ML12010A103: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:
William J. Froehlich, Chairman Nicholas G. Trikouros Dr. William E. Kastenberg In the Matter of:
William J. Froehlich, Chairman Nicholas G. Trikouros Dr. William E. Kastenberg In the Matter of:                                   Docket No. 50-346-LR FirstEnergy NUCLEAR OPERATING                       ASLBP No. 11-907-01-LR-BD01 COMPANY (Davis-Besse Nuclear Power Station, Unit 1)         January 10, 2012 MEMORANDUM AND ORDER (Denying Motion to Dismiss Contention 1)
FirstEnergy NUCLEAR OPERATING COMPANY (Davis-Besse Nuclear Power Station, Unit 1)  
Before this Board is a motion by FirstEnergy Nuclear Operating Company (FENOC) to dismiss Contention 1, which challenges the adequacy of FENOCs consideration of renewable energy alternatives.1 FENOC argues that its recent revision of its Environmental Report (ER) has cured any alleged defect, and that Contention 1 is now moot.2 Pursuant to 10 C.F.R.
§ 2.323(a), we find that the Motion is not timely and we therefore deny it without addressing its merits.
I.      Background On August 27, 2010, FENOC submitted a license renewal application (LRA) to the Nuclear Regulatory Commission (NRC) to extend its operating license for the Davis-Besse 1
FirstEnergy Nuclear Operating Companys Motion to Dismiss Contention 1 (Dec. 19, 2011) at 1 [hereinafter Motion].
2 Id.


Docket No. 50-346-LR
Nuclear Power Station, Unit 1 (Davis-Besse) for an additional twenty-year period beyond its current expiration date of April 22, 2017.3 On April 26, 2011, we granted the petition to intervene of Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario, Dont Waste Michigan, and the Green Party of Ohio (collectively, Joint Intervenors) and admitted two contentions, including Contention 1.4 As limited and reworded by the Board, Contention 1 reads as follows:
 
The FirstEnergy Nuclear Operating Companys Environmental Report fails to adequately evaluate the full potential for renewable energy sources, specifically wind power in the form of interconnected wind farms and/or solar photovoltaic power, in combination with compressed air energy storage, to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action unnecessary. The FENOC Environmental Report (§ 7.2) treats all of the alternatives to license renewal except for natural gas and coal plants as unreasonable and does not provide a substantial analysis of the potential for significant alternatives in the Region of Interest.5 On September 19, 2011, FENOC submitted to the NRC revisions to its ER6 which FENOC claims significantly expand the discussion of renewable energy alternatives.7 However, FENOC did not file the instant motion until December 19, 2011.8 Neither the NRC Staff nor the Joint Intervenors filed an answer by December 29, 2011.9 3
ASLBP No. 11-907-01-LR-BD01
See License Renewal Application: Davis-Besse Nuclear Power Station (August 2010),
 
available at http://www.nrc.gov/reactors/operating/licensing/renewal/applications/davis-besse/davis-besse-lra.pdf.
January 10, 2012 MEMORANDUM AND ORDER (Denying Motion to Dismiss Contention 1)
Before this Board is a motion by FirstE nergy Nuclear Operating Company (FENOC) to dismiss Contention 1, which challenges the adequacy of FENOC's consideration of renewable energy alternatives.
1  FENOC argues that its recent revision of its Environmental Report (ER) has cured any alleged defect, and that Contention 1 is now moot.
2  Pursuant to 10 C.F.R. § 2.323(a), we find that the Motion is not timely and we therefore deny it without addressing its merits.
I. Background On August 27, 2010, FENOC submitted a license renewal application (LRA) to the Nuclear Regulatory Commission (NRC) to extend its operating license for the Davis-Besse 1 FirstEnergy Nuclear Operating Company's Motion to Dismiss Contention 1 (Dec. 19, 2011) at 1 [hereinafter Motion].
2 Id. Nuclear Power Station, Unit 1 (Davis-Besse) for an additional twenty-year period beyond its current expiration date of April 22, 2017.
3 On April 26, 2011, we granted the petition to intervene of Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario, Don't Waste Michigan, and the Green Party of Ohio (collectively, Joint Intervenors) and admitted two contentions, including Contention 1.
4 As limited and reworded by the Board, Contention 1 reads as follows: The FirstEnergy Nuclear Operating Company's Environmental Report fails to adequately evaluate the full potential for renewable energy sources, specifically wind power in the form of interconnected wind farms and/or solar photovoltaic power, in combination with compressed air energy storage, to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action unnecessary. The FENOC Environmental Report (§ 7.2) treats all of the alternatives to license renewal except for natural gas and coal plants as unreasonable and does not provide a substantial analysis of the potential for significant alternatives in the Region of Interest.
5   On September 19, 2011, FENOC submitted to the NRC revisions to its ER 6 which FENOC claims "significantly expand the discussion of renewable energy alternatives."
7 However, FENOC did not file the instant motion until December 19, 2011.
8 Neither the NRC Staff nor the Joint Intervenors filed an answer by December 29, 2011.
9 3 See License Renewal Application: Davis-Besse Nuclear Power Station (August 2010), available at http://www.nrc.gov/reactors/operating/licensing/renewal/applications/davis-besse/davis-besse-lra.pdf.
4 LBP-11-13, 73 NRC __, __ (slip op. at 64-65) (Apr. 26, 2011).
4 LBP-11-13, 73 NRC __, __ (slip op. at 64-65) (Apr. 26, 2011).
5 Id. at __ (slip op. at 64).
5 Id. at __ (slip op. at 64).
6 See Letter from Kendall Byrd, Director, Site Performance Improvement, FENOC, to NRC, "License Renewal Application Amendment 16 for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application Environmental Report," Enclosure A (Sept. 19, 2011) (ADAMS Accession No. ML11266A062) [hereinafter Amendment 16].
6 See Letter from Kendall Byrd, Director, Site Performance Improvement, FENOC, to NRC, License Renewal Application Amendment 16 for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application Environmental Report, Enclosure A (Sept. 19, 2011) (ADAMS Accession No. ML11266A062) [hereinafter Amendment 16].
7 Motion at 4.
7 Motion at 4.
8 Id. at 1. 9 See 10 C.F.R. § 2.323(c). II. Relevant Legal Standards 10 C.F.R. § 2.323 governs the filing of motions in NRC adjudicatory proceedings, including proceedings before this Board. Section 2.323(a) states that "[a] motion must be made no later than ten (10) days after the occurrence or circumstance from which the motion arises."
8 Id. at 1.
10  The Board addressed this regulation in its Initial Scheduling Order, noting that "[t]he regulations require that, unless otherwise specified by the Board, a motion, such as a motion to compel, shall be filed within ten (10) days after the occurrence or circumstance from which the motion arises and that the movant certify his or her sincere effort to contact the other parties and resolve the issues raised in the motion."
9 See 10 C.F.R. § 2.323(c).
11  The Board went on to explain that this strict ten-day time limit would be expanded for a narrow set of disputes concerning mandatory disclosures.
12  The Board did not provide in its Initial Scheduling Order for any other expansion or waiver of the
 
