ML110750091: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 85: Line 85:
/ Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop  
/ Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop  
- O-15D21 Washington, DC  20555 Telephone:  (301) 415-1 988 E-mail:  Lloyd.Subin@nrc.gov Date of signature
- O-15D21 Washington, DC  20555 Telephone:  (301) 415-1 988 E-mail:  Lloyd.Subin@nrc.gov Date of signature
: March 1 5, 2011    - Diablo Canyon License Renewal Hearing File and Manadatory DisclosuresHearing File Index Update - March 15, 2011 Page 1 of 2 ID No.ADAMS Accession No.Document DateADAMS Package Nos.  
: March 1 5, 2011    - Diablo Canyon License Renewal Hearing File and Manadatory DisclosuresHearing File Index Update - March 15, 2011 Page 1 of 2 ID No.ADAMS Accession No.Document DateADAMS Package Nos.
(If Applicable)Title06-0001 ML1105903949/20/20102010/09/20 Diablo Canyon LR - RE: DCPP Regional Inspection Notifications06-0002 ML1105903869/21/20102010/09/21 Diablo Canyon LR - RE: DCPP NRC Regional Inspection Exit Meeting Roster 9/16/201006-0003 ML1105903939/21/20102010/09/21 Diablo Canyon LR - RE: DCPP NRC Regional Inspection Exit Meeting Roster 9/16/201006-0004 ML1105903739/21/20102010/09/21 Diablo Canyon LR - RE: Documents Request06-0005 ML11059035910/13/20102010/10/13 Diablo Canyon LR - RE: Diesel Engine Jacket Cooling Water Pumps (128-2)06-0006 ML11059034910/27/20102010/10/27 Diablo Canyon LR - RE: Regional Inspection Spreadsheet06-0007 ML11059031010/28/20102010/10/28 Diablo Canyon LR - Doc List Docs needed & Civil Question06-0008 ML11059028910/29/20102010/10/29 Diablo Canyon LR - RE: Doc List Docs needed & Civil Question06-0009 ML11059028810/31/20102010/10/31 Diablo Canyon LR - Last Set of files needed electronically06-0010 ML11059028711/9/20102010/11/09 Diablo Canyon LR - RE: Regional Inspection Spreadsheet06-0011 ML11059026811/10/20102010/11/10 Diablo Canyon LR - RE: One time inspection - basis for sampling size and criteria06-0012 ML11059028011/10/20102010/11/10 Diablo Canyon LR - RE: SAPN 50341879 (Regulator Material)06-0013 ML11059024511/15/20102010/11/15 Diablo Canyon LR - RE: Two simple questions06-0014 ML11059025811/15/20102010/11/15 Diablo Canyon LR - Two simple questions06-0015 ML11062052712/21/20102010/12/21 Diablo Canyon LR - FW: Information request - Diablo Canyon - Neutron noise06-0016 ML1106205321/21/20112011/01/21 Diablo Canyon LR - RE: Information request - Diablo Canyon - Neutron noise06-0017 ML1105902322/16/20112011/02/16 Diablo Canyon LR - RE: SAP Notifications and Compressed air system drawing06-0018 ML1104704472/16/20112011/02/16 Diablo Canyon LR - Schedule Update06-0019 ML1104808732/17/20112011/02/17 Diablo Canyon LR - Schedule change letter is signed. . .  - Diablo Canyon License Renewal Hearing File and Manadatory DisclosuresHearing File Index Update - March 15, 2011 Page 2 of 206-0020 ML1105601072/18/20112011/02/18 Diablo Canyon LR - FW: Diablo Canyon:  REVISION OF SCHEDULE FOR THE REVIEW OF THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION06-0021 ML1105601422/23/20112011/02/23 Diablo Canyon LR - RE: NRC review schedule for Diablo Canyon re-licensing06-0022 ML1106901233/3/20112011/03/03 Diablo Canyon LR - SER Input 3.0.3.2.14 Event Driven RAI Reposne Inaccessible Cable.doc06-0023 ML1106300993/4/20112011/03/04 Diablo Canyon LR - Endangered Species Consultation with Fish and Wildlife Service re: License Renewal06-0024 ML1106805763/9/20112011/03/09 Diablo Canyon LR - Diablo License Renewal follow up question.06-0025 ML1107307793/14/20112011/03/14 Diablo Canyon LR - Draft Telecon Summary In the Matter PACIFIC GAS & ELECTRIC (Diablo Canyon Nuclear Power Plant, Units 1 and Docket Nos. 50-275-LR and NRC Staff Transmittal Letter dated March 15, Attachment Affidavit of Nathaniel B.
