{{#Wiki_filter:October 31, 2018
{{#Wiki_filter:October 31, 2018
  Mr. Bryan C. Hanson
Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
President and CNO, Exelon Nuclear
4300 Winfield Road
4300 Winfield Road
Warrenville, IL 60555
Warrenville, IL 60555
  SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2INFORMATION
-INFORMATION REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF CHANGES, TESTS AND EXPERIMENTS) BASELINE INSPECTION; INSPECTION REPORT 05000254/2019010; 05000265/2019010
            REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF
  D ear M r. Hanson:   On January 14, 2019 , the U.S. Nuclear Regulatory Commission (NRC) will begin a Title 10 of the Code of Federal Regulation, Part 50.59, (Evaluation of Changes, Tests and Experiments), baseline inspection at the Quad Cities Nuclear Power Station, Units 1 and 2. This inspection  
            CHANGES, TESTS AND EXPERIMENTS) BASELINE INSPECTION;
will be performed in accordance
            INSPECTION REPORT 05000254/2019010; 05000265/2019010
with the NRC baseline Inspection Procedu
Dear Mr. Hanson:
re 71111.17 T. The onsite portion s of the inspection will take place on January 14
On January 14, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin a Title 10 of
-18, 2019.   Experience has shown that these baseline inspections are extremely resource intensive, both
the Code of Federal Regulation, Part 50.59, (Evaluation of Changes, Tests and Experiments),
for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have b
baseline inspection at the Quad Cities Nuclear Power Station, Units 1 and 2. This inspection
een divided into three groups.
will be performed in accordance with the NRC baseline Inspection Procedure 71111.17T. The
  The first group
onsite portions of the inspection will take place on January 14-18, 2019.
of information
Experience has shown that these baseline inspections are extremely resource intensive, both
is necessary to ensure that the inspection team
for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on
is adequately prepared for the
the site and to ensure a productive inspection for both parties, we have enclosed a request for
inspection. This information should be made available via compact disc
documents needed for the inspection. These documents have been divided into three groups.
and delivered
    *  The first group of information is necessary to ensure that the inspection team is
to the regional office no later than December 3, 2018. The inspection team will review this information and, by December 10, 2018 will request specific items that should be provided for review in the regional office by December 31
        adequately prepared for the inspection. This information should be made available
, 2018.  The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents contained within  
        via compact disc and delivered to the regional office no later than December 3, 2018.
Group II (i.e., Item (1)), will be requested for review in the regional office prior to the inspection
        The inspection team will review this information and, by December 10, 2018 will
by December 31, 2018 , as identified above.
        request specific items that should be provided for review in the regional office by
  The remaining documents should be available by the first day of the onsite inspection, January 14, 2019
        December 31, 2018.
. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is
    * The second group of requested documents contains additional items that the team will
requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
        review, or need access to, during the inspection. Certain documents contained within
 
        Group II (i.e., Item (1)), will be requested for review in the regional office prior to the
B. Hanson -2- The lead inspector for this inspection is Atif Shaikh.
        inspection by December 31, 2018, as identified above. The remaining documents
We understand that our regulatory contact for this inspection is Rachel Luebbe
        should be available by the first day of the onsite inspection, January 14, 2019.
of your organization. If there are any questions about the inspection or the material requested, pleas
    * The third group lists information necessary to aid the inspection team in tracking issues
e contact the lead inspector at  
        identified as a result of the inspection. It is requested that this information be provided to
630-829-9824 or via e-mail at Atif.Shaikh@nrc.gov
        the lead inspector as the information is generated during the inspection. It is important
This letter does not contain new or amended information collection requirements subject  
        that all of these documents are up to date and complete in order to minimize the number
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150
        of additional documents requested during the preparation and/or the onsite portions of
-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.   This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading
        the inspection.
-rm/adams.html
 
and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, "Public Inspections, Exemptions, Requests for Withholding."
B. Hanson                                       -2-
  Sincerely, /RA/   Atif Shaikh, Senior Inspector
The lead inspector for this inspection is Atif Shaikh. We understand that our regulatory contact
Engineering Branch 3
for this inspection is Rachel Luebbe of your organization. If there are any questions about the
Division of Reactor Safety
inspection or the material requested, please contact the lead inspector at 630-829-9824 or via
  Docket Nos. 50
e-mail at Atif.Shaikh@nrc.gov.
-254, 50-265; 72-053 License Nos. DPR
This letter does not contain new or amended information collection requirements subject
-29; DPR-30 Enclosure:
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
Document Request for 10 CFR 50.59
collection requirements were approved by the Office of Management and Budget, Control
  Baseline Inspection
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
  cc: Distribution via LISTSERV
respond to, a request for information or an information collection requirement unless the
 