ten-day limit imposed by 10 C.F.R. § 2.323(a).
III. Discussion and Analysis As noted above, generally a party may file a motion no later than ten days after the


event triggering the motion.
II.        Relevant Legal Standards 10 C.F.R. § 2.323 governs the filing of motions in NRC adjudicatory proceedings, including proceedings before this Board. Section 2.323(a) states that [a] motion must be made no later than ten (10) days after the occurrence or circumstance from which the motion arises.10 The Board addressed this regulation in its Initial Scheduling Order, noting that [t]he regulations require that, unless otherwise specified by the Board, a motion, such as a motion to compel, shall be filed within ten (10) days after the occurrence or circumstance from which the motion arises and that the movant certify his or her sincere effort to contact the other parties and resolve the issues raised in the motion.11 The Board went on to explain that this strict ten-day time limit would be expanded for a narrow set of disputes concerning mandatory disclosures.12 The Board did not provide in its Initial Scheduling Order for any other expansion or waiver of the ten-day limit imposed by 10 C.F.R. § 2.323(a).
13 In addition, the movant must make a sincere effort to contact the other parties to the proceeding and resolve the dispute raised in the motion within those ten days.14 Here, the event triggering the motion is FENOC's September 19, 2011 filing of Amendment 16 to the ER, which FENOC claims cures the defects in the ER alleged in 10 10 C.F.R. § 2.323(a).
III.      Discussion and Analysis As noted above, generally a party may file a motion no later than ten days after the event triggering the motion.13 In addition, the movant must make a sincere effort to contact the other parties to the proceeding and resolve the dispute raised in the motion within those ten days.14 Here, the event triggering the motion is FENOCs September 19, 2011 filing of Amendment 16 to the ER, which FENOC claims cures the defects in the ER alleged in 10 10 C.F.R. § 2.323(a).
11 Initial Scheduling Order (June 15, 2011) at 11 (unpublished) [hereinafter ISO].
11 Initial Scheduling Order (June 15, 2011) at 11 (unpublished) [hereinafter ISO].
12 Id. at 11-12.
12 Id. at 11-12.
13 10 C.F.R. § 2.323(a).
13 10 C.F.R. § 2.323(a).
14 See ISO at 11. Contention 1.
14 See ISO at 11.
15 FENOC states, "Now that FENOC has revised the ER to include the information that the Intervenors alleged to be missing, the Board should dismiss Contention 1 now as moot."16 To comply with the Board's order and NRC regulations, FENOC should have consulted with Joint Intervenors and the NRC Staff and filed the instant motion within ten days, or by September 29, 2011. By its own admission, though, FENOC did not contact Joint Intervenors until October 19, 2011, or 30 days after it filed Amendment 16 to the ER.
 
17 Then, FENOC filed the instant motion on December 19, 2011, or 60 days after contacting Joint Intervenors, and 90 days after filing Amendment 16, upon which the Motion is based.
Contention 1.15 FENOC states, Now that FENOC has revised the ER to include the information that the Intervenors alleged to be missing, the Board should dismiss Contention 1 now as moot.16 To comply with the Boards order and NRC regulations, FENOC should have consulted with Joint Intervenors and the NRC Staff and filed the instant motion within ten days, or by September 29, 2011.
18 In other words, FENOC filed the instant motion 80 days late
By its own admission, though, FENOC did not contact Joint Intervenors until October 19, 2011, or 30 days after it filed Amendment 16 to the ER.17 Then, FENOC filed the instant motion on December 19, 2011, or 60 days after contacting Joint Intervenors, and 90 days after filing Amendment 16, upon which the Motion is based.18 In other words, FENOC filed the instant motion 80 days late.19 FENOC has made no attempt to explain this delay in filing.
.19 FENOC has made no attempt to explain this delay in filing. On January 9, 2012, the NRC Staff filed a response stating it does not oppose the Motion.20 The response is not timely. Answers to motions are governed by Section 2.323(c) of our regulations which provide for ten (10) days to respond to a motion. A timely response to FENOC's Motion to Dismiss would have been due December 29, 2011. The Joint Intervenors filed an answer in opposition to the Motion on January 9, 2012.
On January 9, 2012, the NRC Staff filed a response stating it does not oppose the Motion.20 The response is not timely. Answers to motions are governed by Section 2.323(c) of our regulations which provide for ten (10) days to respond to a motion. A timely response to FENOCs Motion to Dismiss would have been due December 29, 2011. The Joint Intervenors filed an answer in opposition to the Motion on January 9, 2012.21 It too is nontimely, but it 15 Motion at 4-5.
21 It too is nontimely, but it 15 Motion at 4-5.
16 Id. at 5.
16 Id. at 5. 17 Motion at 1, n.1.
17 Motion at 1, n.1.
18 Motion at 1.
18 Motion at 1.
19 Given that FENOC undertook these actions in neat 30-day intervals, it appears as if FENOC was operating under the impression the NRC regulations or our ISO established these dates. However, 10 C.F.R. § 2.323(a) is unequivocal, and nothing in our ISO should lead any party to  
19 Given that FENOC undertook these actions in neat 30-day intervals, it appears as if FENOC was operating under the impression the NRC regulations or our ISO established these dates.
However, 10 C.F.R. § 2.323(a) is unequivocal, and nothing in our ISO should lead any party to believe that the ten-day limit would be extended in cases not involving disclosure disputes.
20 NRC Staff Response to FirstEnergy Nuclear Operating Companys Motion to Dismiss Contention 1 (Jan. 9, 2012).
21
[Joint] Intervenors Memorandum in Opposition to Motion to Dismiss (Opposition to Summary Disposition of Contention 1) (Jan. 9, 2012).


