| issue date = 09/09/2009 | | issue date = 09/09/2009 | ||
| title = EN-09-045, Carolina Power and Light Company | | title = EN-09-045, Carolina Power and Light Company | ||
| author name = Bowman G | | author name = Bowman G, Gulla G | ||
| author affiliation = NRC/OE | | author affiliation = NRC/OE | ||
| addressee name = | | addressee name = | ||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:PRELIMINARY INFORMATION | {{#Wiki_filter:PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION September 9, 2009 EN-09-045 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Carolina Power and Light Company (EA-09-121) | ||
Brunswick Steam Electric Plant Docket No. 05000324/325 | |||
- NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION September 9, 2009 EN-09-045 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION | |||
Licensee: Carolina Power and Light Company | |||
==Subject:== | ==Subject:== | ||
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION This is to inform the Commission that a White Significance Determination Process (SDP) finding will be issued on or about September 14, 2009, to Carolina Power and Light Company (CP&L) as a result of inspections at the Brunswick Steam Electric Plant. This White finding, an issue with low to moderate safety significance, which may require additional NRC inspections, involved the failure to perform an adequate design modification to their emergency diesel generators (EDGs) such that local control of the EDGs could not be established as required by the Safe Shutdown Analysis Report. The finding involved a failure to correctly designate termination points for linking control power to the EDG lockout relay reset circuitry during the implementation of a design change which resulted in a loss of EDG local control function. A Regulatory Conference was held on July 28, 2009, in which CP&L provided their assessment of the significance of the finding (i.e., Green), root causes, and detailed corrective actions. After considering the information obtained from the Regulatory Conference, the NRC concluded that the inspection finding was appropriately characterized as White. | ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION This is to inform the Commission that a White Significance Determination Process (SDP) finding will be issued on or about September 14, 2009, to Carolina Power and Light Company (CP&L) as a result of inspections at the Brunswick Steam Electric Plant. This White finding, an issue with low to moderate safety significance, which may require additional NRC inspections, involved the failure to perform an adequate design modification to their emergency diesel generators (EDGs) such that local control of the EDGs could not be established as required by the Safe Shutdown Analysis Report. The finding involved a failure to correctly designate termination points for linking control power to the EDG lockout relay reset circuitry during the implementation of a design change which resulted in a loss of EDG local control function. | ||
A Notice of Violation is included based on a violation of Appendix B of 10 CFR 50, Criterion III, | A Regulatory Conference was held on July 28, 2009, in which CP&L provided their assessment of the significance of the finding (i.e., Green), root causes, and detailed corrective actions. After considering the information obtained from the Regulatory Conference, the NRC concluded that the inspection finding was appropriately characterized as White. | ||
A Notice of Violation is included based on a violation of Appendix B of 10 CFR 50, Criterion III, Design Control, which requires, in part, that measures shall be established to assure that the design basis are correctly translated into specifications, drawings, procedures and instructions. | |||
Contrary to this requirement, during the implementation of an Engineering Change Notice, the licensee failed to correctly replace control relays on all four EDGs. The termination points for linking control power to the EDG lockout relay reset circuitry were incorrectly designated, such that the EDGs could not be operated locally. | |||
It should be noted that the licensee has not been specifically informed of the enforcement action. | It should be noted that the licensee has not been specifically informed of the enforcement action. | ||
The schedule of issuance and notification is: | The schedule of issuance and notification is: | ||
