RNP-RA/15-0048, H.B Robinson, Unit 2 - Transmits Rev 0 to the Core Operating Limits Report (Colr) for Cycle 30: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML15167A081 | |||
| issue date = 06/16/2015 | |||
| title = H.B Robinson, Unit 2 - Transmits Rev 0 to the Core Operating Limits Report (Colr) for Cycle 30 | |||
| author name = Peavyhouse S W | |||
| author affiliation = Duke Energy Progress, Inc | |||
| addressee name = | |||
| addressee affiliation = NRC/Document Control Desk, NRC/NRR | |||
| docket = 05000261 | |||
| license number = DPR-023 | |||
| contact person = | |||
| case reference number = RNP-RA/15-0048 | |||
| document type = Fuel Cycle Reload Report, Letter type:RNP | |||
| page count = 27 | |||
}} | |||
=Text= | |||
{{#Wiki_filter:}} |
Revision as of 18:24, 2 February 2019
ML15167A081 | |
Person / Time | |
---|---|
Site: | ![]() |
Issue date: | 06/16/2015 |
From: | Peavyhouse S W Duke Energy Progress |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
RNP-RA/15-0048 | |
Download: ML15167A081 (27) | |