 CY 2013 NUMBER OF REACTOR 12 12 OPERATORS NUMBER OF SENIOR REACTOR 0 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 8 8 NUMBER OF SENIOR REACTOR 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 01/31/2011 08/27/2012 ALTERNATE DATE C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2010 CY 2011 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 12 CANDIDATES NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER