{{#Wiki_filter:From: Martinez, Nancy To: "Carolyn Haass" Cc: Balazik, Michael
{{#Wiki_filter:From:             Martinez, Nancy To:               "Carolyn Haass" Cc:               Balazik, Michael; Steve Reese
; Steve Reese


==Subject:==
==Subject:==
RE: Re: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium Date: Tuesday, May 24, 2016 4:16:00 PM Attachments:
RE: Re: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium Date:             Tuesday, May 24, 2016 4:16:00 PM Attachments:     image001.png image002.png
image001.png image002.png Carolyn, Thank you for this clarification.
: Carolyn, Thank you for this clarification. The information provided below regarding the diesel generator building and waste management building location clarifies the NRCs question pertaining to NWMIs response to RAI ALT-2A discussed during an April 14, 2016 teleconference (ADAMS No. ML. ML16110A253). Additionally, thank you for providing a public version of PSAR Section 4.4.2.7.1 below; this non-proprietary write-up of Section 4.4.2.7.1 will be placed in ADAMS and will be made publically available.
The information provided below regarding the diesel generator building and waste management building location clarifies the NRC's question pertaining to NWMI's response to RAI ALT-2A discussed during an April 14, 2016 teleconference (ADAMS No. ML. ML16110A253).
Nancy From: Carolyn Haass [mailto:carolyn.haass@nwmedicalisotopes.com]
Additionally, thank you for providing a public version of PSAR Section 4.4.2.7.1 below; this non-proprietary write-up of Section 4.4.2.7.1 will be placed in ADAMS and will be made publically
 
available.
 
Nancy   From: Carolyn Haass [mailto:carolyn.haass@nwmedicalisotopes.com]
Sent: Tuesday, May 24, 2016 1:23 PM To: Martinez, Nancy <Nancy.Martinez@nrc.gov>
Sent: Tuesday, May 24, 2016 1:23 PM To: Martinez, Nancy <Nancy.Martinez@nrc.gov>
Cc: Balazik, Michael <Michael.Balazik@nrc.gov>; Steve Reese
Cc: Balazik, Michael <Michael.Balazik@nrc.gov>; Steve Reese
Line 32: Line 26:


==Subject:==
==Subject:==
[External_Sender] Re: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of
[External_Sender] Re: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium
: Nancy, Yes, the diesel generator building and waste management building are part of the 1 ha (2.5 acre) partially paved parking lot of the MURR alternative site Carolyn Haass Northwest Medical Isotopes, LLC Chief Operating Officer l Vice President 509-430-6921 carolyn.haass@nwmedicalisotopes.com www.nwmedicalisotopes.com From: "Martinez, Nancy" <Nancy.Martinez@nrc.gov>
Date: Friday, May 20, 2016 at 6:26 AM To: Carolyn Haass <carolyn.haass@nwmedicalisotopes.com>


Off-Specification Uranium Nancy, Yes, the diesel generator building and waste management building are part of the 1 ha (2.5 acre) partially paved parking lot of the MURR alternative site
Cc: "Balazik, Michael" <Michael.Balazik@nrc.gov>, Steve Reese
 
  <steve.reese@nwmedicalisotopes.com>
Carolyn Haass Northwest Medical Isotopes, LLC Chief Operating Officer l Vice President 509-430-6921 carolyn.haass@nwmedicalisotopes.com www.nwmedicalisotopes.com From: "Martinez, Nancy" <
Nancy.Martinez@nrc.gov
>Date: Friday, May 20, 2016 at 6:26 AM To: Carolyn Haass <
carolyn.haass@nwmedicalisotopes.com
>
Cc: "Balazik, Michael" <
Michael.Balazik@nrc.gov
>, Steve Reese
  <steve.reese@nwmedicalisotopes.com
>


==Subject:==
==Subject:==
RE: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium Carolyn, Thank you for the information below. Regarding the clarification response to RAI ALT-2A (location of support buildings).
RE: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium
I want to confirm that that the diesel generator building and waste management building at the MURR alternative site be located within the 1 ha (2.5 acre) partially paved parking lot?
: Carolyn, Thank you for the information below. Regarding the clarification response to RAI ALT-2A (location of support buildings). I want to confirm that that the diesel generator building and waste management building at the MURR alternative site be located within the 1 ha (2.5 acre) partially paved parking lot?
: Thanks, Nancy
: Thanks, Nancy From: Carolyn Haass [mailto:carolyn.haass@nwmedicalisotopes.com]
 
