SBK-L-17183, Submittal of Revision 23 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:SAFEGUARDS INFORMATION l\lE)(li r /
{{#Wiki_filter:SAFEGUARDS INFORMATION l\lE)(li                 r ENER        ~~
October 23, 2017 Docket No. 50-443 SBK-L-17183 U.S. Nuclear Regulatory Commission ATTN: Document Control' Desk Washington, DC 20555-0001 Revision 23 to the Physical Security Plan, Trainillg and Qualification Plan and Safeguards Contingency Plan for Seabrook Station In accordance with 10 CFR 50.4(b)(4), "Security plan and related submissions," and 10 CFR 50.54(p)(2), "Conditions oflicenses," NextEra Energy Seabrook, LLC submits Revision 23 to the Seabrook Station Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan. The Physical Security Plan has been revised to reflect the following changes: e Revised to incorporate new maps depicting site layout and revised vehicle barrier system. @ Removed reference to channeling barriers as there are no longer any in the VBS design . ., Changed references to Bullet Resistant Enclosures (BREs) to Blast and Bullet Resistant Enclosures (BBREs) to reflect the addition ofBBREs 9 & 10. One (1) CD-ROM containing Safeguards Information is included in this submission.
GY~*
The ROM labeled "Seabrook Station PSP, Revision 23, Safeguards Infomiation" contains the following files: --001 Seabrook Station PSP Rev 23_SGI_.pdf-SGI (67,739,648 bytes)* 002 Seabrook Station PSP Rev 23 Change Synopsis_SGI_.pdf-SOI-Decontrolled upon separation (16,384 bytes) 003 Seabrook Station PSP Rev 23 50.54 (p) _SGI.pdf (1,433,600 bytes) 004 CD Index.pdf  
                                                                                                                          /             :itA~t1UuK October 23, 2017 Docket No. 50-443 SBK-L-17183 U.S. Nuclear Regulatory Commission ATTN: Document Control' Desk Washington, DC 20555-0001 Revision 23 to the Physical Security Plan, Trainillg and Qualification Plan and Safeguards Contingency Plan for Seabrook Station In accordance with 10 CFR 50.4(b)(4), "Security plan and related submissions," and 10 CFR 50.54(p)(2), "Conditions oflicenses," NextEra Energy Seabrook, LLC submits Revision 23 to the Seabrook Station Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan.
-SGI -Decontrolled upon separation (12,288 bytes) SAFEGUARDS INFORMATION. (Enclosure contains Safeguards Information.
The Physical Security Plan has been revised to reflect the following changes:
Upon separation this page is decontrolled.)
e     Revised to incorporate new maps depicting site layout and revised vehicle barrier system.
NextEra Energy Seabrook, LLC PO Box 300, Seabrook, NH 03874 SAFEGUARDS INFORMATION Nuclear Regulatory Commission SBK-L-17183 I Page 2 File 001 contains Safeguards Information that must be protected from public disclosure as required by 10 CPR 73 .22, "Protection of Safeguards Information:
      @     Removed reference to channeling barriers as there are no longer any in the VBS design.
Specific There are no regulatory commitments contained in this correspondence.
      .,   Changed references to Bullet Resistant Enclosures (BREs) to Blast and Bullet Resistant Enclosures (BBREs) to reflect the addition ofBBREs 9 & 10.
Should you have any question regarding this submittal, please contact Bruce Fielding -(bruce.fielding@nexteraenergy.com), Secrnity Manager, at (603) 773-7021.
One (1) CD-ROM containing Safeguards Information is included in this submission. The CD-ROM labeled "Seabrook Station PSP, Revision 23, Safeguards Infomiation" contains the following files:
                                                              -                                               -
001 Seabrook Station PSP Rev 23_SGI_.pdf- SGI (67,739,648 bytes)*
002 Seabrook Station PSP Rev 23 Change Synopsis_SGI_.pdf- SOI- Decontrolled upon separation (16,384 bytes) 003 Seabrook Station PSP Rev 23 50.54 (p) _SGI.pdf (1,433,600 bytes) 004 CD Index.pdf - SGI - Decontrolled upon separation (12,288 bytes)
SAFEGUARDS INFORMATION.
(Enclosure contains Safeguards Information. Upon separation this page is decontrolled.)
NextEra Energy Seabrook, LLC
----*----~---*--------------------------------*--*------~--------*--**-----------------~----------*-------~*---~--------~-----***----------------------*
PO Box 300, Seabrook, NH 03874
 
SAFEGUARDS INFORMATION Nuclear Regulatory Commission SBK-L-17183 I Page 2 File 001 contains Safeguards Information that must be protected from public disclosure as required by 10 CPR 73 .22, "Protection of Safeguards Information: Specific Requirem~nts."
There are no regulatory commitments contained in this correspondence.
Should you have any question regarding this submittal, please contact Bruce Fielding
-(bruce.fielding@nexteraenergy.com), Secrnity Manager, at (603) 773-7021.
Sincerely,-
Sincerely,-
Enclosure  
Enclosure - SGI CD-ROM labeled "Seabrook Station PSP, Rev. 23, Safeguards Information" cc:     Regional Administrator, Region I (with enclosure)
-SGI CD-ROM labeled "Seabrook Station PSP, Rev. 23, Safeguards Information" cc: Regional Administrator, Region I (with enclosure)
USNRC Project Manager, Seabrook Station (without enclosure)
USNRC Project Manager, Seabrook Station (without enclosure)
Senior Resident Inspector, USNRC, Seabrook Station (without enciosure)
Senior Resident Inspector, USNRC, Seabrook Station (without enciosure)
SAFEGUARDS INFORMATION (Enclosure contains Safeguards Information.
SAFEGUARDS INFORMATION (Enclosure contains Safeguards Information. Upon separation this page is decontrolled.)}}
Upon separation this page is decontrolled.)}}

Revision as of 11:32, 29 October 2019

Submittal of Revision 23 to the Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan
ML17300A455
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 10/23/2017
From: Browne K
NextEra Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-17183
Download: ML17300A455 (2)


Text

SAFEGUARDS INFORMATION l\lE)(li r ENER ~~

GY~*

/ :itA~t1UuK October 23, 2017 Docket No. 50-443 SBK-L-17183 U.S. Nuclear Regulatory Commission ATTN: Document Control' Desk Washington, DC 20555-0001 Revision 23 to the Physical Security Plan, Trainillg and Qualification Plan and Safeguards Contingency Plan for Seabrook Station In accordance with 10 CFR 50.4(b)(4), "Security plan and related submissions," and 10 CFR 50.54(p)(2), "Conditions oflicenses," NextEra Energy Seabrook, LLC submits Revision 23 to the Seabrook Station Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan.

The Physical Security Plan has been revised to reflect the following changes:

e Revised to incorporate new maps depicting site layout and revised vehicle barrier system.

@ Removed reference to channeling barriers as there are no longer any in the VBS design.

., Changed references to Bullet Resistant Enclosures (BREs) to Blast and Bullet Resistant Enclosures (BBREs) to reflect the addition ofBBREs 9 & 10.

One (1) CD-ROM containing Safeguards Information is included in this submission. The CD-ROM labeled "Seabrook Station PSP, Revision 23, Safeguards Infomiation" contains the following files:

- -

001 Seabrook Station PSP Rev 23_SGI_.pdf- SGI (67,739,648 bytes)*

002 Seabrook Station PSP Rev 23 Change Synopsis_SGI_.pdf- SOI- Decontrolled upon separation (16,384 bytes) 003 Seabrook Station PSP Rev 23 50.54 (p) _SGI.pdf (1,433,600 bytes) 004 CD Index.pdf - SGI - Decontrolled upon separation (12,288 bytes)

SAFEGUARDS INFORMATION.

(Enclosure contains Safeguards Information. Upon separation this page is decontrolled.)

NextEra Energy Seabrook, LLC


*----~---*--------------------------------*--*------~--------*--**-----------------~----------*-------~*---~--------~-----***----------------------*

PO Box 300, Seabrook, NH 03874

SAFEGUARDS INFORMATION Nuclear Regulatory Commission SBK-L-17183 I Page 2 File 001 contains Safeguards Information that must be protected from public disclosure as required by 10 CPR 73 .22, "Protection of Safeguards Information: Specific Requirem~nts."

There are no regulatory commitments contained in this correspondence.

Should you have any question regarding this submittal, please contact Bruce Fielding

-(bruce.fielding@nexteraenergy.com), Secrnity Manager, at (603) 773-7021.

Sincerely,-

Enclosure - SGI CD-ROM labeled "Seabrook Station PSP, Rev. 23, Safeguards Information" cc: Regional Administrator, Region I (with enclosure)

USNRC Project Manager, Seabrook Station (without enclosure)

Senior Resident Inspector, USNRC, Seabrook Station (without enciosure)

SAFEGUARDS INFORMATION (Enclosure contains Safeguards Information. Upon separation this page is decontrolled.)