ML082350494: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/22/2008
| issue date = 08/22/2008
| title = SRM-M080822 - I. SECY-08-0081- Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), Application for Order Approving Indirect Transfer of Control of Licenses (Filed 7/30/08) Ii. SECY-08-0087 - U.S. DOE (HLW) Petitions of the Sta
| title = SRM-M080822 - I. SECY-08-0081- Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), Application for Order Approving Indirect Transfer of Control of Licenses (Filed 7/30/08) Ii. SECY-08-0087 - U.S. DOE (HLW) Petitions of the Sta
| author name = Vietti-Cook A L
| author name = Vietti-Cook A
| author affiliation = NRC/SECY
| author affiliation = NRC/SECY
| addressee name = Cordes J F
| addressee name = Cordes J
| addressee affiliation = NRC/OCAA
| addressee affiliation = NRC/OCAA
| docket = 05000293, WM-00011
| docket = 05000293, WM-00011
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:IN RESPONSE, PLEASE REFER TO: M080822  
{{#Wiki_filter:IN RESPONSE, PLEASE REFER TO: M080822 August 22, 2008 MEMORANDUM FOR:                 John F. Cordes, Director Office of Commission Appellate Adjudication FROM:                           Annette L. Vietti-Cook, Secretary                   /RA/
 
August 22, 2008  
 
MEMORANDUM FOR: John F. Cordes, Director Office of Commission Appellate Adjudication FROM:   Annette L. Vietti-Cook, Secretary   /RA/


==SUBJECT:==
==SUBJECT:==
STAFF REQUIREMENTS - AFFIRMATION SESSION, 9:35 A.M., FRIDAY, AUGUST 22, 2008, COMMISSIONERS' CONFERENCE ROOM, ONE WHITE FLINT NORTH, ROCKVILLE, MARYLAND (OPEN TO PUBLIC ATTENDANCE) 1
STAFF REQUIREMENTS - AFFIRMATION SESSION, 9:35 A.M.,
 
FRIDAY, AUGUST 22, 2008, COMMISSIONERS' CONFERENCE ROOM, ONE WHITE FLINT NORTH, ROCKVILLE, MARYLAND (OPEN TO PUBLIC ATTENDANCE) 1 I.       SECY-08-0081 - Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station),
I. SECY-08-0081 - Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), Application for Order Approving Indirect Transfer of Control of Licenses (Filed July 30, 2007 The Commission approved a Memorandum and Order responding to two petitions to intervene in Entergy Nuclear Operations' Application for Approval of the indirect transfer of control of licenses for the Pilgrim, Palisades, FitzPatrick, Vermont Yankee, Indian Point, and Big Rock Point facilities. Petitions were submitted by Union Locals 369 and 590 of the Utility Workers of America, AFL-CIO, representing workers at the Pilgrim Nuclear Power Station and by Westchester Citizen's Awareness Network (WestCAN), Rockland County Conservation Association (RCCA), Promoting Health and Sustainable Energy (PHASE), Sierra Club - North East Chapter (Sierra Club), and State Representative Richard Brodsky, representing the Indian Point Nuclear Generating Units. Subsequently, Union Local 369 withdrew from the proceeding.
Application for Order Approving Indirect Transfer of Control of Licenses (Filed July 30, 2007 The Commission approved a Memorandum and Order responding to two petitions to intervene in Entergy Nuclear Operations Application for Approval of the indirect transfer of control of licenses for the Pilgrim, Palisades, FitzPatrick, Vermont Yankee, Indian Point, and Big Rock Point facilities. Petitions were submitted by Union Locals 369 and 590 of the Utility Workers of America, AFL-CIO, representing workers at the Pilgrim Nuclear Power Station and by Westchester Citizens Awareness Network (WestCAN), Rockland County Conservation Association (RCCA), Promoting Health and Sustainable Energy (PHASE), Sierra Club - North East Chapter (Sierra Club), and State Representative Richard Brodsky, representing the Indian Point Nuclear Generating Units. Subsequently, Union Local 369 withdrew from the proceeding.
The Memorandum and Order denies the petitions to intervene and their associated requests and terminates this adjudication. Commissioner Jaczko disapproved the Order in part.  
The Memorandum and Order denies the petitions to intervene and their associated requests and terminates this adjudication. Commissioner Jaczko disapproved the Order in part.
 
(Subsequently, on August 22, 2008, the Secretary signed the Memorandum and Order.)
(Subsequently, on August 22, 2008, the Secretary signed the Memorandum and Order.)  
1 Section 201 of the Energy Reorganization Act, 42 U.S.C. Section 5841, provides that action of the Commission shall be determined by a Amajority vote of the members present.@
 
Commissioners Jaczko and Svinicki were present in the Conference Room. Chairman Klein and Commissioner Lyons participated in the meeting via speakerphone.
1 Section 201 of the Energy Reorganization Act, 42 U.S.C. Section 5841, provides that action of the Commission shall be determined by a Amajority vote of the members present.
Commissioners Jaczko and Svinicki were present in the Conference Room. Chairman Klein and Commissioner Lyons participated in the meeting via speakerphone.  
 
II. SECY-08-0087 - U.S. Department of Energy (High Level Waste Repository) - Petitions of the State of Nevada and Dr. Jacob Paz to Reject the Department of Energy's (DOE) Application to Construct a Geologic Repository at Yucca Mountain, Nevada
 
The Commission approved a Memorandum and Order responding to petitions by the State of Nevada and Dr. Jacob Paz requesting that the Commission reject DOE's license application seeking authorization to construct a geologic repository at Yucca Mountain, Nevada. The Memorandum and Order rejects the petitions without prejudice to the petitioners' right to pursue identical claims as proposed contentions if and when the application is docketed and a notice of hearing issues. Commissioner Jaczko voted to approve the Memorandum and Order, but would have provided the staff with guidance not to docket DOE's Yucca Mountain application until the Environmental Protection Agency issues its final rule regarding radiation protection standards at the proposed facility.
 