(If Applicable)Title06-0001 ML1105903949/20/20102010/09/20 Diablo Canyon LR - RE: DCPP Regional Inspection Notifications06-0002 ML1105903869/21/20102010/09/21 Diablo Canyon LR - RE: DCPP NRC Regional Inspection Exit Meeting Roster 9/16/201006-0003 ML1105903939/21/20102010/09/21 Diablo Canyon LR - RE: DCPP NRC Regional Inspection Exit Meeting Roster 9/16/201006-0004 ML1105903739/21/20102010/09/21 Diablo Canyon LR - RE: Documents Request06-0005 ML11059035910/13/20102010/10/13 Diablo Canyon LR - RE: Diesel Engine Jacket Cooling Water Pumps (128-2)06-0006 ML11059034910/27/20102010/10/27 Diablo Canyon LR - RE: Regional Inspection Spreadsheet06-0007 ML11059031010/28/20102010/10/28 Diablo Canyon LR - Doc List Docs needed & Civil Question06-0008 ML11059028910/29/20102010/10/29 Diablo Canyon LR - RE: Doc List Docs needed & Civil Question06-0009 ML11059028810/31/20102010/10/31 Diablo Canyon LR - Last Set of files needed electronically06-0010 ML11059028711/9/20102010/11/09 Diablo Canyon LR - RE: Regional Inspection Spreadsheet06-0011 ML11059026811/10/20102010/11/10 Diablo Canyon LR - RE: One time inspection - basis for sampling size and criteria06-0012 ML11059028011/10/20102010/11/10 Diablo Canyon LR - RE: SAPN 50341879 (Regulator Material)06-0013 ML11059024511/15/20102010/11/15 Diablo Canyon LR - RE: Two simple questions06-0014 ML11059025811/15/20102010/11/15 Diablo Canyon LR - Two simple questions06-0015 ML11062052712/21/20102010/12/21 Diablo Canyon LR - FW: Information request - Diablo Canyon - Neutron noise06-0016 ML1106205321/21/20112011/01/21 Diablo Canyon LR - RE: Information request - Diablo Canyon - Neutron noise06-0017 ML1105902322/16/20112011/02/16 Diablo Canyon LR - RE: SAP Notifications and Compressed air system drawing06-0018 ML1104704472/16/20112011/02/16 Diablo Canyon LR - Schedule Update06-0019 ML1104808732/17/20112011/02/17 Diablo Canyon LR - Schedule change letter is signed. . .  - Diablo Canyon License Renewal Hearing File and Manadatory DisclosuresHearing File Index Update - March 15, 2011 Page 2 of 206-0020 ML1105601072/18/20112011/02/18 Diablo Canyon LR - FW: Diablo Canyon:  REVISION OF SCHEDULE FOR THE REVIEW OF THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION06-0021 ML1105601422/23/20112011/02/23 Diablo Canyon LR - RE: NRC review schedule for Diablo Canyon re-licensing06-0022 ML1106901233/3/20112011/03/03 Diablo Canyon LR - SER Input 3.0.3.2.14 Event Driven RAI Reposne Inaccessible Cable.doc06-0023 ML1106300993/4/20112011/03/04 Diablo Canyon LR - Endangered Species Consultation with Fish and Wildlife Service re: License Renewal06-0024 ML1106805763/9/20112011/03/09 Diablo Canyon LR - Diablo License Renewal follow up question.06-0025 ML1107307793/14/20112011/03/14 Diablo Canyon LR - Draft Telecon Summary In the Matter PACIFIC GAS & ELECTRIC (Diablo Canyon Nuclear Power Plant, Units 1 and Docket Nos. 50-275-LR and NRC Staff Transmittal Letter dated March 15, Attachment Affidavit of Nathaniel B.
March 1S, 2011 UNITED STATES OF NUCLEAR REGULATORY BEFORE THE ATOMIC SAFETY AND LICENSING In the Matter of ) ) PACIFIC GAS & ELECTRIC COMPANY ) Docket Nos. SO-27S-LRI SO-323-LR ) (Diablo Canyon Nuclear Power Plant ) Units 1 and 2) AFFIDAVIT OF NATHANIEL B. FERRER MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § I, Nathaniel B. Ferrer, do hereby state as follows: 1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's  
March 1S, 2011 UNITED STATES OF NUCLEAR REGULATORY BEFORE THE ATOMIC SAFETY AND LICENSING In the Matter of ) ) PACIFIC GAS & ELECTRIC COMPANY ) Docket Nos. SO-27S-LRI SO-323-LR ) (Diablo Canyon Nuclear Power Plant ) Units 1 and 2) AFFIDAVIT OF NATHANIEL B. FERRER MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § I, Nathaniel B. Ferrer, do hereby state as follows: 1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's
("NRC") Office of Nuclear Reactor Regulation.
("NRC") Office of Nuclear Reactor Regulation.
I serve as a project manager for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 license renewal application  
I serve as a project manager for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 license renewal application
("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.  
("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.
: 2. I hereby certify that all relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified by the Staff as of March 1S, 2011. 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief. Nathaniel B. Ferrer Executed in Rockville, Maryland this 1Sth day of March, 2011}}
: 2. I hereby certify that all relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified by the Staff as of March 1S, 2011. 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief. Nathaniel B. Ferrer Executed in Rockville, Maryland this 1Sth day of March, 2011}}

