| issue date = 09/09/2009
| issue date = 09/09/2009
| title = EN-09-045, Carolina Power and Light Company
| title = EN-09-045, Carolina Power and Light Company
| author name = Bowman G T, Gulla G J
| author name = Bowman G, Gulla G
| author affiliation = NRC/OE
| author affiliation = NRC/OE
| addressee name =  
| addressee name =  
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:PRELIMINARY INFORMATION  
{{#Wiki_filter:PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION September 9, 2009 EN-09-045 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee:       Carolina Power and Light Company                             (EA-09-121)
- NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION PRELIMINARY INFORMATION
Brunswick Steam Electric Plant Docket No. 05000324/325
- NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION September 9, 2009 EN-09-045 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION
 
Licensee: Carolina Power and Light Company   (EA-09-121)   Brunswick Steam Electric Plant   Docket No. 05000324/325  


==Subject:==
==Subject:==
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION This is to inform the Commission that a White Significance Determination Process (SDP) finding will be issued on or about September 14, 2009, to Carolina Power and Light Company (CP&L) as a result of inspections at the Brunswick Steam Electric Plant. This White finding, an issue with low to moderate safety significance, which may require additional NRC inspections, involved the failure to perform an adequate design modification to their emergency diesel generators (EDGs) such that local control of the EDGs could not be established as required by the Safe Shutdown Analysis Report. The finding involved a failure to correctly designate termination points for linking control power to the EDG lockout relay reset circuitry during the implementation of a design change which resulted in a loss of EDG local control function. A Regulatory Conference was held on July 28, 2009, in which CP&L provided their assessment of the significance of the finding (i.e., Green), root causes, and detailed corrective actions. After considering the information obtained from the Regulatory Conference, the NRC concluded that the inspection finding was appropriately characterized as White.
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION This is to inform the Commission that a White Significance Determination Process (SDP) finding will be issued on or about September 14, 2009, to Carolina Power and Light Company (CP&L) as a result of inspections at the Brunswick Steam Electric Plant. This White finding, an issue with low to moderate safety significance, which may require additional NRC inspections, involved the failure to perform an adequate design modification to their emergency diesel generators (EDGs) such that local control of the EDGs could not be established as required by the Safe Shutdown Analysis Report. The finding involved a failure to correctly designate termination points for linking control power to the EDG lockout relay reset circuitry during the implementation of a design change which resulted in a loss of EDG local control function.
A Notice of Violation is included based on a violation of Appendix B of 10 CFR 50, Criterion III, "Design Control," which requires, in part, that measures shall be established to assure that the design basis are correctly translated into specifications, drawings, procedures and instructions. Contrary to this requirement, during the implementation of an Engineering Change Notice, the licensee failed to correctly replace control relays on all four EDGs. The termination points for linking control power to the EDG lockout relay reset circuitry were incorrectly designated, such that the EDGs could not be operated locally.  
A Regulatory Conference was held on July 28, 2009, in which CP&L provided their assessment of the significance of the finding (i.e., Green), root causes, and detailed corrective actions. After considering the information obtained from the Regulatory Conference, the NRC concluded that the inspection finding was appropriately characterized as White.
 
A Notice of Violation is included based on a violation of Appendix B of 10 CFR 50, Criterion III, Design Control, which requires, in part, that measures shall be established to assure that the design basis are correctly translated into specifications, drawings, procedures and instructions.
Contrary to this requirement, during the implementation of an Engineering Change Notice, the licensee failed to correctly replace control relays on all four EDGs. The termination points for linking control power to the EDG lockout relay reset circuitry were incorrectly designated, such that the EDGs could not be operated locally.
It should be noted that the licensee has not been specifically informed of the enforcement action.
It should be noted that the licensee has not been specifically informed of the enforcement action.
The schedule of issuance and notification is:  
The schedule of issuance and notification is:
 
Mailing of Final Significance Determination           September 14, 2009 Telephone Notification of Licensee                     September 14, 2009 The State of North Carolina will be notified.
Mailing of Final Significance Determination September 14, 2009 Telephone Notification of Licensee   September 14, 2009  
Contacts: Gerry Gulla, OE, (301) 415-2872               Greg Bowman, OE, (301) 415-2939 PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION
 
The State of North Carolina will be notified.  
 
