ENS 42579
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
14:45 May 16, 2006 | |
Title | Disruption of Incoming and Outgoing Telephone Communciation Capability |
Event Description | On 05/16/2006 at 0945 CDT, the control room was notified that problems with Bell South and Verizon phone services had occurred which disrupted incoming and outgoing telephone communications capability for both Unit 1 and Unit 2. Subsequent attempts from the control room confirmed that the State and County ringdown line was dead as well as the Emergency Notification System line. It was also determined that although outgoing calls from the control room and Emergency Operations Facility via land line were possible, incoming calls could not be received. The NRC Operations Center was contacted via land line at 09:50 CDT to inform the NRC of the issue. Alternate communication via cell phone and satellite phone was established to allow incoming calls from the NRC, State and County. The NRC Senior Resident Inspector was notified of the issue.
Telephone service was restored at 13:50 CDT which re-established all normal and emergency telephone communications capability. |
Where | |
---|---|
South Texas ![]() Texas (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+0.93 h0.0388 days <br />0.00554 weeks <br />0.00127 months <br />) | |
Opened: | Robert Scarborough 15:41 May 16, 2006 |
NRC Officer: | Mike Ripley |
Last Updated: | May 16, 2006 |
42579 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 42579\u003C/a\u003E - \u003Ca href=\"/South_Texas\" title=\"South Texas\"\u003ESouth Texas\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EDisruption of Incoming and Outgoing Telephone Communciation Capability\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 42579 - South Texas\n","link":"","lat":30.925369444444446,"lon":-95.372575,"icon":"/w/images/9/9c/STP_Nuclear_Operating_Company_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (95 %) |
After | Power Operation (95 %) |
WEEKMONTHYEARENS 542842019-09-18T12:50:00018 September 2019 12:50:00
[Table view]10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Communication with Emergency Operations Facility ENS 541452019-07-03T15:26:0003 July 2019 15:26:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Offsite Notification Due to Radio Transmitter Out of Service ENS 536562018-10-09T05:00:0009 October 2018 05:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Unplanned Loss of Emergency Response Equipment ENS 531182017-12-12T23:57:00012 December 2017 23:57:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Unplanned Loss of Emergency Response Equipment ENS 527752017-05-30T14:29:00030 May 2017 14:29:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Operations Facility Integrated Computer System Data for Planned Maintenance ENS 511152015-06-01T15:26:0001 June 2015 15:26:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Unit 2 Ventilation Radiation Monitor Operability ENS 484482012-10-27T19:15:00027 October 2012 19:15:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Offsite Communications ENS 465882011-02-02T14:30:0002 February 2011 14:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Partial Loss of Prompt Notification System (Pns) Emergency Sirens Due to a Loss of Power ENS 435952007-08-25T12:30:00025 August 2007 12:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Erds System and Portions of Plant Computer Out of Service for Planned Maintenance Outage ENS 430862007-01-10T18:35:00010 January 2007 18:35:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Offsite Landline Communications Capability Due to Cut Fiber Optic Cable ENS 425792006-05-16T14:45:00016 May 2006 14:45:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Disruption of Incoming and Outgoing Telephone Communciation Capability 2019-09-18T12:50:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_42579&oldid=427401"