believe that the ten-day limit would be extended in cases not involving disclosure disputes.
postulates that the Applicants motion is one seeking summary disposition of a pending contention on the ground of mootness.22 Although the Commissions rules of practice do not explicitly provide for the filing of motions to dismiss, and do not have a separate regulation which applies specifically to motions to dismiss, a Licensing Board must fashion a fair procedure for dealing with them.23 We hold that motions to dismiss are governed by Section 2.323 of the regulations. The parties to Licensing Board proceedings often remind us that the Commissions regulations, when applied to petitions to intervene or requests for hearing, are strict by design24 and must be applied rigorously.25 We believe the same strictness and rigor should apply to motions to dismiss and responses to motions to dismiss. We therefore deny the motion to dismiss Contention 1 as it was not timely filed.26 We note that the NRC Staff has informed the Board that its Draft Supplemental Environmental Impact Statement (DSEIS) is scheduled to be issued this month.27 The DSEIS is 22 Id. at 1.
20 NRC Staff Response to FirstEnergy Nuclear Operating Company's Motion to Dismiss Contention 1 (Jan. 9, 2012).
23 Houston Lighting & Power Co. (Allens Creek Nuclear Generating Station, Unit 1), ALAB-565, 10 NRC 521, 524 (1979).
21 [Joint] Intervenors' Memorandum in Opposition to 'Motion to Dismiss' (Opposition to Summary Disposition of Contention 1) (Jan. 9, 2012). postulates that "the Applicant's motion is one seeking summary disposition of a pending contention on the ground of mootness."
24 FENOC Answer Opposing Request for Public Hearing and Petition for Leave to Intervene, (Jan. 21, 2011) at 14; NRC Staffs Answer to Joint Petitioners Request for a Hearing and Petition for Leave to Intervene, (Jan. 21, 2011) at 8.
22 Although the Commission's rules of practice do not explicitly provide for the filing of motions to dismiss, and do not have a separate regulation which applies specifically to motions to dismiss, a Licensing Board must fashion a fair procedure for dealing with them.
25 FENOC Answer Opposing Request for Public Hearing and Petition for Leave to Intervene, (Jan. 21, 2011) at 11-13; NRC Staffs Answer to Joint Petitioners Request for a Hearing and Petition for Leave to Intervene, (Jan. 21, 2011) at 10.
23 We hold that motions to dismiss are governed by Section 2.323 of the regulations. The parties to Licensing Board proceedings often remind us that the Commission's regulations, when applied to petitions to intervene or requests for hearing, are strict by design 24 and must be applied rigorously.
25 We believe the same strictness and rigor should apply to motions to dismiss and responses to motions to dismiss. We therefore deny the motion to dismiss Contention 1 as it  
 
was not timely filed.
26   We note that the NRC Staff has informed the Board that its Draft Supplemental Environmental Impact Statement (DSEIS) is scheduled to be issued this month.
27 The DSEIS is 22 Id. at 1. 23 Houston Lighting & Power Co. (Allens Creek Nuclear Generating Station, Unit 1), ALAB-565, 10 NRC 521, 524 (1979).
24 FENOC Answer Opposing Request for Public Hearing and Petition for Leave to Intervene, (Jan. 21, 2011) at 14; NRC Staff's Answer to Joint Petitioners Request for a Hearing and Petition for Leave to Intervene, (Jan. 21, 2011) at 8.
25 FENOC Answer Opposing Request for Public Hearing and Petition for Leave to Intervene, (Jan. 21, 2011) at 11-13; NRC Staff's Answer to Joint Petitioners Request for a Hearing and Petition for Leave to Intervene, (Jan. 21, 2011) at 10.
26 The Motion would also be denied if it were considered a motion for summary disposition as our regulations require motions for summary disposition to include affidavits to support statements of fact. 10 C.F.R. § 2.1205. The Motion does not contain any affidavits.
26 The Motion would also be denied if it were considered a motion for summary disposition as our regulations require motions for summary disposition to include affidavits to support statements of fact. 10 C.F.R. § 2.1205. The Motion does not contain any affidavits.
27 NRC Staff Projections for the Draft Supplemental Environmental Impact Statement and Final Supplemental Environmental Impact Statement in the Matter of First Energy Nuclear Operating Co. (Davis-Bess Nuclear Power Station, Unit 1) (Nov. 15, 2011) at 1. likely to address the issues raised by Contention 1.
27 NRC Staff Projections for the Draft Supplemental Environmental Impact Statement and Final Supplemental Environmental Impact Statement in the Matter of First Energy Nuclear Operating Co. (Davis-Bess Nuclear Power Station, Unit 1) (Nov. 15, 2011) at 1.
28  FENOC will, therefore, have an opportunity to file a (or refile this) motion to dismiss 29 or a motion for summary disposition 30 within 10 days of the issuance of the DSEIS.
31  Similarly, the Joint Intervenors will have the opportunity to file motions to admit new contentions and any proposed new contentions "within sixty (60) days of the date when the material information on which it is based first becomes available."
32  If filed thereafter, the motion and proposed new contention shall be deemed nontimely under 10 C.F.R. 2.309(c). This Board has already reminded the parties that pleadings in this docket shall be proof-read, cite-checked, and filed in strict conformance with 10 C.F.R. § 2.323.
33 28  FENOC states, "The NRC Staff has shifted the date for issuing the Draft Supplemental Environmental Impact Statement ('DSEIS') for the Davis-Besse license renewal from October 2011, to January 2012, to consider, among other things, the 'in-depth alternatives' presented in
 