Contacts: Gerry Gulla, OE, (301) 415-2872 Greg Bowman, OE, (301) 415-2939 PRELIMINARY INFORMATION  
- NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION PRELIMINARY INFORMATION
- NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION Distribution: EN-09-045, September 9, 2009 OWFN              Chairman Jaczko Comm. Klein Comm. Svinicki SECY OCA OPA OIP OWFN EDO DEDR DEDMRT OE OGC NRR OI NSIR TWFN OCFO OP CENTER NMSS OIG OIS RES ACRS FSME Regional Offices RI          RII RIII        RIV


MAIL PUBLIC OE staff   Electronic DISTRIBUTION
PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION Distribution: EN-09-045, September 9, 2009 OWFN                    OWFN              TWFN            Regional Offices Chairman Jaczko        EDO              OCFO            RI      RII Comm. Klein            DEDR              OP CENTER        RIII    RIV Comm. Svinicki          DEDMRT            NMSS SECY                    OE                OIG OCA                    OGC              OIS              MAIL OPA                    NRR              RES              PUBLIC OIP                    OI                ACRS            OE staff NSIR              FSME Electronic DISTRIBUTION:
C. Carpenter, OE N. Hilton, OE G. Bowman, OE G. Gulla, OE OE r/f EN binder Publicly Available X     Non-Sensitive X
C. Carpenter, OE N. Hilton, OE G. Bowman, OE G. Gulla, OE OE r/f EN binder Publicly Available X Non-Sensitive X ML092520063 OFFICE OE:ES                   OE:BC NAME         G. Gulla         G Bowman DATE         09/09/09         09/09/09 OFFICIAL RECORD COPY PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION}}
ML092520063 OFFICE OE:ES OE:BC NAME G. Gulla G Bowman DATE 09/09/09 09/09/09 OFFICIAL RECORD COPY}}

Latest revision as of 02:23, 14 November 2019

EN-09-045, Carolina Power and Light Company
ML092520063
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/09/2009
From: Gregory Bowman, Gerald Gulla
NRC/OE
To:
Gulla G. 415-2872
References
EA-09-121 EN-09-045
Download: ML092520063 (2)


Text

PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION September 9, 2009 EN-09-045 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Carolina Power and Light Company (EA-09-121)

Brunswick Steam Electric Plant Docket No. 05000324/325

Subject:

ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION This is to inform the Commission that a White Significance Determination Process (SDP) finding will be issued on or about September 14, 2009, to Carolina Power and Light Company (CP&L) as a result of inspections at the Brunswick Steam Electric Plant. This White finding, an issue with low to moderate safety significance, which may require additional NRC inspections, involved the failure to perform an adequate design modification to their emergency diesel generators (EDGs) such that local control of the EDGs could not be established as required by the Safe Shutdown Analysis Report. The finding involved a failure to correctly designate termination points for linking control power to the EDG lockout relay reset circuitry during the implementation of a design change which resulted in a loss of EDG local control function.

A Regulatory Conference was held on July 28, 2009, in which CP&L provided their assessment of the significance of the finding (i.e., Green), root causes, and detailed corrective actions. After considering the information obtained from the Regulatory Conference, the NRC concluded that the inspection finding was appropriately characterized as White.

A Notice of Violation is included based on a violation of Appendix B of 10 CFR 50, Criterion III, Design Control, which requires, in part, that measures shall be established to assure that the design basis are correctly translated into specifications, drawings, procedures and instructions.

Contrary to this requirement, during the implementation of an Engineering Change Notice, the licensee failed to correctly replace control relays on all four EDGs. The termination points for linking control power to the EDG lockout relay reset circuitry were incorrectly designated, such that the EDGs could not be operated locally.

It should be noted that the licensee has not been specifically informed of the enforcement action.

The schedule of issuance and notification is:

Mailing of Final Significance Determination September 14, 2009 Telephone Notification of Licensee September 14, 2009 The State of North Carolina will be notified.

Contacts: Gerry Gulla, OE, (301) 415-2872 Greg Bowman, OE, (301) 415-2939 PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION

PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION Distribution: EN-09-045, September 9, 2009 OWFN OWFN TWFN Regional Offices Chairman Jaczko EDO OCFO RI RII Comm. Klein DEDR OP CENTER RIII RIV Comm. Svinicki DEDMRT NMSS SECY OE OIG OCA OGC OIS MAIL OPA NRR RES PUBLIC OIP OI ACRS OE staff NSIR FSME Electronic DISTRIBUTION:

C. Carpenter, OE N. Hilton, OE G. Bowman, OE G. Gulla, OE OE r/f EN binder Publicly Available X Non-Sensitive X ML092520063 OFFICE OE:ES OE:BC NAME G. Gulla G Bowman DATE 09/09/09 09/09/09 OFFICIAL RECORD COPY PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION