SBK-L-18097, Additional Changes to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:May 24, 2018 10CFR54 Docket No. 50-443 SBK-L-18097 U. S. Nuclear Regu l atory Comm i ss ion Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Stat ion NEXT era SEABROOK Additional Changes to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application  
{{#Wiki_filter:NEXTera EN ERGY ~
SEABROOK May 24, 2018 10CFR54 Docket No. 50-443 SBK-L-18097 U. S. Nuclear Regu latory Comm ission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station Additional Changes to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application


==References:==
==References:==
: 1. NextEra Energy Seabrook, LLC letter SBK-L-10077, "Seabrook Station Application for Renewed Operating License," May 25, 2010. (Accession Number ML101590099)
: 1. NextEra Energy Seabrook, LLC letter SBK-L-10077, "Seabrook Station Application for Renewed Operating License," May 25, 2010. (Accession Number ML101590099)
: 2. NextEra Energy Seabrook, LLC letter SBK-L-18075, "Eighth Annual Update to the Seabrook License Rene wal Application," May 1, 2018. (Accession Number ML18121A403)
: 2. NextEra Energy Seabrook, LLC letter SBK-L-18075, "Eighth Annual Update to the Seabrook License Renewal Application," May 1, 2018 . (Accession Number ML18121A403)
In Reference 1, NextEra Energ y Seabrook, LLC (NextEra Energy Seabrook) submitted an app lic ation for a renewed facility operating license for Seabrook Station Unit 1 in accordance with the Code of Federal Regulations, Title 10, Parts 50, 51, and 54. In Reference 2, NextEra Energy Seabrook provided the eighth annual review, which identified changes to the Current Licensing Basis (CLB) of the facility that materially affected the content of the License Renewal Application (LRA). Upon discussion with the NRC staff, NextEra Energ y Seabrook agreed to revise a portion of the updated information in order to align with NUREG-1801 GALL Rev. 2. The Enc lo sure provides additiona l changes to the LRA. To facilitate understanding, the changes are exp l a in ed, and where appropriate, portions of the LRA are repeated with the change highlighted by strikethroughs for deleted text and balded italics for inserted text. NextEra Energy Seabrook, LLC P.O. Bo x 300 , Lafayette Road , Seabrook, NH 03874 U.S. Nuclear Regulatory Commissio n SBK-L-18097 I Page 2 There are no n e w or revi sed r eg ulatory commitments cont a in e d in this lett er. If there are any questions or add ition a l information i s needed, please contact Mr. E dward J. Carley, E ngineering Super vi sor -License Renewa l, at (603) 773-7 957. I f you have any questions regarding this correspondence, plea se contact Mr. Kenneth Browne, Licensing Manager, at (603) 773-7932.
In Reference 1, NextEra Energy Seabrook, LLC (NextEra Energy Seabrook) submitted an application for a renewed facility operating license for Seabrook Station Unit 1 in accordance with the Code of Federal Regulations, Title 10, Parts 50, 51, and 54.
I declare under penalty of perjury that the foregoing is true and correct. Executed on May 24, 2018 Sincere ly, NextEra E nergy Seabrook, LLC Christopher Domingos Site Director  
In Reference 2, NextEra Energy Seabrook provided the eighth annual review, which identified changes to the Current Licensing Basis (CLB) of the facility that materially affected the content of the License Renewal Application (LRA). Upon discussion with the NRC staff, NextEra Energy Seabrook agreed to revise a portion of the updated information in order to align with NUREG-1801 GALL Rev. 2.
The Enclosure provides additiona l changes to the LRA. To facilitate understanding, the changes are explained, and where appropriate, portions of the LRA are repeated with the change highlighted by strikethroughs for deleted text and balded italics for inserted text.
NextEra Energy Seabrook, LLC P.O. Box 300 , Lafayette Road , Seabrook, NH 03874
 
U.S. Nuclear Regulatory Commission SBK-L- 18097 I Page 2 There are no new or revi sed reg ulatory commitments contained in this letter.
If there are any questions or add itional information is needed, please contact Mr.
Edward J. Carley, Engineering Supervisor - License Renewa l, at (603) 773-7957.
If you have any questions regarding this correspondence, please contact Mr. Kenneth Browne, Licensing Manager, at (603) 773-7932.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on May 24, 2018 Sincerely, NextEra Energy Seabrook, LLC Christopher Domingos Site Director