FENOC's revised ER."  Motion at 4. See Letter from M. Galloway, NRC, to B. Allen, FENOC, "Schedule Revision for the Environmental and Safety Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application" (October 31, 2011) (ADAMS Accession No.
ML11256A164).  


likely to address the issues raised by Contention 1.28 FENOC will, therefore, have an opportunity to file a (or refile this) motion to dismiss29 or a motion for summary disposition30 within 10 days of the issuance of the DSEIS.31 Similarly, the Joint Intervenors will have the opportunity to file motions to admit new contentions and any proposed new contentions within sixty (60) days of the date when the material information on which it is based first becomes available.32 If filed thereafter, the motion and proposed new contention shall be deemed nontimely under 10 C.F.R. 2.309(c). This Board has already reminded the parties that pleadings in this docket shall be proof-read, cite-checked, and filed in strict conformance with 10 C.F.R. § 2.323.33 28 FENOC states, The NRC Staff has shifted the date for issuing the Draft Supplemental Environmental Impact Statement (DSEIS) for the Davis-Besse license renewal from October 2011, to January 2012, to consider, among other things, the in-depth alternatives presented in FENOCs revised ER. Motion at 4. See Letter from M. Galloway, NRC, to B. Allen, FENOC, Schedule Revision for the Environmental and Safety Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (October 31, 2011) (ADAMS Accession No.
ML11256A164).
29 10 C.F.R. § 2.323(a).
29 10 C.F.R. § 2.323(a).
30 Id. § 2.1205.
30 Id. § 2.1205.
31 The parties have thirty (30) days after the "Trigger Date" to file dispositive motions. The Trigger Date is defined as the latter of the issuance of the FSEIS or the FSER. ISO Section F.1.
31 The parties have thirty (30) days after the Trigger Date to file dispositive motions. The Trigger Date is defined as the latter of the issuance of the FSEIS or the FSER. ISO Section F.1.
32 ISO Section B.1. We note also that the Joint Intervenors will not be required to refile Contention 1 in order to challenge the NRC Staff's tr eatment of the same issues in the DSEIS.
32 ISO Section B.1. We note also that the Joint Intervenors will not be required to refile Contention 1 in order to challenge the NRC Staffs treatment of the same issues in the DSEIS.
See Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), LBP-01-23, 54 NRC 163, 172 n.3 (2001) ("[A] contention 'initially framed as a challenge to the substance of an applicant's ER analysis of particular matters would not necessarily require a late-filed revision or substitution to constitute a litigable issue statement relative to the substance of the Staff's DEIS (or final environmental impact statement) analysis of the same matter.'").
See Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), LBP-01-23, 54 NRC 163, 172 n.3 (2001) ([A] contention initially framed as a challenge to the substance of an applicants ER analysis of particular matters would not necessarily require a late-filed revision or substitution to constitute a litigable issue statement relative to the substance of the Staffs DEIS (or final environmental impact statement) analysis of the same matter.).
33 Board Memorandum and Order (Granting Motion to Strike and Requiring Re-filing of Reply) (Feb. 18, 2011) at 4 (unpublished). III. Order For the reasons stated above, FENOC's Motion to Dismiss Contention 1 is denied. It is so ORDERED.
33 Board Memorandum and Order (Granting Motion to Strike and Requiring Re-filing of Reply)
THE ATOMIC SAFETY AND LICENSING BOARD
(Feb. 18, 2011) at 4 (unpublished).


III. Order For the reasons stated above, FENOCs Motion to Dismiss Contention 1 is denied.
It is so ORDERED.
THE ATOMIC SAFETY AND LICENSING BOARD
                                                  /RA/
_______________________
_______________________
William J. Froehlich, Chairman       ADMINISTRATIVE JUDGE Rockville, Maryland  
William J. Froehlich, Chairman ADMINISTRATIVE JUDGE Rockville, Maryland January 10, 2012
 
January 10, 2012 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )  )
FIRST ENERGY NUCLEAR OPERATING  )
COMPANY )  Docket No. 50-346-LR 
)
(Davis-Besse Nuclear Power Station, Unit 1) )  )  CERTIFICATE OF SERVICE
 
I hereby certify that copies of  the  foregoing  MEMORANDUM AND ORDER (Denying Motion to Dismiss Contention 1)  have been served upon the following persons by Electronic Information Exchange.
 
Office of Commission Appellate Adjudication Mail Stop O-7H4M U.S. Nuclear Regulatory Commission Washington, DC  20555-0001
 
E-mail: ocaamail@nrc.gov
 
Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission.
 
Mail Stop T-3F23 Washington, DC  20555-0001
 
William J. Froehlich, Chair Administrative Judge 
 
E-mail:  william.froehlich@nrc.gov
 
Nicholas G. Trikouros
 
Administrative Judge E-mail: nicholas.trikouros@nrc.gov
 
William E. Kastenberg
 
Administrative Judge
 
E-mail: wek1@nrc.gov Hillary  Cain, Law Clerk
 
E-mail: hillary.cain@nrc.gov Matthew Flyntz, Law Clerk
 
E-mail: matthew.flyntz@nrc.gov Office of the Secretary of the Commission U.S. Nuclear Regulatory Commission Mail Stop O-16C1 Washington, DC  20555-0001
 
Hearing Docket
 
E-mail: hearingdocket@nrc.gov
 
Office of the General Counsel U.S. Nuclear Regulatory Commission Mail Stop O-15D21 Washington, DC  20555-0001 Edward L. Williamson, Esq.
 
E-mail: edward.williamson@nrc.gov Lloyd B. Subin, Esq.
E-mail:  lloyd.subin@nrc.gov Brian Harris, Esq.
 
E-mail: brian.harris@nrc.gov Richard S. Harper, Esq.
 
E-mail: richard.harper@nrc.gov Brian P. Newell, Paralegal E-mail: brian.newell@nrc.gov
 
OGC Mail Center :
OGCMailCenter@nrc.gov FirstEnergy Service Company. Mailstop: A-GO-15
 
76 South Main Street Akron, OH  44308 David W. Jenkins, Esq.


UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of                              )
                                              )
FIRST ENERGY NUCLEAR OPERATING                )
COMPANY                                    )            Docket No. 50-346-LR
                                              )
(Davis-Besse Nuclear Power Station, Unit 1)    )
                                              )
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing MEMORANDUM AND ORDER (Denying Motion to Dismiss Contention 1) have been served upon the following persons by Electronic Information Exchange.
Office of Commission Appellate                  Office of the Secretary of the Commission Adjudication                                  U.S. Nuclear Regulatory Commission Mail Stop O-7H4M                                Mail Stop O-16C1 U.S. Nuclear Regulatory Commission              Washington, DC 20555-0001 Washington, DC 20555-0001                        Hearing Docket E-mail: ocaamail@nrc.gov                        E-mail: hearingdocket@nrc.gov Office of the General Counsel Atomic Safety and Licensing Board Panel          U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission.              Mail Stop O-15D21 Mail Stop T-3F23                                Washington, DC 20555-0001 Washington, DC 20555-0001                        Edward L. Williamson, Esq.
E-mail: edward.williamson@nrc.gov William J. Froehlich, Chair                      Lloyd B. Subin, Esq.
Administrative Judge                            E-mail: lloyd.subin@nrc.gov E-mail: william.froehlich@nrc.gov                Brian Harris, Esq.
E-mail: brian.harris@nrc.gov Nicholas G. Trikouros                            Richard S. Harper, Esq.
Administrative Judge                            E-mail: richard.harper@nrc.gov E-mail: nicholas.trikouros@nrc.gov              Brian P. Newell, Paralegal E-mail: brian.newell@nrc.gov William E. Kastenberg Administrative Judge                            OGC Mail Center : OGCMailCenter@nrc.gov E-mail: wek1@nrc.gov FirstEnergy Service Company.
Hillary Cain, Law Clerk                          Mailstop: A-GO-15 E-mail: hillary.cain@nrc.gov                    76 South Main Street Matthew Flyntz, Law Clerk                        Akron, OH 44308 E-mail: matthew.flyntz@nrc.gov                  David W. Jenkins, Esq.
E-mail : djenkins@firstenergycorp.com
E-mail : djenkins@firstenergycorp.com


Docket No. 50-346-LR MEMORANDUM AND ORDER (Denying Moti on to Dismiss Contention 1) 2 Morgan, Lewis & Bockius  
Docket No. 50-346-LR MEMORANDUM AND ORDER (Denying Motion to Dismiss Contention 1)
 
Morgan, Lewis & Bockius                       Citizens Environmental Alliance (CEA) 1111 Pennsylvania Avenue, NW                   of Southwestern Ontario Washington, D.C. 20004                       1950 Ottawa Street Stephen Burdick, Esq.                         Windsor, Ontario Canada N8Y 197 E-mail: sburdick@morganlewis.com Alex Polonsky, Esq.                           Green Party of Ohio E-mail: apolonsky@morganlewis.com             2626 Robinwood Avenue Kathryn M. Sutton, Esq.                       Toledo, Ohio 43610 E-mail: ksutton@morganlewis.com Martin ONeill, Esq.                         Dont Waste Michigan E-mail: martin.oneill@morganlewis.com         811 Harrison Street Timothy Matthews, Esq.                       Monroe, Michigan 48161 E-mail: tmatthews@morganlewis.com             Michael Keegan Brooke Leach, Esq.                           E-mail: mkeeganj@comcast.net E-mail: bleach@morganlewis.com Jane Diecker, Esq.                           Terry J. Lodge, Counsel for CEA, Dont E-mail: jdiecker@morganlewis.com               Waste Michigan, and Green Party of Ohio Mary Freeze, Legal Secretary                 316 N. Michigan Street, Suite 520 E-mail: mfreeze@morganlewis.com               Toledo, OH 43604-5627 Lesa Williams-Richardson, Legal Secretary     E-mail: tjlodge50@yahoo.com E-mail: lrichardson@morganlewis.com Beyond Nuclear 6930 Carroll Avenue Suite 400 Takoma Park, Md. 20912 Kevin Kamps E-mail : kevin@beyondnuclear.org Paul Gunter E-mail : paul@beyondnuclear.org
1111 Pennsylvania Avenue, NW Washington, D.C. 20004 Stephen Burdick, Esq.  
[Original signed by Christine M. Pierpoint ]
 
Office of the Secretary of the Commission Dated at Rockville, Maryland this 10th day of January 2012 2}}
E-mail: sburdick@morganlewis.com Alex Polonsky, Esq.
E-mail: apolonsky@morganlewis.com Kathryn M. Sutton, Esq.  
 
E-mail: ksutton@morganlewis.com Martin O'Neill, Esq.
E-mail: martin.oneill@morganlewis.com Timothy Matthews, Esq.  
 
E-mail: tmatthews@morganlewis.com Brooke Leach, Esq.  
 
E-mail: bleach@morganlewis.com Jane Diecker, Esq.
E-mail: jdiecker@morganlewis.com Mary Freeze, Legal Secretary  
 
E-mail: mfreeze@morganlewis.com Lesa Williams-Richardson, Legal Secretary  
 
E-mail: lrichardson@morganlewis.com Citizens Environmental Alliance (CEA)
 
of  Southwestern Ontario
 
1950 Ottawa Street
 
Windsor, Ontario Canada  N8Y 197
 
Green Party of Ohio 2626 Robinwood Avenue
 
Toledo, Ohio  43610
 
Don't Waste Michigan 811 Harrison Street Monroe, Michigan  48161
 
Michael Keegan
 
E-mail: mkeeganj@comcast.net Terry J. Lodge, Counsel for CEA, Don't    Waste Michigan, and Green Party of Ohio
 
316 N. Michigan Street, Suite 520
 
Toledo, OH  43604-5627
 
E-mail: tjlodge50@yahoo.com Beyond Nuclear 6930 Carroll Avenue Suite 400  
 
Takoma Park, Md. 20912 Kevin Kamps  
 
E-mail : kevin@beyondnuclear.org Paul Gunter E-mail : paul@beyondnuclear.org
 
[Original signed by Christine M. Pierpoint ]                                     Office of the Secretary of the Commission  
 
Dated at Rockville, Maryland this 10 th day of January 2012}}

Revision as of 09:52, 12 November 2019

Memorandum and Order (Denying Motion to Dismiss Contention 1)
ML12010A103
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/10/2012
From: William Froehlich, Kastenberg W, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 21713, 50-346-LR, ASLBP 11-907-01-LR-BD01
Download: ML12010A103 (9)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD Before Administrative Judges:

William J. Froehlich, Chairman Nicholas G. Trikouros Dr. William E. Kastenberg In the Matter of: Docket No. 50-346-LR FirstEnergy NUCLEAR OPERATING ASLBP No. 11-907-01-LR-BD01 COMPANY (Davis-Besse Nuclear Power Station, Unit 1) January 10, 2012 MEMORANDUM AND ORDER (Denying Motion to Dismiss Contention 1)

Before this Board is a motion by FirstEnergy Nuclear Operating Company (FENOC) to dismiss Contention 1, which challenges the adequacy of FENOCs consideration of renewable energy alternatives.1 FENOC argues that its recent revision of its Environmental Report (ER) has cured any alleged defect, and that Contention 1 is now moot.2 Pursuant to 10 C.F.R.

§ 2.323(a), we find that the Motion is not timely and we therefore deny it without addressing its merits.

I. Background On August 27, 2010, FENOC submitted a license renewal application (LRA) to the Nuclear Regulatory Commission (NRC) to extend its operating license for the Davis-Besse 1

FirstEnergy Nuclear Operating Companys Motion to Dismiss Contention 1 (Dec. 19, 2011) at 1 [hereinafter Motion].

2 Id.

Nuclear Power Station, Unit 1 (Davis-Besse) for an additional twenty-year period beyond its current expiration date of April 22, 2017.3 On April 26, 2011, we granted the petition to intervene of Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario, Dont Waste Michigan, and the Green Party of Ohio (collectively, Joint Intervenors) and admitted two contentions, including Contention 1.4 As limited and reworded by the Board, Contention 1 reads as follows:

The FirstEnergy Nuclear Operating Companys Environmental Report fails to adequately evaluate the full potential for renewable energy sources, specifically wind power in the form of interconnected wind farms and/or solar photovoltaic power, in combination with compressed air energy storage, to offset the loss of energy production from Davis-Besse, and to make the requested license renewal action unnecessary. The FENOC Environmental Report (§ 7.2) treats all of the alternatives to license renewal except for natural gas and coal plants as unreasonable and does not provide a substantial analysis of the potential for significant alternatives in the Region of Interest.5 On September 19, 2011, FENOC submitted to the NRC revisions to its ER6 which FENOC claims significantly expand the discussion of renewable energy alternatives.7 However, FENOC did not file the instant motion until December 19, 2011.8 Neither the NRC Staff nor the Joint Intervenors filed an answer by December 29, 2011.9 3

See License Renewal Application: Davis-Besse Nuclear Power Station (August 2010),

available at http://www.nrc.gov/reactors/operating/licensing/renewal/applications/davis-besse/davis-besse-lra.pdf.

4 LBP-11-13, 73 NRC __, __ (slip op. at 64-65) (Apr. 26, 2011).

5 Id. at __ (slip op. at 64).

6 See Letter from Kendall Byrd, Director, Site Performance Improvement, FENOC, to NRC, License Renewal Application Amendment 16 for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application Environmental Report, Enclosure A (Sept. 19, 2011) (ADAMS Accession No. ML11266A062) [hereinafter Amendment 16].

7 Motion at 4.

8 Id. at 1.

9 See 10 C.F.R. § 2.323(c).

II. Relevant Legal Standards 10 C.F.R. § 2.323 governs the filing of motions in NRC adjudicatory proceedings, including proceedings before this Board. Section 2.323(a) states that [a] motion must be made no later than ten (10) days after the occurrence or circumstance from which the motion arises.10 The Board addressed this regulation in its Initial Scheduling Order, noting that [t]he regulations require that, unless otherwise specified by the Board, a motion, such as a motion to compel, shall be filed within ten (10) days after the occurrence or circumstance from which the motion arises and that the movant certify his or her sincere effort to contact the other parties and resolve the issues raised in the motion.11 The Board went on to explain that this strict ten-day time limit would be expanded for a narrow set of disputes concerning mandatory disclosures.12 The Board did not provide in its Initial Scheduling Order for any other expansion or waiver of the ten-day limit imposed by 10 C.F.R. § 2.323(a).

III. Discussion and Analysis As noted above, generally a party may file a motion no later than ten days after the event triggering the motion.13 In addition, the movant must make a sincere effort to contact the other parties to the proceeding and resolve the dispute raised in the motion within those ten days.14 Here, the event triggering the motion is FENOCs September 19, 2011 filing of Amendment 16 to the ER, which FENOC claims cures the defects in the ER alleged in 10 10 C.F.R. § 2.323(a).

11 Initial Scheduling Order (June 15, 2011) at 11 (unpublished) [hereinafter ISO].

12 Id. at 11-12.

13 10 C.F.R. § 2.323(a).

14 See ISO at 11.

Contention 1.15 FENOC states, Now that FENOC has revised the ER to include the information that the Intervenors alleged to be missing, the Board should dismiss Contention 1 now as moot.16 To comply with the Boards order and NRC regulations, FENOC should have consulted with Joint Intervenors and the NRC Staff and filed the instant motion within ten days, or by September 29, 2011.

By its own admission, though, FENOC did not contact Joint Intervenors until October 19, 2011, or 30 days after it filed Amendment 16 to the ER.17 Then, FENOC filed the instant motion on December 19, 2011, or 60 days after contacting Joint Intervenors, and 90 days after filing Amendment 16, upon which the Motion is based.18 In other words, FENOC filed the instant motion 80 days late.19 FENOC has made no attempt to explain this delay in filing.

On January 9, 2012, the NRC Staff filed a response stating it does not oppose the Motion.20 The response is not timely. Answers to motions are governed by Section 2.323(c) of our regulations which provide for ten (10) days to respond to a motion. A timely response to FENOCs Motion to Dismiss would have been due December 29, 2011. The Joint Intervenors filed an answer in opposition to the Motion on January 9, 2012.21 It too is nontimely, but it 15 Motion at 4-5.

16 Id. at 5.

17 Motion at 1, n.1.

18 Motion at 1.

19 Given that FENOC undertook these actions in neat 30-day intervals, it appears as if FENOC was operating under the impression the NRC regulations or our ISO established these dates.

However, 10 C.F.R. § 2.323(a) is unequivocal, and nothing in our ISO should lead any party to believe that the ten-day limit would be extended in cases not involving disclosure disputes.

20 NRC Staff Response to FirstEnergy Nuclear Operating Companys Motion to Dismiss Contention 1 (Jan. 9, 2012).

21

[Joint] Intervenors Memorandum in Opposition to Motion to Dismiss (Opposition to Summary Disposition of Contention 1) (Jan. 9, 2012).

postulates that the Applicants motion is one seeking summary disposition of a pending contention on the ground of mootness.22 Although the Commissions rules of practice do not explicitly provide for the filing of motions to dismiss, and do not have a separate regulation which applies specifically to motions to dismiss, a Licensing Board must fashion a fair procedure for dealing with them.23 We hold that motions to dismiss are governed by Section 2.323 of the regulations. The parties to Licensing Board proceedings often remind us that the Commissions regulations, when applied to petitions to intervene or requests for hearing, are strict by design24 and must be applied rigorously.25 We believe the same strictness and rigor should apply to motions to dismiss and responses to motions to dismiss. We therefore deny the motion to dismiss Contention 1 as it was not timely filed.26 We note that the NRC Staff has informed the Board that its Draft Supplemental Environmental Impact Statement (DSEIS) is scheduled to be issued this month.27 The DSEIS is 22 Id. at 1.

23 Houston Lighting & Power Co. (Allens Creek Nuclear Generating Station, Unit 1), ALAB-565, 10 NRC 521, 524 (1979).

24 FENOC Answer Opposing Request for Public Hearing and Petition for Leave to Intervene, (Jan. 21, 2011) at 14; NRC Staffs Answer to Joint Petitioners Request for a Hearing and Petition for Leave to Intervene, (Jan. 21, 2011) at 8.

25 FENOC Answer Opposing Request for Public Hearing and Petition for Leave to Intervene, (Jan. 21, 2011) at 11-13; NRC Staffs Answer to Joint Petitioners Request for a Hearing and Petition for Leave to Intervene, (Jan. 21, 2011) at 10.

26 The Motion would also be denied if it were considered a motion for summary disposition as our regulations require motions for summary disposition to include affidavits to support statements of fact. 10 C.F.R. § 2.1205. The Motion does not contain any affidavits.

27 NRC Staff Projections for the Draft Supplemental Environmental Impact Statement and Final Supplemental Environmental Impact Statement in the Matter of First Energy Nuclear Operating Co. (Davis-Bess Nuclear Power Station, Unit 1) (Nov. 15, 2011) at 1.

likely to address the issues raised by Contention 1.28 FENOC will, therefore, have an opportunity to file a (or refile this) motion to dismiss29 or a motion for summary disposition30 within 10 days of the issuance of the DSEIS.31 Similarly, the Joint Intervenors will have the opportunity to file motions to admit new contentions and any proposed new contentions within sixty (60) days of the date when the material information on which it is based first becomes available.32 If filed thereafter, the motion and proposed new contention shall be deemed nontimely under 10 C.F.R. 2.309(c). This Board has already reminded the parties that pleadings in this docket shall be proof-read, cite-checked, and filed in strict conformance with 10 C.F.R. § 2.323.33 28 FENOC states, The NRC Staff has shifted the date for issuing the Draft Supplemental Environmental Impact Statement (DSEIS) for the Davis-Besse license renewal from October 2011, to January 2012, to consider, among other things, the in-depth alternatives presented in FENOCs revised ER. Motion at 4. See Letter from M. Galloway, NRC, to B. Allen, FENOC, Schedule Revision for the Environmental and Safety Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application (October 31, 2011) (ADAMS Accession No.

ML11256A164).

29 10 C.F.R. § 2.323(a).

30 Id. § 2.1205.

31 The parties have thirty (30) days after the Trigger Date to file dispositive motions. The Trigger Date is defined as the latter of the issuance of the FSEIS or the FSER. ISO Section F.1.

32 ISO Section B.1. We note also that the Joint Intervenors will not be required to refile Contention 1 in order to challenge the NRC Staffs treatment of the same issues in the DSEIS.

See Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), LBP-01-23, 54 NRC 163, 172 n.3 (2001) ([A] contention initially framed as a challenge to the substance of an applicants ER analysis of particular matters would not necessarily require a late-filed revision or substitution to constitute a litigable issue statement relative to the substance of the Staffs DEIS (or final environmental impact statement) analysis of the same matter.).

33 Board Memorandum and Order (Granting Motion to Strike and Requiring Re-filing of Reply)

(Feb. 18, 2011) at 4 (unpublished).

III. Order For the reasons stated above, FENOCs Motion to Dismiss Contention 1 is denied.

It is so ORDERED.

THE ATOMIC SAFETY AND LICENSING BOARD

/RA/

_______________________

William J. Froehlich, Chairman ADMINISTRATIVE JUDGE Rockville, Maryland January 10, 2012

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of )

)

FIRST ENERGY NUCLEAR OPERATING )

COMPANY ) Docket No. 50-346-LR

)

(Davis-Besse Nuclear Power Station, Unit 1) )

)

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing MEMORANDUM AND ORDER (Denying Motion to Dismiss Contention 1) have been served upon the following persons by Electronic Information Exchange.

Office of Commission Appellate Office of the Secretary of the Commission Adjudication U.S. Nuclear Regulatory Commission Mail Stop O-7H4M Mail Stop O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Hearing Docket E-mail: ocaamail@nrc.gov E-mail: hearingdocket@nrc.gov Office of the General Counsel Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission. Mail Stop O-15D21 Mail Stop T-3F23 Washington, DC 20555-0001 Washington, DC 20555-0001 Edward L. Williamson, Esq.

E-mail: edward.williamson@nrc.gov William J. Froehlich, Chair Lloyd B. Subin, Esq.

Administrative Judge E-mail: lloyd.subin@nrc.gov E-mail: william.froehlich@nrc.gov Brian Harris, Esq.

E-mail: brian.harris@nrc.gov Nicholas G. Trikouros Richard S. Harper, Esq.

Administrative Judge E-mail: richard.harper@nrc.gov E-mail: nicholas.trikouros@nrc.gov Brian P. Newell, Paralegal E-mail: brian.newell@nrc.gov William E. Kastenberg Administrative Judge OGC Mail Center : OGCMailCenter@nrc.gov E-mail: wek1@nrc.gov FirstEnergy Service Company.

Hillary Cain, Law Clerk Mailstop: A-GO-15 E-mail: hillary.cain@nrc.gov 76 South Main Street Matthew Flyntz, Law Clerk Akron, OH 44308 E-mail: matthew.flyntz@nrc.gov David W. Jenkins, Esq.

E-mail : djenkins@firstenergycorp.com

Docket No. 50-346-LR MEMORANDUM AND ORDER (Denying Motion to Dismiss Contention 1)

Morgan, Lewis & Bockius Citizens Environmental Alliance (CEA) 1111 Pennsylvania Avenue, NW of Southwestern Ontario Washington, D.C. 20004 1950 Ottawa Street Stephen Burdick, Esq. Windsor, Ontario Canada N8Y 197 E-mail: sburdick@morganlewis.com Alex Polonsky, Esq. Green Party of Ohio E-mail: apolonsky@morganlewis.com 2626 Robinwood Avenue Kathryn M. Sutton, Esq. Toledo, Ohio 43610 E-mail: ksutton@morganlewis.com Martin ONeill, Esq. Dont Waste Michigan E-mail: martin.oneill@morganlewis.com 811 Harrison Street Timothy Matthews, Esq. Monroe, Michigan 48161 E-mail: tmatthews@morganlewis.com Michael Keegan Brooke Leach, Esq. E-mail: mkeeganj@comcast.net E-mail: bleach@morganlewis.com Jane Diecker, Esq. Terry J. Lodge, Counsel for CEA, Dont E-mail: jdiecker@morganlewis.com Waste Michigan, and Green Party of Ohio Mary Freeze, Legal Secretary 316 N. Michigan Street, Suite 520 E-mail: mfreeze@morganlewis.com Toledo, OH 43604-5627 Lesa Williams-Richardson, Legal Secretary E-mail: tjlodge50@yahoo.com E-mail: lrichardson@morganlewis.com Beyond Nuclear 6930 Carroll Avenue Suite 400 Takoma Park, Md. 20912 Kevin Kamps E-mail : kevin@beyondnuclear.org Paul Gunter E-mail : paul@beyondnuclear.org

[Original signed by Christine M. Pierpoint ]

Office of the Secretary of the Commission Dated at Rockville, Maryland this 10th day of January 2012 2