Sent: Thursday, May 19, 2016 12:24 AM To: Martinez, Nancy <Nancy.Martinez@nrc.gov>
From: Carolyn Haass [
Cc: Balazik, Michael <Michael.Balazik@nrc.gov>; Steve Reese
mailto:carolyn.haass@nwmedicalisotopes.com
<steve.reese@nwmedicalisotopes.com>; Carolyn Haass <carolyn.haass@nwmedicalisotopes.com>
] Sent: Thursday, May 19, 2016 12:24 AM To: Martinez, Nancy <
Nancy.Martinez@nrc.gov
>Cc: Balazik, Michael <
Michael.Balazik@nrc.gov
>; Steve Reese
<steve.reese@nwmedicalisotopes.com
>; Carolyn Haass <
carolyn.haass@nwmedicalisotopes.com
>


==Subject:==
==Subject:==
[External_Sender] NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium Nancy, Per your request during yesterday's weekly meeting, below is the revised public version of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium.
[External_Sender] NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium
 
: Nancy, Per your request during yesterdays weekly meeting, below is the revised public version of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium.
Please let me know if you have any other clarifications.
Please let me know if you have any other clarifications.
NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium Off-specification uranium can be generated during target fabrication in the target fabrication system.
NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium Off-specification uranium can be generated during target fabrication in the target fabrication system.
The off-specification uranium is anticipated to be generated intermittently. The general approach to deal with off specification uranium is for it to be recycled and processed into fresh LEU target material. The exception is if the uranium is not suitable for LEU target material production (e.g.,
the enrichment is too low). Any LEU material with low enrichment, it will be stabilized, packaged for secured storage and then returned to DOE per the Uranium Lease Take Back contract.
For the preliminary design, the off-specification uranium operations will be sized to accommodate 25 percent of the total throughput. An allowance has been made in the mass balance for the generation of off-specification uranium. There are three potential areas in the target fabrication system that off-specification uranium may be recovered including:
* Uranium that has been irradiated, recovered during irradiated target processing, and recycled into new LEU target material may eventually be unacceptable for continued 99Mo


The off-specification uranium is anticipated to be generated intermittently.
production due to the burnup of 235U and buildup of unwanted uranium isotopes. This material, which is recovered as uranyl nitrate, will be converted into a stable form for disposition and packaged for secured storage and returned to DOE.
The general approach to deal with off specification uranium is for it to be recycled and processed into fresh LEU target material.
* If uranium is identified as being off-specification due to the presence of chemical impurities, the material will be recycled to the Uranium Recycle System within the hot cells. The purified uranyl nitrate will then be recycled to the target fabrication process.
The exception is if the uranium is not suitable for LEU target material production (e.g.,
* If LEU target material is identified as being off-specification after being produced (e.g.,
the enrichment is too low).
doesnt meet process requirements), the material will be recycled to the uranium dissolution step in the Target Fabrication System.
Any LEU material with low enrichment, it will be stabilized, packaged for secured storage and then returned to DOE per the Uranium Lease Take Back contract.
 
For the preliminary design, the off-specification uranium operations will be sized to accommodate 25 percent of the total throughput. An allowance has been made in the mass balance for the generation of off-specification uranium.
There are three potential areas in the target fabrication
 
system that off-specification uranium may be recovered including:
~      Uranium that has been irradiated, recovered during irradiated target processing, and recycled into new LEU target material may eventually be unacceptable for continued 99 Mo production due to the burnup of 235 U and buildup of unwanted uranium isotopes.
This material, which is recovered as uranyl nitrate, will be converted into a stable form for disposition and packaged for secured storage and returned to DOE.
~      If uranium is identified as being off-specification due to the presence of chemical impurities, the material will be recycled to the Uranium Recycle System within the hot cells.
The purified uranyl nitrate will then be recycled to the target fabrication process.
~      If LEU target material is identified as being off-specification after being produced (e.g., doesn't meet process requirements), the material will be recycled to the uranium dissolution
 
step in the Target Fabrication System.
Carolyn Haass Northwest Medical Isotopes, LLC Chief Operating Officer l Vice President 509-430-6921 carolyn.haass@nwmedicalisotopes.com www.nwmedicalisotopes.com
Carolyn Haass Northwest Medical Isotopes, LLC Chief Operating Officer l Vice President 509-430-6921 carolyn.haass@nwmedicalisotopes.com www.nwmedicalisotopes.com


From: Martinez, Nancy To: "Carolyn Haass" Cc: Balazik, Michael
From:             Martinez, Nancy To:               "Carolyn Haass" Cc:               Balazik, Michael; Steve Reese
; Steve Reese


==Subject:==
==Subject:==
RE: Re: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium Date: Tuesday, May 24, 2016 4:16:00 PM Attachments:
RE: Re: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium Date:             Tuesday, May 24, 2016 4:16:00 PM Attachments:     image001.png image002.png
image001.png image002.png Carolyn, Thank you for this clarification.
: Carolyn, Thank you for this clarification. The information provided below regarding the diesel generator building and waste management building location clarifies the NRCs question pertaining to NWMIs response to RAI ALT-2A discussed during an April 14, 2016 teleconference (ADAMS No. ML. ML16110A253). Additionally, thank you for providing a public version of PSAR Section 4.4.2.7.1 below; this non-proprietary write-up of Section 4.4.2.7.1 will be placed in ADAMS and will be made publically available.
The information provided below regarding the diesel generator building and waste management building location clarifies the NRC's question pertaining to NWMI's response to RAI ALT-2A discussed during an April 14, 2016 teleconference (ADAMS No. ML. ML16110A253).
Nancy From: Carolyn Haass [mailto:carolyn.haass@nwmedicalisotopes.com]
Additionally, thank you for providing a public version of PSAR Section 4.4.2.7.1 below; this non-proprietary write-up of Section 4.4.2.7.1 will be placed in ADAMS and will be made publically
 
available.
 
Nancy   From: Carolyn Haass [mailto:carolyn.haass@nwmedicalisotopes.com]
Sent: Tuesday, May 24, 2016 1:23 PM To: Martinez, Nancy <Nancy.Martinez@nrc.gov>
Sent: Tuesday, May 24, 2016 1:23 PM To: Martinez, Nancy <Nancy.Martinez@nrc.gov>
Cc: Balazik, Michael <Michael.Balazik@nrc.gov>; Steve Reese
Cc: Balazik, Michael <Michael.Balazik@nrc.gov>; Steve Reese
Line 107: Line 68:


==Subject:==
==Subject:==
[External_Sender] Re: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of
[External_Sender] Re: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium
: Nancy, Yes, the diesel generator building and waste management building are part of the 1 ha (2.5 acre) partially paved parking lot of the MURR alternative site Carolyn Haass Northwest Medical Isotopes, LLC Chief Operating Officer l Vice President 509-430-6921 carolyn.haass@nwmedicalisotopes.com www.nwmedicalisotopes.com From: "Martinez, Nancy" <Nancy.Martinez@nrc.gov>
Date: Friday, May 20, 2016 at 6:26 AM To: Carolyn Haass <carolyn.haass@nwmedicalisotopes.com>


Off-Specification Uranium Nancy, Yes, the diesel generator building and waste management building are part of the 1 ha (2.5 acre) partially paved parking lot of the MURR alternative site
Cc: "Balazik, Michael" <Michael.Balazik@nrc.gov>, Steve Reese
 
  <steve.reese@nwmedicalisotopes.com>
Carolyn Haass Northwest Medical Isotopes, LLC Chief Operating Officer l Vice President 509-430-6921 carolyn.haass@nwmedicalisotopes.com www.nwmedicalisotopes.com From: "Martinez, Nancy" <
Nancy.Martinez@nrc.gov
>Date: Friday, May 20, 2016 at 6:26 AM To: Carolyn Haass <
carolyn.haass@nwmedicalisotopes.com
>
Cc: "Balazik, Michael" <
Michael.Balazik@nrc.gov
>, Steve Reese
  <steve.reese@nwmedicalisotopes.com
>


==Subject:==
==Subject:==
RE: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium Carolyn, Thank you for the information below. Regarding the clarification response to RAI ALT-2A (location of support buildings).
RE: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium
I want to confirm that that the diesel generator building and waste management building at the MURR alternative site be located within the 1 ha (2.5 acre) partially paved parking lot?
: Carolyn, Thank you for the information below. Regarding the clarification response to RAI ALT-2A (location of support buildings). I want to confirm that that the diesel generator building and waste management building at the MURR alternative site be located within the 1 ha (2.5 acre) partially paved parking lot?
: Thanks, Nancy
: Thanks, Nancy From: Carolyn Haass [mailto:carolyn.haass@nwmedicalisotopes.com]
 
Sent: Thursday, May 19, 2016 12:24 AM To: Martinez, Nancy <Nancy.Martinez@nrc.gov>
From: Carolyn Haass [
Cc: Balazik, Michael <Michael.Balazik@nrc.gov>; Steve Reese
mailto:carolyn.haass@nwmedicalisotopes.com
<steve.reese@nwmedicalisotopes.com>; Carolyn Haass <carolyn.haass@nwmedicalisotopes.com>
] Sent: Thursday, May 19, 2016 12:24 AM To: Martinez, Nancy <
Nancy.Martinez@nrc.gov
>Cc: Balazik, Michael <
Michael.Balazik@nrc.gov
>; Steve Reese
<steve.reese@nwmedicalisotopes.com
>; Carolyn Haass <
carolyn.haass@nwmedicalisotopes.com
>


==Subject:==
==Subject:==
[External_Sender] NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium Nancy, Per your request during yesterday's weekly meeting, below is the revised public version of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium.
[External_Sender] NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium
 
: Nancy, Per your request during yesterdays weekly meeting, below is the revised public version of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium.
Please let me know if you have any other clarifications.
Please let me know if you have any other clarifications.
NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium Off-specification uranium can be generated during target fabrication in the target fabrication system.
NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium Off-specification uranium can be generated during target fabrication in the target fabrication system.
The off-specification uranium is anticipated to be generated intermittently. The general approach to deal with off specification uranium is for it to be recycled and processed into fresh LEU target material. The exception is if the uranium is not suitable for LEU target material production (e.g.,
the enrichment is too low). Any LEU material with low enrichment, it will be stabilized, packaged for secured storage and then returned to DOE per the Uranium Lease Take Back contract.
For the preliminary design, the off-specification uranium operations will be sized to accommodate 25 percent of the total throughput. An allowance has been made in the mass balance for the generation of off-specification uranium. There are three potential areas in the target fabrication system that off-specification uranium may be recovered including:
* Uranium that has been irradiated, recovered during irradiated target processing, and recycled into new LEU target material may eventually be unacceptable for continued 99Mo


The off-specification uranium is anticipated to be generated intermittently.
production due to the burnup of 235U and buildup of unwanted uranium isotopes. This material, which is recovered as uranyl nitrate, will be converted into a stable form for disposition and packaged for secured storage and returned to DOE.
The general approach to deal with off specification uranium is for it to be recycled and processed into fresh LEU target material.
* If uranium is identified as being off-specification due to the presence of chemical impurities, the material will be recycled to the Uranium Recycle System within the hot cells. The purified uranyl nitrate will then be recycled to the target fabrication process.
The exception is if the uranium is not suitable for LEU target material production (e.g.,
* If LEU target material is identified as being off-specification after being produced (e.g.,
the enrichment is too low).
doesnt meet process requirements), the material will be recycled to the uranium dissolution step in the Target Fabrication System.
Any LEU material with low enrichment, it will be stabilized, packaged for secured storage and then returned to DOE per the Uranium Lease Take Back contract.
 
For the preliminary design, the off-specification uranium operations will be sized to accommodate 25 percent of the total throughput. An allowance has been made in the mass balance for the generation of off-specification uranium.
There are three potential areas in the target fabrication
 
system that off-specification uranium may be recovered including:
~      Uranium that has been irradiated, recovered during irradiated target processing, and recycled into new LEU target material may eventually be unacceptable for continued 99 Mo production due to the burnup of 235 U and buildup of unwanted uranium isotopes.
This material, which is recovered as uranyl nitrate, will be converted into a stable form for disposition and packaged for secured storage and returned to DOE.
~      If uranium is identified as being off-specification due to the presence of chemical impurities, the material will be recycled to the Uranium Recycle System within the hot cells.
The purified uranyl nitrate will then be recycled to the target fabrication process.
~      If LEU target material is identified as being off-specification after being produced (e.g., doesn't meet process requirements), the material will be recycled to the uranium dissolution
 
step in the Target Fabrication System.
Carolyn Haass Northwest Medical Isotopes, LLC Chief Operating Officer l Vice President 509-430-6921 carolyn.haass@nwmedicalisotopes.com www.nwmedicalisotopes.com}}
Carolyn Haass Northwest Medical Isotopes, LLC Chief Operating Officer l Vice President 509-430-6921 carolyn.haass@nwmedicalisotopes.com www.nwmedicalisotopes.com}}