Revision as of 17:17, 30 April 2019

2011/03/15 - Diablo Canyon - March Hearing File Update
ML110750091
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/15/2011
From: Subin L B
NRC/OGC
To: Curran D, Repka D A, ZamEk J
Atomic Safety and Licensing Board Panel
Subin, Lloyd B., 415-1988
References
50-275-LR, 50-323-LR, RAS QQ-9
Download: ML110750091 (8)


Text

March 15, 2011 David A. Repka, Esq.

Tyson Smith, Esq.

Carlos Sisco Winston & Strawn LLP 101 California Street San Francisco, CA 94111

-5802 E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com Jill ZamEk, Esq.

San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net Diane Curran, Esq.

Harmon, Curran, Spielberg, and Eisenberg

1726 M Street NW Washington, DC 20036 Suite 600 E-mail: dcurran@harmoncurran.com In the Matter of Pacific Gas and Electric Company (Diablo Cany on Nuclear Power Plant, Units 1 and 2

) Docket Nos. 5 0-275-LR and 5 0-323-LR

Dear Parties:

Pursuant to the Licensing Board's Memorandum and Order dated September 15, 20 10, the Staff is providing the parties an index identifying the hearing file and mandatory disclosures in accordance with 10 C.F.R. §§ 2.1203 and 2.336

. For purposes of producing the mandatory disclosures and hearing file, and considering any document as privileged or protected, the Staff treated documents created by agents and contractors of the NRC the same as if those documents were created by the Staff.

The index contains the ADAMS accession number, date, and title of each item so as to make the item readily retrievable from the agency's website, www.nrc.gov, using the ADAMS "Find" function in accordance with 10 C.F.R. § 2.1203. Also attac hed is the Affidavit of Andrew L. Stuyvenberg, as required by 10 C.F.R. § 2.336(c). Respectfully submitted, /signed (electronically) by/

Lloyd B. Subin Counsel for the NRC Staff

Enclosures:

Attachment 1: Hearing File Index Attachment 2: Affidavit of Andrew L Stuyvenberg

March 15, 2011 In the Matter of PACIFIC GAS AND ELECTRIC COMPANY (Diablo Canyon Power Plant, Units 1 and 2)

Docket Nos. 50

-275-LR and 50-323-LR

Dear Administrative Judges:

In accordance with the Board's September 15, 2010, Memorandum, and Section 2.1203(a), the NRC staff is providing notice that it has updated the hearing file for this proceeding and has made it available to the parties. For any member of the public that wishes to inspect the hearing file, the Staff has created a separate folder in the agency's Electronic Hearing Docket ("EHD") associated with this proceeding entitled "Diablo Hearing File," and the updated documents, along with an index listing the documents, will be published in that folder.

