ML17037B892: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:STANDARD DISTRIBUTION FOR INCOMING MATERIAL RELATING TO MARK II CONTAINMENT | {{#Wiki_filter:STANDARD DISTRIBUTION FOR INCOMING MATERIAL RELATING TO MARK II CONTAINMENT UAe NUCI EAR REGULATORY COMMISSION OOCKET NUMBER NRC FoRM 1SB I2-78) | ||
ZIMMER 50-358'INE MILE POINT 50-0 LIMERICK 50-352/353 RJL-ll/8/77 (2-P)BAILLY 50-367 | MiKIIMMMII NRC DISTRIBUTION FoR PART 60 DOCKET MATERIAL TOPICAL REPORT TO: FROM: OATS OF OOCUMENT | ||
I 7 | ('eneral Electric Company 10/25/77 Mr. John Fi Stolz San Jose, California OATE RECEIVEO Lo Ji Sabon 11/7/77 QLETTER QNOTORIZEO PROP INPUT FORM NUMBER OF COPIES RECEIVEO QORIGINAL Q UN C LASS IF I E 0 QCOPY 0 E S C R I PT I 0 N ENCI OSURE SEE ATTACHED FOR LISTING OF REPORTS' LETTERS OF INCORPORATION WILL BE PLACED IN EACH DOCKET LISTED BELOW NOTE CYS WILL BE PLACED IN THE LPDR FOR THE FOLLOWING: | ||
ZIMMER 50-358 'INE MILE POINT 50- 0 LIMERICK 50-352/353 RJL-ll/8/77 (2-P) (2-P) ]ft!~ lT 4 'S BAILLY SHOREHAM 50-367 | |||
.$ 0 332 /gas.46bo - st I7 | |||
~o->7~/~74 l5isrfkaldAKi'. I 7 ]0 s. ow c -gzF68E~E gPr 8, FOR AC ION/INFORMATION INTERNAL D ISTRI BUTION CENTRAL FILES+ 2 W 9 s o eac LETTER ONLY PFS G-PER~~~ Ro DEYOUNG LIUKE>l. WC LPDRiS 7 See Note A De VASSALLO Ko KNIEL R /04 NSIC Oo PARR Si Hump/ c-ACRS 6 J ~ TO 4R/u 5 Ie S XHWELL 2 Ro TEDESCO Ge LAXNAS 7 Me RUSHBROOK Ja KNIGHT 2 Wo PIKE Ce ANDERSON S ~ VARGA Xe PELTIER Ri BXRKEL LYNCH MD Jo SNELL Ao BCURNXA W ~ KANE Si MAR EXTERNAL DISi RIBUTION CONTROL NUMBER I7v g 2O 1 ~~) | |||
r~ | r~ | ||
GENERAL ELECTRIC TOPICAL REPORT NEDO 23617"MARK II LEAD PLANT TOPICAL REPORT: POOL BOUNDARY AND t@IN VENT CHUGGING LOAD JUSTIFICATION," DATED JULY, 1977 1)NEDO 24013,"Results of Pressure Suppression Systems Tests Employed by GE, Series No.2," dated June, 1977 2)NEDO 24014,"Calculation of the Spatial Pressure Distribution Mhen Several Condensation Events are Superimposed," dated June, 1977 3)NEDO 24015,"Load Predictions for the Pressure Suppression System in Two BMR Plants," dated June, 1977!4)NEDO 24016,"Pressure Oscillations Due to Condensation of Steam in a Water Pool," dated June, 1977 5)NEDO 24017,"Influence of Backpressure During Chugging," dated June, 1977 6)NEDO 23627,"Loads on the Vents'truts Due to Con-densation of Steam in a Mater Pool," dated June, 1977~'73120124 A | GENERAL ELECTRIC TOPICAL REPORT NEDO 23617 "MARK II LEAD PLANT TOPICAL REPORT: POOL BOUNDARY AND t@IN VENT CHUGGING LOAD JUSTIFICATION," DATED JULY, 1977 | ||
: 1) NEDO 24013, "Results of Pressure Suppression Systems Tests Employed by GE, Series No. 2," dated June, 1977 | |||
: 2) NEDO 24014, "Calculation of the Spatial Pressure Distribution Mhen Several Condensation Events are Superimposed," dated June, 1977 | |||
: 3) NEDO 24015, "Load Predictions for the Pressure Suppression System in Two BMR Plants," dated June, 1977 | |||
! 4) NEDO 24016, "Pressure Oscillations Due to Condensation of Steam in a Water Pool," dated June, 1977 | |||
: 5) NEDO 24017, "Influence of Backpressure During Chugging," | |||
dated June, 1977 | |||
: 6) NEDO 23627, "Loads on the Vents'truts Due to Con-densation of Steam in a Mater Pool," dated June, 1977 | |||
~ | |||
'73120124 A | |||
GENERAL''ELECTRIC NUCLEAR ENERGY GENERAL ELECTRIC COMPANY, 175 CURTNER AVE., SAN JOSE, CALIFORNIA 95125 MC 681, (408)925-3495 | GENERAL '' ELECTRIC NUCLEAR ENERGY SYSTEMS DIVISION GENERAL ELECTRIC COMPANY, 175 CURTNER AVE., SAN JOSE, CALIFORNIA 95125 MC 681, (408) 925-3495 NUCLEAR ENERGY PROJECTS DIVISION MFN-413-77 October 25, 1977 e | ||
~Office of Nuclear Reactor Regulation Washington, D.C.20555 Attention: | U. S. Nuclear Regulatory Commission ~ l'p CPj//y Division of Projects Management ~ u, Office of Nuclear Reactor Regulation ,q, Jp Washington, D. C. 20555 Attention: Mr. John F. Stolz, Chief Light Water Reactors Branch No. 1 Gent 1 e'men: | ||
Mr.John F.Stolz, Chief Light Water Reactors Branch No.1 | |||
==SUBJECT:== | ==SUBJECT:== | ||
GENERAL ELECTRIC TOPICAL REPORT NEDO 23617 "MARK II LEAD PLANT TOPICAL REPORT: POOL BOUNDARY AND MAIN VENT CHUGGING LOAD JUSTIFICATION," DATED JULY. 1977 | |||
==References:== | ==References:== | ||
: 1) NEDO 24013, "Results of Pressure Suppression Systems Tests Employed by GE, Series No. 2," dated June, 1977 | |||
: 2) NEDO 24014, "Calculation of the Spatial Pressure Distribution When Several Condensation Events are Superimposed," dated June, 1977 | |||
: 3) NEDO 24015, "Load Predictions for the Pressure Suppression System in Two BWR Plants," dated June, 1977 | |||
: 4) NEDO 24016, "Pressure Oscillations Due to Condensation of Steam in a Water Pool," dated June, 1977 | |||
: 5) NEDO 24017, "Influence of Backpressure During Chugging," | |||
dated June, 1977 | |||
: 6) NEDO 23627, "Loads on the Vents'truts Due to Con-densation of Steam in a Water Pool," dated June, 1977 | |||
: 7) Letter with report, "General Electr ic Topical Report NEDE 23617-,P, Mark II Lead Plant Topical Report: Pool Boundary and Main Vent Chugging Load Justification, dated July, 1977," to 0. D. Parr from L. J . Sobon, dated August 15, 1977 Seventy (70) copies of the subject report (NEDO 23617) are being provided by General Electric for the Mark II Owners Group for your review as part of the Mark- II Containment Supporting Progr am. This report, which is the non-proprietary version of NEDE 23617-P provided to you earlier this year (reference 7), provides the justification for the chugging loads used in Mark II Containment Design Assessment. | |||
GENERAL @ ELECTlllC Mr. John F. Stolz Page 2 October 25, 1977 Also included with this submittal are ten (10) copies each of the non-proprietary version of the documents listed in Appendix 1 of NEDO 23617 (references 1 through 6). The proprietary version 'of these documents was submitted with NEDE 23617-P, (reference 7). | |||
Any questions regarding this report should be directed to L. H. Frauenholz, the Mark II Containment Licensing Engineer, (408) 925-2623. | |||
GENERAL@ELECTlllC Mr.John F.Stolz Page 2 October 25, 1977 Also included with this submittal are ten (10)copies each of the non-proprietary version of the documents listed in Appendix 1 of NEDO 23617 (references 1 through 6).The proprietary version'of these documents was submitted with NEDE 23617-P, (reference 7).Any questions regarding this report should be directed to L.H.Frauenholz, the Mark II Containment Licensing Engineer, (408)925-2623.Sincerely, L.J.Sobon, Manag r BWR Containment Licensing Containment Improvement Programs LJS:at/128-129 | Sincerely, L. J. Sobon, Manag r BWR Containment Licensing Containment Improvement Programs LJS:at/128-129 | ||
==Enclosures:== | ==Enclosures:== | ||
130 cc: C. J. Anderson (NRC) | |||
H. C. Brinkmann (Mark II Owners Group) | |||
L. S. Gifford (GE Bethesda) | |||
I. A. Peltier (NRC) | |||
R. L. Tedesco (NRC) | |||
File 3,4.4.7 3.2.7 | |||
A}} | |||
Revision as of 08:16, 30 October 2019
| ML17037B892 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point, Columbia, Limerick, LaSalle, Zimmer, Shoreham, Bailly File:Long Island Lighting Company icon.png |
| Issue date: | 10/25/1977 |
| From: | Sobon L General Electric Co |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| References | |
| NEDO 23617 | |
| Download: ML17037B892 (8) | |
Text
STANDARD DISTRIBUTION FOR INCOMING MATERIAL RELATING TO MARK II CONTAINMENT UAe NUCI EAR REGULATORY COMMISSION OOCKET NUMBER NRC FoRM 1SB I2-78)
MiKIIMMMII NRC DISTRIBUTION FoR PART 60 DOCKET MATERIAL TOPICAL REPORT TO: FROM: OATS OF OOCUMENT
('eneral Electric Company 10/25/77 Mr. John Fi Stolz San Jose, California OATE RECEIVEO Lo Ji Sabon 11/7/77 QLETTER QNOTORIZEO PROP INPUT FORM NUMBER OF COPIES RECEIVEO QORIGINAL Q UN C LASS IF I E 0 QCOPY 0 E S C R I PT I 0 N ENCI OSURE SEE ATTACHED FOR LISTING OF REPORTS' LETTERS OF INCORPORATION WILL BE PLACED IN EACH DOCKET LISTED BELOW NOTE CYS WILL BE PLACED IN THE LPDR FOR THE FOLLOWING:
ZIMMER 50-358 'INE MILE POINT 50- 0 LIMERICK 50-352/353 RJL-ll/8/77 (2-P) (2-P) ]ft!~ lT 4 'S BAILLY SHOREHAM 50-367
.$ 0 332 /gas.46bo - st I7
~o->7~/~74 l5isrfkaldAKi'. I 7 ]0 s. ow c -gzF68E~E gPr 8, FOR AC ION/INFORMATION INTERNAL D ISTRI BUTION CENTRAL FILES+ 2 W 9 s o eac LETTER ONLY PFS G-PER~~~ Ro DEYOUNG LIUKE>l. WC LPDRiS 7 See Note A De VASSALLO Ko KNIEL R /04 NSIC Oo PARR Si Hump/ c-ACRS 6 J ~ TO 4R/u 5 Ie S XHWELL 2 Ro TEDESCO Ge LAXNAS 7 Me RUSHBROOK Ja KNIGHT 2 Wo PIKE Ce ANDERSON S ~ VARGA Xe PELTIER Ri BXRKEL LYNCH MD Jo SNELL Ao BCURNXA W ~ KANE Si MAR EXTERNAL DISi RIBUTION CONTROL NUMBER I7v g 2O 1 ~~)
r~
GENERAL ELECTRIC TOPICAL REPORT NEDO 23617 "MARK II LEAD PLANT TOPICAL REPORT: POOL BOUNDARY AND t@IN VENT CHUGGING LOAD JUSTIFICATION," DATED JULY, 1977
- 1) NEDO 24013, "Results of Pressure Suppression Systems Tests Employed by GE, Series No. 2," dated June, 1977
- 2) NEDO 24014, "Calculation of the Spatial Pressure Distribution Mhen Several Condensation Events are Superimposed," dated June, 1977
- 3) NEDO 24015, "Load Predictions for the Pressure Suppression System in Two BMR Plants," dated June, 1977
! 4) NEDO 24016, "Pressure Oscillations Due to Condensation of Steam in a Water Pool," dated June, 1977
- 5) NEDO 24017, "Influence of Backpressure During Chugging,"
dated June, 1977
- 6) NEDO 23627, "Loads on the Vents'truts Due to Con-densation of Steam in a Mater Pool," dated June, 1977
~
'73120124 A
GENERAL ELECTRIC NUCLEAR ENERGY SYSTEMS DIVISION GENERAL ELECTRIC COMPANY, 175 CURTNER AVE., SAN JOSE, CALIFORNIA 95125 MC 681, (408) 925-3495 NUCLEAR ENERGY PROJECTS DIVISION MFN-413-77 October 25, 1977 e
U. S. Nuclear Regulatory Commission ~ l'p CPj//y Division of Projects Management ~ u, Office of Nuclear Reactor Regulation ,q, Jp Washington, D. C. 20555 Attention: Mr. John F. Stolz, Chief Light Water Reactors Branch No. 1 Gent 1 e'men:
SUBJECT:
GENERAL ELECTRIC TOPICAL REPORT NEDO 23617 "MARK II LEAD PLANT TOPICAL REPORT: POOL BOUNDARY AND MAIN VENT CHUGGING LOAD JUSTIFICATION," DATED JULY. 1977
References:
- 1) NEDO 24013, "Results of Pressure Suppression Systems Tests Employed by GE, Series No. 2," dated June, 1977
- 2) NEDO 24014, "Calculation of the Spatial Pressure Distribution When Several Condensation Events are Superimposed," dated June, 1977
- 3) NEDO 24015, "Load Predictions for the Pressure Suppression System in Two BWR Plants," dated June, 1977
- 4) NEDO 24016, "Pressure Oscillations Due to Condensation of Steam in a Water Pool," dated June, 1977
- 5) NEDO 24017, "Influence of Backpressure During Chugging,"
dated June, 1977
- 6) NEDO 23627, "Loads on the Vents'truts Due to Con-densation of Steam in a Water Pool," dated June, 1977
- 7) Letter with report, "General Electr ic Topical Report NEDE 23617-,P, Mark II Lead Plant Topical Report: Pool Boundary and Main Vent Chugging Load Justification, dated July, 1977," to 0. D. Parr from L. J . Sobon, dated August 15, 1977 Seventy (70) copies of the subject report (NEDO 23617) are being provided by General Electric for the Mark II Owners Group for your review as part of the Mark- II Containment Supporting Progr am. This report, which is the non-proprietary version of NEDE 23617-P provided to you earlier this year (reference 7), provides the justification for the chugging loads used in Mark II Containment Design Assessment.
GENERAL @ ELECTlllC Mr. John F. Stolz Page 2 October 25, 1977 Also included with this submittal are ten (10) copies each of the non-proprietary version of the documents listed in Appendix 1 of NEDO 23617 (references 1 through 6). The proprietary version 'of these documents was submitted with NEDE 23617-P, (reference 7).
Any questions regarding this report should be directed to L. H. Frauenholz, the Mark II Containment Licensing Engineer, (408) 925-2623.
Sincerely, L. J. Sobon, Manag r BWR Containment Licensing Containment Improvement Programs LJS:at/128-129
Enclosures:
130 cc: C. J. Anderson (NRC)
H. C. Brinkmann (Mark II Owners Group)
L. S. Gifford (GE Bethesda)
I. A. Peltier (NRC)
R. L. Tedesco (NRC)
File 3,4.4.7 3.2.7
A