| | title = Partial Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Flood Hazard Reevaluation (TAC Nos. MF1110 and MF1111) | | | title = Partial Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Flood Hazard Reevaluation (TAC Nos. MF1110 and MF1111) |
| | author name = Powell G T | | | author name = Powell G |
| | author affiliation = South Texas Project Nuclear Operating Co | | | author affiliation = South Texas Project Nuclear Operating Co |
| | addressee name = | | | addressee name = |
Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML13358A0652014-01-14014 January 2014 Request for Additional Information, Response to 10 CFR 50.54(f) Request for Information Recommendation 2.1 Flooding of the Near-Term Task Force, Flood Hazard Reevaluation Report Project stage: RAI NOC-AE-14003074, Partial Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Flood Hazard Reevaluation2014-01-22022 January 2014 Partial Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Flood Hazard Reevaluation Project stage: Response to RAI NOC-AE-13003068, Update to Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding - Review of Available Physical Margin (APM) Assessments2014-01-30030 January 2014 Update to Response to NRC 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Flooding - Review of Available Physical Margin (APM) Assessments Project stage: Request NOC-AE-14003085, Second Partial Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Flood Hazard Reevaluation2014-02-13013 February 2014 Second Partial Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Flood Hazard Reevaluation Project stage: Response to RAI 2014-01-22
[Table View] |
|
---|
Category:Letter type:NOC
MONTHYEARNOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic NOC-AE-20003760, Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal2020-09-0808 September 2020 Update Foreign Ownership. Control. or Influence(FOCI)- Transmittal 2023-07-11
[Table view] |
Text
Nuclear Operating Company South Tevas Prolect Electric Generating Station PO. Boa 28,9 Wadsworth, Temas 77483 January 22, 2014 NOC-AE-1 4003074 10 CFR 50.54(f)U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 STPNOC Partial Response to Request for Additional Information Associated With Near-Term Task Force Recommendation 2.1, Flood Hazard Reevaluation (TAC Nos. MF1110 and MF1111)
References:
- 1. Letter from NRC to All Power Reactor Licensees, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3, of the Near-Term Task Force Review of the Insights from the Fukushima Dai-ichi Accident" March 12, 2012 (ML12056A046).
- 2. Letter from G.T. Powell, STPNOC, to NRC Document Control Desk,"Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding Recommendation 2.1 Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Enclosure 2, Required Response 2, Flood Hazard Reevaluation Report", March 11, 2013 (ML13079A806)
- 3. Letter from B. K. Singal, NRC, to D.L. Koehl, STPNOC, "South Texas Project, Units 1 and 2 -Request for Additional Information Regarding Fukushima Lessons Learned -Flooding Hazard Reanalysis Report ", January 14, 2014 (ML13358A065)
On March 12, 2012 (Reference 1), the U.S. Nuclear Regulatory Commission (NRC) staff issued a letter requesting additional information per Title 10 of the Code of Federal Regulations, Section 50.54(f) (hereafter called the 50.54(f) letter). The 50.54(f) letter requested that licensees reevaluate the flooding hazards at their sites against present-day regulatory guidance and methodologies.
STPNOC submitted the requested Flood Hazard Reevaluation Report to the NRC on March 11, 2013 (Reference 2)STI: 33810702 NOC-AE-14003074 Page 2 of 3 By letter dated January 14, 2014 (Reference 3), the NRC requested additional information (RAI)related to the flooding reevaluations.
