Line 54: |
Line 54: |
|
| |
|
| D. Grinnell 3 DISTRIBUTION: (via email): | | D. Grinnell 3 DISTRIBUTION: (via email): |
| [2016-SST-0 948] DDorman, RA DLew, DRP MScott, DRP DPelton, DRP RLorson, DRS JYerokun, DRS MGray, DRS WCook, DRS FBower, DRP RBarkley, DRP PCataldo, DRP, SRI PMeier, DRP, RI JBowen, RI, OEDO DScrenci, PAO NSheehan, PAO JGreives, SLO DTifft, SLO ABuford, NRR JPoole, NRR BLehman, NRR JDanna, NRR BWittick, NRR LJames, NRR RidsNrrPMSeabrookResource RidsNRRDorlLp1Resource Natalie@C-10.org Debbie@C-10.org Info@C-10.org DOCUMENT NAME: G:\DRP\BRANCH3\Action Items
| | [2016-SST-0 948] DDorman, RA DLew, DRP MScott, DRP DPelton, DRP RLorson, DRS JYerokun, DRS MGray, DRS WCook, DRS FBower, DRP RBarkley, DRP PCataldo, DRP, SRI PMeier, DRP, RI JBowen, RI, OEDO DScrenci, PAO NSheehan, PAO JGreives, SLO DTifft, SLO ABuford, NRR JPoole, NRR BLehman, NRR JDanna, NRR BWittick, NRR LJames, NRR RidsNrrPMSeabrookResource RidsNRRDorlLp1Resource Natalie@C-10.org Debbie@C-10.org Info@C-10.org DOCUMENT NAME: G:\DRP\BRANCH3\Action Items |
| \2017\2017-SST-0948-Grinnell Emails Response_2017 | | \2017\2017-SST-0948-Grinnell Emails Response_2017 |
| \Resp Ltr to DGrinnell_C10_emails_03 | | \Resp Ltr to DGrinnell_C10_emails_03 |
|
---|
Category:Letter
MONTHYEARIR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 L-2024-058, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-038, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-037, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0606 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source ML24065A2522024-03-0505 March 2024 Notice of Enforcement Discretion for Seabrook Station, Unit No. 1 (EPID: L-2024-033) L-2024-035, Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0505 March 2024 Supplement to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source L-2024-033, Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B2024-03-0404 March 2024 Request for Enforcement Discretion - Technical Specification (TS) 3/4.8.1.1 Ac. Sources Required Action Completion Time to Replace ED-X-3-B L-2024-032, Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0404 March 2024 Emergency License Amendment Request- One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source IR 05000443/20230062024-02-28028 February 2024 Annual Assessment Letter for Seabrook Station (Report 05000443/2023006) L-2024-019, Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-02-28028 February 2024 Relief Request 4A-01- Request for an Alternative to the Requirements of the ASME Code for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld L-2024-016, Radiological Emergency Plan (Ssrep), Revision 822024-02-13013 February 2024 Radiological Emergency Plan (Ssrep), Revision 82 IR 05000443/20230042024-02-12012 February 2024 Integrated Inspection Report 05000443/2023004 ML24009A1152024-01-29029 January 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L 2023 LLE-0043 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML24022A0652024-01-22022 January 2024 Senior Reactor and Reactor Operator Initial License Examinations L-2024-003, NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2024-01-11011 January 2024 NextEra Energy Seabrook, LLC - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report ML23312A1822023-12-22022 December 2023 Issuance of Amendment No. 172 Revision to Cooling Tower Service Water Loop or Cell Requirements L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update 2024-09-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD.
KING OF PRUSSIA, PA 19406
-2713 April 1 1, 2017 Ms. Debbie Grinnell Emeritus Research Director C-10 Research and Education Foundation, Inc.
44 Merrimac Street Newburyport, MA 01950
Dear Ms. Grinnell:
Ms. Angela Buford forwarded me your email to her dated March 1, 2017, and I am writing to acknowledge its receipt. You sent Ms. Buford a clarifying email later the same day. Your emails have been entered into the NRC's Agencywide Documents Access and Management System (ADAMS) as public ly available records (ML17069A049 1 and ML17069A064) at http://www.nrc.gov/reading
-rm/adams.html
. To begin a search for these documents, select "ADAMS Public Documents" and then select "Begin Web
-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at
1-800-397-4209, 301-415-4737, or by e
-mail to pdr.resource@nrc.gov. As Ms. Buford stated to you in a n email dated March 10, 2017 (ML 17069A077), at this point, the agency has accept ed NextEra's license amendment requests (LAR) only for review by the staff. This means that the NRC considers the LAR to be acceptable for review upon the NRC staff's conclusion that the application for a license amendment reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to complete the detailed technical review and render, in an appropriate time frame, an independent assessment of the proposed action with regard to applicable regulatory requirements and the protection of public health, safety, and security.
More information on the NRC's acceptance review process can be found at:
https://www.nrc.gov/docs/ML0918/ML16144A521.pdf The NRC staff's technical review and processing of the license amendment is expected to take a considerable period of time as described in the acceptance letter dated October 12, 2016 (ML16265A440
). Specifically, the letter stated that NRC staff has estimated this licensing request will take about 2 ,000 hours0 days <br />0 weeks <br />0 months <br /> to complete and it further stated that the NRC staff expects to complete this review in 22 months, which is August 2018.
More information on the review and processing of LAR s can be found at: https://www.nrc.gov/docs/ML0918/ML16061A451.pdf. We are aware that the NRR Project Manager for Seabrook, Mr. Justin Poole, informed you and your organization (C-1 0) by an email dated February 7, 2017 (ML17069A039), that the comment period for the Seabrook
's alkali silica reaction (ASR) LAR was noticed in the Federal Register. We further understand that C
-10 submitted comments by the deadline and the comments have been entered into ADAMS as a public record (ML17081A015). The document located at ML16061A451 also provides guidance for addressing comments received
, from the public , in the safety evaluation report (SER) for the license amendment. As I previously
1 Designation in parentheses refers to an Agency
-wide Documents Access and Management System (ADAMS) accession number. Unless otherwise noted, documents referenced in this letter are publicly
-available using the accession number in ADAMS.
D. Grinnell 2 indicated to you in an email dated October 12, 2016 (ML16286A058), any questions regarding the LAR should be directed to Mr. Poole.
We would urge you and C
-10 to continue to review the long list of documents and information on our website page for ASR at Seabrook: https://www.nrc.gov/reactors/operating/ops
-experience/concrete
-degradation.html
. This webpage is frequently updated and includes every significant piece of correspondence on this subject issued since 2010.
I plan to file this response to you in ADAMS at ML17096A412 and make it publically available.
I trust that this is responsive to your questions.
Sincerely,
/RA/ Fred L. Bower III, Chief Reactor Projects Branch 3 Division of Reactor Projects
D. Grinnell 3 DISTRIBUTION: (via email):
[2016-SST-0 948] DDorman, RA DLew, DRP MScott, DRP DPelton, DRP RLorson, DRS JYerokun, DRS MGray, DRS WCook, DRS FBower, DRP RBarkley, DRP PCataldo, DRP, SRI PMeier, DRP, RI JBowen, RI, OEDO DScrenci, PAO NSheehan, PAO JGreives, SLO DTifft, SLO ABuford, NRR JPoole, NRR BLehman, NRR JDanna, NRR BWittick, NRR LJames, NRR RidsNrrPMSeabrookResource RidsNRRDorlLp1Resource Natalie@C-10.org Debbie@C-10.org Info@C-10.org DOCUMENT NAME: G:\DRP\BRANCH3\Action Items
\2017\2017-SST-0948-Grinnell Emails Response_2017
\Resp Ltr to DGrinnell_C10_emails_03
-2017_final revision.docx ADAMS Accession No.
ML17096A412 (document)
SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP NRR/DORL RI/DRP NAME RBarkley JPoole/RB FBower DATE 4/6/1 7 4/6/17 4/11/17 OFFICIAL RECORD CO PY