Latest revision as of 19:39, 30 October 2019

Nwmi Non-Proprietary Write-up of PSAR Section 4.4.2.7.1
ML16146A213
Person / Time
Site: Northwest Medical Isotopes
Issue date: 05/24/2016
From: Martinez N
Division of License Renewal
To: Haass C
Northwest Medical Isotopes
References
Download: ML16146A213 (3)


Text

From: Martinez, Nancy To: "Carolyn Haass" Cc: Balazik, Michael; Steve Reese

Subject:

RE: Re: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium Date: Tuesday, May 24, 2016 4:16:00 PM Attachments: image001.png image002.png

Carolyn, Thank you for this clarification. The information provided below regarding the diesel generator building and waste management building location clarifies the NRCs question pertaining to NWMIs response to RAI ALT-2A discussed during an April 14, 2016 teleconference (ADAMS No. ML. ML16110A253). Additionally, thank you for providing a public version of PSAR Section 4.4.2.7.1 below; this non-proprietary write-up of Section 4.4.2.7.1 will be placed in ADAMS and will be made publically available.

Nancy From: Carolyn Haass [1]

Sent: Tuesday, May 24, 2016 1:23 PM To: Martinez, Nancy <Nancy.Martinez@nrc.gov>

Cc: Balazik, Michael <Michael.Balazik@nrc.gov>; Steve Reese

<steve.reese@nwmedicalisotopes.com>; Carolyn Haass <carolyn.haass@nwmedicalisotopes.com>

Subject:

[External_Sender] Re: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium

Nancy, Yes, the diesel generator building and waste management building are part of the 1 ha (2.5 acre) partially paved parking lot of the MURR alternative site Carolyn Haass Northwest Medical Isotopes, LLC Chief Operating Officer l Vice President 509-430-6921 carolyn.haass@nwmedicalisotopes.com www.nwmedicalisotopes.com From: "Martinez, Nancy" <Nancy.Martinez@nrc.gov>

Date: Friday, May 20, 2016 at 6:26 AM To: Carolyn Haass <carolyn.haass@nwmedicalisotopes.com>

Cc: "Balazik, Michael" <Michael.Balazik@nrc.gov>, Steve Reese

<steve.reese@nwmedicalisotopes.com>

Subject:

RE: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium

Carolyn, Thank you for the information below. Regarding the clarification response to RAI ALT-2A (location of support buildings). I want to confirm that that the diesel generator building and waste management building at the MURR alternative site be located within the 1 ha (2.5 acre) partially paved parking lot?
Thanks, Nancy From: Carolyn Haass [2]

Sent: Thursday, May 19, 2016 12:24 AM To: Martinez, Nancy <Nancy.Martinez@nrc.gov>

Cc: Balazik, Michael <Michael.Balazik@nrc.gov>; Steve Reese

<steve.reese@nwmedicalisotopes.com>; Carolyn Haass <carolyn.haass@nwmedicalisotopes.com>

Subject:

[External_Sender] NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium

Nancy, Per your request during yesterdays weekly meeting, below is the revised public version of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium.

Please let me know if you have any other clarifications.

NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium Off-specification uranium can be generated during target fabrication in the target fabrication system.

The off-specification uranium is anticipated to be generated intermittently. The general approach to deal with off specification uranium is for it to be recycled and processed into fresh LEU target material. The exception is if the uranium is not suitable for LEU target material production (e.g.,

the enrichment is too low). Any LEU material with low enrichment, it will be stabilized, packaged for secured storage and then returned to DOE per the Uranium Lease Take Back contract.

For the preliminary design, the off-specification uranium operations will be sized to accommodate 25 percent of the total throughput. An allowance has been made in the mass balance for the generation of off-specification uranium. There are three potential areas in the target fabrication system that off-specification uranium may be recovered including:

  • Uranium that has been irradiated, recovered during irradiated target processing, and recycled into new LEU target material may eventually be unacceptable for continued 99Mo

production due to the burnup of 235U and buildup of unwanted uranium isotopes. This material, which is recovered as uranyl nitrate, will be converted into a stable form for disposition and packaged for secured storage and returned to DOE.

  • If uranium is identified as being off-specification due to the presence of chemical impurities, the material will be recycled to the Uranium Recycle System within the hot cells. The purified uranyl nitrate will then be recycled to the target fabrication process.
  • If LEU target material is identified as being off-specification after being produced (e.g.,

doesnt meet process requirements), the material will be recycled to the uranium dissolution step in the Target Fabrication System.

