ENS 53557: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 21: Line 21:
The automatic actuation of the Reactor Protection System (RPS) is being reported as a four-hour report under 10 CFR 50.72 (b)(2)(iv)(B).
The automatic actuation of the Reactor Protection System (RPS) is being reported as a four-hour report under 10 CFR 50.72 (b)(2)(iv)(B).
The expected actuation of the Auxiliary Feedwater System (an engineered safety feature) is being reported as an eight-hour report under 10 CFR 50.72 (b)(3)(iv)(A).   
The expected actuation of the Auxiliary Feedwater System (an engineered safety feature) is being reported as an eight-hour report under 10 CFR 50.72 (b)(3)(iv)(A).   
The NRC Senior Resident Inspector has been notified for this event."
The NRC Senior Resident Inspector has been notified for this event.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20180823en.html#en53557
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20180823en.html#en53557
}}{{unit info
}}{{unit info

Latest revision as of 00:05, 24 February 2020

ENS 53557 +/-
Where
Watts Bar Tennessee Valley Authority icon.png
Tennessee (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+7.38 h0.308 days <br />0.0439 weeks <br />0.0101 months <br />)
Opened: Dean Baker
11:23 Aug 22, 2018
NRC Officer: Bethany Cecere
Last Updated: Aug 22, 2018
53557 - NRC Website
Loading map...