Per an agreement with the NRC, STPNOC will be responding to the RAls in two parts. The first part of the STPNOC response addresses RAls 1, 2, 7, 8 and 9. The second part of the STPNOC response will address RAls 3, 4, 5 and 6 and will be submitted by February 13, 2014.The requested information for RAls 1, 2, 7, 8 and 9 is included in the attachment and enclosures submitted along with this letter There are no commitments in this letter.If there are any questions regarding.this letter, please contact Ken Taplett at (361) 972-8416 or me at (361) 972-7566.I declare under penalty of perjury that the foregoing is true and correct.Executed on .J, 2-. zd'/V G.T. Powell Site Vice President web
Attachment:
- 1. STPNOC Partial Response to Request for Additional Information Related to Fukushima Lessons Learned Flooding Hazard Reevaluation Report 1. Input files for RAls 1, 2, 7, 8 and 9 (DVD labeled NOC-AE-14003074 Disc 1)
Enclosures:
NOC-AE-14003074 Page 3 of 3 cc: (papercopy)(electronic copy)Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Balwant K. Singal *Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (MS 8 Bi)11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector U. S. Nuclear Regulatory Commission
- P. 0. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 Jim Collins City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP Balwant K. Singal U. S. Nuclear Regulatory Commission John Ragan Chris O'Hara Jim von Suskil NRG South Texas LP Kevin Polio Richard Pela L.D. Blaylock City Public Service Peter Nemeth Crain Caton & James, P.C.C. Mele City of Austin Richard A. Ratliff Robert Free Texas Department of State Health Services* Digital media enclosure is only being transmitted to the NRC Document Control Desk and to STPNOC's NRC Project Manager, Balwant K. Singal, for distribution to the NRC staff reviewers Attachment 1 NOC-AE-14003074 Page 1 of 3 STPNOC Partial Response to Request for Additional Information Related to Fukushima Lessons Learned Flooding Hazard Reevaluation Report RAI 1: Local Intense Precipitation and Associated Site Drainage Please provide electronic versions of the input files used for HEC-HMS analysis in the flood hazard reevaluation report (FHRR) related to the local intense precipitation analyses.STPNOC Response: The requested information is provided in the enclosed digital media (Disc 1).RAI 2: Local Intense Precipitation and Associated Site Drainage Please provide electronic versions of the input files used for HEC-RAS analysis in the FHRR related to local intense precipitation analyses.STPNOC Response: The requested information is provided in the enclosed digital media (Disc 1).RAI 3: Local Intense Precipitation and Associated Site Drainage Please provide descriptions of the sources of elevation data, the methods used to incorporate elevation measurements into local intense precipitation flood analysis, and the likely magnitude of the errors associated with these elevations.
STPNOC Response: The requested information will be provided by February 13, 2014 as part of the second partial RAI response.RAI 4: Local Intense Precipitation and Associated Site Drainage Please provide a description of the basis used to classify Probable Maximum Flood (PMF) flow as shallow concentrated flow used in the Natural Resources Conservation Service (NRCS) TR-55 methodology.
STPNOC Response: The requested information will be provided by February 13, 2014 as part of the second partial RAI response.
Attachment 1 NOC-AE-14003074 Page 2 of 3 RAI 5: Failure of Dams and Onsite Water Control/Storage Structures Please provide details of the ineffective flow areas and levees that were removed from the Halff Associates, Inc. HEC-RAS model while developing the HEC-RAS model used to reevaluate the flood hazard from upstream dam failures at the South Texas Project (STP), Units 1 and 2 site. Also, please provide a justification for removal of these features.STPNOC Response: The requested information will be provided by February 13, 2014 as part of the second partial RAI response.RAI 6: Failure of Dams and Onsite Water Control/Storage Structures Please provide details of the intra-basin flows that were allowed to occur in the HEC-RAS model.Also, because allowing intra-basin flows would reduce the discharge at STP, Units 1 and 2 site, the licensee is requested to provide a justification how the flood hazard from upstream dam failures would still be conservative.
STPNOC Response: The requested information will be provided by February 13, 2014 as part of the second partial RAI response.RAI 7: Failure of Dams and Onsite Water Control/Storage Structures Please provide electronic versions of the input files used for HEC-RAS analysis in the FHRR related to upstream dam failures.STPNOC Response: The requested information is provided in the enclosed digital media (Disc 1)RAI 8: Failure of Dams and Onsite Water Control/Storage Structures Please provide the electronic version of National Weather Service (NWS) BREACH model input files used in the recent Main Cooling Reservoir (MCR) breach analyses of the three postulated breach locations described in FHRR Section 2.3.STPNOC Response: The requested information is provided in the enclosed digital media (Disc 1).Note: As described in the FHRR (Reference
- 2) there were no BREACH model simulations performed for the Unit I and 2 flood analysis.
Rather, the output hydrograph of the BREACH model that had been developed for the Units 3 and 4 analyses was used. Also note that the same hydrograph was used for all three breach locations.
Attachment 1 NOC-AE-1 4003074 Page 3 of 3 RAI 9: Failure of Dams and Onsite Water Control/Storage Structures Please provide a description of model configuration, boundary conditions, and model parameters for the three RMA2 simulations.
Also, Please provide the RMA2 input files, including the computational grids, used for the three simulations.
STPNOC Response: The requested information is provided in the enclosed digital media (Disc 1).Note: A separate input and grid file is provided for the Unit I BREACH model, the Unit 2 BREACH model, and the Office BREACH model.