Carolyn Haass Northwest Medical Isotopes, LLC Chief Operating Officer l Vice President 509-430-6921 carolyn.haass@nwmedicalisotopes.com www.nwmedicalisotopes.com

From: Martinez, Nancy To: "Carolyn Haass" Cc: Balazik, Michael; Steve Reese

Subject:

RE: Re: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium Date: Tuesday, May 24, 2016 4:16:00 PM Attachments: image001.png image002.png

Carolyn, Thank you for this clarification. The information provided below regarding the diesel generator building and waste management building location clarifies the NRCs question pertaining to NWMIs response to RAI ALT-2A discussed during an April 14, 2016 teleconference (ADAMS No. ML. ML16110A253). Additionally, thank you for providing a public version of PSAR Section 4.4.2.7.1 below; this non-proprietary write-up of Section 4.4.2.7.1 will be placed in ADAMS and will be made publically available.

Nancy From: Carolyn Haass [3]

Sent: Tuesday, May 24, 2016 1:23 PM To: Martinez, Nancy <Nancy.Martinez@nrc.gov>

Cc: Balazik, Michael <Michael.Balazik@nrc.gov>; Steve Reese

<steve.reese@nwmedicalisotopes.com>; Carolyn Haass <carolyn.haass@nwmedicalisotopes.com>

Subject:

[External_Sender] Re: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium

Nancy, Yes, the diesel generator building and waste management building are part of the 1 ha (2.5 acre) partially paved parking lot of the MURR alternative site Carolyn Haass Northwest Medical Isotopes, LLC Chief Operating Officer l Vice President 509-430-6921 carolyn.haass@nwmedicalisotopes.com www.nwmedicalisotopes.com From: "Martinez, Nancy" <Nancy.Martinez@nrc.gov>

Date: Friday, May 20, 2016 at 6:26 AM To: Carolyn Haass <carolyn.haass@nwmedicalisotopes.com>

Cc: "Balazik, Michael" <Michael.Balazik@nrc.gov>, Steve Reese

<steve.reese@nwmedicalisotopes.com>

Subject:

RE: NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium

Carolyn, Thank you for the information below. Regarding the clarification response to RAI ALT-2A (location of support buildings). I want to confirm that that the diesel generator building and waste management building at the MURR alternative site be located within the 1 ha (2.5 acre) partially paved parking lot?
Thanks, Nancy From: Carolyn Haass [4]

Sent: Thursday, May 19, 2016 12:24 AM To: Martinez, Nancy <Nancy.Martinez@nrc.gov>

Cc: Balazik, Michael <Michael.Balazik@nrc.gov>; Steve Reese

<steve.reese@nwmedicalisotopes.com>; Carolyn Haass <carolyn.haass@nwmedicalisotopes.com>

Subject:

[External_Sender] NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium

Nancy, Per your request during yesterdays weekly meeting, below is the revised public version of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium.

Please let me know if you have any other clarifications.

NWMI Non-Proprietary Write-up of Section 4.4.2.7.1 - Recovery of Off-Specification Uranium Off-specification uranium can be generated during target fabrication in the target fabrication system.

The off-specification uranium is anticipated to be generated intermittently. The general approach to deal with off specification uranium is for it to be recycled and processed into fresh LEU target material. The exception is if the uranium is not suitable for LEU target material production (e.g.,

the enrichment is too low). Any LEU material with low enrichment, it will be stabilized, packaged for secured storage and then returned to DOE per the Uranium Lease Take Back contract.

For the preliminary design, the off-specification uranium operations will be sized to accommodate 25 percent of the total throughput. An allowance has been made in the mass balance for the generation of off-specification uranium. There are three potential areas in the target fabrication system that off-specification uranium may be recovered including:

  • Uranium that has been irradiated, recovered during irradiated target processing, and recycled into new LEU target material may eventually be unacceptable for continued 99Mo

production due to the burnup of 235U and buildup of unwanted uranium isotopes. This material, which is recovered as uranyl nitrate, will be converted into a stable form for disposition and packaged for secured storage and returned to DOE.

  • If uranium is identified as being off-specification due to the presence of chemical impurities, the material will be recycled to the Uranium Recycle System within the hot cells. The purified uranyl nitrate will then be recycled to the target fabrication process.
  • If LEU target material is identified as being off-specification after being produced (e.g.,

doesnt meet process requirements), the material will be recycled to the uranium dissolution step in the Target Fabrication System.

Carolyn Haass Northwest Medical Isotopes, LLC Chief Operating Officer l Vice President 509-430-6921 carolyn.haass@nwmedicalisotopes.com www.nwmedicalisotopes.com