ENS 52775: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 05/30/2017 09:29 CDT
| event date = 05/30/2017 09:29 CDT
| last update date = 05/30/2017
| last update date = 05/30/2017
| title = Loss Of Emergency Operations Facility Integrated Computer System Data For Planned Maintenance
| title = Loss of Emergency Operations Facility Integrated Computer System Data for Planned Maintenance
| event text = On May 30, 2017 at 0929 (CDT), South Texas Project (STP) removed from service Integrated Computer System (ICS) connections to the Emergency Operations Facility (EOF) for planned maintenance. The ICS computers are used in the EOF to directly monitor selected plant parameters and to provide Emergency Response assessment capabilities. This planned maintenance implements a software modification and is expected to last for four days.
| event text = On May 30, 2017 at 0929 (CDT), South Texas Project (STP) removed from service Integrated Computer System (ICS) connections to the Emergency Operations Facility (EOF) for planned maintenance. The ICS computers are used in the EOF to directly monitor selected plant parameters and to provide Emergency Response assessment capabilities. This planned maintenance implements a software modification and is expected to last for four days.
This is reportable under 10 CFR 50.72(b)(3)(xiii) because the EOF assessment capabilities would not be able to be restored within the facility activation time and assessment capabilities cannot be performed at a backup facility (i.e., there is no backup EOF).
This is reportable under 10 CFR 50.72(b)(3)(xiii) because the EOF assessment capabilities would not be able to be restored within the facility activation time and assessment capabilities cannot be performed at a backup facility (i.e., there is no backup EOF).

Latest revision as of 21:42, 1 March 2018

ENS 52775 +/-
Where
South Texas STP Nuclear Operating Company icon.png
Texas (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-0.32 h-0.0133 days <br />-0.0019 weeks <br />-4.38336e-4 months <br />)
Opened: William Herzog
14:10 May 30, 2017
NRC Officer: Jeff Rotton
Last Updated: May 30, 2017
52775 - NRC Website
Loading map...