Respectfully submitted, Lloyd B. Subin

/signed (electronically) by/

Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O

-15 D21 Washington, DC 20555

-0001 (301) 415-1 988 Lloyd.Subin@nrc.gov Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel Mail Stop: T

-3F23 Washington, DC 20555

-001 Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop: T

-3F23 Washington, DC 20555

-0001 Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop: T

-3F23 Washington, DC 20555

-0001 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

) ) PACIFIC GAS AND ELECTRIC COMPANY

) Docket Nos. 50

-275-LR/ 50-323-LR ) (Diablo Canyon Nuclear Power Plant, ) ASLBP No. 10

-900-01-LR-BD01 Units 1 and 2)

) CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing NRC Staff letter dated March 15, 201 1, have been served upon the following by the Electronic Information Exchange, this 1 5 th day of March, 20 1 1: Administrative Judge Alex S. Karlin, Chair Atomic Safety and Licensing Board Panel Mail Stop

- T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555

-0001 E-mail: ask 2@nrc.gov Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Panel Mail Stop

- T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555

-0001 E-mail: ngt@nrc.gov Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop

- T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555

-0001 E-mail: pba@nrc.gov

Office of Commission Appellate Adjudication U.S. Nuclear Regulatory Commission Mail Stop

- O-16G4 Washington, DC 20555

-0001 E-mail: ocaamail@nrc.gov Office of the Secretary Attn: Rulemakings and Adjudications Staff Mail Stop: O

-16G4 U.S. Nuclear Regulatory Commission Washington, DC 20555

-0001 E-mail: HEARINGDOCKET@nrc.gov David A. Repka, Esq.

Tyson Smith, Esq.

Carlos Sisco Winston & Strawn LLP 101 California Street San Francisco, CA 94111

-5802 E-mail: drepka@winston.com trsmith@winston.com CSisco@winston.com

Jill ZamEk, Esq.

San Luis Obispo Mothers for Peace 1123 Flora Road Arroyo Grande, CA 93420 E-mail: jzk@charter.net Diane Curran, Esq.

Harmon, Curran, Spielberg, and Eisenberg

1726 M Street NW Suite 600 Washington, DC 20036 E-mail: dcurran@harmoncurran.com

Lloyd B. Subin

/signed (electronically) by

/ Counsel for NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop

- O-15D21 Washington, DC 20555 Telephone: (301) 415-1 988 E-mail: Lloyd.Subin@nrc.gov Date of signature

March 1 5, 2011 - Diablo Canyon License Renewal Hearing File and Manadatory DisclosuresHearing File Index Update - March 15, 2011 Page 1 of 2 ID No.ADAMS Accession No.Document DateADAMS Package Nos.

(If Applicable)Title06-0001 ML1105903949/20/20102010/09/20 Diablo Canyon LR - RE: DCPP Regional Inspection Notifications06-0002 ML1105903869/21/20102010/09/21 Diablo Canyon LR - RE: DCPP NRC Regional Inspection Exit Meeting Roster 9/16/201006-0003 ML1105903939/21/20102010/09/21 Diablo Canyon LR - RE: DCPP NRC Regional Inspection Exit Meeting Roster 9/16/201006-0004 ML1105903739/21/20102010/09/21 Diablo Canyon LR - RE: Documents Request06-0005 ML11059035910/13/20102010/10/13 Diablo Canyon LR - RE: Diesel Engine Jacket Cooling Water Pumps (128-2)06-0006 ML11059034910/27/20102010/10/27 Diablo Canyon LR - RE: Regional Inspection Spreadsheet06-0007 ML11059031010/28/20102010/10/28 Diablo Canyon LR - Doc List Docs needed & Civil Question06-0008 ML11059028910/29/20102010/10/29 Diablo Canyon LR - RE: Doc List Docs needed & Civil Question06-0009 ML11059028810/31/20102010/10/31 Diablo Canyon LR - Last Set of files needed electronically06-0010 ML11059028711/9/20102010/11/09 Diablo Canyon LR - RE: Regional Inspection Spreadsheet06-0011 ML11059026811/10/20102010/11/10 Diablo Canyon LR - RE: One time inspection - basis for sampling size and criteria06-0012 ML11059028011/10/20102010/11/10 Diablo Canyon LR - RE: SAPN 50341879 (Regulator Material)06-0013 ML11059024511/15/20102010/11/15 Diablo Canyon LR - RE: Two simple questions06-0014 ML11059025811/15/20102010/11/15 Diablo Canyon LR - Two simple questions06-0015 ML11062052712/21/20102010/12/21 Diablo Canyon LR - FW: Information request - Diablo Canyon - Neutron noise06-0016 ML1106205321/21/20112011/01/21 Diablo Canyon LR - RE: Information request - Diablo Canyon - Neutron noise06-0017 ML1105902322/16/20112011/02/16 Diablo Canyon LR - RE: SAP Notifications and Compressed air system drawing06-0018 ML1104704472/16/20112011/02/16 Diablo Canyon LR - Schedule Update06-0019 ML1104808732/17/20112011/02/17 Diablo Canyon LR - Schedule change letter is signed. . . - Diablo Canyon License Renewal Hearing File and Manadatory DisclosuresHearing File Index Update - March 15, 2011 Page 2 of 206-0020 ML1105601072/18/20112011/02/18 Diablo Canyon LR - FW: Diablo Canyon: REVISION OF SCHEDULE FOR THE REVIEW OF THE DIABLO CANYON NUCLEAR POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION06-0021 ML1105601422/23/20112011/02/23 Diablo Canyon LR - RE: NRC review schedule for Diablo Canyon re-licensing06-0022 ML1106901233/3/20112011/03/03 Diablo Canyon LR - SER Input 3.0.3.2.14 Event Driven RAI Reposne Inaccessible Cable.doc06-0023 ML1106300993/4/20112011/03/04 Diablo Canyon LR - Endangered Species Consultation with Fish and Wildlife Service re: License Renewal06-0024 ML1106805763/9/20112011/03/09 Diablo Canyon LR - Diablo License Renewal follow up question.06-0025 ML1107307793/14/20112011/03/14 Diablo Canyon LR - Draft Telecon Summary In the Matter PACIFIC GAS & ELECTRIC (Diablo Canyon Nuclear Power Plant, Units 1 and Docket Nos. 50-275-LR and NRC Staff Transmittal Letter dated March 15, Attachment Affidavit of Nathaniel B.

March 1S, 2011 UNITED STATES OF NUCLEAR REGULATORY BEFORE THE ATOMIC SAFETY AND LICENSING In the Matter of ) ) PACIFIC GAS & ELECTRIC COMPANY ) Docket Nos. SO-27S-LRI SO-323-LR ) (Diablo Canyon Nuclear Power Plant ) Units 1 and 2) AFFIDAVIT OF NATHANIEL B. FERRER MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § I, Nathaniel B. Ferrer, do hereby state as follows: 1. I am employed as a Project Manager in the Division of License Renewal in the U.S. Nuclear Regulatory Commission's

("NRC") Office of Nuclear Reactor Regulation.

I serve as a project manager for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 license renewal application

("LRA"). Among other things, I am managing the preparation of the hearing file and mandatory disclosures in connection with the LRA at issue in this proceeding.

2. I hereby certify that all relevant materials related to the issues in connection with the LRA that are required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete for documents identified by the Staff as of March 1S, 2011. 3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief. Nathaniel B. Ferrer Executed in Rockville, Maryland this 1Sth day of March, 2011