==Enclosure:==
==Enclosure:==
Additional Changes to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application cc:    D. H. Dorman                NRC  Region I Administrator J.C. Poole                NRC  Project Manager P. C. Cataldo              NRC  Senior Resident Inspector E. H. Gettys                NRC  Project Manager, License Renewal Mr. Perry Plummer Director Homeland Security and Emergency Management New Hampshire Department of Safety Division of Homeland Security and Emergency Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 perry.plummer@dos .nh.gov
U.S. Nuclear Regulatory Commission SBK-L-18097 I Page 3 Mr. John Giarrusso, Jr., Nuclear Preparedness Manager The Commonwealth of Massachusetts Emergency Management Agency 400 Worcester Road Fram ingham, MA 01702-5 399 John.Giarrusso@massmail.state.ma.us
Enclosure to SBK-L-18097 Addition al Changes to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application


Additional Changes to the Eighth Annual Update to the NextEra E nergy Seabrook License Renewal Application cc: D. H. Dorman J.C. Poole P. C. Cataldo E. H. Gettys Mr. Perry Plummer NRC Region I Administrator NRC Project Manager NRC Senior Resident Inspector NRC Project Manager, License Renewal Director Homeland Security and Emergenc y Management New Hampshire Department of Safety Division of Homeland Security and Emergenc y Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 perry.plummer@dos
U.S. Nuclear Regulatory Co1runission SBK-L-18097 I Enclosure I Page 2 Screen W ash Piping Additiona l Material: Select portion s of piping in the Screen W ash System were rep laced with a fiberglass material. As a result of this change, the following chang es are made to the License Re newal Application (LRA).
.nh.gov U.S. Nuclear Regulatory Commission SBK-L-18097 I Page 3 Mr. John G i arrusso, Jr., Nuclear Preparedness Manager The Commonwealth of Massachusetts Emergenc y Management Agency 400 Worc ester Road Fram ingham, MA 01702-5 399 John.Giarrusso@massmail.state.ma.us Enclosure to SBK-L-18097 Addition a l Changes to the E ighth Annual Update to the Next E ra E n e rgy Seabrook License Renewal Application U.S. Nuclear Regulatory C o1runis s ion SBK-L-18097 I Encl osur e I Page 2 Scree n W ash P i p in g Additiona l M a t er i a l: Se l ec t portion s of piping in the Sc r ee n W ash S y stem w ere rep l aced with a fiberglass material.
: 1. In Section 3.3.2 .1.39, Screen W ash System, Page 3.3-54 , under Aging Effects Requ iring Management add " Cracking, blistering, change in color due to water absorption "
As a result of t hi s change, the following chang es are made to the License Re n e w a l Application (LRA). 1. In Sect ion 3.3.2.1.39, Screen W ash S y stem, Page 3.3-54 , under Aging Effe cts Requ iring M anagement add " Cracking, blistering, change in color due to water absorption " 2. Tab l e 3.3.2-36, Sc reen W ash S y stem S umm ar y of Aging M anagement E v a lu ation, on LRA Page 3.3-458, add the following new row: NU REG Comp on ent Int e nd ed Material E nvironment Aging Eff ect Ag in g 1801 Vol. Tab l e Note T yp e Fu nc t ion Requiring Management 2 Item 3.X.1 Management Program It em Piping a n d L eakage Fibergla ss Raw W a t e r Cracking, Nooe Vll.C1.A P-None i;;:a Fittings Boundary (Internal) blistering, Inspection o f 238 '+5 (Spat i a l) change in Internal Nooe color due to Surfaces in water Miscellaneou s absorption Piping Nooe and Ducting Component s Program 3. In Sect ion A.2.1.25 , Inspection of Int erna l S urfaces in Miscellan eous Piping and Ducting Components, Page A-1 5, add to the list of materials  
: 2. Tab le 3.3 .2-36, Screen W ash System Summary of Aging Management Evaluation, on LRA Page 3.3-458, add the following new row:
" fiberglass." 4. In Sect ion B.2.1.25, Inspection of Int erna l S urfac es in Mi s cellan eous Piping a nd Ducting Components, Page B-139 , add to the ag ing effects "Cracking, blistering, change in co l or due to water absorption
NU REG Comp on ent       Intended    Material   Environment  Aging Effect      Ag in g 1801 Vol. Table  Note Typ e       Fu nct ion                           Requiring   Management     2 Item     3.X.1 Management       Program               Item Piping and      Leakage    Fiberglass Raw W ater  Cracking,     Nooe         Vll.C1.A P- None   i;;:a Fittings         Boundary               (Internal)   blistering,   Inspection of 238               '+5 (Spatial)                           change in     Internal     Nooe color due to Surfaces in water         Miscellaneous absorption   Piping Nooe         and Ducting Components Program
," and to the li st of materials add " fiberg l ass."}}
: 3. In Section A.2.1. 25 , Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components, Page A-15, add to the list of materials "fiberglass. "
: 4. In Section B.2. 1.25, Inspection of Interna l Surfaces in Miscellan eous Piping and Ducting Components, Page B-139 , add to the ag ing effects "Cracking, blistering, change in color due to water absorption," and to the list of materials add "fiberglass."}}

Latest revision as of 02:03, 21 October 2019

Additional Changes to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application
ML18144A242
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/24/2018
From: Domingos C
NextEra Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-18097
Download: ML18144A242 (5)


Text

NEXTera EN ERGY ~

SEABROOK May 24, 2018 10CFR54 Docket No. 50-443 SBK-L-18097 U. S. Nuclear Regu latory Comm ission Attn: Document Control Desk Washington, DC 20555-0001 Seabrook Station Additional Changes to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application

References:

1. NextEra Energy Seabrook, LLC letter SBK-L-10077, "Seabrook Station Application for Renewed Operating License," May 25, 2010. (Accession Number ML101590099)
2. NextEra Energy Seabrook, LLC letter SBK-L-18075, "Eighth Annual Update to the Seabrook License Renewal Application," May 1, 2018 . (Accession Number ML18121A403)

In Reference 1, NextEra Energy Seabrook, LLC (NextEra Energy Seabrook) submitted an application for a renewed facility operating license for Seabrook Station Unit 1 in accordance with the Code of Federal Regulations, Title 10, Parts 50, 51, and 54.

In Reference 2, NextEra Energy Seabrook provided the eighth annual review, which identified changes to the Current Licensing Basis (CLB) of the facility that materially affected the content of the License Renewal Application (LRA). Upon discussion with the NRC staff, NextEra Energy Seabrook agreed to revise a portion of the updated information in order to align with NUREG-1801 GALL Rev. 2.

The Enclosure provides additiona l changes to the LRA. To facilitate understanding, the changes are explained, and where appropriate, portions of the LRA are repeated with the change highlighted by strikethroughs for deleted text and balded italics for inserted text.

NextEra Energy Seabrook, LLC P.O. Box 300 , Lafayette Road , Seabrook, NH 03874

U.S. Nuclear Regulatory Commission SBK-L- 18097 I Page 2 There are no new or revi sed reg ulatory commitments contained in this letter.

If there are any questions or add itional information is needed, please contact Mr.

Edward J. Carley, Engineering Supervisor - License Renewa l, at (603) 773-7957.

If you have any questions regarding this correspondence, please contact Mr. Kenneth Browne, Licensing Manager, at (603) 773-7932.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on May 24, 2018 Sincerely, NextEra Energy Seabrook, LLC Christopher Domingos Site Director

Enclosure:

Additional Changes to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application cc: D. H. Dorman NRC Region I Administrator J.C. Poole NRC Project Manager P. C. Cataldo NRC Senior Resident Inspector E. H. Gettys NRC Project Manager, License Renewal Mr. Perry Plummer Director Homeland Security and Emergency Management New Hampshire Department of Safety Division of Homeland Security and Emergency Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 perry.plummer@dos .nh.gov

U.S. Nuclear Regulatory Commission SBK-L-18097 I Page 3 Mr. John Giarrusso, Jr., Nuclear Preparedness Manager The Commonwealth of Massachusetts Emergency Management Agency 400 Worcester Road Fram ingham, MA 01702-5 399 John.Giarrusso@massmail.state.ma.us

Enclosure to SBK-L-18097 Addition al Changes to the Eighth Annual Update to the NextEra Energy Seabrook License Renewal Application

U.S. Nuclear Regulatory Co1runission SBK-L-18097 I Enclosure I Page 2 Screen W ash Piping Additiona l Material: Select portion s of piping in the Screen W ash System were rep laced with a fiberglass material. As a result of this change, the following chang es are made to the License Re newal Application (LRA).

1. In Section 3.3.2 .1.39, Screen W ash System, Page 3.3-54 , under Aging Effects Requ iring Management add " Cracking, blistering, change in color due to water absorption "
2. Tab le 3.3 .2-36, Screen W ash System Summary of Aging Management Evaluation, on LRA Page 3.3-458, add the following new row:

NU REG Comp on ent Intended Material Environment Aging Effect Ag in g 1801 Vol. Table Note Typ e Fu nct ion Requiring Management 2 Item 3.X.1 Management Program Item Piping and Leakage Fiberglass Raw W ater Cracking, Nooe Vll.C1.A P- None i;;:a Fittings Boundary (Internal) blistering, Inspection of 238 '+5 (Spatial) change in Internal Nooe color due to Surfaces in water Miscellaneous absorption Piping Nooe and Ducting Components Program

3. In Section A.2.1. 25 , Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components, Page A-15, add to the list of materials "fiberglass. "
4. In Section B.2. 1.25, Inspection of Interna l Surfaces in Miscellan eous Piping and Ducting Components, Page B-139 , add to the ag ing effects "Cracking, blistering, change in color due to water absorption," and to the list of materials add "fiberglass."