(Subsequently, on August 22, 2008, the Secretary signed the Memorandum and Order.)


cc: Chairman Klein Commissioner Jaczko Commissioner Lyons Commissioner Svinicki   EDO OGC CFO OCAA OCA OIG OPA Office Directors, Regions, ACRS, ASLBP (via E-Mail)
II. SECY-08-0087 - U.S. Department of Energy (High Level Waste Repository) - Petitions of the State of Nevada and Dr. Jacob Paz to Reject the Department of Energys (DOE)
Application to Construct a Geologic Repository at Yucca Mountain, Nevada The Commission approved a Memorandum and Order responding to petitions by the State of Nevada and Dr. Jacob Paz requesting that the Commission reject DOEs license application seeking authorization to construct a geologic repository at Yucca Mountain, Nevada. The Memorandum and Order rejects the petitions without prejudice to the petitioners right to pursue identical claims as proposed contentions if and when the application is docketed and a notice of hearing issues. Commissioner Jaczko voted to approve the Memorandum and Order, but would have provided the staff with guidance not to docket DOEs Yucca Mountain application until the Environmental Protection Agency issues its final rule regarding radiation protection standards at the proposed facility.
(Subsequently, on August 22, 2008, the Secretary signed the Memorandum and Order.)
cc:     Chairman Klein Commissioner Jaczko Commissioner Lyons Commissioner Svinicki EDO OGC CFO OCAA OCA OIG OPA Office Directors, Regions, ACRS, ASLBP (via E-Mail)
PDR}}
PDR}}

Latest revision as of 13:42, 14 November 2019

SRM-M080822 - I. SECY-08-0081- Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), Application for Order Approving Indirect Transfer of Control of Licenses (Filed 7/30/08) Ii. SECY-08-0087 - U.S. DOE (HLW) Petitions of the Sta
ML082350494
Person / Time
Site: Pilgrim, WM-00011
Issue date: 08/22/2008
From: Annette Vietti-Cook
NRC/SECY
To: Cordes J
NRC/OCAA
References
-nr, M080822, SECY-08-0081, SECY-08-0087, FOIA/PA-2013-0151 SRM-M080822
Download: ML082350494 (2)


Text

IN RESPONSE, PLEASE REFER TO: M080822 August 22, 2008 MEMORANDUM FOR: John F. Cordes, Director Office of Commission Appellate Adjudication FROM: Annette L. Vietti-Cook, Secretary /RA/

SUBJECT:

STAFF REQUIREMENTS - AFFIRMATION SESSION, 9:35 A.M.,

FRIDAY, AUGUST 22, 2008, COMMISSIONERS' CONFERENCE ROOM, ONE WHITE FLINT NORTH, ROCKVILLE, MARYLAND (OPEN TO PUBLIC ATTENDANCE) 1 I. SECY-08-0081 - Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station),

Application for Order Approving Indirect Transfer of Control of Licenses (Filed July 30, 2007 The Commission approved a Memorandum and Order responding to two petitions to intervene in Entergy Nuclear Operations Application for Approval of the indirect transfer of control of licenses for the Pilgrim, Palisades, FitzPatrick, Vermont Yankee, Indian Point, and Big Rock Point facilities. Petitions were submitted by Union Locals 369 and 590 of the Utility Workers of America, AFL-CIO, representing workers at the Pilgrim Nuclear Power Station and by Westchester Citizens Awareness Network (WestCAN), Rockland County Conservation Association (RCCA), Promoting Health and Sustainable Energy (PHASE), Sierra Club - North East Chapter (Sierra Club), and State Representative Richard Brodsky, representing the Indian Point Nuclear Generating Units. Subsequently, Union Local 369 withdrew from the proceeding.

The Memorandum and Order denies the petitions to intervene and their associated requests and terminates this adjudication. Commissioner Jaczko disapproved the Order in part.

(Subsequently, on August 22, 2008, the Secretary signed the Memorandum and Order.)

1 Section 201 of the Energy Reorganization Act, 42 U.S.C. Section 5841, provides that action of the Commission shall be determined by a Amajority vote of the members present.@

Commissioners Jaczko and Svinicki were present in the Conference Room. Chairman Klein and Commissioner Lyons participated in the meeting via speakerphone.

II. SECY-08-0087 - U.S. Department of Energy (High Level Waste Repository) - Petitions of the State of Nevada and Dr. Jacob Paz to Reject the Department of Energys (DOE)

Application to Construct a Geologic Repository at Yucca Mountain, Nevada The Commission approved a Memorandum and Order responding to petitions by the State of Nevada and Dr. Jacob Paz requesting that the Commission reject DOEs license application seeking authorization to construct a geologic repository at Yucca Mountain, Nevada. The Memorandum and Order rejects the petitions without prejudice to the petitioners right to pursue identical claims as proposed contentions if and when the application is docketed and a notice of hearing issues. Commissioner Jaczko voted to approve the Memorandum and Order, but would have provided the staff with guidance not to docket DOEs Yucca Mountain application until the Environmental Protection Agency issues its final rule regarding radiation protection standards at the proposed facility.

(Subsequently, on August 22, 2008, the Secretary signed the Memorandum and Order.)

cc: Chairman Klein Commissioner Jaczko Commissioner Lyons Commissioner Svinicki EDO OGC CFO OCAA OCA OIG OPA Office Directors, Regions, ACRS, ASLBP (via E-Mail)

PDR