requesting document displays a currently valid Office of Management and Budget Control
B. Hanson -3- Letter to Bryan C. Hanson
Number.
from Atif Shaikh
This letter and its enclosure will be made available for public inspection and copying at
dated October 31, 2018. SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
-INFORMATION REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF CHANGES, TESTS AND EXPERIMENTS) BASELINE INSPECTION; INSPECTION REPORT 05000254/2019010; 05000265/2019010
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
  DISTRIBUTION
Exemptions, Requests for Withholding.
: Christopher Cook
                                                Sincerely,
RidsNrrDorlLpl3
                                                /RA/
RidsNrrPMQuadCities Resource
                                                Atif Shaikh, Senior Inspector
RidsNrrDirsIrib Resource
                                                Engineering Branch 3
Steven West
                                                Division of Reactor Safety
Darrell Roberts
Docket Nos. 50-254, 50-265; 72-053
Jamnes Cameron
License Nos. DPR-29; DPR-30
Allan Barker
Enclosure:
DRPIII DRSIII                           ADAMS Accession Number: ML18304A279
Document Request for 10 CFR 50.59
  OFFICE RIII        NAME AShaikh:cl
  Baseline Inspection
    DATE 10/31/18   OFFICIAL RECORD COPY
cc: Distribution via LISTSERV
 
 
DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION
B. Hanson                                   -3-
Enclosure Inspection Report
Letter to Bryan C. Hanson from Atif Shaikh dated October 31, 2018.
: 05000254/2019010; 05000265/2019010
SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2INFORMATION
  Inspection Dates
            REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF
: January 14
            CHANGES, TESTS AND EXPERIMENTS) BASELINE INSPECTION;
-18, 2019   Inspection Procedure
            INSPECTION REPORT 05000254/2019010; 05000265/2019010
: Inspection  
DISTRIBUTION:
Procedure 71111.17 T , "Evaluation
Christopher Cook
s of Changes, Tests and Experiments
RidsNrrDorlLpl3
Lead Inspector
RidsNrrPMQuadCities Resource
: Atif Shaikh
RidsNrrDirsIrib Resource
630-829-9824 Atif.Shaikh@nrc.gov
Steven West
  I. Information Requested for In
Darrell Roberts
-Office Preparation Week
Jamnes Cameron
  The following information is requested by December 3, 2018
Allan Barker
, or sooner, to facilitate the selection of
DRPIII
specific items that will be reviewed during the onsite inspection week. The inspection team will select
DRSIII
specific items from the information requested below and submit a list to your staff by December 10, 2018. We will request that certain items be made available to the regional office prior to the inspection by December 31, 2018. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should identify the associated system and cover the time frame from the receipt of information for the last 50.59 inspection to the present.
ADAMS Accession Number: ML18304A279
  The required information identified below should be provided on compact disc (CD)
  OFFICE RIII
or uploaded to accessible links. Please provide three copies of each CD submitted (i.e., one for each inspector, if applicable). The preferred file format is a searchable "pdf" file. The CDs should be indexed and hyper
NAME       AShaikh:cl
-linked to facilitate ease of use, if possible.
DATE       10/31/18
If you have any questions regarding this information, please call the inspection team leader as soon as possible.
                                OFFICIAL RECORD COPY
  (1) List of all Title 10 of the Code of Federal Regulations
 
(CFR), Part 50.59 completed evaluations involving
              DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION
: (a) calculations, (b)
Inspection Report:               05000254/2019010; 05000265/2019010
procedure revisions, (c) changes to the facility (modifications), (d)
Inspection Dates:                 January 14-18, 2019
non-routine operating configurations, or (e)
Inspection Procedure:             Inspection Procedure 71111.17T, Evaluations of Changes,
departures in methods of analyses. This list should include 50.59 evaluations for the following:
                                  Tests and Experiments
  a. Changes that have been made under the provisions of 10
Lead Inspector:                   Atif Shaikh
CFR 50.59 that have been updated in accordance with 10
                                  630-829-9824
CFR 50.71(e)(4) since the last 50.59 inspection
                                  Atif.Shaikh@nrc.gov
b. Modifications that are field work complete; and
I.     Information Requested for In-Office Preparation Week
 
      The following information is requested by December 3, 2018, or sooner, to facilitate the
DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION
      selection of specific items that will be reviewed during the onsite inspection week. The
2 c. Changes to calculations (or initiation of new calculations) that have been issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior U.S. Nuclear Regulatory Commission approval was sought and obtained.
      inspection team will select specific items from the information requested below and
  (2) A list of all 10
      submit a list to your staff by December 10, 2018. We will request that certain items be
CFR 50.59 changes that have been screened out as not requiring  
      made available to the regional office prior to the inspection by December 31, 2018. We
a full evaluation
      request that the remaining items selected from the lists be available and ready for review
involving: (a)
      on the first day of inspection. All requested information should identify the associated
calculations; (b)
      system and cover the time frame from the receipt of information for the last 50.59
procedure revisions; (c)
      inspection to the present.
changes to the facility (modifications); (d)
      The required information identified below should be provided on compact disc (CD)
non-routine operating configurations; or (e) departures in methods of analyses.
      or uploaded to accessible links. Please provide three copies of each CD submitted
  The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies).
      (i.e., one for each inspector, if applicable). The preferred file format is a searchable pdf
  (3) A list of any modifications, procedure revisions, or Updated Final Safety Analysis Report (UFSAR) changes where it was determined that 10
      file. The CDs should be indexed and hyper-linked to facilitate ease of use, if possible. If
CFR 50.59 did not apply. (4) A list of calculation changes that have been issued for use.
      you have any questions regarding this information, please call the inspection team
  (5) A list of corrective action documents (open and closed) that address  
      leader as soon as possible.
10 CFR 50.59 issues, concerns, or processes. These documents should also include the associated corrective action documents and the 50.59 change implementation.
      (1)     List of all Title 10 of the Code of Federal Regulations (CFR), Part 50.59
  The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance.
                completed evaluations involving: (a) calculations, (b) procedure revisions,
  (6) Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post
                (c) changes to the facility (modifications), (d) non-routine operating
-modification testing, 10
                configurations, or (e) departures in methods of analyses. This list should
CFR 50.59 evaluations and screenings, and UFSAR updates.
                include 50.59 evaluations for the following:
  (7) UFSAR updates submitted in accordance with 10
                a. Changes that have been made under the provisions of 10 CFR 50.59 that
CFR 50.71(e)(4). Provide copies of the complete submittal.
                    have been updated in accordance with 10 CFR 50.71(e)(4) since the last
  (8) Copy of the UFSAR
                    50.59 inspection;
change log or a synopsis of the changes. This should include all of the changes made to the UFSAR that were incorporated in the last  
                b. Modifications that are field work complete; and
10 CFR 50.71(e)(4) submittal.
                                                                                          Enclosure
  (9) Electronic copy of the UFSAR
 
and Bases, and technical specifications, if available.  
    DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION
  (10) Name(s) and phone numbers for the regulatory and technical contacts.
      c. Changes to calculations (or initiation of new calculations) that have been
  (11) Current management and engineering organizational chart.
          issued. The list should contain the number and title of each document, a brief
 
          description of the change, and the corresponding number and type of the
DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION
          affected document (i.e., the modification or procedure to which the evaluation
3 II. Information Requested to be Available Prior to Inspection
          applies). The list should NOT include any evaluations in which prior
. Request s will be M ade for Specific Item (1) Documents by
          U.S. Nuclear Regulatory Commission approval was sought and obtained.
December 10, 2018 , for Availability of
(2)   A list of all 10 CFR 50.59 changes that have been screened out as not requiring
Requested Item (1) Documents in Regional Office by December 31, 2018, and Items (2), (3) and (4) Documents on
      a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes
First Day of Inspection (January 14, 2019
      to the facility (modifications); (d) non-routine operating configurations; or
(1) Copies of all selected items from Section I. This includes copies
      (e) departures in methods of analyses.
of associated documents such as calculations, post
      The list should contain the number and title of each document, a brief description
-modification test packages, 10 CFR 50.59 evaluations or screenings, and any corrective action documents.
      of the change, and the corresponding number and type of the affected document
  (2) Copies of these documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them.
      (i.e., the modification or procedure to which the evaluation applies).
  a. UFSAR, if not previously provided
(3)   A list of any modifications, procedure revisions, or Updated Final Safety Analysis
b. Original Final Safety Analysis Report
      Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not
Volumes; c. Original Safety Evaluation Report
      apply.
and Supplements;
(4)   A list of calculation changes that have been issued for use.
  d. Final Safety Analysis Report
(5)   A list of corrective action documents (open and closed) that address
Question and Answers;
      10 CFR 50.59 issues, concerns, or processes. These documents should also
  e. Quality Assurance Plan; f. Technical Specifications, if not previously provided
      include the associated corrective action documents and the 50.59 change
g. Latest Probabilistic Risk Assessment
      implementation.
Report; h. Vendor Manuals; and
      The list should contain the number, title and revision (or date) of each document,
  i. The latest 10 CFR 50.59  
      the affected system and corresponding documentation (if applicable), and should
UFSAR Update Submittal.
      be sorted in order of significance.
  (3) Please ensure that other supporting documents for the selected items have been
(6)   Copies of procedures addressing the following: modifications, design changes,
located and are readily retrievable as the inspection team will likely be requesting these documents during the inspection. Examples of supporting documents are:
      set point changes, equivalency evaluations or suitability analyses, commercial
  a. Drawings supporting the modifications;
      grade dedications, post-modification testing, 10 CFR 50.59 evaluations and
  b. Procedures affected by the modifications; and
      screenings, and UFSAR updates.
  c. UFSAR change papers generated due to a 10 CFR 50.59
(7)   UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide
evaluation.
      copies of the complete submittal.
  (4) Assessment and Corrective Actions:
(8)   Copy of the UFSAR change log or a synopsis of the changes. This should
  a. The most recent 50.59 Quality Assurance audit and/or self
      include all of the changes made to the UFSAR that were incorporated in the last
-assessment; and
      10 CFR 50.71(e)(4) submittal.
  b. Corrective action documents (e.g., condition reports, including status of corrective
(9)   Electronic copy of the UFSAR and Bases, and technical specifications, if
actions) generate as a result of the most recent 50.59 Quality Assurance audit and/or self
      available.
-assessment.
(10) Name(s) and phone numbers for the regulatory and technical contacts.
 
(11) Current management and engineering organizational chart.
DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION
                                          2
4 III. Information Requested to be provided throughout the inspection
 
  (1) Copies of any corrective action documents generated as a result of the
        DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION
inspection
II. Information Requested to be Available Prior to Inspection. Requests will be Made
team's questions or queries during this inspection.
    for Specific Item (1) Documents by December 10, 2018, for Availability of
  (2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide daily during the inspection to each inspection team member).
    Requested Item (1) Documents in Regional Office by December 31, 2018, and
  If you have any questions regarding the information requested, please contact the inspection team leader.
    Items (2), (3) and (4) Documents on First Day of Inspection (January 14, 2019)
    (1)   Copies of all selected items from Section I. This includes copies of
          associated documents such as calculations, post-modification test packages,
          10 CFR 50.59 evaluations or screenings, and any corrective action documents.
    (2)   Copies of these documents do not need to be solely available to the inspection
          team as long as the inspectors have easy and unrestrained access to them.
          a. UFSAR, if not previously provided;
          b. Original Final Safety Analysis Report Volumes;
          c. Original Safety Evaluation Report and Supplements;
          d. Final Safety Analysis Report Question and Answers;
          e. Quality Assurance Plan;
          f.   Technical Specifications, if not previously provided;
          g. Latest Probabilistic Risk Assessment Report;
          h. Vendor Manuals; and
          i.   The latest 10 CFR 50.59 UFSAR Update Submittal.
    (3)   Please ensure that other supporting documents for the selected items have been
          located and are readily retrievable as the inspection team will likely be requesting
          these documents during the inspection. Examples of supporting documents are:
          a. Drawings supporting the modifications;
          b. Procedures affected by the modifications; and
          c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
    (4)   Assessment and Corrective Actions:
          a. The most recent 50.59 Quality Assurance audit and/or self-assessment; and
          b. Corrective action documents (e.g., condition reports, including status of
                corrective actions) generate as a result of the most recent 50.59 Quality
                Assurance audit and/or self-assessment.
                                              3
 
            DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION
III.   Information Requested to be provided throughout the inspection
        (1)   Copies of any corrective action documents generated as a result of the
              inspection teams questions or queries during this inspection.
        (2)   Copies of the list of questions submitted by the inspection team members and
              the status/resolution of the information requested (provide daily during the
              inspection to each inspection team member).
If you have any questions regarding the information requested, please contact the inspection
team leader.
                                                  4
}}
}}

Latest revision as of 11:29, 20 October 2019

Ltr. 10/31/18 Quad Cities Nuclear Power Station, Units 1 & 2 - Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests and Experiments) Baseline Inspection; Inspection Report 05000254/2019010; 05000265/2019010 (D
ML18304A279
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 10/31/2018
From: Atif Shaikh
Engineering Branch 3
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2019010
Download: ML18304A279 (7)


See also: IR 05000254/2019010

Text

October 31, 2018

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2INFORMATION

REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF

CHANGES, TESTS AND EXPERIMENTS) BASELINE INSPECTION;

INSPECTION REPORT 05000254/2019010; 05000265/2019010

Dear Mr. Hanson:

On January 14, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin a Title 10 of

the Code of Federal Regulation, Part 50.59, (Evaluation of Changes, Tests and Experiments),

baseline inspection at the Quad Cities Nuclear Power Station, Units 1 and 2. This inspection

will be performed in accordance with the NRC baseline Inspection Procedure 71111.17T. The

onsite portions of the inspection will take place on January 14-18, 2019.

Experience has shown that these baseline inspections are extremely resource intensive, both

for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on

the site and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into three groups.

  • The first group of information is necessary to ensure that the inspection team is

adequately prepared for the inspection. This information should be made available

via compact disc and delivered to the regional office no later than December 3, 2018.

The inspection team will review this information and, by December 10, 2018 will

request specific items that should be provided for review in the regional office by

December 31, 2018.

  • The second group of requested documents contains additional items that the team will

review, or need access to, during the inspection. Certain documents contained within

Group II (i.e., Item (1)), will be requested for review in the regional office prior to the

inspection by December 31, 2018, as identified above. The remaining documents

should be available by the first day of the onsite inspection, January 14, 2019.

  • The third group lists information necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to

the lead inspector as the information is generated during the inspection. It is important

that all of these documents are up to date and complete in order to minimize the number

of additional documents requested during the preparation and/or the onsite portions of

the inspection.

B. Hanson -2-

The lead inspector for this inspection is Atif Shaikh. We understand that our regulatory contact

for this inspection is Rachel Luebbe of your organization. If there are any questions about the

inspection or the material requested, please contact the lead inspector at 630-829-9824 or via

e-mail at Atif.Shaikh@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

/RA/

Atif Shaikh, Senior Inspector

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-254, 50-265;72-053

License Nos. DPR-29; DPR-30

Enclosure:

Document Request for 10 CFR 50.59

Baseline Inspection

cc: Distribution via LISTSERV

B. Hanson -3-

Letter to Bryan C. Hanson from Atif Shaikh dated October 31, 2018.

SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2INFORMATION

REQUEST FOR AN NRC TRIENNIAL 10 CFR 50.59 (EVALUATION OF

CHANGES, TESTS AND EXPERIMENTS) BASELINE INSPECTION;

INSPECTION REPORT 05000254/2019010; 05000265/2019010

DISTRIBUTION:

Christopher Cook

RidsNrrDorlLpl3

RidsNrrPMQuadCities Resource

RidsNrrDirsIrib Resource

Steven West

Darrell Roberts

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML18304A279

OFFICE RIII

NAME AShaikh:cl

DATE 10/31/18

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION

Inspection Report: 05000254/2019010; 05000265/2019010

Inspection Dates: January 14-18, 2019

Inspection Procedure: Inspection Procedure 71111.17T, Evaluations of Changes,

Tests and Experiments

Lead Inspector: Atif Shaikh

630-829-9824

Atif.Shaikh@nrc.gov

I. Information Requested for In-Office Preparation Week

The following information is requested by December 3, 2018, or sooner, to facilitate the

selection of specific items that will be reviewed during the onsite inspection week. The

inspection team will select specific items from the information requested below and

submit a list to your staff by December 10, 2018. We will request that certain items be

made available to the regional office prior to the inspection by December 31, 2018. We

request that the remaining items selected from the lists be available and ready for review

on the first day of inspection. All requested information should identify the associated

system and cover the time frame from the receipt of information for the last 50.59

inspection to the present.

The required information identified below should be provided on compact disc (CD)

or uploaded to accessible links. Please provide three copies of each CD submitted

(i.e., one for each inspector, if applicable). The preferred file format is a searchable pdf

file. The CDs should be indexed and hyper-linked to facilitate ease of use, if possible. If

you have any questions regarding this information, please call the inspection team

leader as soon as possible.

(1) List of all Title 10 of the Code of Federal Regulations (CFR), Part 50.59

completed evaluations involving: (a) calculations, (b) procedure revisions,

(c) changes to the facility (modifications), (d) non-routine operating

configurations, or (e) departures in methods of analyses. This list should

include 50.59 evaluations for the following:

a. Changes that have been made under the provisions of 10 CFR 50.59 that

have been updated in accordance with 10 CFR 50.71(e)(4) since the last

50.59 inspection;

b. Modifications that are field work complete; and

Enclosure

DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION

c. Changes to calculations (or initiation of new calculations) that have been

issued. The list should contain the number and title of each document, a brief

description of the change, and the corresponding number and type of the

affected document (i.e., the modification or procedure to which the evaluation

applies). The list should NOT include any evaluations in which prior

U.S. Nuclear Regulatory Commission approval was sought and obtained.

(2) A list of all 10 CFR 50.59 changes that have been screened out as not requiring

a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes

to the facility (modifications); (d) non-routine operating configurations; or

(e) departures in methods of analyses.

The list should contain the number and title of each document, a brief description

of the change, and the corresponding number and type of the affected document

(i.e., the modification or procedure to which the evaluation applies).

(3) A list of any modifications, procedure revisions, or Updated Final Safety Analysis

Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not

apply.

(4) A list of calculation changes that have been issued for use.

(5) A list of corrective action documents (open and closed) that address

10 CFR 50.59 issues, concerns, or processes. These documents should also

include the associated corrective action documents and the 50.59 change

implementation.

The list should contain the number, title and revision (or date) of each document,

the affected system and corresponding documentation (if applicable), and should

be sorted in order of significance.

(6) Copies of procedures addressing the following: modifications, design changes,

set point changes, equivalency evaluations or suitability analyses, commercial

grade dedications, post-modification testing, 10 CFR 50.59 evaluations and

screenings, and UFSAR updates.

(7) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide

copies of the complete submittal.

(8) Copy of the UFSAR change log or a synopsis of the changes. This should

include all of the changes made to the UFSAR that were incorporated in the last

10 CFR 50.71(e)(4) submittal.

(9) Electronic copy of the UFSAR and Bases, and technical specifications, if

available.

(10) Name(s) and phone numbers for the regulatory and technical contacts.

(11) Current management and engineering organizational chart.

2

DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION

II. Information Requested to be Available Prior to Inspection. Requests will be Made

for Specific Item (1) Documents by December 10, 2018, for Availability of

Requested Item (1) Documents in Regional Office by December 31, 2018, and

Items (2), (3) and (4) Documents on First Day of Inspection (January 14, 2019)

(1) Copies of all selected items from Section I. This includes copies of

associated documents such as calculations, post-modification test packages,

10 CFR 50.59 evaluations or screenings, and any corrective action documents.

(2) Copies of these documents do not need to be solely available to the inspection

team as long as the inspectors have easy and unrestrained access to them.

a. UFSAR, if not previously provided;

b. Original Final Safety Analysis Report Volumes;

c. Original Safety Evaluation Report and Supplements;

d. Final Safety Analysis Report Question and Answers;

e. Quality Assurance Plan;

f. Technical Specifications, if not previously provided;

g. Latest Probabilistic Risk Assessment Report;

h. Vendor Manuals; and

i. The latest 10 CFR 50.59 UFSAR Update Submittal.

(3) Please ensure that other supporting documents for the selected items have been

located and are readily retrievable as the inspection team will likely be requesting

these documents during the inspection. Examples of supporting documents are:

a. Drawings supporting the modifications;

b. Procedures affected by the modifications; and

c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

(4) Assessment and Corrective Actions:

a. The most recent 50.59 Quality Assurance audit and/or self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generate as a result of the most recent 50.59 Quality

Assurance audit and/or self-assessment.

3

DOCUMENT REQUEST FOR 10 CFR 50.59 BASELINE INSPECTION

III. Information Requested to be provided throughout the inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during this inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provide daily during the

inspection to each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.

4