Mailing of Final Significance Determination September 14, 2009 Telephone Notification of Licensee September 14, 2009 The State of North Carolina will be notified. | |||
Mailing of Final Significance Determination | Contacts: Gerry Gulla, OE, (301) 415-2872 Greg Bowman, OE, (301) 415-2939 PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION | ||
The State of North Carolina will be notified. | |||
Contacts: | |||
- NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION | |||
MAIL PUBLIC OE staff | PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION Distribution: EN-09-045, September 9, 2009 OWFN OWFN TWFN Regional Offices Chairman Jaczko EDO OCFO RI RII Comm. Klein DEDR OP CENTER RIII RIV Comm. Svinicki DEDMRT NMSS SECY OE OIG OCA OGC OIS MAIL OPA NRR RES PUBLIC OIP OI ACRS OE staff NSIR FSME Electronic DISTRIBUTION: | ||
C. Carpenter, OE N. Hilton, OE G. Bowman, OE G. Gulla, OE OE r/f EN binder Publicly Available X Non-Sensitive X ML092520063 OFFICE OE:ES OE:BC NAME G. Gulla G Bowman DATE 09/09/09 09/09/09 OFFICIAL RECORD COPY PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION}} | |||
ML092520063 OFFICE OE:ES |
Latest revision as of 02:23, 14 November 2019
ML092520063 | |
Person / Time | |
---|---|
Site: | Brunswick |
Issue date: | 09/09/2009 |
From: | Gregory Bowman, Gerald Gulla NRC/OE |
To: | |
Gulla G. 415-2872 | |
References | |
EA-09-121 EN-09-045 | |
Download: ML092520063 (2) | |
Text
PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION September 9, 2009 EN-09-045 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Carolina Power and Light Company (EA-09-121)
Brunswick Steam Electric Plant Docket No. 05000324/325
Subject:
ISSUANCE OF FINAL SIGNIFICANCE DETERMINATION This is to inform the Commission that a White Significance Determination Process (SDP) finding will be issued on or about September 14, 2009, to Carolina Power and Light Company (CP&L) as a result of inspections at the Brunswick Steam Electric Plant. This White finding, an issue with low to moderate safety significance, which may require additional NRC inspections, involved the failure to perform an adequate design modification to their emergency diesel generators (EDGs) such that local control of the EDGs could not be established as required by the Safe Shutdown Analysis Report. The finding involved a failure to correctly designate termination points for linking control power to the EDG lockout relay reset circuitry during the implementation of a design change which resulted in a loss of EDG local control function.
A Regulatory Conference was held on July 28, 2009, in which CP&L provided their assessment of the significance of the finding (i.e., Green), root causes, and detailed corrective actions. After considering the information obtained from the Regulatory Conference, the NRC concluded that the inspection finding was appropriately characterized as White.
A Notice of Violation is included based on a violation of Appendix B of 10 CFR 50, Criterion III, Design Control, which requires, in part, that measures shall be established to assure that the design basis are correctly translated into specifications, drawings, procedures and instructions.
Contrary to this requirement, during the implementation of an Engineering Change Notice, the licensee failed to correctly replace control relays on all four EDGs. The termination points for linking control power to the EDG lockout relay reset circuitry were incorrectly designated, such that the EDGs could not be operated locally.
It should be noted that the licensee has not been specifically informed of the enforcement action.
The schedule of issuance and notification is:
Mailing of Final Significance Determination September 14, 2009 Telephone Notification of Licensee September 14, 2009 The State of North Carolina will be notified.
Contacts: Gerry Gulla, OE, (301) 415-2872 Greg Bowman, OE, (301) 415-2939 PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION
PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION Distribution: EN-09-045, September 9, 2009 OWFN OWFN TWFN Regional Offices Chairman Jaczko EDO OCFO RI RII Comm. Klein DEDR OP CENTER RIII RIV Comm. Svinicki DEDMRT NMSS SECY OE OIG OCA OGC OIS MAIL OPA NRR RES PUBLIC OIP OI ACRS OE staff NSIR FSME Electronic DISTRIBUTION:
C. Carpenter, OE N. Hilton, OE G. Bowman, OE G. Gulla, OE OE r/f EN binder Publicly Available X Non-Sensitive X ML092520063 OFFICE OE:ES OE:BC NAME G. Gulla G Bowman DATE 09/09/09 09/09/09 OFFICIAL RECORD COPY PRELIMINARY INFORMATION - NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION