Line 5: Line 5:
| author name = Unlu K
| author name = Unlu K
| author affiliation = Pennsylvania State Univ, University Park, PA
| author affiliation = Pennsylvania State Univ, University Park, PA
| addressee name = Kennedy W B
| addressee name = Kennedy W
| addressee affiliation = NRC/NRR
| addressee affiliation = NRC/NRR
| docket = 05000005
| docket = 05000005
Line 12: Line 12:
| document type = Letter
| document type = Letter
| page count = 72
| page count = 72
| project =
| stage = Response to RAI
}}
}}


=Text=
=Text=
{{#Wiki_filter:KENAN UNLU, Ph.D. Phone: (814) 865-6351 Director, Radiation Science and Engineering Center Fax: (814) 863-4840 Professor, Department of Mechanical and Nuclear Engineering E-mail: k-unlu6)npsu.edu The Pennsylvania State University University Park, PA 16802-2304 September 1, 2009 US Nuclear Regulatory Commission ATTN: Mr. William Kennedy, Project Manager Office of Nuclear Reactor Regulation Mail Stop 012-G13 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738
{{#Wiki_filter:KENAN UNLU, Ph.D.                                           Phone: (814) 865-6351 Director, Radiation Science and Engineering Center         Fax: (814) 863-4840 Professor, Department of Mechanical and Nuclear Engineering E-mail: k-unlu6)npsu.edu The Pennsylvania State University University Park, PA 16802-2304 September 1, 2009 US Nuclear Regulatory Commission ATTN: Mr. William Kennedy, Project Manager Office of Nuclear Reactor Regulation Mail Stop 012-G13 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738


==Reference:==
==Reference:==
 
Pennsylvania State University Breazeale Nuclear Reactor Docket No. 50-005, License No. R-2 USNRC Request for Additional Information (RAI) dated July 28, 2009
Pennsylvania State University Breazeale Nuclear Reactor Docket No. 50-005, License No. R-2 USNRC Request for Additional Information (RAI) dated July 28, 2009  


==Subject:==
==Subject:==
Response to RAI dated July 28, 2009  
Response to RAI dated July 28, 2009


==Dear Mr. Kennedy:==
==Dear Mr. Kennedy:==
The.attachment to this letter answers the questions presented in the RAI dated September 1, 2009. The response and attachments do not contain any sensitive information.
The.attachment to this letter answers the questions presented in the RAI dated September 1, 2009. The response and attachments do not contain any sensitive information.
If there are any questions regarding the information submitted, please contact Mr. Mark Trump, Associate Director for Operations at the RSEC. I declare under penalty of perjury that the foregoing is true and correct.Executed on see. , 1 2Cog5 Sincerely yours, Kenan Unuii Director, Radiation Science and Engineering Center Professor, Department of Mechanical and Nuclear Engineering cc: E.J. Pell (w/o)A.A. Atchley (w/o)M.A. Trump.College of Engineering An Equal Opportunity University PSBR response to NRC RAI Dtd. 07/28/09 1. Provide clarification as to whether the peak-to-measured pulse fuel temperature ratio of 1.6 accounts for the power peaking effects caused by vacant core positions (i.e., water holes).Recent analytical modeling work performed in support of the use of LEU fuel in TRIGA reactors has raised questions concerning TRIGA fuel temperature performance during pulsing. These issues were originally satisfied by extensive testing done during the TRIGA development and deployment stage in the 1960's.1 In the 1970s and 80s, PSU and others conducted tests on 8.5 and 12 wt% elements that builds on the earlier work and formed the basis for the limiting reactor pulse ($3.50) in the PSBR SAR.2'3 Review of the development work for the SAR shows the tests were conducted with new and used instrumented 12 wt% elements in multiple locations (including next to a water hole) with the element rotated to indicate maximum temperatures.
If there are any questions regarding the information submitted, please contact Mr. Mark Trump, Associate Director for Operations at the RSEC. I declare under penalty of perjury that the foregoing is true and correct.
The limiting case for the PSBR SAR analysis involved new 12 wt% fuel elements.
Executed on         see.     ,       1     2Cog5 Sincerely yours, Kenan Unuii Director, Radiation Science and Engineering Center Professor, Department of Mechanical and Nuclear Engineering cc:       E.J. Pell (w/o)
8.5 wt% and used (-8000 MWD/MTU) 12wt% elements were shown to have peak temperatures that do not approach or challenge the fuel safety limit based on lower "in-pin" peaking factors of -1.1 instead of 1.6. for the 12 wt% elements.
A.A. Atchley (w/o)
Therefore PSU believes the effects of the waterhole peaking are adequately represented in this work and the analysis to ensure fuel safety.However, the discussion and documentation in the available references is insufficient to provide the level of assurance needed to meet today's expectations for analytical verification without the involvement of the vendor and development of additional PSBR specific neutronic and thermo-hydraulic models. Development of such analysis is not warranted considering the remaining number of new 12 wt% elements and fuel management methodology used at PSBR. A restriction on the use of new 12 wt% elements will eliminate the question raised by the aforementioned recent water hole peaking analysis.
M.A. Trump
Future fuel procurement at PSBR will be 20 and 30 wt% standard LEU TRIGA elements that have been well analyzed.4 Use of these standard fuels at PSBR will require additional site-specific analysis (in accordance with NUREG-1282) and a license amendment.
.College of Engineering                                                                   An Equal Opportunity University
Therefore PSU requests a change to the facility technical specifications that restricts the use of new (less than 8000 MWD/MTU) 12 wt% fuel elements adjacent to a water hole (open fuel element position in the contiguous core array not filled with fuel, control rod, graphite, or experiment that displaces water).Additionally, provide a discussion of requirements in the technical specifications (TS) that ensure the peak-to-measured pulse fuel temperature ratio of 1.6 is conservative for any allowed core configuration.
 
The 1.6:1 ratio of maximum to measured fuel temperature (which is only applicable during a pulse) was calculated in a 1974 paper by then Director-Breazeale Nuclear Reactor Dr. Samuel Levine (et al.).2 It was the more conservative of two analyses that expanded the work of Goodwin on 8 wt.% TRIGA fuel.3 The analysis that the authors considered more likely, set the ratio of temperatures at 1.45:1. The use of the higher ratio institutionalized a conservative bias of 1 -(1.60/1.45)  
PSBR response to NRC RAI Dtd. 07/28/09
= 10% to the pulse temperatures.
: 1.       Provide clarification as to whether the peak-to-measured pulse fuel temperature ratio of 1.6 accounts for the power peaking effects caused by vacant core positions (i.e., water holes).
Page of 12 PSBR response to NRC RAI Dtd. 07/28/09 In order to maintain the assumptions in the SAR analysis, the following technical specifications are in place at Penn State.1.) TS 2.2: Limited Safety System Setting. This specification limits the maximum operating temperature of the reactor to 650'C so that there is ample margin to the safety limit. The basis to this specification states that "Thus, 500'C of safety margin exists before the 1150'C safety limit is reached. This safety margin provides adequate compensation for variations in the temperature profile of depleted and differently loaded fuel" (i.e. 8.5wt% vs. 12wt% fuel elements.).
Recent analytical modeling work performed in support of the use of LEU fuel in TRIGA reactors has raised questions concerning TRIGA fuel temperature performance during pulsing. These issues were originally satisfied by extensive testing done during the TRIGA development and deployment stage in the 1960's.1 In the 1970s and 80s, PSU and others conducted tests on 8.5 and 12 wt% elements that builds on the earlier work and formed the basis for the limiting reactor pulse ($3.50) in the PSBR SAR.2 '3 Review of the development work for the SAR shows the tests were conducted with new and used instrumented 12 wt% elements in multiple locations (including next to a water hole) with the element rotated to indicate maximum temperatures. The limiting case for the PSBR SAR analysis involved new 12 wt% fuel elements. 8.5 wt% and used
2.) TS 3.1.5: Core Configuration Limitation. (subsections a, b, c, and e of technical specifications included in this RAI response)
(-8000 MWD/MTU) 12wt% elements were shown to have peak temperatures that do not approach or challenge the fuel safety limit based on lower "in-pin" peaking factors of - 1.1 instead of 1.6. for the 12 wt% elements. Therefore PSU believes the effects of the waterhole peaking are adequately represented in this work and the analysis to ensure fuel safety.
These specifications limit the type and configuration of fuel (subsection a) used in the Penn State reactor, the amount of power that the fuel can produce (subsection b), the normalized power and pulsing (subsection c), and the arrangement of the fuel (subsection e waterholes).
However, the discussion and documentation in the available references is insufficient to provide the level of assurance needed to meet today's expectations for analytical verification without the involvement of the vendor and development of additional PSBR specific neutronic and thermo-hydraulic models. Development of such analysis is not warranted considering the remaining number of new 12 wt% elements and fuel management methodology used at PSBR. A restriction on the use of new 12 wt% elements will eliminate the question raised by the aforementioned recent water hole peaking analysis. Future fuel procurement at PSBR will be 20 and 30 wt% standard LEU TRIGA elements that have been well analyzed. 4 Use of these standard fuels at PSBR will require additional site-specific analysis (in accordance with NUREG-1282) and a license amendment.
These actions help to protect the assumptions in the SAR, including the fuel temperature ratio of 1.6.3.) TS 5.1: Reactor Fuel. This specification limits the type of fuel used in the Penn State reactor to 8.5 wt% and 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator elements which were analyzed in the SAR. The use of other types of TRIGA fuel is not yet analyzed and therefore prohibited.
Therefore PSU requests a change to the facility technical specifications that restricts the use of new (less than 8000 MWD/MTU) 12 wt% fuel elements adjacent to a water hole (open fuel element position in the contiguous core array not filled with fuel, control rod, graphite, or experiment that displaces water).
4.) TS 5.2: Reactor Core. This specification limits the type of reflectors used in the Penn State reactor in order to limit the effects of flux perturbation caused by unanalyzed materials.
Additionally, provide a discussion of requirements in the technical specifications (TS) that ensure the peak-to-measured pulse fuel temperature ratio of 1.6 is conservative for any allowed core configuration.
Subsection 5.2.b limits the reflector to "water, D 2 0, or graphite or any combination of the three moderator materials." The above specifications ensure that the only fuel used in the Penn State reactor is as analyzed in the SAR with a maximum peaking factor of 1.6:1.Page of 12 PSBR response to NRC RAI Dtd. 07/28/09 2. The table at the top of page 22 of the supplement to your application dated October 31, 2008, shows that the maximum deviation between the measured and calculated pulse fuel temperatures was 13.2 percent for element 1-13 located in core position G-8. A discussion of the deviation applied to steady-state fuel temperatures follows the table.Provide a similar discussion of the deviation between the measured and calculated pulse fuel temperatures as it applies to maximum fuel temperature during a pulse.There are four analyzed cases in the Penn State SAR.1. New 12 wt % fuel element at steady state power of 1MW (fuel element 1-14)2. Used 12 wt % fuel element at steady state power of 1MW (fuel element 1-13)3. New 12 wt % fuel element during pulsing (fuel element 1-14)4. Used 12 wt % fuel element during pulsing (fuel element 1-13)The used 12 wt % fuel element (1-13) had aburnup of 2.2 MWd or 8000 MWD/MTU for a 275 gram loading of uranium in a nominal 12 wt % TRIGA fuel element.Tables 2-1 to 2-4 below show data for cases 1-4 from the SAR and the previous submission question 13.2. Position G-8 is in the B-Ring of the core adjacent to the central water hole.Position G-10 is in the C-Ring and surrounded by fuel.Table 2-1: Deviation for a new 12 wt % fuel element at steady state power of 1MW (1-14)1-14 G-8 2.01 466 467 -0.2%1-14 G-10 1.84 450 439 2.4%Table 2-2: Deviation for a Used 12 wt % fuel element at steady state power of 1MW (1-13)I 1-13 G-8 1.56 411 411 -0.12% I 1-13 G-10 1.39 381 382 -0.24%Page of 12 PSBR response to NRC RAI Dtd. 07/28/09 Table 2-3: Deviation for a new 12 wt % fuel element during Pulsing (1-14)1-14 U-8 2.07 517 518 -0.1 U/1-14 G-10 1.8 466 453 2.8%Table 2-4: Deviation for a used 12 wt % fuel element during Pulsing (1-13)fauel Q.oFie.NP$27 Isulse $v2.7 M uls5 e _1 1-137 G-8 1.62 511 443 13.2%ý: 1-13 G-10 1.54 453 422 6.7% 1 An important distinction in this discussion is that the deviation tabulated here is the difference between the calculated value of the temperature at the thermocouple location and the measured value at the thermocouple location.
The 1.6:1 ratio of maximum to measured fuel temperature (which is only applicable during a pulse) was calculated in a 1974 paper by then Director- Breazeale Nuclear Reactor Dr. Samuel Levine (et al.). 2 It was the more conservative of two analyses that expanded the work of Goodwin on 8 wt.% TRIGA fuel.3 The analysis that the authors considered more likely, set the ratio of temperatures at 1.45:1. The use of the higher ratio institutionalized a conservative bias of 1 - (1.60/1.45) = 10% to the pulse temperatures.
The actual measurement uncertainty is quite small (on the order of 1-2 degrees Celsius) and is bore out on the steady state temperature predictions to be a based on daily comparisons between a cold fuel element and the pool water temperature.
Page of 12
With that in mind, the SAR explains the relatively large deviation for the partially burned element 1-13 was due to: 1.) Excess burnup of U-235 at the periphery of the fuel element that is not accounted for in the Ao+Bor2 assumed shape of the power distribution and, 2.) The gap temperature difference is probably different in 1-13 and 1-14 (as would be expected for any two instrumented fuel elements)A partially burned fuel element has a much lower peak-to-measured fuel temperature ratio during a pulse as compared to a new 12 wt % fuel element (1.1 as compared to 1.6).Page of 12 PSBR response to NRC RAI Dtd. 07/28/09 Using a conservative assumption that the observed calculated/measured difference is a multiplicative error the maximum temperature for a $3.50 pulse in NP 2.2 fuel can be calculated.
 
For the cases of pulsing the two types of elements, the calculations below are the same as the calculation in the SAR (page XIII-25) and would proceed as follows: Case 3 (1-14): tpo, = 1.177x1O4
PSBR response to NRC RAI Dtd. 07/28/09 In order to maintain the assumptions in the SAR analysis, the following technical specifications are in place at Penn State.
* NP 1
1.) TS 2.2: Limited Safety System Setting. This specification limits the maximum operating temperature of the reactor to 650'C so that there is ample margin to the safety limit. The basis to this specification states that "Thus, 500'C of safety margin exists before the 1150'Csafety limit is reached. This safety marginprovides adequate compensationfor variations in the temperatureprofile of depleted anddifferently loaded fuel" (i.e. 8.5wt% vs. 12wt% fuel elements.).
2.) TS 3.1.5: Core Configuration Limitation. (subsections a, b, c, and e of technical specifications included in this RAI response) These specifications limit the type and configuration of fuel (subsection a) used in the Penn State reactor, the amount of power that the fuel can produce (subsection b), the normalized power and pulsing (subsection c),
and the arrangement of the fuel (subsection e waterholes). These actions help to protect the assumptions in the SAR, including the fuel temperature ratio of 1.6.
3.) TS 5.1: Reactor Fuel. This specification limits the type of fuel used in the Penn State reactor to 8.5 wt% and 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator elements which were analyzed in the SAR. The use of other types of TRIGA fuel is not yet analyzed and therefore prohibited.
4.) TS 5.2: Reactor Core. This specification limits the type of reflectors used in the Penn State reactor in order to limit the effects of flux perturbation caused by unanalyzed materials. Subsection 5.2.b limits the reflector to "water,D 20, or graphiteor any combination of the three moderatormaterials."
The above specifications ensure that the only fuel used in the Penn State reactor is as analyzed in the SAR with a maximum peaking factor of 1.6:1.
Page of 12
 
PSBR response to NRC RAI Dtd. 07/28/09
: 2. The table at the top of page 22 of the supplement to your application dated October 31, 2008, shows that the maximum deviation between the measured and calculated pulse fuel temperatures was 13.2 percent for element 1-13 located in core position G-
: 8. A discussion of the deviation applied to steady-state fuel temperatures follows the table.
Provide a similar discussion of the deviation between the measured and calculated pulse fuel temperatures as it applies to maximum fuel temperature during a pulse.
There are four analyzed cases in the Penn State SAR.
: 1.     New 12 wt % fuel element at steady state power of 1MW (fuel element 1-14)
: 2.     Used 12 wt % fuel element at steady state power of 1MW (fuel element 1-13)
: 3.     New 12 wt % fuel element during pulsing (fuel element 1-14)
: 4.       Used 12 wt % fuel element during pulsing (fuel element 1-13)
The used 12 wt % fuel element (1-13) had aburnup of 2.2 MWd or 8000 MWD/MTU for a 275 gram loading of uranium in a nominal 12 wt % TRIGA fuel element.
Tables 2-1 to 2-4 below show data for cases 1-4 from the SAR and the previous submission question 13.2. Position G-8 is in the B-Ring of the core adjacent to the central water hole.
Position G-10 is in the C-Ring and surrounded by fuel.
Table 2-1: Deviation for a new 12 wt % fuel element at steady state power of 1MW (1-14) 1-14               G-8         2.01           466             467             -0.2%
1-14             G-10         1.84           450             439             2.4%
Table 2-2: Deviation for a Used 12 wt % fuel element at steady state power of 1MW (1-13)
I           1-13               G-8         1.56           411             411           -0.12% I 1-13               G-10         1.39           381             382           -0.24%
Page of 12
 
PSBR response to NRC RAI Dtd. 07/28/09 Table 2-3: Deviation for a new 12 wt % fuel element during Pulsing (1-14) 1-14             U-8           2.07               517               518             -0.1 U/
1-14           G-10             1.8               466               453             2.8%
Table 2-4: Deviation for a used 12 wt % fuel element during Pulsing (1-13) fauel             Q.oFie.NP$27                         Isulse         M
                                                                      $v2.7   uls5 e           _
1 1-137           G-8           1.62               511                 443             13.2%ý:
1-13           G-10           1.54               453                 422             6.7%   1 An important distinction in this discussion is that the deviation tabulated here is the difference between the calculated value of the temperature at the thermocouple location and the measured value at the thermocouple location. The actual measurement uncertainty is quite small (on the order of 1-2 degrees Celsius) and is bore out on the steady state temperature predictions to be a based on daily comparisons between a cold fuel element and the pool water temperature.
With that in mind, the SAR explains the relatively large deviation for the partially burned element 1-13 was due to:
1.) Excess burnup of U-235 at the periphery of the fuel element that is not accounted for in the Ao+Bor2 assumed shape of the power distribution and, 2.) The gap temperature difference is probably different in 1-13 and 1-14 (as would be expected for any two instrumented fuel elements)
A partially burned fuel element has a much lower peak-to-measured fuel temperature ratio during a pulse as compared to a new 12 wt % fuel element (1.1 as compared to 1.6).
Page of 12
 
PSBR response to NRC RAI Dtd. 07/28/09 Using a conservative assumption that the observed calculated/measured difference is a multiplicative error the maximum temperature for a $3.50 pulse in NP 2.2 fuel can be calculated.
For the cases of pulsing the two types of elements, the calculations below are the same as the calculation in the SAR (page XIII-25) and would proceed as follows:
Case 3 (1-14): tpo, = 1.177x1O4
* NP1
* akp + 95.8
* akp + 95.8
* NPj + To (SAR eqn 34)tpo= 1.177x10 4
* NPj + To         (SAR eqn 34) tpo= 1.177x10 4
* 2.2 * ($3.50
* 2.2 * ($3.50
* 0.007 -0.007) + 95.8 2.2 + 20 tpo =684'C
* 0.007 - 0.007) + 95.8       2.2 + 20 tpo =684'C
* Uncertainty of 2.8% = 703'C 703 0 C
* Uncertainty of 2.8% = 703'C 703 0 C
* pin radial peaking factor of 1.6 = 1125°C Case 4 (1-13): tpo, = 1.475x1O4
* pin radial peaking factor of 1.6 = 1125°C Case 4 (1-13): tpo, = 1.475x1O4
* NPj *kp + 80
* NPj *kp         + 80
* NPj + T, (SAR eqn 37)tpoi = 1.475xi04
* NPj + T, (SAR eqn 37) tpoi = 1.475xi04
* 2.2 * ($3.50
* 2.2 * ($3.50
* 0.007 -0.007) + 80
* 0.007 - 0.007) + 80
* 2.2 + 20 tpoi =764°C
* 2.2 + 20 tpoi =764°C
* Uncertainty of 13.2% = 865°C 865°C
* Uncertainty of 13.2% = 865°C 865°C
* pin radial peaking factor of 1.1 = 951 'C Both cases are below the safety limit with the new (1-14) being limiting.
* pin radial peaking factor of 1.1 = 951 'C Both cases are below the safety limit with the new (1-14) being limiting. Since 1-13 is not a limiting case the SAR provides not further discussion of the deviations.
Since 1-13 is not a limiting case the SAR provides not further discussion of the deviations.
Explain any uncertainties in the calculation and measurement of the maximum pulse fuel temperature. Explain how the uncertainties are treated to ensure that the maximum pulse fuel temperature will not exceed the safety limit for any core configuration allowed by the TS.
Explain any uncertainties in the calculation and measurement of the maximum pulse fuel temperature.
There is no method to measure the maximum pulse fuel temperature. All methods are computer models (such as the General Atomics work cited below) or extrapolation of experimental data to the to the point of maximum temperature.
Explain how the uncertainties are treated to ensure that the maximum pulse fuel temperature will not exceed the safety limit for any core configuration allowed by the TS.There is no method to measure the maximum pulse fuel temperature.
The PSBR SAR was based on extrapolation to 12 wt% of analytically derived flux and heat production profiles that were experimentally verified using sophisticated techniques for 8 wt% as described by Goodwin (SAR Chapter 13 Ref. 15). Goodwin's work showed that volumetric heat generation from a pulse was related to the thermal neutron flux profile in an element at the start of the pulse. Fourteen high speed thermocouple junctions were placed in an 8 wt% TRIGA fuel element that was then subjected to multiple pulse events to validate the analytical work and develop .a temperature (hence heat generation and flux) profile for the element. This enabled Goodwin to predict the element's performance and peak temperatures with a good degree of accuracy up to the "adiabatic limit" of the fuel.
All methods are computer models (such as the General Atomics work cited below) or extrapolation of experimental data to the to the point of maximum temperature.
Page of 12
The PSBR SAR was based on extrapolation to 12 wt% of analytically derived flux and heat production profiles that were experimentally verified using sophisticated techniques for 8 wt% as described by Goodwin (SAR Chapter 13 Ref. 15). Goodwin's work showed that volumetric heat generation from a pulse was related to the thermal neutron flux profile in an element at the start of the pulse. Fourteen high speed thermocouple junctions were placed in an 8 wt% TRIGA fuel element that was then subjected to multiple pulse events to validate the analytical work and develop .a temperature (hence heat generation and flux) profile for the element. This enabled Goodwin to predict the element's performance and peak temperatures with a good degree of accuracy up to the "adiabatic limit" of the fuel.Page of 12 PSBR response to NRC RAI Dtd. 07/28/09 The work done by Levine for the PSU 12 wt% elements used the basic theoretical premises of Goodwin -that the temperature profile during a pulse can be predicted based on the volumetric heat generation.
 
Both General Atomics (GA) and Levine (et al.)2 concluded that the installed thermocouples in an instrumented fuel element perform adequately to be used to develop a temperature relationship between measured values and peak pulse temperatures.
PSBR response to NRC RAI Dtd. 07/28/09 The work done by Levine for the PSU 12 wt% elements used the basic theoretical premises of Goodwin - that the temperature profile during a pulse can be predicted based on the volumetric heat generation. Both General Atomics (GA) and Levine (et al.) 2 concluded that the installed thermocouples in an instrumented fuel element perform adequately to be used to develop a temperature relationship between measured values and peak pulse temperatures. Levine used measured temperature values to develop a predictive model.
Levine used measured temperature values to develop a predictive model.Penn State experimental data (including any temperature measurement uncertainties) for a new 12 wt% element (1- 14) agreed closely with the calculated predictions.
Penn State experimental data (including any temperature measurement uncertainties) for a new 12 wt% element (1-14) agreed closely with the calculated predictions. Therefore the sum of the errors and uncertainties regarding flux profile and heat generation were determined to be relatively small differences from the actual values and provided appropriate accuracy for the measurement and prediction of pulsing performance. The SAR does not give additional consideration to the uncertainties on the partially depleted 12 wt% fuel element (Q-13) since that case was not limiting due to the burnup and reduced peaking.
Therefore the sum of the errors and uncertainties regarding flux profile and heat generation were determined to be relatively small differences from the actual values and provided appropriate accuracy for the measurement and prediction of pulsing performance.
Larger uncertainties were encountered with the total heat generation in a 12 wt% element versus an 8 wt%, the flux depression in the 12 wt%, and the resultant heat generation profile. These uncertainties yielded two different values for the peak to measured temperature ratios: 1.45:1 (which Levine considered more likely 2) and 1.6:1. The 'SAR was written with the more conservative 1.6:1 ratio to assure compliance with the safety limit for a maximum allowed pulse of the maximum power element.
The SAR does not give additional consideration to the uncertainties on the partially depleted 12 wt% fuel element (Q-13) since that case was not limiting due to the burnup and reduced peaking.Larger uncertainties were encountered with the total heat generation in a 12 wt% element versus an 8 wt%, the flux depression in the 12 wt%, and the resultant heat generation profile. These uncertainties yielded two different values for the peak to measured temperature ratios: 1.45:1 (which Levine considered more likely 2) and 1.6:1. The 'SAR was written with the more conservative 1.6:1 ratio to assure compliance with the safety limit for a maximum allowed pulse of the maximum power element.In 1975, GA published information on TRIGA performance that included temperature predictions and profiles for 12 wt% elements at the' Sandia ACPR (E-l1177393 Fuel Elements for Pulsed TRIGA Reactor dated 1975). Figure 2-1 shows the calculated temperature distribution of the highest power new 12 wt% TRIGA fuel element during a $4.80 pulse calculated for the Sandia ACPR (20,000 MW pulse peak power). The highest ratio of the maximum temperature anywhere in the fuel to the temperature at the thermocouple location is 1.57:1 and occurs immediately with the pulse. The PSBR SAR assumption of 1.6:1 bounds the GA analysis.
In 1975, GA published information on TRIGA performance that included temperature predictions and profiles for 12 wt% elements at the' Sandia ACPR (E-l1177393 Fuel Elements for Pulsed TRIGA Reactor dated 1975). Figure 2-1 shows the calculated temperature distribution of the highest power new 12 wt% TRIGA fuel element during a $4.80 pulse calculated for the Sandia ACPR (20,000 MW pulse peak power). The highest ratio of the maximum temperature anywhere in the fuel to the temperature at the thermocouple location is 1.57:1 and occurs immediately with the pulse. The PSBR SAR assumption of 1.6:1 bounds the GA analysis. Note the maximum predicted temperature anywhere in the hot element is -1000 'C.
Note the maximum predicted temperature anywhere in the hot element is -1000 'C.One of the principal reasons the PSBR SAR is so conservative is the SAR uses the peak measured fuel temperature at the thermocouple location to calculate the maximum peak temperature.
One of the principal reasons the PSBR SAR is so conservative is the SAR uses the peak measured fuel temperature at the thermocouple location to calculate the maximum peak temperature. In earlier GA work, it was concluded that the time response was sufficiently fast (SAR Chapter 13 Reference 25 - GA-6216 1965) to measure the peak temperature at the thermocouple following pulsing. Levine's work concluded the same. However, unlike 8 wt%
In earlier GA work, it was concluded that the time response was sufficiently fast (SAR Chapter 13 Reference 25 -GA-6216 1965) to measure the peak temperature at the thermocouple following pulsing. Levine's work concluded the same. However, unlike 8 wt%fuel where there is little change in the thermocouple location temperature for seconds after the pulse the temperature in a 12 wt% at the thermocouple rises significantly for -10 seconds after the pulse as conduction equalizes the element temperature (see Figure 14 GA-6216 which is on page 24 of 40 in the October 31, 2008 RAI response and Figure 2-1 below). Since the SAR applies the 1.6:1 ratio to the peak measured value (not temperature at the thermocouple during the maximum temperature profile), the predicted maximum fuel temperatures in the SAR are conservative..Page of 12 PSBR response to NRC RAI Dtd. 07/28/09 From Figure 2-1, the ratio of the maximum fuel temperature (at -. 1 second) to peak measured (at 10 seconds) is -1.3:1, not 1.6:1. Applying the 1.6 ratio to a peak measured temperature in 12 wt% fuel inserts conservancy of 1.6/1.3 = 23%.i~o6a 990'U..I.-, I.'-80p, 7p,9~p500.0.~3 0o1.6%0ý.,TýEL-O6 18&Figure 2-1: Standard Pulse Radial Temperature Distribution in a Fuel Rod (General Atomics E-1 17-393)Page of 12 PSBR response to NRC RAI Dtd. 07/28/09 3. Your application describes qualified locations within the reactor pool for operation of the reactor. Page 7 of the supplement to your application dated October 31, 2008, states: "Qualification of a new operating location is governed by operating procedures.
fuel where there is little change in the thermocouple location temperature for seconds after the pulse the temperature in a 12 wt% at the thermocouple rises significantly for -10 seconds after the pulse as conduction equalizes the element temperature (see Figure 14 GA-6216 which is on page 24 of 40 in the October 31, 2008 RAI response and Figure 2-1 below). Since the SAR applies the 1.6:1 ratio to the peak measured value (not temperature at the thermocouple during the maximum temperature profile), the predicted maximum fuel temperatures in the SAR are conservative.
New locations are analyzed for reactivity coupling effects in addition to stresses and radiation effects." Provide clarification as to whether the qualification of a new operating location requires an evaluation, consistent with the criteria of Title 10 of the Code of Federal Regulations (10 CFR) Part 50.59(c), to determine that the new operating location does not require a license amendment.
                                            .Page of 12
The qualification of a new operating position per the Standard Operating Procedure (SOP) does not require a re-evaluation of criteria of 1 OCRF50(c).
 
The design criterion of the original modification that increased the degrees of movement (reactor bridge modification) for the reactor included that there are no unreviewed reactor safety questions as a result of the motion or new position.A simple movement of the reactor and subsequent operation at a "new" position does-not qualify as a change as defined by 50.59(a)(1).
PSBR response to NRC RAI Dtd. 07/28/09 From Figure 2-1, the ratio of the maximum fuel temperature (at -. 1 second) to peak measured (at 10 seconds) is -1.3:1, not 1.6:1. Applying the 1.6 ratio to a peak measured temperature in 12 wt% fuel inserts conservancy of 1.6/1.3 = 23%.
Movement of the reactor and operation of the reactor in the pool are described by the SAR. Qualification of a new position is not a modification or addition to or removal from the facility or procedures that affects a design function.
i~o6a 990' 80p, U..
It is not a change to a method ofperforming or controlling that function, nor a change to the evaluation that demonstrates that intended functions will be accomplished.
I.-,
Qualification of a new operating position is the verification that the new operating position did not result in any unexpected radiation levels, reactivity couplings, or affect any design functions.
I.'-
Since the installation of the bridge modification, two new operating positions have been qualified (and one removed).
7p,9~
Both are associated with new irradiation fixtures (D 2 0 thermal column and Fast Neutron Irradiator).
p500.
SOP-5 Experiment Evaluation and Authorization requires an evaluation of 1OCFR50.59 for new experiments.
0.~3                         0o1.6%     0ý.,Tý EL-O6 18&
AP-12 Change would be used to approve any new irradiation fixture and requires screening for 1OCFR50.59 applicability.
Figure 2-1: Standard Pulse Radial Temperature Distribution in a Fuel Rod (General Atomics E-1 17-393)
Page of 12 PSBR response to NRC RAI Dtd. 07/28/09 4. TS 5.1.b requires that the hydrogen-to-zirconium atom ratio shall be a nominal 1.65 hydrogen atoms to 1.0 zirconium atoms. Section 4.2.1 of the safety analysis report states that this ratio is 1.7 to 1.0 for 8.5 weight percent fuel elements.a. Clarify this apparent discrepancy.
Page of 12
The optimal ratio of H/Zr has been refined by new research results since the inception of the TRIGA reactor design. TS 5.1 .b states that the nominal ratio shall be 1.65. Nominal is interpreted to be a both target value for fuel fabrication and a value representative of previously procured fuel in use. In 1980 General Atomics revised their specifications for TRIGA fuel H/Zr ratio to a nominal value of 1.6:1 with a maximum of 1.65:1 for both 8.5 and 12.0 wt%6 (page 4-1). The original loading of 8.5 wt% fuel at Penn State had a nominal value of 1L68 with a maximum of 1.707. The fuel-follower control rods had ratios of 1.72, 1.75 and 1.76, but an explanation for this difference can no longer be located. The documented range of H/Zr in PSU fuel is 1.57 to 1.76.TRIGA fuel was originally constructed with aluminum cladding, 8 wt% uranium and hydrogen to zirconium ratio of 1:1 on an atomic basis'. The change to stainless steel cladding and the higher hydrogen ratio made the fuel more reliable and robust. Once the hydride concentration gets above 1.5, the fuel is no longer subject to thermal phase separation or the thermal cycling effects that cause hydrogen migration in the earlier fuels 6 (page 2-14/2-16).
 
The nominal H/Zr ratio was stated as 1.6:16 (page 1-1). Figure 4-1 shows the phase diagram for H/Zr. For any ratio > 1.65, the fuel stays in the delta or epsilon phase for all temperatures below the safety limit (11500)6 (Fig 2.4).The presence of uranium in the matrix drops the transition temperatures slightly 6 (page2-5).
PSBR response to NRC RAI Dtd. 07/28/09
,#-z, MAitO Fig. 274. Zirconim.
: 3.     Your application describes qualified locations within the reactor pool for operation of the reactor. Page 7 of the supplement to your application dated October 31, 2008, states:
hydride ph 'ase diagrams showing, bourndary deeermination (from .Ref. 19)Page of 12 PSBR response to NRC RAI Dtd. 07/28/09 Figure 4-1: Phases of Zirconium-Hydride as a Function of Temperature The safety limit for TRIGA fuel with a stainless steel cladding and a H/Zr ratio of 1.65:1 is listed as 1 150'C under all conditions when the cladding temperature is _< 500,C 6 (page 4-1).Figure 4-2 shows the change in internal pressure for a given H/Zr ratio versus temperature 6 (Fig 2.8). This shows that the internal fuel pressure for a given temperature will be slightly higher for the higher H-Zr ratios in the earlier fuel. Since this is only 8.5 wt% fuel for Penn State, it is not the limiting case.OXYGEN 5; 1400 PPM 0-NITROGEN 4: 200 pPMM C.ARBONU 4 ,0PP0, 0.1 01 t O500 550 600 "0 ' 00 750 800 850 9.,r 950(VC)Fig. 2-8.. Disiociat'ioik pressure iAsochares of zirconrium (expressed as H/Zi atom ratios)(from Ref. 23)Figure 4-2: Hydrogen Disassociation Pressure from TRIGA Fuel b) Additionally, provide a discussion of any controls in place that ensure TS 5.1.b is satisfied for new fuel received at the facility (e.g., review of vendor quality assurance documentation).
            "Qualificationof a new operatinglocation is governed by operatingprocedures.
Historically there were no PSU specific administrative controls in place to ensure the Department of Energy (DOE) contract vendors (fuel providers) provided fuel that met the specifications required by the DOE purchase contract and TS 5.1.b. Receipt validation was done on an ad hoc basis. A change to SOP-3 Core Loading and Fuel Handling has been initiated to verify and document compliance with TS 5.1 .b prior to loading any new elements into the core.Page of 12 PSBR response to NRC RAI Dtd. 07/28/09 5. In accordance with 10 CFR 50.36(a)(1), provide bases for proposed technical specifications 5.1 through 5.6. Your response should include the proposed technical specifications in their entirety.Attached is a copy of the proposed technical specifications which includes the following changes from Amendment 37: 1. Reformatted the entire document -to remove multiple font sizes and margins shift used to accommodate previous amendments;
New locations are analyzedfor reactivity coupling effects in addition to stresses and radiationeffects."
: 2. Removed all amendment references and change bars -to support reissue with license renewal;3. Added a header with title and footer to each page with "page # of #" format -convenience and clarity;4. Added a table of contents -not part of PSBR Technical Specifications, provided for convenience only;5. Updated multiple references to sections of the Safety Analysis Report in technical speculations to reflect the current (new SAR) chapter numbers and if necessary chapter titles -to support reissue with new SAR and license renewal.6. TS 1.1.34.g changed "containment" to "confinement" -Correct typographic error, the facility does not have a containment;
Provide clarification as to whether the qualification of a new operating location requires an evaluation, consistent with the criteria of Title 10 of the Code of Federal Regulations (10 CFR) Part 50.59(c), to determine that the new operating location does not require a license amendment.
: 7. Split TS 3.1.5.c into two specifications 3.1.5.c and 3.1.5.d, changed new TS 3.1.5.d"Reactivity Accident in the Safety Analysis Report" to "Insertion of Excess Reactivity", provided guidance on when the calculation in TS 3.1.5.d is required, and modified basis to support the revision -for clarity of requirement and match wording used the SAR;8. Added TS 3.1.5.e and associated basis -new restriction on core configuration resulting from review of peaking issues in the vicinity of internal water filled core positions.
The qualification of a new operating position per the Standard Operating Procedure (SOP) does not require a re-evaluation of criteria of 1OCRF50(c). The design criterion of the original modification that increased the degrees of movement (reactor bridge modification) for the reactor included that there are no unreviewed reactor safety questions as a result of the motion or new position.
Refer to question 1 above;9. Deleted reference to SAR in TS 3.3.2 -information removed from new SAR for security reasons.10. Added to TS 4.0 permission to operate the reactor to accomplish surveillance requirements that exceed the specified performance interval -current Technical Specifications provide no mechanism to accomplish overdue requirements that require operation of the reactor. This addition corrects that oversight and limits operations to those required to complete the surveillance(s);
A simple movement of the reactor and subsequent operation at a "new" position does-not qualify as a change as defined by 50.59(a)(1). Movement of the reactor and operation of the reactor in the pool are described by the SAR. Qualificationof a new position is not a modification or addition to or removalfrom the facility or procedures that affects a designfunction. It is not a change to a method ofperforming or controllingthatfunction, nor a change to the evaluation that demonstrates that intendedfunctions will be accomplished. Qualification of a new operating position is the verification that the new operating position did not result in any unexpected radiation levels, reactivity couplings, or affect any design functions.
: 11. Added basis to TS Section 5 -to support compliance with 1OCFR50.36(a)(1).
Since the installation of the bridge modification, two new operating positions have been qualified (and one removed). Both are associated with new irradiation fixtures (D 20 thermal column and Fast Neutron Irradiator). SOP-5 Experiment Evaluation andAuthorization requires an evaluation of 10CFR50.59 for new experiments. AP-12 Change would be used to approve any new irradiation fixture and requires screening for 10CFR50.59 applicability.
Page- 11 -of 12 PSBR response to NRC RAI Dtd. 07/28/09  
Page of 12
 
PSBR response to NRC RAI Dtd. 07/28/09
: 4.     TS 5.1.b requires that the hydrogen-to-zirconium atom ratio shall be a nominal 1.65 hydrogen atoms to 1.0 zirconium atoms. Section 4.2.1 of the safety analysis report states that this ratio is 1.7 to 1.0 for 8.5 weight percent fuel elements.
: a. Clarify this apparent discrepancy.
The optimal ratio of H/Zr has been refined by new research results since the inception of the TRIGA reactor design. TS 5.1 .b states that the nominal ratio shall be 1.65. Nominal is interpreted to be a both target value for fuel fabrication and a value representative of previously procured fuel in use. In 1980 General Atomics revised their specifications for TRIGA fuel H/Zr ratio to a nominal value of 1.6:1 with a maximum of 1.65:1 for both 8.5 and 12.0 wt% 6 (page 4-1). The original loading of 8.5 wt% fuel at Penn State had a nominal value of 1L68 with a maximum of 1.707. The fuel-follower control rods had ratios of 1.72, 1.75 and 1.76, but an explanation for this difference can no longer be located. The documented range of H/Zr in PSU fuel is 1.57 to 1.76.
TRIGA fuel was originally constructed with aluminum cladding, 8 wt% uranium and hydrogen to zirconium ratio of 1:1 on an atomic basis'. The change to stainless steel cladding and the higher hydrogen ratio made the fuel more reliable and robust. Once the hydride concentration gets above 1.5, the fuel is no longer subject to thermal phase separation or the thermal cycling effects that cause hydrogen migration in the earlier fuels 6 (page 2-14/2-16). The nominal H/Zr ratio was stated as 1.6:16 (page 1-1). Figure 4-1 shows the phase diagram for H/Zr. For any ratio > 1.65, the fuel stays in the delta or epsilon phase for all temperatures below the safety limit (11500)6 (Fig 2.4).
The presence of uranium in the matrix drops the transition temperatures slightly 6 (page2-5).
                                                        ,#-z, Ar* MAitO Fig. 274. Zirconim. hydride ph'ase diagrams showing, bourndary deeermination (from .Ref. 19)
Page of 12
 
PSBR response to NRC RAI Dtd. 07/28/09 Figure 4-1: Phases of Zirconium-Hydride as a Function of Temperature The safety limit for TRIGA fuel with a stainless steel cladding and a H/Zr ratio of 1.65:1 is listed as 1 150'C under all conditions when the cladding temperature is _<500,C 6 (page 4-1).
Figure 4-2 shows the change in internal pressure for a given H/Zr ratio versus temperature 6 (Fig 2.8). This shows that the internal fuel pressure for a given temperature will be slightly higher for the higher H-Zr ratios in the earlier fuel. Since this is only 8.5 wt% fuel for Penn State, it is not the limiting case.
OXYGEN5;   1400PPM    0
                            -NITROGEN       4: 200 pPMM C.ARBONU4 ,0PP0, 0.101 t O500               550         600             "0 ' 00     750     800   850   9.,r 950 rtkPIE*ArtI*" (VC)
Fig. 2-8.. Disiociat'ioik pressure iAsochares of zirconrium hydri*de (expressed as H/Zi atom ratios)
(from Ref. 23)
Figure 4-2: Hydrogen Disassociation Pressure from TRIGA Fuel b) Additionally, provide a discussion of any controls in place that ensure TS 5.1.b is satisfied for new fuel received at the facility (e.g., review of vendor quality assurance documentation).
Historically there were no PSU specific administrative controls in place to ensure the Department of Energy (DOE) contract vendors (fuel providers) provided fuel that met the specifications required by the DOE purchase contract and TS 5.1.b. Receipt validation was done on an ad hoc basis. A change to SOP-3 Core Loading and Fuel Handlinghas been initiated to verify and document compliance with TS 5.1 .b prior to loading any new elements into the core.
Page of 12
 
PSBR response to NRC RAI Dtd. 07/28/09
: 5. In accordance with 10 CFR 50.36(a)(1), provide bases for proposed technical specifications 5.1 through 5.6. Your response should include the proposed technical specifications in their entirety.
Attached is a copy of the proposed technical specifications which includes the following changes from Amendment 37:
: 1. Reformatted the entire document - to remove multiple font sizes and margins shift used to accommodate previous amendments;
: 2. Removed all amendment references and change bars - to support reissue with license renewal;
: 3. Added a header with title and footer to each page with "page # of #" format -
convenience and clarity;
: 4. Added a table of contents - not part of PSBR Technical Specifications, provided for convenience only;
: 5. Updated multiple references to sections of the Safety Analysis Report in technical speculations to reflect the current (new SAR) chapter numbers and if necessary chapter titles - to support reissue with new SAR and license renewal.
: 6. TS 1.1.34.g changed "containment" to "confinement" - Correct typographic error, the facility does not have a containment;
: 7. Split TS 3.1.5.c into two specifications 3.1.5.c and 3.1.5.d, changed new TS 3.1.5.d "Reactivity Accident in the Safety Analysis Report" to "Insertion of Excess Reactivity", provided guidance on when the calculation in TS 3.1.5.d is required, and modified basis to support the revision - for clarity of requirement and match wording used the SAR;
: 8. Added TS 3.1.5.e and associated basis - new restriction on core configuration resulting from review of peaking issues in the vicinity of internal water filled core positions. Refer to question 1 above;
: 9. Deleted reference to SAR in TS 3.3.2 - information removed from new SAR for security reasons.
: 10. Added to TS 4.0 permission to operate the reactor to accomplish surveillance requirements that exceed the specified performance interval - current Technical Specifications provide no mechanism to accomplish overdue requirements that require operation of the reactor. This addition corrects that oversight and limits operations to those required to complete the surveillance(s);
: 11. Added basis to TS Section 5 - to support compliance with 10CFR50.36(a)(1).
Page of 12
 
PSBR response to NRC RAI Dtd. 07/28/09


==References:==
==References:==
: 1. Goodwin, W., "The Measurement of Radial Power Distributions in a TRIGA Fuel Element during Reactor Excursions," Ph.D. Thesis, University of Illinois, 1969.2. Levine, S., G. Geisler and R. Totenbier, "Temperature Behavior of 12 WT.% U TRIGA Fuel", TOC-5, TRIGA Owners' Conference III, February 1974.3. Simnad, M., "Fuel Elements for Pulsed TRIGA Research Reactors E- 117-393" General Atomics 1975.4. U.S. Nuclear Regulatory Commission, "NUREG-1282 Safety Evaluation Report on High-Uranium Content, Low-Enriched Zirconium Hydride Fuels for TRIGA Reactors", Government Printing Office, Washington D.C., 1987.5. Penn State Safety Analysis Report Chapter XIII, 1997.6. Simnad, M., "The U-ZrHx Alloy: Its Properties and Use in TRIGA Fuel E-117-833" General Atomics 1980.7. PSBR Fuel Receipt Records 1965.Page of 12 TECHNICAL SPECIFICATIONS:
: 1. Goodwin, W., "The Measurement of Radial Power Distributions in a TRIGA Fuel Element during Reactor Excursions," Ph.D. Thesis, University of Illinois, 1969.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2
: 2. Levine, S., G. Geisler and R. Totenbier, "Temperature Behavior of 12 WT.% U TRIGA Fuel", TOC-5, TRIGA Owners' Conference III, February 1974.
: 3. Simnad, M., "Fuel Elements for Pulsed TRIGA Research Reactors E- 117-393" General Atomics 1975.
: 4. U.S. Nuclear Regulatory Commission, "NUREG-1282 Safety Evaluation Report on High-Uranium Content, Low-Enriched Zirconium Hydride Fuels for TRIGA Reactors",
Government Printing Office, Washington D.C., 1987.
: 5. Penn State Safety Analysis Report Chapter XIII, 1997.
: 6. Simnad, M., "The U-ZrHx Alloy: Its Properties and Use in TRIGA Fuel E-117-833" General Atomics 1980.
: 7. PSBR Fuel Receipt Records 1965.
Page of 12


==1.0 INTRODUCTION==
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2


1 1.1 Definitions 1 2.0 SAFETY LIMIT AND LIMITING SAFETY SYSTEM SETTING 8 2.1 Safety Limit-Fuel Element Temperature 8 2.2 Limiting Safety System Setting (LSSS) 9 3.0 LIMITING CONDITIONS FOR OPERATION 10 3.1 Reactor Core Parameters 10 3.1.1 Non-Pulse Mode Operation 10 3.1.2 Reactivity Limitation 11 3.1.3 Shutdown Margin 12 3.1.4 Pulse Mode Operation 13 3.1.5 Core Configuration Limitation 14 3.1.6 TRIGA Fuel Elements 15 3.2 Reactor Control and Reactor Safety System 16 3.2.1 Reactor Control Rods 16 3.2.2 Manual Control and Automatic Control 17 3.2.3 Reactor Control System 18 3.2.4 Reactor Safety System and Reactor Interlocks 19 3.2.5 Core Loading and Unloading Operation 21 3.2.6 SCRAM Time 21 3.3 Coolant System 22 3.3.1 Coolant Level Limits 22 3.3.2 Detection of Leak or Loss of Coolant 23 3.3.3 Fission Product Activity 23 3.3.4 Pool Water Supply for Leak Protection 24 3.3.5 Coolant Conductivity Limits 24 3.3.6 Coolant Temperature Limits 25 3.4 Confinement 25 3.5 Engineered Safety Features -Facility Exhaust System and Emergency Exhaust System 26 3.6 Radiation Monitoring System 27 3.6.1 Radiation Monitoring Information 27 3.6.2 Evacuation Alarm 28 3.6.3 Argon-41 Discharge Limit 28 3.6.4 As Low As Reasonably Achievable (ALARA) 29 3.7 Limitations of Experiments 29-i-TECHNICAL SPECIFICATIONS:
==1.0      INTRODUCTION==
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 4.0 SURVEILLANCE REQUIREMENTS 32 4.1 Reactor Parameters 32 4.1.1 Reactor Power Calibration 32 4.1.2 Reactor Excess Reactivity 32 4.1.3 TRIGA Fuel Elements 33 4.2 Reactor Control and Safety System 34 4.2.1 Reactivity Worth 34 4.2.2 Reactivity Insertion Rate 34 4.2.3 Reactor Safety System 35 4.2.4 Reactor Interlocks 36 4.2.5 Overpower' SCRAM 37 4.2.6 Transient Rod Test 37 4.3.1 Fire Hose Inspection 38 4.3.2 Pool Water Temperature 39 4.3.3 Pool Water Conductivity 39 4.3.4 Pool Water Level Alarm 40 4.4 Confinement 40 4.5 Facility Exhaust System and Emergency Exhaust System 41 4.6 Radiation Monitoring System and Effluents 41 4.6.1 Radiation Monitoring System and Evacuation Alarm 41 4.6.2 Argon-41 42 4.6.3 ALARA 42 4.7 Experiments 43 5.0 DESIGN FEATURES 44 5.1 Reactor Fuel 44 5.2 Reactor Core 44 5.3 Control Rods 45 5.4 Fuel Storage 45 5.5 Reactor Bay and Exhaust Systems 46 5.6 Reactor Pool Water Systems 46-ii -
1 1.1       Definitions                                                                         1 2.0       SAFETY LIMIT AND LIMITING SAFETY SYSTEM SETTING                                     8 2.1       Safety Limit-Fuel Element Temperature                                               8 2.2       Limiting Safety System Setting (LSSS)                                               9 3.0       LIMITING CONDITIONS FOR OPERATION                                                 10 3.1       Reactor Core Parameters                                                           10 3.1.1   Non-Pulse Mode Operation                                                       10 3.1.2   Reactivity Limitation                                                           11 3.1.3   Shutdown Margin                                                                 12 3.1.4   Pulse Mode Operation                                                           13 3.1.5   Core Configuration Limitation                                                   14 3.1.6   TRIGA Fuel Elements                                                             15 3.2       Reactor Control and Reactor Safety System                                         16 3.2.1   Reactor Control Rods                                                           16 3.2.2   Manual Control and Automatic Control                                           17 3.2.3   Reactor Control System                                                         18 3.2.4   Reactor Safety System and Reactor Interlocks                                   19 3.2.5   Core Loading and Unloading Operation                                           21 3.2.6   SCRAM Time                                                                     21 3.3       Coolant System                                                                     22 3.3.1   Coolant Level Limits                                                           22 3.3.2   Detection of Leak or Loss of Coolant                                           23 3.3.3   Fission Product Activity                                                       23 3.3.4   Pool Water Supply for Leak Protection                                           24 3.3.5   Coolant Conductivity Limits                                                     24 3.3.6   Coolant Temperature Limits                                                     25 3.4       Confinement                                                                       25 3.5       Engineered Safety Features - Facility Exhaust System and Emergency Exhaust System 26 3.6       Radiation Monitoring System                                                       27 3.6.1   Radiation Monitoring Information                                               27 3.6.2   Evacuation Alarm                                                               28 3.6.3   Argon-41 Discharge Limit                                                       28 3.6.4   As Low As Reasonably Achievable (ALARA)                                         29 3.7       Limitations of Experiments                                                         29
TECHNICAL SPECIFICATIONS:
                                                    -i-
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 6.0 ADMINISTRATIVE CONTROLS 47 6.1 Organization 47 6.1.1 Structure 47 6.1.2 Responsibility 47 6.1.3 Staffing 49 6.1.4 Selection and Training of Personnel 49 6.2 Review and Audit 50 6.2.1 Safeguards Committee Composition 50 6.2.2 Charter and Rules 50 6.2.3 Review Function 51 6.2.4 Audit 51 6.3 Operating Procedures 52 6.4 Review and Approval of Experiments 53 6.5 Required Action 53 6.6 Reports 54 6.6.1 Operating Reports 54 6.6.2 Special Reports 55 6.7 Records 56 6.7.1 Records to be Retained for at Least Five Years 56 6.7.2 Records to be Retained for at Least One Training Cycle 56 6.7.3 Records to be Retained for the Life of the Reactor Facility 56-111 -
TECHNICAL SPECIFICATIONS:
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2


==1.0 INTRODUCTION==
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 4.0      SURVEILLANCE REQUIREMENTS                                  32 4.1      Reactor Parameters                                          32 4.1.1    Reactor Power Calibration                                32 4.1.2    Reactor Excess Reactivity                                32 4.1.3    TRIGA Fuel Elements                                      33 4.2      Reactor Control and Safety System                            34 4.2.1   Reactivity Worth                                          34 4.2.2    Reactivity Insertion Rate                                34 4.2.3    Reactor Safety System                                    35 4.2.4    Reactor Interlocks                                        36 4.2.5    Overpower' SCRAM                                          37 4.2.6    Transient Rod Test                                        37 4.3.1    Fire Hose Inspection                                      38 4.3.2    Pool Water Temperature                                    39 4.3.3    Pool Water Conductivity                                  39 4.3.4    Pool Water Level Alarm                                    40 4.4      Confinement                                                  40 4.5      Facility Exhaust System and Emergency Exhaust System        41 4.6      Radiation Monitoring System and Effluents                    41 4.6.1    Radiation Monitoring System and Evacuation Alarm          41 4.6.2    Argon-41                                                  42 4.6.3    ALARA                                                    42 4.7      Experiments                                                  43 5.0       DESIGN FEATURES                                            44 5.1      Reactor Fuel                                                44 5.2      Reactor Core                                                44 5.3      Control Rods                                                45 5.4      Fuel Storage                                                45 5.5      Reactor Bay and Exhaust Systems                              46 5.6      Reactor Pool Water Systems                                  46
                                                  - ii -


Included in this document are the Technical Specifications and the Basis for the Technical Specifications.
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
These Bases, which provide the technical support for the individual technical specifications, are included for information purposes only. They are not part of the Technical Specifications and they do not constitute limitations or requirements to which the licensee must adhere.1.1 Definitions 1.1.1 ALARA The ALARA (As Low As Reasonably Achievable) program is a program for maintaining occupational exposures to radiation and release of radioactive effluents to the environs as low as reasonably achievable.
FACILITY LICENSE NO. R-2 6.0      ADMINISTRATIVE CONTROLS                                      47 6.1      Organization                                                  47 6.1.1  Structure                                                    47 6.1.2  Responsibility                                              47 6.1.3  Staffing                                                    49 6.1.4  Selection and Training of Personnel                          49 6.2      Review and Audit                                              50 6.2.1  Safeguards Committee Composition                            50 6.2.2  Charter and Rules                                            50 6.2.3  Review Function                                              51 6.2.4  Audit                                                        51 6.3      Operating Procedures                                          52 6.4      Review and Approval of Experiments                            53 6.5      Required Action                                                53 6.6      Reports                                                        54 6.6.1  Operating Reports                                            54 6.6.2  Special Reports                                              55 6.7      Records                                                        56 6.7.1  Records to be Retained for at Least Five Years              56 6.7.2  Records to be Retained for at Least One Training Cycle      56 6.7.3  Records to be Retained for the Life of the Reactor Facility  56
1.1.2 Automatic Control Automatic control mode operation is when normal reactor operations, including start up, power level change, power regulation, and protective power reductions are performed by the reactor control system without, or with minimal, operator intervention.
                                                    - 111 -
1.1.3 Channel A channel is the combination of sensor, line, amplifier, and output devices which are connected for the purpose of measuring the value of a parameter.
 
1.1.4 Channel Calibration A channel calibration is an adjustment of the channel such that its output responds, with acceptable range, and accuracy, to known values of the parameter which the channel measures.
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
Calibration SHALL encompass the entire channel, including equipment actuation, alarm, or trip, and SHALL be deemed to include a Channel Test.1.1.5 Channel Check A channel check is a qualitative verification of acceptable performance by observation of channel behavior.
FACILITY LICENSE NO. R-2
This verification, where possible, SHALL include comparison of the channel with other independent channels or systems measuring the same variable.1.1.6 Channel Test A channel test is the introduction of a signal into the channel to verify that it is operable.1.1.7 Cold Critical Cold critical is the condition of the reactor when it is critical with the fuel and bulk water temperatures both below l00&deg;F (37.8&deg;C).Page I of 56 TECHNICAL SPECIFICATIONS:
 
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 1.1.8 Confinement Confinement means an enclosure on the overall facility which controls the movement of air into it and out through a controlled path.1.1.9 Excess Reactivity Excess reactivity is that amount of reactivity that would exist if all control rods (safety, regulating, etc.) were moved to the maximum reactive condition from the point where the reactor is exactly critical (keff=l) in the reference core condition.
==1.0  INTRODUCTION==
 
Included in this document are the Technical Specifications and the Basis for the Technical Specifications. These Bases, which provide the technical support for the individual technical specifications, are included for information purposes only. They are not part of the Technical Specifications and they do not constitute limitations or requirements to which the licensee must adhere.
1.1 Definitions 1.1.1     ALARA The ALARA (As Low As Reasonably Achievable) program is a program for maintaining occupational exposures to radiation and release of radioactive effluents to the environs as low as reasonably achievable.
1.1.2     Automatic Control Automatic control mode operation is when normal reactor operations, including start up, power level change, power regulation, and protective power reductions are performed by the reactor control system without, or with minimal, operator intervention.
1.1.3     Channel A channel is the combination of sensor, line, amplifier, and output devices which are connected for the purpose of measuring the value of a parameter.
1.1.4     Channel Calibration A channel calibration is an adjustment of the channel such that its output responds, with acceptable range, and accuracy, to known values of the parameter which the channel measures. Calibration SHALL encompass the entire channel, including equipment actuation, alarm, or trip, and SHALL be deemed to include a Channel Test.
1.1.5     Channel Check A channel check is a qualitative verification of acceptable performance by observation of channel behavior. This verification, where possible, SHALL include comparison of the channel with other independent channels or systems measuring the same variable.
1.1.6     Channel Test A channel test is the introduction of a signal into the channel to verify that it is operable.
1.1.7     Cold Critical Cold critical is the condition of the reactor when it is critical with the fuel and bulk water temperatures both below l00&deg;F (37.8&deg;C).
Page I of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 1.1.8 Confinement Confinement means an enclosure on the overall facility which controls the movement of air into it and out through a controlled path.
1.1.9 Excess Reactivity Excess reactivity is that amount of reactivity that would exist if all control rods (safety, regulating, etc.) were moved to the maximum reactive condition from the point where the reactor is exactly critical (keff=l) in the reference core condition.
1.1.10 Experiment Experiment SHALL mean (a) any apparatus, device, or material which is not a normal part of the core or experimental facilities, but which is inserted in these facilities or is in line with a beam of radiation originating from the reactor core; or (b) any operation designed to measure reactor parameters or characteristics.
1.1.10 Experiment Experiment SHALL mean (a) any apparatus, device, or material which is not a normal part of the core or experimental facilities, but which is inserted in these facilities or is in line with a beam of radiation originating from the reactor core; or (b) any operation designed to measure reactor parameters or characteristics.
1.1.11 Experimental Facility Experimental facility SHALL mean beam port, including extension tube with shields, thermal column with shields, vertical tube, central thimble, in-core irradiation holder, pneumatic transfer system, and in-pool irradiation facility.1.1.12 Instrumented Element An instrumented element is a TRIGA fuel element in which sheathed chromel-alumel or equivalent thermocouples are embedded in the, fuel.1.1.13 Limiting Conditions for Operation Limiting conditions for operation of the reactor are those constraints included in the Technical Specifications that are required for safe operation of the facility.
1.1.11 Experimental Facility Experimental facility SHALL mean beam port, including extension tube with shields, thermal column with shields, vertical tube, central thimble, in-core irradiation holder, pneumatic transfer system, and in-pool irradiation facility.
These limiting conditions are applicable only when the reactor is operating unless otherwise specified.
1.1.12 Instrumented Element An instrumented element is a TRIGA fuel element in which sheathed chromel-alumel or equivalent thermocouples are embedded in the, fuel.
1.1.14 Limiting Safety System Setting A limiting safety system setting (LSSS) is a setting for an automatic protective device related to a variable having a significant safety function.1.1.15 Manual Control Manual control mode is operation of the reactor with the power level controlled by the operator adjusting the control rod positions.
1.1.13 Limiting Conditions for Operation Limiting conditions for operation of the reactor are those constraints included in the Technical Specifications that are required for safe operation of the facility. These limiting conditions are applicable only when the reactor is operating unless otherwise specified.
Page 2 of 56 TECHNICAL SPECIFICATIONS:
1.1.14 Limiting Safety System Setting A limiting safety system setting (LSSS) is a setting for an automatic protective device related to a variable having a significant safety function.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 1.1.16 Maximum Elemental Power Density The maximum elemental power density (MEPD) is the power density of the element in the core producing more power than any other element in that loading. The power density of an element is the total power of the core divided by the number of fuel elements in the core multiplied by the normalized power of that element. This definition is only applicable for non-pulse operation.
1.1.15 Manual Control Manual control mode is operation of the reactor with the power level controlled by the operator adjusting the control rod positions.
Page 2 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 1.1.16 Maximum Elemental Power Density The maximum elemental power density (MEPD) is the power density of the element in the core producing more power than any other element in that loading. The power density of an element is the total power of the core divided by the number of fuel elements in the core multiplied by the normalized power of that element. This definition is only applicable for non-pulse operation.
1.1.17 Maximum Power Level Maximum Power Level is the maximum measured value of reactor power for non-pulse operation.
1.1.17 Maximum Power Level Maximum Power Level is the maximum measured value of reactor power for non-pulse operation.
1.1.18 Measured Value The measured value is the value of a parameter as it appears on the output of a channel.1.1.19 Movable Experiment A movable experiment is one where it is intended that the entire experiment may be moved in or near the core or into and out of the reactor while the reactor is operating.
1.1.18 Measured Value The measured value is the value of a parameter as it appears on the output of a channel.
1.1.20 Normalized Power The normalized power, NP, is the ratio of the power of a fuel element to the average power per fuel element.1.1.21 Operable Operable means a component or system is capable of performing its intended function.1.1.22 Operating Operating means a component or system is performing its intended function.1.1.23 PulseMode Pulse mode operation SHALL mean operation of the reactor allowing the operator to insert preselected reactivity by the ejection of the transient rod.1.1.24 Reactivity Limits The reactivity limits are those limits imposed on reactor core reactivity.
1.1.19 Movable Experiment A movable experiment is one where it is intended that the entire experiment may be moved in or near the core or into and out of the reactor while the reactor is operating.
1.1.20 Normalized Power The normalized power, NP, is the ratio of the power of a fuel element to the average power per fuel element.
1.1.21 Operable Operable means a component or system is capable of performing its intended function.
1.1.22 Operating Operating means a component or system is performing its intended function.
1.1.23 PulseMode Pulse mode operation SHALL mean operation of the reactor allowing the operator to insert preselected reactivity by the ejection of the transient rod.
1.1.24 Reactivity Limits The reactivity limits are those limits imposed on reactor core reactivity.
Quantities are referenced to a reference core condition.
Quantities are referenced to a reference core condition.
Page 3 of 56 TECHNICAL SPECIFICATIONS:
Page 3 of 56
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 1.1.25 Reactivity Worth of an Experiment The reactivity worth of an experiment is the maximum absolute value of the reactivity change that would occur as a result of intended or anticipated changes or credible malfunctions that alter experiment position or configuration.
 
1.1.26 Reactor Control System The reactor control system is composed of control and operational interlocks, reactivity adjustment controls, flow and temperature controls, and display systems which permit the operator to operate the reactor reliably in its allowed modes.1.1.27 Reactor Interlock A reactor interlock is a device which prevents some action, associated with reactor operation, until certain reactor operation conditions are satisfied.
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
1.1.28 Reactor Operating The reactor is operating whenever it is not secured or shutdown.1.1.29 Reactor Secured The reactor is secured when: a. It contains insufficient fissile material or moderator present in the reactor, adjacent experiments, or control rods, to attain criticality under optimum available conditions of moderation, and reflection, or b. A combination of the following:
FACILITY LICENSE NO. R-2 1.1.25 Reactivity Worth of an Experiment The reactivity worth of an experiment is the maximum absolute value of the reactivity change that would occur as a result of intended or anticipated changes or credible malfunctions that alter experiment position or configuration.
: 1) The minimum number of neutron absorbing control rods are fully inserted or other safety devices are in shutdown positions, as required by technical specifications, and 2) The console key switch is in the off position and the key is removed from the lock, and 3) No work is in progress involving core fuel, core structure, installed control rods, orcontrol rod drives unless they are physically decoupled from the control rods, and 4) No experiments in or near the reactor are being moved or serviced that have, on movement, a reactivity worth exceeding the maximum value allowed for a single experiment or one dollar whichever is smaller.Page 4 of 56 TECHNICAL SPECIFICATIONS:
1.1.26 Reactor Control System The reactor control system is composed of control and operational interlocks, reactivity adjustment controls, flow and temperature controls, and display systems which permit the operator to operate the reactor reliably in its allowed modes.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 1.1.30 Reactor Shutdown The reactor is shutdown if it is subcritical by at least one dollar in the reference core condition and the reactivity worth of all experiments is included.1.1.31 Reactor Safety System Reactor safety systems are those systems, including their associated input channels, which are designed to initiate automatic reactor protection or to provide information for initiation of manual protective action.1.1.32 Reference Core Condition The condition of the core when it is at ambient temperature (cold) and the reactivity worth of xenon is negligible  
1.1.27 Reactor Interlock A reactor interlock is a device which prevents some action, associated with reactor operation, until certain reactor operation conditions are satisfied.
(<0.21% Ak/k (-$0.30)).
1.1.28 Reactor Operating The reactor is operating whenever it is not secured or shutdown.
1.1.29 Reactor Secured The reactor is secured when:
: a. It contains insufficient fissile material or moderator present in the reactor, adjacent experiments, or control rods, to attain criticality under optimum available conditions of moderation, and reflection, or
: b. A combination of the following:
: 1) The minimum number of neutron absorbing control rods are fully inserted or other safety devices are in shutdown positions, as required by technical specifications, and
: 2) The console key switch is in the off position and the key is removed from the lock, and
: 3) No work is in progress involving core fuel, core structure, installed control rods, orcontrol rod drives unless they are physically decoupled from the control rods, and
: 4) No experiments in or near the reactor are being moved or serviced that have, on movement, a reactivity worth exceeding the maximum value allowed for a single experiment or one dollar whichever is smaller.
Page 4 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 1.1.30 Reactor Shutdown The reactor is shutdown if it is subcritical by at least one dollar in the reference core condition and the reactivity worth of all experiments is included.
1.1.31 Reactor Safety System Reactor safety systems are those systems, including their associated input channels, which are designed to initiate automatic reactor protection or to provide information for initiation of manual protective action.
1.1.32 Reference Core Condition The condition of the core when it is at ambient temperature (cold) and the reactivity worth of xenon is negligible (<0.21% Ak/k (-$0.30)).
1.1.33 Research Reactor A research reactor is defined as a device designed to support a self-sustaining neutron chain reaction for research, development, educational, training, or experimental purposes, and which may have provisions for the production of radioisotopes.
1.1.33 Research Reactor A research reactor is defined as a device designed to support a self-sustaining neutron chain reaction for research, development, educational, training, or experimental purposes, and which may have provisions for the production of radioisotopes.
1.1.34 Reportable Occurrence A reportable occurrence is any of the following which occurs during reactor operation:
1.1.34 Reportable Occurrence A reportable occurrence is any of the following which occurs during reactor operation:
: a. Operation with the safety system setting less conservative than specified in Section 2.2, Limiting Safety System Setting.b. Operation in violation of a limiting condition for operation.
: a. Operation with the safety system setting less conservative than specified in Section 2.2, Limiting Safety System Setting.
: c. Failure of a required reactor safety system component which could render the system incapable of performing its intended safety function.d. Any unanticipated or uncontrolled change in reactivity greater than one dollar.e. An observed inadequacy in the implementation of either administrative or procedural controls which could result in operation of the reactor outside the limiting conditions for operation.
: b. Operation in violation of a limiting condition for operation.
: f. Release of fission products from a fuel element.g. Abnormal and significant degradation in reactor fuel, cladding, coolant boundary or confinement boundary that could result in exceeding 10 CFR Part 20 exposure criteria.Page 5 of 56 TECHNICAL SPECIFICATIONS:
: c. Failure of a required reactor safety system component which could render the system incapable of performing its intended safety function.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 1.1.35 Rod-Transient The transient rod is a control rod with SCRAM capabilities that is capable of providing rapid reactivity insertion for use in either pulse or square wave mode of operation.
: d. Any unanticipated or uncontrolled change in reactivity greater than one dollar.
1.1.36 Safety Limit Safety limits are limits on important process variables which are found to be necessary to reasonably protect the integrity of certain physical barriers which guard against the uncontrolled release of radioactivity.
: e. An observed inadequacy in the implementation of either administrative or procedural controls which could result in operation of the reactor outside the limiting conditions for operation.
The principal physical barrier is the fuel element cladding.1.1.37 SCRAM Time SCRAM time is the elapsed time between reaching a limiting safety system set point and a specified control rod movement.1.1.38 Secured Experiment A secured experiment is any experiment, experimental facility, or component of an experiment that is held in a stationary position relative to the reactor by mechanical means. The restraining forces must be substantially greater than those to which the experiment might be subjected to by hydraulic, pneumatic, buoyant, or other forces which are normal to the operating environment of the experiment, or by forces which can arise as a result of credible malfunctions.
: f. Release of fission products from a fuel element.
: g. Abnormal and significant degradation in reactor fuel, cladding, coolant boundary or confinement boundary that could result in exceeding 10 CFR Part 20 exposure criteria.
Page 5 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 1.1.35 Rod-Transient The transient rod is a control rod with SCRAM capabilities that is capable of providing rapid reactivity insertion for use in either pulse or square wave mode of operation.
1.1.36 Safety Limit Safety limits are limits on important process variables which are found to be necessary to reasonably protect the integrity of certain physical barriers which guard against the uncontrolled release of radioactivity. The principal physical barrier is the fuel element cladding.
1.1.37 SCRAM Time SCRAM time is the elapsed time between reaching a limiting safety system set point and a specified control rod movement.
1.1.38 Secured Experiment A secured experiment is any experiment, experimental facility, or component of an experiment that is held in a stationary position relative to the reactor by mechanical means. The restraining forces must be substantially greater than those to which the experiment might be subjected to by hydraulic, pneumatic, buoyant, or other forces which are normal to the operating environment of the experiment, or by forces which can arise as a result of credible malfunctions.
1.1.39 Secured.Experiment with Movable Parts A secured experiment with movable parts is one that contains parts that are intended to be moved while the reactor is operating.
1.1.39 Secured.Experiment with Movable Parts A secured experiment with movable parts is one that contains parts that are intended to be moved while the reactor is operating.
1.1.40 Shall, Should, and May The word "shall" is used to denote a requirement; the word "should" to denote a recommendation; and the word "may" to denote permission, neither a requirement nor a recommendation.
1.1.40 Shall, Should, and May The word "shall" is used to denote a requirement; the word "should" to denote a recommendation; and the word "may" to denote permission, neither a requirement nor a recommendation.
1.1.41 Shim, Regulating, and Safety Rods A shim, regulating, or safety rod is a control rod having an electric motor drive and SCRAM capabilities.
1.1.41 Shim, Regulating, and Safety Rods A shim, regulating, or safety rod is a control rod having an electric motor drive and SCRAM capabilities. It has a fueled follower section.
It has a fueled follower section.Page 6 of 56 TECHNICAL SPECIFICATIONS:
Page 6 of 56
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 1.1.42 Shutdown Margin Shutdown margin SHALL mean the minimum shutdown reactivity necessary to provide confidence that the reactor can be made subcritical by means of the control and safety systems starting from any permissible operating condition although the most reactive rod is in its most reactive position, and that the reactor will remain subcritical without further operator action.1.1.43 Square Wave Mode Square wave (SW) mode operation SHALL mean operation of the reactor allowing the operator to insert preselected reactivity by the ejection of the transient rod, and which results in a maximum power within the license limit.1.1.44 Steady State Power Level Steady state power level is the nominal measured value of reactor power to which reactor power is being controlled whether by manual or automatic actions. Minor variations about this level may occur due to noise, normal signal variation, and reactivity adjustments.
 
During manual, automatic, or square wave modes of operation, some initial, momentary overshoot may occur.1.1.45 TRIGA Fuel Element A TRIGA fuel element is a single TRIGA fuel rod of standard type, either 8.5 wt% U-ZrH in stainless steel cladding or 12 wt% U-ZrH in stainless steel cladding enriched to less than 20% uranium-235.
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
1.1.46 Watchdog Circuit A watchdog circuit is a circuit consisting of a timer and a relay. The timer energizes the relay as long as it is reset prior to the expiration of the timing interval.
FACILITY LICENSE NO. R-2 1.1.42 Shutdown Margin Shutdown margin SHALL mean the minimum shutdown reactivity necessary to provide confidence that the reactor can be made subcritical by means of the control and safety systems starting from any permissible operating condition although the most reactive rod is in its most reactive position, and that the reactor will remain subcritical without further operator action.
If it is not reset within the timing interval, the relay will de-energize thereby causing a SCRAM.Page 7 of 56 TECHNICAL SPECIFICATIONS:
1.1.43 Square Wave Mode Square wave (SW) mode operation SHALL mean operation of the reactor allowing the operator to insert preselected reactivity by the ejection of the transient rod, and which results in a maximum power within the license limit.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 2.0 SAFETY LIMIT AND LIMITING SAFETY SYSTEM SETTING 2.1 Safety Limit-Fuel Element Temperature Applicability The safety limit specification applies to the maximum temperature in the reactor fuel.Objective The objective is to define the maximum fuel element temperature that can be permitted with confidence that no damage to the fuel element and/or cladding will result.Specification The temperature in a water-cooled TRIGA fuel element SHALL NOT exceed 1 150'C under any operating condition.
1.1.44 Steady State Power Level Steady state power level is the nominal measured value of reactor power to which reactor power is being controlled whether by manual or automatic actions. Minor variations about this level may occur due to noise, normal signal variation, and reactivity adjustments. During manual, automatic, or square wave modes of operation, some initial, momentary overshoot may occur.
Basis The important parameter for a TRIGA reactor is the fuel element temperature.
1.1.45 TRIGA Fuel Element A TRIGA fuel element is a single TRIGA fuel rod of standard type, either 8.5 wt% U-ZrH in stainless steel cladding or 12 wt% U-ZrH in stainless steel cladding enriched to less than 20% uranium-235.
This parameter is well suited as a single specification especially since it can be measured at a point within the fuel element and the relationship between the measured and actual temperature is well characterized analytically.
1.1.46 Watchdog Circuit A watchdog circuit is a circuit consisting of a timer and a relay. The timer energizes the relay as long as it is reset prior to the expiration of the timing interval. If it is not reset within the timing interval, the relay will de-energize thereby causing a SCRAM.
A loss in the integrity of the fuel element cladding could arise from a build-up of excessive pressure between the fuel-moderator and the cladding if the maximum fuel temperature exceeds 1150'C.The pressure is caused by the presence of air, fission product gases, and hydrogen from the dissociation of the hydrogen and zirconium in the fuel-moderator.
Page 7 of 56
The magnitude of this pressure is determined by the fuel-moderator temperature, the ratio of hydrogen to zirconium in the alloy, and the rate change in the pressure.The safety limit for the standard TRIGA fuel is based on data, including the large mass of experimental evidence obtained during high performance reactor tests on this fuel. These data indicate that the stress in the cladding due to the increase in the hydrogen pressure from the dissociation of zirconium hydride will remain below the ultimate stress provided that the temperature of the fuel does not exceed 1150'C and the fuel cladding is below 500'C. See Safety Analysis Report, Ref. 13 and 30 in Section 13 and Simnad, M.T., F.C. Foushee, and G.B. West, "Fuel Elements for Pulsed Reactors," Nucl. Technology, Vol. 28, p. 31-56 (January 1976).Page 8 of 56 TECHNICAL SPECIFICATIONS:
 
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 2.2 Limiting Safety System Setting (LSSS)Applicability The LSSS specification applies to the SCRAM setting which prevents the safety limit from being reached.Objective The objective is to prevent the safety limit (1 150'C) from being reached.Specification The limiting safety system setting SHALL be a maximum of 650'C as measured with an instrumented fuel element if it is located in a core position representative of the maximum elemental power density (MEPD) in that loading. If it is not practical to locate the instrumented fuel in such a position, the LSSS SHALL be reduced.The reduction of the LSSS SHALL be by a ratio based on the calculated linear relationship between the normalized power at the monitored position as compared to normalized power at the core position representative of the MEPD in that loading.Basis The limiting safety system setting is a temperature which, if reached, SHALL cause a reactor SCRAM to be initiated preventing the safety limit from being exceeded.Experiments and analyses described in the Safety Analysis Report, Section 13 -Accident Analysis, show that the measured fuel temperature at steady state power has a simple linear relationship to the normalized power of a fuel element in the core. Maximum fuel temperature occurs when an instrumented element is in a core position of MEPD. The actual location of the instrumented element and the associated LSSS SHALL be chosen by calculation and/or experiment prior to going to maximum reactor operational power level. The measured fuel temperature during steady state operation is close to the maximum fuel temperature in that element.Thus, 500*C of safety margin exists before the 11 50'C safety limit is reached. This safety margin provides adequate compensation for variations in the temperature profile of depleted and differently loaded fuel elements (i.e. 8.5 wt% vs. 12 wt%fuel elements).
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
See Safety Analysis Report, Chapter 13.If it is not practical to place an instrumented element in the position representative of MEPD the LSSS SHALL be reduced to maintain the 500'C safety margin between the 11 50 0 C safety limit and the highest fuel temperature in the core if it was being measured.
FACILITY LICENSE NO. R-2 2.0 SAFETY LIMIT AND LIMITING SAFETY SYSTEM SETTING 2.1 Safety Limit-Fuel Element Temperature Applicability The safety limit specification applies to the maximum temperature in the reactor fuel.
The reduction ratio SHALL be determined by calculation using the accepted techniques used in Safety Analysis Report, Chapter 13.In the pulse mode of operation, the same LSSS SHALL apply. However, the temperature channel will have no effect on limiting the peak power or fuel temperature, generated, because of its relatively long time constant (seconds), compared with the width of the pulse (milliseconds).
Objective The objective is to define the maximum fuel element temperature that can be permitted with confidence that no damage to the fuel element and/or cladding will result.
Page 9 of 56 TECHNICAL SPECIFICATIONS:
Specification The temperature in a water-cooled TRIGA fuel element SHALL NOT exceed 1150'C under any operating condition.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 3.0 LIMITING CONDITIONS FOR OPERATION The limiting conditions for operation as set forth in this section are applicable only when the reactor is operating.
Basis The important parameter for a TRIGA reactor is the fuel element temperature. This parameter is well suited as a single specification especially since it can be measured at a point within the fuel element and the relationship between the measured and actual temperature is well characterized analytically. A loss in the integrity of the fuel element cladding could arise from a build-up of excessive pressure between the fuel-moderator and the cladding if the maximum fuel temperature exceeds 1150'C.
They need not be met when the reactor is shutdown unless specified otherwise.
The pressure is caused by the presence of air, fission product gases, and hydrogen from the dissociation of the hydrogen and zirconium in the fuel-moderator. The magnitude of this pressure is determined by the fuel-moderator temperature, the ratio of hydrogen to zirconium in the alloy, and the rate change in the pressure.
3.1 Reactor Core Parameters 3.1.1 Non-Pulse Mode Operation Applicability These specifications apply to the power generated during manual control mode, automatic control mode, and square wave mode operations.
The safety limit for the standard TRIGA fuel is based on data, including the large mass of experimental evidence obtained during high performance reactor tests on this fuel. These data indicate that the stress in the cladding due to the increase in the hydrogen pressure from the dissociation of zirconium hydride will remain below the ultimate stress provided that the temperature of the fuel does not exceed 1150'C and the fuel cladding is below 500'C. See Safety Analysis Report, Ref. 13 and 30 in Section 13 and Simnad, M.T., F.C. Foushee, and G.B. West, "Fuel Elements for Pulsed Reactors," Nucl. Technology, Vol. 28, p. 31-56 (January 1976).
Objective The objective is to limit the source term and energy production to that used in the Safety Analysis Report.Specifications
Page 8 of 56
: a. The reactor may be operated at steady state power levels of 1 Mw (thermal) or less.b. The maximum power level SHALL be no greater than 1.1 Mw (thermal).
 
: c. The steady state fuel temperature SHALL be a maximum of 650'C as measured with an instrumented fuel element if it is located in a core position representative of MEPD in that loading. If it is not practical to locate the instrumented fuel in such a position, the steady state fuel temperature SHALL be calculated by a ratio based on the calculated linear relationship between the normalized power at the monitored position as compared to normalized power at the core position representative of the MEPD in that loading. In this case, the measured steady state fuel temperature SHALL be limited such that the calculated steady state fuel temperature at the core position representative of the MEPD in that loading SHALL NOT exceed 650'C.Basis a. Thermal and hydraulic calculations and operational experience indicate that a compact TRIGA reactor core can be safely operated up to power levels of at least 1.15 Mw (thermal) with natural convective cooling.b. Operation at 1.1 Mw (thermal) is within the bounds established by the SAR for steady state operations.
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
See Chapter 13, Section C of the SAR.c. Limiting the maximum steady state measured fuel temperature of any position to 650'C places an upper bound on the fission product release fraction to that used in the analysis of a Maximum Hypothetical Accident (MHA). See Safety Analysis Report, Chapter 13.Page 10 of 56 TECHNICAL SPECIFICATIONS:
FACILITY LICENSE NO. R-2 2.2 Limiting Safety System Setting (LSSS)
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 3.1.2 Reactivity Limitation Applicability This specification applies to the reactivity condition of the reactor and the reactivity worth of control rods, experiments, and experimental facilities.
Applicability The LSSS specification applies to the SCRAM setting which prevents the safety limit from being reached.
It applies to all modes of operation.
Objective The objective is to prevent the safety limit (1 150'C) from being reached.
Objective The objective is to ensure that the reactor is operated within the limits analyzed in the Safety Analysis Report and to ensure that the safety limit will not be exceeded.Specification
Specification The limiting safety system setting SHALL be a maximum of 650'C as measured with an instrumented fuel element if it is located in a core position representative of the maximum elemental power density (MEPD) in that loading. If it is not practical to locate the instrumented fuel in such a position, the LSSS SHALL be reduced.
: a. The maximum excess reactivity above cold, clean, critical plus samarium poison of the core configuration with experiments and experimental facilities in place SHALL be 4.9% Ak/k (-$7.00).b. During initial measurements of maximum excess reactivity for a new core/experimental configuration this specification is suspended provided the reactor is operated at power levels no greater than 1 kw.If the power level exceeds 1 kw, power SHALL be reduced to less that 1 kw within one minute. This exemption does not apply for the annual confirmatory measurement of excess reactivity required by TS 4.1.2.Basis Limiting the excess reactivity of the core to 4.9% Ak/k (-$7.00) prevents the fuel temperature in the core from exceeding 1150'C under any assumed accident condition as described in the Safety Analysis Report, Chapter 13.The exemption allows the initial physics measurement of maximum excess reactivity for a new core/experimental configuration to be measured without creating a reportable occurrence.
The reduction of the LSSS SHALL be by a ratio based on the calculated linear relationship between the normalized power at the monitored position as compared to normalized power at the core position representative of the MEPD in that loading.
Maintaining the power level less that 1 kw during this exemption assures there is no challenge to the safety limit on fuel temperature.
Basis The limiting safety system setting is a temperature which, if reached, SHALL cause a reactor SCRAM to be initiated preventing the safety limit from being exceeded.
Page 11 of 56 TECHNICAL SPECIFICATIONS:
Experiments and analyses described in the Safety Analysis Report, Section 13 -
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 3.1.3 Shutdown Margin Applicability This specification applies to the reactivity condition of the reactor and the reactivity worth of control rods, experiments, and experimental facilities.
Accident Analysis, show that the measured fuel temperature at steady state power has a simple linear relationship to the normalized power of a fuel element in the core. Maximum fuel temperature occurs when an instrumented element is in a core position of MEPD. The actual location of the instrumented element and the associated LSSS SHALL be chosen by calculation and/or experiment prior to going to maximum reactor operational power level. The measured fuel temperature during steady state operation is close to the maximum fuel temperature in that element.
It applies to all modes of operation.
Thus, 500*C of safety margin exists before the 11 50'C safety limit is reached. This safety margin provides adequate compensation for variations in the temperature profile of depleted and differently loaded fuel elements (i.e. 8.5 wt% vs. 12 wt%
Objective The objective is to ensure that the reactor can be shut down at all times and to ensure that the safety limit will not be exceeded.Specification The reactor SHALL NOT be operated unless the shutdown margin provided by control rods is greater than 0.175% Ak/k (-$0.25) with: a. All movable experiments, experiments with movable parts and experimental facilities in their most reactive state, and b. The highest reactivity worth control rod fully withdrawn.
fuel elements). See Safety Analysis Report, Chapter 13.
Basis A shutdown margin of 0.175% Ak/k (-$0.25) ensures that the reactor can be made subcritical from any operating condition even if the highest worth control rod should remain in the fully withdrawn position.
If it is not practical to place an instrumented element in the position representative of MEPD the LSSS SHALL be reduced to maintain the 500'C safety margin between the 11 500C safety limit and the highest fuel temperature in the core if it was being measured. The reduction ratio SHALL be determined by calculation using the accepted techniques used in Safety Analysis Report, Chapter 13.
The shutdown margin requirement may be more restrictive than Specification 3.1.2.Page 12 of 56 TECHNICAL SPECIFICATIONS:
In the pulse mode of operation, the same LSSS SHALL apply. However, the temperature channel will have no effect on limiting the peak power or fuel temperature, generated, because of its relatively long time constant (seconds),
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 3.1.4 Pulse Mode Operation Applicability These specifications apply to the energy generated in the reactor as a result of a pulse insertion of reactivity.
compared with the width of the pulse (milliseconds).
Page 9 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 3.0 LIMITING CONDITIONS FOR OPERATION The limiting conditions for operation as set forth in this section are applicable only when the reactor is operating. They need not be met when the reactor is shutdown unless specified otherwise.
3.1   Reactor Core Parameters 3.1.1   Non-Pulse Mode Operation Applicability These specifications apply to the power generated during manual control mode, automatic control mode, and square wave mode operations.
Objective The objective is to limit the source term and energy production to that used in the Safety Analysis Report.
Specifications
: a. The reactor may be operated at steady state power levels of 1 Mw (thermal) or less.
: b. The maximum power level SHALL be no greater than 1.1 Mw (thermal).
: c. The steady state fuel temperature SHALL be a maximum of 650'C as measured with an instrumented fuel element if it is located in a core position representative of MEPD in that loading. If it is not practical to locate the instrumented fuel in such a position, the steady state fuel temperature SHALL be calculated by a ratio based on the calculated linear relationship between the normalized power at the monitored position as compared to normalized power at the core position representative of the MEPD in that loading. In this case, the measured steady state fuel temperature SHALL be limited such that the calculated steady state fuel temperature at the core position representative of the MEPD in that loading SHALL NOT exceed 650'C.
Basis
: a. Thermal and hydraulic calculations and operational experience indicate that a compact TRIGA reactor core can be safely operated up to power levels of at least 1.15 Mw (thermal) with natural convective cooling.
: b. Operation at 1.1 Mw (thermal) is within the bounds established by the SAR for steady state operations. See Chapter 13, Section C of the SAR.
: c. Limiting the maximum steady state measured fuel temperature of any position to 650'C places an upper bound on the fission product release fraction to that used in the analysis of a Maximum Hypothetical Accident (MHA). See Safety Analysis Report, Chapter 13.
Page 10 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 3.1.2 Reactivity Limitation Applicability This specification applies to the reactivity condition of the reactor and the reactivity worth of control rods, experiments, and experimental facilities. It applies to all modes of operation.
Objective The objective is to ensure that the reactor is operated within the limits analyzed in the Safety Analysis Report and to ensure that the safety limit will not be exceeded.
Specification
: a. The maximum excess reactivity above cold, clean, critical plus samarium poison of the core configuration with experiments and experimental facilities in place SHALL be 4.9% Ak/k (-$7.00).
: b. During initial measurements of maximum excess reactivity for a new core/experimental configuration this specification is suspended provided the reactor is operated at power levels no greater than 1 kw.
If the power level exceeds 1 kw, power SHALL be reduced to less that 1 kw within one minute. This exemption does not apply for the annual confirmatory measurement of excess reactivity required by TS 4.1.2.
Basis Limiting the excess reactivity of the core to 4.9% Ak/k (-$7.00) prevents the fuel temperature in the core from exceeding 1150'C under any assumed accident condition as described in the Safety Analysis Report, Chapter 13.
The exemption allows the initial physics measurement of maximum excess reactivity for a new core/experimental configuration to be measured without creating a reportable occurrence. Maintaining the power level less that 1 kw during this exemption assures there is no challenge to the safety limit on fuel temperature.
Page 11 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 3.1.3 Shutdown Margin Applicability This specification applies to the reactivity condition of the reactor and the reactivity worth of control rods, experiments, and experimental facilities. It applies to all modes of operation.
Objective The objective is to ensure that the reactor can be shut down at all times and to ensure that the safety limit will not be exceeded.
Specification The reactor SHALL NOT be operated unless the shutdown margin provided by control rods is greater than 0.175% Ak/k (-$0.25) with:
: a. All movable experiments, experiments with movable parts and experimental facilities in their most reactive state, and
: b. The highest reactivity worth control rod fully withdrawn.
Basis A shutdown margin of 0.175% Ak/k (-$0.25) ensures that the reactor can be made subcritical from any operating condition even if the highest worth control rod should remain in the fully withdrawn position. The shutdown margin requirement may be more restrictive than Specification 3.1.2.
Page 12 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 3.1.4 Pulse Mode Operation Applicability These specifications apply to the energy generated in the reactor as a result of a pulse insertion of reactivity.
Obiective The objective is to ensure that the safety limit will not be exceeded during pulse mode operation.
Obiective The objective is to ensure that the safety limit will not be exceeded during pulse mode operation.
Specifications
Specifications
: a. The stepped reactivity insertion for pulse operation SHALL NOT exceed 2.45% Ak/k (-$3.50) and the maximum worth of the poison section of the transient rod SHALL be limited to 2.45% Ak/k (-$3.50).b. Pulses SHALL NOT be initiated from power levels above 1 kw.Basis a. Experiments and analyses described in the Safety Analysis Report, Chapter 13, show that the peak pulse temperatures can be predicted for new 12 wt% fuel placed in any core position.
: a. The stepped reactivity insertion for pulse operation SHALL NOT exceed 2.45% Ak/k (-$3.50) and the maximum worth of the poison section of the transient rod SHALL be limited to 2.45% Ak/k (-$3.50).
These experiments and analyses show that the maximum allowed pulse reactivity of 2.45% Ak/k (-$3.50), prevents the maximum fuel temperature from reaching the safety limit (1 150'C) for any core configuration that meets the requirements of 3.1.5.The maximum worth of the pulse rod is limited to 2.45% Ak/k (-$3.50)to preventexceeding the safety limit (1 150'C) with an accidental ejection of the transient rod.b. If a pulse is initiated from power levels below 1 kw, the maximum allowed full worth of the pulse rod can be used without exceeding the safety limit.Page 13 of 56 TECHNICAL SPECIFICATIONS:
: b. Pulses SHALL NOT be initiated from power levels above 1 kw.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 3.1.5 Core Configuration Limitation Applicability These specifications apply to all core configurations except as noted.Objective The objective is to ensure that the safety limit (1 150'C) will not be exceeded due to power peaking effects in the various core configurations.
Basis
: a. Experiments and analyses described in the Safety Analysis Report, Chapter 13, show that the peak pulse temperatures can be predicted for new 12 wt% fuel placed in any core position. These experiments and analyses show that the maximum allowed pulse reactivity of 2.45% Ak/k
(-$3.50), prevents the maximum fuel temperature from reaching the safety limit (1 150'C) for any core configuration that meets the requirements of 3.1.5.
The maximum worth of the pulse rod is limited to 2.45% Ak/k (-$3.50) to preventexceeding the safety limit (1 150'C) with an accidental ejection of the transient rod.
: b. If a pulse is initiated from power levels below 1 kw, the maximum allowed full worth of the pulse rod can be used without exceeding the safety limit.
Page 13 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 3.1.5 Core Configuration Limitation Applicability These specifications apply to all core configurations except as noted.
Objective The objective is to ensure that the safety limit (1 150'C) will not be exceeded due to power peaking effects in the various core configurations.
Specifications
Specifications
: a. The critical core SHALL be an assembly of either 8.5 wt% U-ZrH stainless steel clad or a mixture of 8.5 wt% and 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator elements placed in water with a 1.7 inch center line grid spacing.b. The maximum calculated MEPD SHALL be less that 24.7 kw per fuel element for non-pulse operation.
: a. The critical core SHALL be an assembly of either 8.5 wt% U-ZrH stainless steel clad or a mixture of 8.5 wt% and 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator elements placed in water with a 1.7 inch center line grid spacing.
: c. The NP of any core loading with a maximum allowed pulse worth of 2.45% Ak/k (-$3.50) SHALL be limited to 2.2. IF the maximum allowed pulse worth is less than 2.45% Ak/k ($-3.50) for any given core loading (i.e. the pulse can be limited by the total worth of the transient rod, by the core excess, or administratively), THEN the maximum NP may be increased above 2.2 as long as the calculated maximum fuel temperature does not exceed the safety limit with that maximum allowed pulse worth and NP.d. IF the maximum NP is increased above 2.2 as described in TS 3.41.5.c above, THEN the Insertion of Excess Reactivity analysis in the Safety Analysis Report SHALL be evaluated to ensure that the safety limit is not exceeded with the new conditions (See Safety Analysis Report, Chapter 13.1.2.).e. The core SHALL NOT be configured such that a 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator element with a burnup less than a nominal 8000 MWD/Metric Ton of Uranium is located adjacent to a vacant (water-filled) internal core position during pulse mode operation.
: b. The maximum calculated MEPD SHALL be less that 24.7 kw per fuel element for non-pulse operation.
Basis a. The safety analysis is based on an assembly of either 8.5 wt% U-ZrH stainless steel clad or a mixture of 8.5 wt% and 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator elements placed in water with a 1.7 inch center line grid spacing.b. Limiting the MEPD to 24.7 kw per element for non-pulse operation places an upper bound on the elemental heat production and the source term of the PSBR to that used in the analysis of a Loss Of Coolant Accident (LOCA) and Maximum Hypothetical Accident (MHA)respectively.
: c. The NP of any core loading with a maximum allowed pulse worth of 2.45% Ak/k (-$3.50) SHALL be limited to 2.2. IF the maximum allowed pulse worth is less than 2.45% Ak/k ($-3.50) for any given core loading (i.e. the pulse can be limited by the total worth of the transient rod, by the core excess, or administratively), THEN the maximum NP may be increased above 2.2 as long as the calculated maximum fuel temperature does not exceed the safety limit with that maximum allowed pulse worth and NP.
See Safety Analysis Report, Chapter 13.Page 14 of 56 TECHNICAL SPECIFICATIONS:
: d. IF the maximum NP is increased above 2.2 as described in TS 3.41.5.c above, THEN the Insertion of Excess Reactivity analysis in the Safety Analysis Report SHALL be evaluated to ensure that the safety limit is not exceeded with the new conditions (See Safety Analysis Report, Chapter 13.1.2.).
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 c. The maximum NP for a given core loading determines the peak pulse temperature with the maximum allowed pulse worth. If the maximum allowed pulse worth is reduced the maximum NP may be increased without exceeding the safety limit (1150'C).
: e. The core SHALL NOT be configured such that a 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator element with a burnup less than a nominal 8000 MWD/Metric Ton of Uranium is located adjacent to a vacant (water-filled) internal core position during pulse mode operation.
The amount of increase in the maximum NP allowed SHALL be calculated by an accepted method documented by an administratively approved procedure.
Basis
: d. If the core loading deviates from the limits set in TS 3.1.5.c then revalidation of the Insertion of Excess Reactivity analysis in the Safety Analysis Report will ensure that the new loading does not inadvertently exceed the safety limit (See Safety Analysis Report, Chapter 13.1.2.).e. Radial peaking effects in unirradiated 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator elements located adjacent to water-filled internal core position may cause a reduction in the safety margin during pulse mode operation with the maximum allowed pulse worth of 2.45% Ak/k (-$3.50) and the maximum allowed NP of 2.2. Locating an 8.5 wt% or moderately-irradiated  
: a. The safety analysis is based on an assembly of either 8.5 wt% U-ZrH stainless steel clad or a mixture of 8.5 wt% and 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator elements placed in water with a 1.7 inch center line grid spacing.
(-8000 Megawatt Days per Metric Ton of Uranium) 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator element adjacent to vacant water-filled internal core positions provides additional safety margin. 12 wt% elements in the periphery of the core are not subject to this concern as the NP is too low to make these elements limiting.3.1.6 TRIGA Fuel Elements Applicability These specifications apply to the mechanical condition of the fuel.Objective The objective is to ensure that the reactor is not operated with damaged fuel that might allow release of fission products.Specifications The reactor SHALL NOT be operated with damaged fuel except to- detect and identify the fuel element for removal. A TRIGA fuel element SHALL be considered damaged and SHALL be removed from the core if: a. In measuring the transverse bend, the bend exceeds the limit of 0.125 inch over the length of the cladding.b. In measuring the elongation, its length exceeds its original length by 0.125 inch.c. A clad defect exists as indicated by release of fission products.Page 15 of 56 TECHNICAL SPECIFICATIONS:
: b. Limiting the MEPD to 24.7 kw per element for non-pulse operation places an upper bound on the elemental heat production and the source term of the PSBR to that used in the analysis of a Loss Of Coolant Accident (LOCA) and Maximum Hypothetical Accident (MHA) respectively. See Safety Analysis Report, Chapter 13.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 Basis a. The limit of transverse bend has been shown to result in no difficulty in disassembling the core. Analysis of the removal of heat from touching fuel elements shows that there will be no hot spots which cause damage to the fuel.b. Experience with TRIGA reactors has shown that fuel element bending that could result in touching has occurred without deleterious effects.This is because (1) during steady state operation, the maximum fuel temperatures are at least 500'C below the safety limit (1150'C), and (2)during a pulse, the cladding temperatures remain well below their stress limit. The elongation limit has been specified to ensure that the cladding material will not be subjected to strains that could cause a loss of fuel integrity and to ensure adequate coolant flow 3.2 Reactor Control and Reactor Safety System 3.2.1 Reactor Control Rods Applicability This specification applies to the reactor control rods.Obiective The objective is to ensure that sufficient control rods are operable to maintain the reactor subcritical.
Page 14 of 56
Specification There SHALL be a minimum of three operable control rods in the reactor core.Basis The shutdown margin and excess reactivity specifications require that the reactor can be made subcritical with the most reactive control rod withdrawn.
 
This specification helps ensure it.Page 16 of 56 TECHNICAL SPECIFICATIONS:
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 3.2.2 Manual Control and Automatic Control Applicability This specification applies to the maximum reactivity insertion rate associated with movement of a standard control rod out of the core.Objective The objective is to ensure that adequate control of the reactor can be maintained during manual and 1, 2, or 3 rod automatic control.Specification The rate of reactivity insertion associated with movement of either the regulating, shim, or safety control rod SHALL be NOT greater than 0.63%Ak/k (-$0.90) per second when averaged over full rod travel. If the automatic control uses a combination of more than one rod, the sum of the reactivity of those rods SHALL be not greater than 0.63% Ak/k (~$0.90) per second when averaged over full travel.Basis accident analysis (refer to Safety Analysis Report, Chapter 13) indicates that the safety limit (1150&deg;C) will not be exceeded if the reactivity addition rate is less than 1.75% Ak/k (-$2.50) per second, when averaged over full travel. This specification of 0.63% Ak/k (-$0.90) per second, when averaged over full travel, is well within that analysis.Page 17 of 56 TECHNICAL SPECIFICATIONS:
FACILITY LICENSE NO. R-2
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 3.2.3 Reactor Control System Applicability This specification applies to the information which must be available to the reactor operator during reactor operation.
: c. The maximum NP for a given core loading determines the peak pulse temperature with the maximum allowed pulse worth. If the maximum allowed pulse worth is reduced the maximum NP may be increased without exceeding the safety limit (1150'C). The amount of increase in the maximum NP allowed SHALL be calculated by an accepted method documented by an administratively approved procedure.
Objective The objective is to require that sufficient information is available to the operator to ensure safe operation of the reactor.Specification The reactor SHALL NOT be operated unless the measuring channels listed in Table 1 are operable. (Note that MN, AU, and SW are abbreviations for manual control mode, automatic control mode, and square wave mode, respectively).
: d. If the core loading deviates from the limits set in TS 3.1.5.c then revalidation of the Insertion of Excess Reactivity analysis in the Safety Analysis Report will ensure that the new loading does not inadvertently exceed the safety limit (See Safety Analysis Report, Chapter 13.1.2.).
Table 1 Measuring Channels Min. No. Effective Mode Measuring Channel Operable, MN, AU & SW Pulse Fuel Element Temperature 1 X X Wide Range Instrument Linear Power 1 X Log Power 1 X Reactor Period/SUR 1 X Power Range Instrument Linear Power 1 X Pulse Peak Power 1 X Basis Fuel temperature displayed at the control console gives continuous information on this parameter which has a specified safety limit. The power level monitors ensure that the reactor power level is adequately monitored for the manual control, automatic control, square wave, and pulsing modes of operation.
: e. Radial peaking effects in unirradiated 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator elements located adjacent to water-filled internal core position may cause a reduction in the safety margin during pulse mode operation with the maximum allowed pulse worth of 2.45% Ak/k
The specifications on reactor power level and reactor period indications are included in this section to provide assurance that the reactor is operated at all times within the limits allowed by these Technical Specifications.
(-$3.50) and the maximum allowed NP of 2.2. Locating an 8.5 wt% or moderately-irradiated (-8000 Megawatt Days per Metric Ton of Uranium) 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator element adjacent to vacant water-filled internal core positions provides additional safety margin. 12 wt% elements in the periphery of the core are not subject to this concern as the NP is too low to make these elements limiting.
Page 18 of 56 TECHNICAL SPECIFICATIONS:
3.1.6 TRIGA Fuel Elements Applicability These specifications apply to the mechanical condition of the fuel.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 3.2.4 Reactor Safety System and Reactor Interlocks Applicability This specification applies to the reactor safety system channels, the reactor interlocks, and the watchdog circuit.Objective The objective is to specify the minimum number of reactor safety system channels and reactor interlocks that must be operable for safe operation.
Objective The objective is to ensure that the reactor is not operated with damaged fuel that might allow release of fission products.
Specification The reactor SHALL NOT be operated unless all of the channels and interlocks described in Table 2a and Table 2b are operable.Basis a. A temperature SCRAM and two power level SCRAMs ensure the reactor is shutdown before the safety limit on the fuel element temperature is reached. The actual setting of the fuel temperature SCRAM depends on the LSSS for that core loading and the location of the instrumented fuel element (see Technical Specification section 2.2).Table 2a Minimum Reactor Safety System Channels Number Operable Channel Function Effective Mode MN, AU Pulse SW X X X Fuel Temperature High Power Detector Power Supply SCRAM Bar on Console 1 SCRAM < 650'C*2 SCRAM -< 110% of maximum reactor operational power not to exceed 1.1 Mw 1 SCRAM on failure of supply voltage 1 Manual SCRAM 1 Transient Rod SCRAM 15 seconds or less after pulse 1 SCRAM on software or self-check failure X X X X x x x Preset Timer X Watchdog Circuit X X X The limit of 650'C SHALL be reduced as required by specification 2.2.Page 19 of 56 TECHNICAL SPECIFICATIONS:
Specifications The reactor SHALL NOT be operated with damaged fuel except to-detect and identify the fuel element for removal. A TRIGA fuel element SHALL be considered damaged and SHALL be removed from the core if:
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 Table 2b.Minimum Reactor Interlocks Channel Source Level Number Operable 1 Effective Mode Function Prevent rod withdrawal without a neutron induced-signal on the log power channel MN, AU X Pulse SW Pulse Mode Inhibit Transient Rod Shim, Safety, and Regulating Rod Simultaneous Rod Withdrawal 1 Prevent pulsing from levels above 1 kw 1 Prevent applications of air unless cylinder is fully inserted 1 Prevent movement of any rod except the transient rod 1 Prevent simultaneous manual withdrawal of two rods X X X X X b. The maximum reactor operational power may be administratively limited to less than 1 Mw depending on section 3.1.5.b of this Technical Specification.
: a. In measuring the transverse bend, the bend exceeds the limit of 0.125 inch over the length of the cladding.
The high power SCRAMs SHALL be set to no more than 110% of the administratively limited maximum reactor operational power if it is less than 1 Mw.c. Operation of the reactor is prevented by SCRAM if there is a failure of the detector power supply for the reactor safety system channels.d. The manual SCRAM allows the operator to shut down the reactor in any mode of operation if an unsafe or abnormal condition occurs.e. The preset timer ensures that the transient rod will be inserted and the reactor will remain at low power after pulsing.f. The watchdog circuit will SCRAM the reactor if the software or the self-checks fail (see Safety Analysis Report, Chapter 7).g. The interlock to prevent startup of the reactor without a neutron induced signal ensures that sufficient neutrons are available for proper startup in all allowable modes of operation.
: b. In measuring the elongation, its length exceeds its original length by 0.125 inch.
: h. The interlock to prevent the initiation of a pulse above 1 kw is to ensure that fuel temperature is approximately pool temperature when a pulse is performed.
: c. A clad defect exists as indicated by release of fission products.
This is to ensure that the safety limit is not reached.Page 20 of 56 TECHNICAL SPECIFICATIONS:
Page 15 of 56
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 i. The interlock to prevent application of air to the transient rod unless the cylinder is fully inserted is to prevent pulsing the reactor in the manual control or automatic control mode.j. In the pulse mode, movement of any rod except the transient rod is prevented by an interlock.
 
This interlock action prevents the addition of reactivity other than with the transient rod.k. Simultaneous manual withdrawal of two rods is prevented to ensure the reactivity rate of insertion is not exceeded.3.2.5 Core Loading and Unloading Operation Applicability This specification applies to the source level interlock.
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
Objective The objective of this specification is to allow bypass of the source level interlock during operations with a subcritical core.Specification During core loading and unloading operations when the reactor is subcritical, the source level interlock may be momentarily defeated using a spring loaded switch in accordance with the fuel loading procedure.
FACILITY LICENSE NO. R-2 Basis
Basis During core loading and unloading, the reactor is subcritical.
: a. The limit of transverse bend has been shown to result in no difficulty in disassembling the core. Analysis of the removal of heat from touching fuel elements shows that there will be no hot spots which cause damage to the fuel.
Thus, momentarily defeating the source level interlockis a safe operation.
: b. Experience with TRIGA reactors has shown that fuel element bending that could result in touching has occurred without deleterious effects.
Should the core become inadvertently supercritical, the accidental insertion of.reactivity will not allow fuel temperature to exceed the 11 50&deg;C safety limit because no single TRIGA fuel element is worth more than-1% Ak/k (-$1.43) in the most reactive core position.3.2.6 SCRAM Time Applicability This specification applies to the time required to fully insert any control rod to a full down position from a full up position.Objective The objective is to achieve rapid shutdown of the reactor to prevent fuel damage.Specification The time from SCRAM initiation to the full insertion of any control rod from a full up position SHALL be less than 1 second.Page 21 of 56 TECHNICAL SPECIFICATIONS:
This is because (1) during steady state operation, the maximum fuel temperatures are at least 500'C below the safety limit (1150'C), and (2) during a pulse, the cladding temperatures remain well below their stress limit. The elongation limit has been specified to ensure that the cladding material will not be subjected to strains that could cause a loss of fuel integrity and to ensure adequate coolant flow 3.2 Reactor Control and Reactor Safety System 3.2.1 Reactor Control Rods Applicability This specification applies to the reactor control rods.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 Basis This specification ensures that the reactor will be promptly shut down when a SCRAM signal is initiated.
Obiective The objective is to ensure that sufficient control rods are operable to maintain the reactor subcritical.
Experience and analysis, Safety Analysis Report, Chapter 13, have indicated that for the range of transients anticipated for a TRIGA reactor, the specified SCRAM time is adequate to ensure the safety of the reactor. If the SCRAM signal is initiated at 1. 1 Mw, while the control rod is being withdrawn, and the negative reactivity is not inserted until the end of the one second rod drop time, the maximum fuel temperature does not reach the safety limit.3.3 Coolant System 3.3.1 Coolant Level Limits Applicability This specification applies to operation of the reactor with respect to a required depth of water above the top of the bottom grid plate.Objective The objective is to ensure that water is present to provide adequate personnel shielding and core cooling when the reactor is operated, and during a LOCA.Specification The reactor SHALL NOT be operated with less than 18 ft. of water above the top of the bottom grid plate.Basis When the water is more than approximately 18 ft. above the top of the bottom grid plate, the water provides sufficient shielding to protect personnel during operation at 1 Mw, and core cooling is achieved with natural circulation of the water through the core. Should the water level drop below approximately 18.25 ft. above the top of the bottom grid plate while operating at 1 Mw, a low pool level alarm (see Technical Specifications 3.3.2) will alert the operator who is required by administratively approved procedure to shutdown the reactor. Once this alarm occurs it will take longer than 1300 seconds before the core is completely uncovered because of a break in the 6" pipe connected to the bottom of the pool. Tests and calculations show that, during a LOCA, 680 seconds is sufficient decay time after shutdown (see Safety Analysis Report, Chapter 13) to prevent the fuel temperature from reaching 950&deg;C. To prevent cladding rupture, the fuel and the cladding temperature must not exceed 950 'C (it is assumed that the fuel and the cladding are the same temperature during air cooling).Page 22 of 56 TECHNICAL SPECIFICATIONS:
Specification There SHALL be a minimum of three operable control rods in the reactor core.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 3.3.2 Detection of Leak or Loss of Coolant Applicability This specification applies to detecting a pool water loss.Objective The objective is to detect the loss of a significant amount of pool water.Specification A pool level alarm SHALL be activated and corrective action taken when the pool level drops 26 cm from a level where the pool is full.Basis The alarm occurs when the water level is approximately 18.25 ft. above the top of the bottom grid plate. The point at which the pool is full is approximately 19.1 ft. above the top of the bottom grid plate. The reactor staff SHALL take action to keep the core covered with water according to existing procedures.
Basis The shutdown margin and excess reactivity specifications require that the reactor can be made subcritical with the most reactive control rod withdrawn. This specification helps ensure it.
The alarm is also transmitted to the Police Services annunciator panel which is monitored 24 hrs. a day. The alarm provides a signal that occurs at all times. Thus, the alarm provides time to initiate corrective action before the radiation from the core poses a serious hazard.3.3.3 Fission Product Activity Applicability This specification applies to the detection of fission product activity.Objective The objective is to ensure that fission products from a leaking fuel element are detected to provide opportunity to take protective action.Specification An air particulate monitor SHALL be operating in the reactor bay whenever the reactor is operating.
Page 16 of 56
An alarm on this unit SHALL activate a building evacuation alarm.Basis This unit will be sensitive to airborne radioactive particulate matter containing fission products and fission gases and will alert personnel in time to take protective action.Page 23 of 56 TECHNICAL SPECIFICATIONS:
 
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 3.3.4 Pool Water Supply for Leak Protection Applicability This specification applies to pool water supplies for the reactor pool for leak protection.
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
Objective The objective is to ensure that a supply of water is available to replenish reactor pool water in the event of pool water leakage.Specification A source of water of at least 100 GPM SHALL be available either from the University water supply or by diverting the heat exchanger secondary flow to the pool.Basis Provisions for both of these supplies are in place and will supply more than the specified flow rate. This flow rate will be more than sufficient to handle leak rates that have occurred in the past or any anticipated leak that might occur in the future.3.3.5 Coolant Conductivity Limits Applicability This specification applies to the conductivity of the water in the pool.Objectives The objectives are: a. To prevent activated contaminants from becoming a radiological hazard, and b. To help preclude corrosion of fuel cladding and other primary system components.
FACILITY LICENSE NO. R-2 3.2.2 Manual Control and Automatic Control Applicability This specification applies to the maximum reactivity insertion rate associated with movement of a standard control rod out of the core.
Objective The objective is to ensure that adequate control of the reactor can be maintained during manual and 1, 2, or 3 rod automatic control.
Specification The rate of reactivity insertion associated with movement of either the regulating, shim, or safety control rod SHALL be NOT greater than 0.63%
Ak/k (-$0.90) per second when averaged over full rod travel. If the automatic control uses a combination of more than one rod, the sum of the reactivity of those rods SHALL be not greater than 0.63% Ak/k (~$0.90) per second when averaged over full travel.
Basis accident analysis (refer to Safety Analysis Report, Chapter 13) indicates that the safety limit (1150&deg;C) will not be exceeded if the reactivity addition rate is less than 1.75% Ak/k (-$2.50) per second, when averaged over full travel. This specification of 0.63% Ak/k (-$0.90) per second, when averaged over full travel, is well within that analysis.
Page 17 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 3.2.3   Reactor Control System Applicability This specification applies to the information which must be available to the reactor operator during reactor operation.
Objective The objective is to require that sufficient information is available to the operator to ensure safe operation of the reactor.
Specification The reactor SHALL NOT be operated unless the measuring channels listed in Table 1 are operable. (Note that MN, AU, and SW are abbreviations for manual control mode, automatic control mode, and square wave mode, respectively).
Table 1 Measuring Channels Min. No.               Effective Mode Measuring Channel               Operable,     MN, AU & SW           Pulse Fuel Element Temperature                   1               X                   X Wide Range Instrument Linear Power                           1               X Log Power                               1               X Reactor Period/SUR                     1               X Power Range Instrument Linear Power                           1               X Pulse Peak Power                       1                                   X Basis Fuel temperature displayed at the control console gives continuous information on this parameter which has a specified safety limit. The power level monitors ensure that the reactor power level is adequately monitored for the manual control, automatic control, square wave, and pulsing modes of operation. The specifications on reactor power level and reactor period indications are included in this section to provide assurance that the reactor is operated at all times within the limits allowed by these Technical Specifications.
Page 18 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 3.2.4 Reactor Safety System and Reactor Interlocks Applicability This specification applies to the reactor safety system channels, the reactor interlocks, and the watchdog circuit.
Objective The objective is to specify the minimum number of reactor safety system channels and reactor interlocks that must be operable for safe operation.
Specification The reactor SHALL NOT be operated unless all of the channels and interlocks described in Table 2a and Table 2b are operable.
Basis
: a. A temperature SCRAM and two power level SCRAMs ensure the reactor is shutdown before the safety limit on the fuel element temperature is reached. The actual setting of the fuel temperature SCRAM depends on the LSSS for that core loading and the location of the instrumented fuel element (see Technical Specification section 2.2).
Table 2a Minimum Reactor Safety System Channels Number                                       Effective Mode Channel        Operable             Function           MN, AU Pulse         SW Fuel Temperature         1      SCRAM < 650'C*                   X        X      X High Power              2     SCRAM -<110% of                 X                X maximum reactor operational power not to exceed 1.1 Mw Detector Power          1     SCRAM on failure of             X                X Supply                          supply voltage SCRAM Bar on            1     Manual SCRAM                     x        x      x Console Preset Timer            1     Transient Rod SCRAM                       X 15 seconds or less after pulse Watchdog Circuit        1     SCRAM on software or             X        X      X self-check failure The limit of 650'C SHALL be reduced as required by specification 2.2.
Page 19 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 Table 2b.
Minimum Reactor Interlocks Number                                Effective    Mode Channel         Operable            Function          MN, AU      Pulse    SW Source Level               1       Prevent rod withdrawal       X without a neutron induced-signal on the log power channel Pulse Mode Inhibit         1       Prevent pulsing from                     X levels above 1 kw Transient Rod              1       Prevent applications of       X air unless cylinder is fully inserted Shim, Safety, and          1       Prevent movement of                     X Regulating Rod                    any rod except the transient rod Simultaneous Rod          1       Prevent simultaneous         X                  X Withdrawal                        manual withdrawal of two rods
: b. The maximum reactor operational power may be administratively limited to less than 1 Mw depending on section 3.1.5.b of this Technical Specification. The high power SCRAMs SHALL be set to no more than 110% of the administratively limited maximum reactor operational power if it is less than 1 Mw.
: c. Operation of the reactor is prevented by SCRAM if there is a failure of the detector power supply for the reactor safety system channels.
: d. The manual SCRAM allows the operator to shut down the reactor in any mode of operation if an unsafe or abnormal condition occurs.
: e. The preset timer ensures that the transient rod will be inserted and the reactor will remain at low power after pulsing.
: f. The watchdog circuit will SCRAM the reactor if the software or the self-checks fail (see Safety Analysis Report, Chapter 7).
: g. The interlock to prevent startup of the reactor without a neutron induced signal ensures that sufficient neutrons are available for proper startup in all allowable modes of operation.
: h. The interlock to prevent the initiation of a pulse above 1 kw is to ensure that fuel temperature is approximately pool temperature when a pulse is performed. This is to ensure that the safety limit is not reached.
Page 20 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2
: i. The interlock to prevent application of air to the transient rod unless the cylinder is fully inserted is to prevent pulsing the reactor in the manual control or automatic control mode.
: j. In the pulse mode, movement of any rod except the transient rod is prevented by an interlock. This interlock action prevents the addition of reactivity other than with the transient rod.
: k. Simultaneous manual withdrawal of two rods is prevented to ensure the reactivity rate of insertion is not exceeded.
3.2.5 Core Loading and Unloading Operation Applicability This specification applies to the source level interlock.
Objective The objective of this specification is to allow bypass of the source level interlock during operations with a subcritical core.
Specification During core loading and unloading operations when the reactor is subcritical, the source level interlock may be momentarily defeated using a spring loaded switch in accordance with the fuel loading procedure.
Basis During core loading and unloading, the reactor is subcritical. Thus, momentarily defeating the source level interlockis a safe operation. Should the core become inadvertently supercritical, the accidental insertion of.
reactivity will not allow fuel temperature to exceed the 11 50&deg;C safety limit because no single TRIGA fuel element is worth more than-1% Ak/k
(-$1.43) in the most reactive core position.
3.2.6 SCRAM Time Applicability This specification applies to the time required to fully insert any control rod to a full down position from a full up position.
Objective The objective is to achieve rapid shutdown of the reactor to prevent fuel damage.
Specification The time from SCRAM initiation to the full insertion of any control rod from a full up position SHALL be less than 1 second.
Page 21 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 Basis This specification ensures that the reactor will be promptly shut down when a SCRAM signal is initiated. Experience and analysis, Safety Analysis Report, Chapter 13, have indicated that for the range of transients anticipated for a TRIGA reactor, the specified SCRAM time is adequate to ensure the safety of the reactor. If the SCRAM signal is initiated at 1. 1 Mw, while the control rod is being withdrawn, and the negative reactivity is not inserted until the end of the one second rod drop time, the maximum fuel temperature does not reach the safety limit.
3.3 Coolant System 3.3.1 Coolant Level Limits Applicability This specification applies to operation of the reactor with respect to a required depth of water above the top of the bottom grid plate.
Objective The objective is to ensure that water is present to provide adequate personnel shielding and core cooling when the reactor is operated, and during a LOCA.
Specification The reactor SHALL NOT be operated with less than 18 ft. of water above the top of the bottom grid plate.
Basis When the water is more than approximately 18 ft. above the top of the bottom grid plate, the water provides sufficient shielding to protect personnel during operation at 1 Mw, and core cooling is achieved with natural circulation of the water through the core. Should the water level drop below approximately 18.25 ft. above the top of the bottom grid plate while operating at 1 Mw, a low pool level alarm (see Technical Specifications 3.3.2) will alert the operator who is required by administratively approved procedure to shutdown the reactor. Once this alarm occurs it will take longer than 1300 seconds before the core is completely uncovered because of a break in the 6" pipe connected to the bottom of the pool. Tests and calculations show that, during a LOCA, 680 seconds is sufficient decay time after shutdown (see Safety Analysis Report, Chapter 13) to prevent the fuel temperature from reaching 950&deg;C. To prevent cladding rupture, the fuel and the cladding temperature must not exceed 950 'C (it is assumed that the fuel and the cladding are the same temperature during air cooling).
Page 22 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 3.3.2 Detection of Leak or Loss of Coolant Applicability This specification applies to detecting a pool water loss.
Objective The objective is to detect the loss of a significant amount of pool water.
Specification A pool level alarm SHALL be activated and corrective action taken when the pool level drops 26 cm from a level where the pool is full.
Basis The alarm occurs when the water level is approximately 18.25 ft. above the top of the bottom grid plate. The point at which the pool is full is approximately 19.1 ft. above the top of the bottom grid plate. The reactor staff SHALL take action to keep the core covered with water according to existing procedures. The alarm is also transmitted to the Police Services annunciator panel which is monitored 24 hrs. a day. The alarm provides a signal that occurs at all times. Thus, the alarm provides time to initiate corrective action before the radiation from the core poses a serious hazard.
3.3.3 Fission Product Activity Applicability This specification applies to the detection of fission product activity.
Objective The objective is to ensure that fission products from a leaking fuel element are detected to provide opportunity to take protective action.
Specification An air particulate monitor SHALL be operating in the reactor bay whenever the reactor is operating. An alarm on this unit SHALL activate a building evacuation alarm.
Basis This unit will be sensitive to airborne radioactive particulate matter containing fission products and fission gases and will alert personnel in time to take protective action.
Page 23 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 3.3.4 Pool Water Supply for Leak Protection Applicability This specification applies to pool water supplies for the reactor pool for leak protection.
Objective The objective is to ensure that a supply of water is available to replenish reactor pool water in the event of pool water leakage.
Specification A source of water of at least 100 GPM SHALL be available either from the University water supply or by diverting the heat exchanger secondary flow to the pool.
Basis Provisions for both of these supplies are in place and will supply more than the specified flow rate. This flow rate will be more than sufficient to handle leak rates that have occurred in the past or any anticipated leak that might occur in the future.
3.3.5 Coolant Conductivity Limits Applicability This specification applies to the conductivity of the water in the pool.
Objectives The objectives are:
: a. To prevent activated contaminants from becoming a radiological hazard, and
: b. To help preclude corrosion of fuel cladding and other primary system components.
Specification The reactor SHALL NOT be operated if the conductivity of the bulk pool water is greater than 5 microsiemens/cm (5 micromhos/cm).
Specification The reactor SHALL NOT be operated if the conductivity of the bulk pool water is greater than 5 microsiemens/cm (5 micromhos/cm).
Basis Experience indicates that 5 microsiemens/cm is an acceptable level of water contaminants in an aluminum/stainless steel system such as that at the PSBR. Based on experience, activation at this level does not pose a significant radiological hazard, and significant corrosion of the stainless steel fuel cladding will not occur when the conductivity is below 5.microsiemens/cm.
Basis Experience indicates that 5 microsiemens/cm is an acceptable level of water contaminants in an aluminum/stainless steel system such as that at the PSBR. Based on experience, activation at this level does not pose a significant radiological hazard, and significant corrosion of the stainless steel fuel cladding will not occur when the conductivity is below 5.
Page 24 of 56 TECHNICAL SPECIFICATIONS:
microsiemens/cm.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 3.3.6 Coolant Temperature Limits Applicability This specification applies to the pool water temperature.
Page 24 of 56
Objective The objective is to maintain the pool water temperature at a level that will not cause damage to the demineralizer resins.Specification An alarm SHALL annunciate and corrective action SHALL be taken if during operation the bulk pool water temperature reaches 140&deg;F (60&deg;C).Basis This specification is primarily to preserve demineralizer resins. Information available indicates that temperature damage will be minimal up to this temperature.


===3.4 Confinement===
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
Applicability This specification applies to reactor bay doors.Objective The objective is to ensure that no large air passages exist to the reactor bay during reactor operation.
FACILITY LICENSE NO. R-2 3.3.6  Coolant Temperature Limits Applicability This specification applies to the pool water temperature.
Specifications The reactor bay truck door SHALL be closed and the reactor bay personnel doors SHALL NOT be blocked open and left unattended if either of the following conditions are true.a. The reactor is not secured, or b. Irradiated fuel or a fueled experiment with significant fission product inventory is being moved outside containers, systems or storage areas.Basis This specification helps to ensure that the air pressure in the reactor bay is lower than the remainder of the building and the outside air pressure.
Objective The objective is to maintain the pool water temperature at a level that will not cause damage to the demineralizer resins.
Controlled air pressure is maintained by the air exhaust system. and ensures controlled release of any airborne radioactivity.
Specification An alarm SHALL annunciate and corrective action SHALL be taken if during operation the bulk pool water temperature reaches 140&deg;F (60&deg;C).
Page 25 of 56 TECHNICAL SPECIFICATIONS:
Basis This specification is primarily to preserve demineralizer resins. Information available indicates that temperature damage will be minimal up to this temperature.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 3.5 Engineered Safety Features -Facility Exhaust System and Emergency Exhaust System Applicability This specification applies to the operation of the facility exhaust system and the emergency exhaust system.Objective The objective is to mitigate the consequences of the release of airborne radioactive materials resulting from reactor operation.
3.4 Confinement Applicability This specification applies to reactor bay doors.
Objective The objective is to ensure that no large air passages exist to the reactor bay during reactor operation.
Specifications The reactor bay truck door SHALL be closed and the reactor bay personnel doors SHALL NOT be blocked open and left unattended if either of the following conditions are true.
: a. The reactor is not secured, or
: b. Irradiated fuel or a fueled experiment with significant fission product inventory is being moved outside containers, systems or storage areas.
Basis This specification helps to ensure that the air pressure in the reactor bay is lower than the remainder of the building and the outside air pressure. Controlled air pressure is maintained by the air exhaust system. and ensures controlled release of any airborne radioactivity.
Page 25 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 3.5 Engineered Safety Features - Facility Exhaust System and Emergency Exhaust System Applicability This specification applies to the operation of the facility exhaust system and the emergency exhaust system.
Objective The objective is to mitigate the consequences of the release of airborne radioactive materials resulting from reactor operation.
Specification
Specification
: a. If the reactor is not secured, at least one facility exhaust fan SHALL be operating and, except for periods of time less than 48 hours during maintenance or repair, the emergency exhaust system SHALL be operable.b. If irradiated fuel or a fueled experiment with significant fission product inventory is being moved outside containers, systems or storage areas, at least one facility exhaust fan SHALL be operating and the emergency exhaust system SHALL be operable.Basis During normal operation, the concentration of airborne radioactivity in unrestricted areas is below effluent release limits as described in the Safety Analysis Report, Chapter 13. In the event of a substantial release of airborne radioactivity, an air radiation monitor and/or an area radiation monitor will sound a building evacuation alarm which will automatically cause the facility exhaust system to close and the exhausted air to be passed through the emergency exhaust system filters before release. This reduces the radiation within the building.
: a. If the reactor is not secured, at least one facility exhaust fan SHALL be operating and, except for periods of time less than 48 hours during maintenance or repair, the emergency exhaust system SHALL be operable.
The filters will remove 90% all of the particulate fission products that escape to the atmosphere.
: b. If irradiated fuel or a fueled experiment with significant fission product inventory is being moved outside containers, systems or storage areas, at least one facility exhaust fan SHALL be operating and the emergency exhaust system SHALL be operable.
Basis During normal operation, the concentration of airborne radioactivity in unrestricted areas is below effluent release limits as described in the Safety Analysis Report, Chapter 13. In the event of a substantial release of airborne radioactivity, an air radiation monitor and/or an area radiation monitor will sound a building evacuation alarm which will automatically cause the facility exhaust system to close and the exhausted air to be passed through the emergency exhaust system filters before release. This reduces the radiation within the building. The filters will remove 90% all of the particulate fission products that escape to the atmosphere.
The emergency exhaust system activities only during an evacuation where upon all personnel are required to evacuate the building (section 3.6.2). If there is an evacuation while the emergency exhaust system is out of service for maintenance or repair, personnel evacuation is not prevented.
The emergency exhaust system activities only during an evacuation where upon all personnel are required to evacuate the building (section 3.6.2). If there is an evacuation while the emergency exhaust system is out of service for maintenance or repair, personnel evacuation is not prevented.
Personnel dose to the public will be equivalent or less whether or not the emergency exhaust system functions in the unlikely event an accident occurs during the maintenance or repair.Page 26 of 56 TECHNICAL SPECIFICATIONS:
Personnel dose to the public will be equivalent or less whether or not the emergency exhaust system functions in the unlikely event an accident occurs during the maintenance or repair.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 3.6 Radiation Monitoring System 3.6.1 Radiation Monitoring Information Applicability This specification applies to the radiation monitoring information which must be available to the reactor operator during reactor operation.
Page 26 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 3.6 Radiation Monitoring System 3.6.1 Radiation Monitoring Information Applicability This specification applies to the radiation monitoring information which must be available to the reactor operator during reactor operation.
Objective The objective is to ensure that sufficient radiation monitoring information is available to the operator to ensure personnel radiation safety during reactor operation.
Objective The objective is to ensure that sufficient radiation monitoring information is available to the operator to ensure personnel radiation safety during reactor operation.
Specification The reactor SHALL NOT be operated unless the radiation monitoring channels listed in Table 3 are operating.
Specification The reactor SHALL NOT be operated unless the radiation monitoring channels listed in Table 3 are operating.
Table 3 Radiation Monitoring Channels Radiation Monitoring Channels Area Radiation Monitor Continuous Air (Radiation)
Table 3 Radiation Monitoring Channels Radiation Monitoring Channels                         Function              Number Area Radiation Monitor           Monitor radiation levels           1 in the reactor bay.
Monitor Beamhole Laboratory Monitor Function Number Monitor radiation levels in the reactor bay.Monitor radioactive particulates in the reactor bay air.Monitor radiation in the Beamhole Laboratory required only when the laboratory is in use.1 1 1 Basis a. The radiation monitors provide information to operating personnel of any impending or existing danger from radiation so that there will be sufficient time to evacuate the facility and to take the necessary steps to control the spread of radioactivity to the surroundings.
Continuous Air                  Monitor radioactive                 1 (Radiation) Monitor              particulates in the reactor bay air.
: b. The area radiation monitor in the Beamhole Laboratory provides information to the user and to the reactor operator when this laboratory is in use.Page 27 of 56 TECHNICAL SPECIFICATIONS:
Beamhole Laboratory              Monitor radiation in the           1 Monitor                          Beamhole Laboratory required only when the laboratory is in use.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 3.6.2 Evacuation Alarm Applicability This specification applies to the evacuation alarm.Objective The objective is to ensure that all personnel are alerted to evacuate the PSBR building when a potential radiation hazard exists within this building.Specification The reactor SHALL NOT be operated unless the evacuation alarm is operable and audible to personnel within the PSBR building when activated by the radiation monitoring channels in Table 3 or a manual switch.Basis The evacuation alarm produces a loud pulsating sound throughout the PSBR building when there is any impending or existing danger from radiation.
Basis
: a. The radiation monitors provide information to operating personnel of any impending or existing danger from radiation so that there will be sufficient time to evacuate the facility and to take the necessary steps to control the spread of radioactivity to the surroundings.
: b. The area radiation monitor in the Beamhole Laboratory provides information to the user and to the reactor operator when this laboratory is in use.
Page 27 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 3.6.2 Evacuation Alarm Applicability This specification applies to the evacuation alarm.
Objective The objective is to ensure that all personnel are alerted to evacuate the PSBR building when a potential radiation hazard exists within this building.
Specification The reactor SHALL NOT be operated unless the evacuation alarm is operable and audible to personnel within the PSBR building when activated by the radiation monitoring channels in Table 3 or a manual switch.
Basis The evacuation alarm produces a loud pulsating sound throughout the PSBR building when there is any impending or existing danger from radiation.
The sound notifies all personnel within the PSBR building to evacuate the building as prescribed by the PSBR emergency procedure.
The sound notifies all personnel within the PSBR building to evacuate the building as prescribed by the PSBR emergency procedure.
3.6.3 Argon-41 Discharge Limit Applicability This specification applies to the concentration of Argon-41 that may be discharged from the PSBR.Obiective The objective is to ensure that the health and safety of the public is not endangered by the discharge of Argon-41 from the PSBR.Specification All Argon-41 concentrations produced by the operation of the reactor SHALL be below the limits imposed by 10 CFR Part 20 when averaged over a year.Basis The maximum allowable concentration of Argon-41 in air in unrestricte_
3.6.3 Argon-41 Discharge Limit Applicability This specification applies to the concentration of Argon-41 that may be discharged from the PSBR.
areas as specified in Appendix B, Table 2 of 10 CFR Part 20 is 1.0 x 10 iiCi/ml. Measurements of Argon-41 have been made in the reactor bay when the reactor operates at 1 Mw. These measurements showsthat the concentrations averaged over a year produce less than 1.0 x 10 jtCi/ml in an unrestricted area (see Environmental Impact Appraisal, December 12, 1996).Page 28 of 56 TECHNICAL SPECIFICATIONS:
Obiective The objective is to ensure that the health and safety of the public is not endangered by the discharge of Argon-41 from the PSBR.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 3.6.4 As Low As Reasonably Achievable (ALARA)Applicability This specification applies to all reactor operations that could result in occupational exposures to radiation or the release of radioactive effluents to the environs.Objective The objective is to maintain all exposures to radiation and release of radioactive effluents to the environs ALARA.Specification An ALARA program SHALL be in effect.Basis Having an ALARA program will ensure that occupational exposures to radiation and the release of radioactive effluents to the environs will be ALARA. Having such a formal program will keep the staff cognizant of the importance to minimize radiation exposures and effluent releases.3.7 Limitations of Experiments Applicability These specifications apply to experiments installed in the reactor and its experimental facilities.
Specification All Argon-41 concentrations produced by the operation of the reactor SHALL be below the limits imposed by 10 CFR Part 20 when averaged over a year.
Obiective The objective is to prevent damage to the reactor and to minimize release of radioactive materials in the event of an experiment failure.Specifications The reactor SHALL NOT be operated unless the following conditions governing experiments exist: a. The reactivity of a movable experiment and/or movable portions of a secured experiment plus the maximum allowed pulse reactivity SHALL be less than 2.45% k/k (-$3.50).
Basis The maximum allowable concentration of Argon-41 in air in unrestricte_
However, the reactivity of a movable experiment and/or movable portions of a secured experiment SHALL have a reactivity worth less than 1.4% Ak/k (-$2.00).
areas as specified in Appendix B, Table 2 of 10 CFR Part 20 is 1.0 x 10 iiCi/ml. Measurements of Argon-41 have been made in the reactor bay when the reactor operates at 1 Mw. These measurements showsthat the concentrations averaged over a year produce less than 1.0 x 10 jtCi/ml in an unrestricted area (see Environmental Impact Appraisal, December 12, 1996).
During measurements made to determine specific worth, this specification is suspended provided the reactor is operated at power levels no greater than 1 kw. When a movable experiment is used, the maximum allowed pulse SHALL be reduced below the allowed pulse reactivity insertion of 2.45% Ak/k (-$3.50) to ensure that the sum is less 2.45% Ak/k (-$3.50).Page 29 of 56 TECHNICAL SPECIFICATIONS:
Page 28 of 56
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 b. A single secured experiment SHALL be limited to a maximum of 2.45% Ak/k (-$3.50).
 
The sum of the reactivity worth of all experiments SHALL be less than 2.45% Ak/k (-$3.50).
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
During measurements made to determine experimental worth, this specification is suspended provided the reactor is operated at power levels no greater that 1 kw.c. When the keffofthe core is less than 1 with all control rods at their upper limit and no experiments in or near the core, secured negative reactivity experiments may be added without limit.d. An experiment may be irradiated or an experimental facility may be used in conjunction with the reactor provided its use does not constitute an unreviewed safety question.
FACILITY LICENSE NO. R-2 3.6.4   As Low As Reasonably Achievable (ALARA)
The failure mechanisms that SHALL be analyzed include, but are not limited to corrosion, overheating, impact from projectiles, chemical, and mechanical explosions.
Applicability This specification applies to all reactor operations that could result in occupational exposures to radiation or the release of radioactive effluents to the environs.
Objective The objective is to maintain all exposures to radiation and release of radioactive effluents to the environs ALARA.
Specification An ALARA program SHALL be in effect.
Basis Having an ALARA program will ensure that occupational exposures to radiation and the release of radioactive effluents to the environs will be ALARA. Having such a formal program will keep the staff cognizant of the importance to minimize radiation exposures and effluent releases.
3.7 Limitations of Experiments Applicability These specifications apply to experiments installed in the reactor and its experimental facilities.
Obiective The objective is to prevent damage to the reactor and to minimize release of radioactive materials in the event of an experiment failure.
Specifications The reactor SHALL NOT be operated unless the following conditions governing experiments exist:
: a. The reactivity of a movable experiment and/or movable portions of a secured experiment plus the maximum allowed pulse reactivity SHALL be less than 2.45% k/k (-$3.50). However, the reactivity of a movable experiment and/or movable portions of a secured experiment SHALL have a reactivity worth less than 1.4% Ak/k (-$2.00). During measurements made to determine specific worth, this specification is suspended provided the reactor is operated at power levels no greater than 1 kw. When a movable experiment is used, the maximum allowed pulse SHALL be reduced below the allowed pulse reactivity insertion of 2.45% Ak/k (-$3.50) to ensure that the sum is less 2.45% Ak/k (-$3.50).
Page 29 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2
: b. A single secured experiment SHALL be limited to a maximum of 2.45% Ak/k
(-$3.50). The sum of the reactivity worth of all experiments SHALL be less than 2.45% Ak/k (-$3.50). During measurements made to determine experimental worth, this specification is suspended provided the reactor is operated at power levels no greater that 1 kw.
: c. When the keffofthe core is less than 1 with all control rods at their upper limit and no experiments in or near the core, secured negative reactivity experiments may be added without limit.
: d. An experiment may be irradiated or an experimental facility may be used in conjunction with the reactor provided its use does not constitute an unreviewed safety question. The failure mechanisms that SHALL be analyzed include, but are not limited to corrosion, overheating, impact from projectiles, chemical, and mechanical explosions.
Explosive material SHALL NOT be stored or used in the facility without proper safeguards to prevent release of fission products or loss of reactor shutdown capability.
Explosive material SHALL NOT be stored or used in the facility without proper safeguards to prevent release of fission products or loss of reactor shutdown capability.
If an experimental failure occurs which could lead to the release of fission products or the loss of reactor shutdown capability, physical inspection SHALL be performed to determine the consequences and the need for corrective action.The results of the inspection and any corrective action taken SHALL be reviewed by the Director or a designated alternate and determined to be satisfactory before operation of the reactor is resumed.e. Experiment materials, except fuel materials, which could off-gas, sublime, volatilize, or produce aerosols under (1) normal operating conditions of the experiment and reactor, (2) credible accident conditions in the reactor, or (3)possible accident conditions in the experiment, SHALL be limited in activity such that the airborne concentration of radioactivity averaged over a year SHALL NOT exceed the limit of Appendix B Table 2 of 10 CFR Part 20.When calculating activity limits, the following assumptions SHALL be used: 1) If an experiment fails and releases radioactive gases or aerosols to the reactor bay or atmosphere, 100% of the gases or aerosols escape.2) If the effluent from an experimental facility exhausts through a holdup tank which closes automatically on high radiation level, at least 10% of the gaseous activity or aerosols produced will escape.3) If the effluent from an experimental facility exhausts through a filter installation designed for greater than 99% efficiency for 0.3 micron particles, at least 10% of these vapors can escape.4) For materials whose boiling point is above 130'F and where vapors formed by boiling this material can escape only through an undisturbed column of water above the core, at least 10% of these vapors can escape.Page 30 of 56 TECHNICAL SPECIFICATIONS:
If an experimental failure occurs which could lead to the release of fission products or the loss of reactor shutdown capability, physical inspection SHALL be performed to determine the consequences and the need for corrective action.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 f, Each fueled experiment SHALL be controlled such that the total inventory of iodine isotopes 131 through 135 in the experiment is no greater than 1.5 curies.In addition, any fueled experiment which would generate an inventory of more than 5 millicuries (mCi) of 1-131 through 1-135 SHALL be reviewed to ensure that in the case of an accident, the total release of iodine will not exceed that postulated for the MHA (see Safety Analysis Report, Chapter 13).Basis a. This specification limits the sum of the reactivities of a maximum allowed pulse and a movable experiment to the specified maximum reactivity of the transient rod. This limits the effects of a pulse simultaneous with the failure of the movable experiment to the effects analyzed for a 2.4 5% Ak/k (-$3.50) pulse. In addition, the maximum power attainable with the ramp insertion of 1.4% Ak/k (-$2.00) is less than 500 kw starting from critical.b. The maximum worth of all experiments is limited to 2.45% Ak/k (-$3.50) so that their inadvertent sudden removal from the cold critical reactor will not result in the reactor achieving a power level high enough to exceed the temperature safety limit (1 150'C). The worth of a single secured experiment is limited to the allowed pulse reactivity insertion as an increased measure of safety. Should the 2.45% Ak/k, (-$3.50) reactivity be inserted by a ramp increase, the maximum power attainable is less than 1 Mw.c. Since the initial core is subcritical, adding and then inadvertently removing all negative reactivity experiments leaves the core in its initial subcritical condition.
The results of the inspection and any corrective action taken SHALL be reviewed by the Director or a designated alternate and determined to be satisfactory before operation of the reactor is resumed.
: d. The design basis accident is the MHA (See Safety Analysis Report, Chapter 13). A chemical explosion (such as detonated TNT) or a mechanical explosion (such as a steam explosion or a high pressure gas container explosion) may release enough energy to cause release of fission products or loss of reactor shutdown capability.
: e. Experiment materials, except fuel materials, which could off-gas, sublime, volatilize, or produce aerosols under (1) normal operating conditions of the experiment and reactor, (2) credible accident conditions in the reactor, or (3) possible accident conditions in the experiment, SHALL be limited in activity such that the airborne concentration of radioactivity averaged over a year SHALL NOT exceed the limit of Appendix B Table 2 of 10 CFR Part 20.
A projectile with a large amount of kinetic energy could cause release of fission products or loss of reactor shutdown capability.
When calculating activity limits, the following assumptions SHALL be used:
Accelerated corrosion of the fuel. cladding due- to material released by a failed experiment could also lead to release of fission products.If an experiment failure occurs a special investigation is required to ensure that all effects from the failure are known before operation proceeds.e. This specification is intended to reduce the likelihood that airborne activities in excess of the limits of Appendix B Table 2 of 10 CFR Part 20 will be released to the atmosphere outside the facility boundary.f. The 5 mCi limitation on 1-131 through 1-135 ensures that in the event of failure of a fueled experiment, the exposure dose at the exclusion area boundary will be less than that postulated for the MHA (See Safety Analysis Report, Chapter 13)even if the iodine is released in the air.Page 31 of 56 TECHNICAL SPECIFICATIONS:
: 1) If an experiment fails and releases radioactive gases or aerosols to the reactor bay or atmosphere, 100% of the gases or aerosols escape.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 4.0 SURVEILLANCE REQUIREMENTS IF a Surveillance Requirement(s) is not accomplished in the specified interval that prohibits reactor operation; THEN the reactor SHALL NOT be operated until the Surveillance Requirement(s) is satisfied EXCEPT as required to accomplish the required Surveillance(s).
: 2) If the effluent from an experimental facility exhausts through a holdup tank which closes automatically on high radiation level, at least 10% of the gaseous activity or aerosols produced will escape.
4.1 Reactor Parameters 4.1.1 Reactor Power Calibration Applicability This specification applies to the surveillance of the reactor power calibration.
: 3) If the effluent from an experimental facility exhausts through a filter installation designed for greater than 99% efficiency for 0.3 micron particles, at least 10% of these vapors can escape.
Objective The objective is to verify the performance and operability of the power measuring channel.Specification A thermal power channel calibration SHALL be made on the linear power level monitoring channel biennially, not to exceed 30 months.Basis The thermal power level channel calibration will ensure that the reactor is operated at the authorized power levels.4.1.2 Reactor Excess Reactivity Applicability This specification applies to surveillance of core excess reactivity.
: 4) For materials whose boiling point is above 130'F and where vapors formed by boiling this material can escape only through an undisturbed column of water above the core, at least 10% of these vapors can escape.
Objective The objective is to ensure that the reactor excess reactivity does not exceed the Technical Specifications and the limit analyzed in Safety Analysis Report, Chapter 13.Specification The excess reactivity of the core SHALL be measured annually, not to.exceed 15 months, and following core or control rod changes equal to or greater than 0.7% Ak/k (-$ 1.00).Page 32 of 56 TECHNICAL SPECIFICATIONS:
Page 30 of 56
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 Basis Excess reactivity measurements on this schedule ensure that no unexpected changes have occurred in the core and the core configuration does not exceed excess reactivity limits established in the Specification 3.1.2.4.1.3 TRIGA Fuel Elements Applicability This specification applies to the surveillance requirements for the TRIGA fuel elements.Objective The objective is to verify the continuing integrity of the fuel element cladding.Specification Fuel elements and control rods with fuel followers SHALL be inspected visually for damage or deterioration and measured for length and bend in accordance with the following:
 
: a. Before being placed in the core for the first time or before return to service.b. Every two years, not to exceed 30 months, or at intervals not to exceed the sum of $3,500 in pulse reactivity, whichever comes first, for elements with a NP greater than 1 and for control rods with fueled followers.
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
: c. Every four years, not to exceed 54 months, for elements with a NP of 1 or less.d. Upon being removed from service. Those removed from service are then exempt from further inspection.
FACILITY LICENSE NO. R-2 f, Each fueled experiment SHALL be controlled such that the total inventory of iodine isotopes 131 through 135 in the experiment is no greater than 1.5 curies.
Basis The frequency of inspection and measurement schedule is based on the parameters most likely to affect the fuel cladding of a pulsing reactor operated at moderate pulsing levels and utilizing fuel elements whose characteristics are well known.Page 33 of 56 TECHNICAL SPECIFICATIONS:
In addition, any fueled experiment which would generate an inventory of more than 5 millicuries (mCi) of 1-131 through 1-135 SHALL be reviewed to ensure that in the case of an accident, the total release of iodine will not exceed that postulated for the MHA (see Safety Analysis Report, Chapter 13).
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 4.2 Reactor Control and Safety System 4.2.1 Reactivity Worth Applicability This specification applies to the reactivity worth of the control rods.Objective The objective is to ensure that the control rods are capable of maintaining the reactor subcritical.
Basis
Specification The reactivity worth of each control rod and the shutdown margin for the core loading in use SHALL be determined annually, not to exceed 15 months, or following core or control rod changes equal to or greater than 0.7% Ak/k (-$1.00).Basis The reactivity worth of the control rod is measured to ensure that the required shutdown margin is available and to provide an accurate means for determining the core excess reactivity, maximum reactivity, insertion rates, and the reactivity worth of experiments inserted in the core.4.2.2 Reactivity Insertion Rate Applicability This specification applies to control rod movement speed.Objective The objective is to ensure that the reactivity addition rate specification is not violated and that the control rod drives are functioning.
: a. This specification limits the sum of the reactivities of a maximum allowed pulse and a movable experiment to the specified maximum reactivity of the transient rod. This limits the effects of a pulse simultaneous with the failure of the movable experiment to the effects analyzed for a 2 .4 5 % Ak/k (-$3.50) pulse. In addition, the maximum power attainable with the ramp insertion of 1.4% Ak/k
Specification The rod drive speed both up and down and the time from SCRAM initiation to the full insertion of any control rod from the full up position SHALL be measured annually, not to exceed 15 months, or when any significant work is done on the rod drive or the rod.Basis This specification ensures that the reactor will be promptly shut down when a SCRAM signal is initiated.
(-$2.00) is less than 500 kw starting from critical.
Experience and analysis have indicated that for the range of transients anticipated for a TRIGA reactor, the specified SCRAM time is adequate to ensure the safety of the reactor. It also ensures that the maximum reactivity addition rate specification will not be exceeded.Page 34 of 56 TECHNICAL SPECIFICATIONS:
: b. The maximum worth of all experiments is limited to 2.45% Ak/k (-$3.50) so that their inadvertent sudden removal from the cold critical reactor will not result in the reactor achieving a power level high enough to exceed the temperature safety limit (1 150'C). The worth of a single secured experiment is limited to the allowed pulse reactivity insertion as an increased measure of safety. Should the 2.45% Ak/k, (-$3.50) reactivity be inserted by a ramp increase, the maximum power attainable is less than 1 Mw.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 4.2.3 Reactor Safety System Applicability The specifications apply to the surveillance requirements for measurements, channel tests, and channel checks of the reactor safety systems and watchdog circuit.Objective The objective is to verify the performance and operability of the systems and components that are directly related to reactor safety.Specifications
: c. Since the initial core is subcritical, adding and then inadvertently removing all negative reactivity experiments leaves the core in its initial subcritical condition.
: a. A channel test of the SCRAM function of the wide range linear, power range linear, fuel temperature, manual, and preset timer safety channels SHALL be made on each day that the reactor is to be operated, or prior to each operation that extends more than one day.b. A channel test of the detector power supply SCRAM functions for both the wide range and the power range and the watchdog circuit SHALL be performed annually, not to exceed 15 months.c. Channel checks for operability SHALL be performed daily on fuel element temperature, wide range linear power, wide range log power, wide range reactor period/SUR, and power range linear power when the reactor is to be operated, or prior to each operation that extends more than one day.d. The power range channel SHALL be compared with other independent channels for proper channel indication, when appropriate, each time the reactor is operated.e. The pulse peak power channel SHALL be compared to the fuel temperature each time the reactor is pulsed, to ensure proper peak power channel operation.
: d. The design basis accident is the MHA (See Safety Analysis Report, Chapter 13). A chemical explosion (such as detonated TNT) or a mechanical explosion (such as a steam explosion or a high pressure gas container explosion) may release enough energy to cause release of fission products or loss of reactor shutdown capability. A projectile with a large amount of kinetic energy could cause release of fission products or loss of reactor shutdown capability.
Accelerated corrosion of the fuel. cladding due- to material released by a failed experiment could also lead to release of fission products.
If an experiment failure occurs a special investigation is required to ensure that all effects from the failure are known before operation proceeds.
: e. This specification is intended to reduce the likelihood that airborne activities in excess of the limits of Appendix B Table 2 of 10 CFR Part 20 will be released to the atmosphere outside the facility boundary.
: f. The 5 mCi limitation on 1-131 through 1-135 ensures that in the event of failure of a fueled experiment, the exposure dose at the exclusion area boundary will be less than that postulated for the MHA (See Safety Analysis Report, Chapter 13) even if the iodine is released in the air.
Page 31 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 4.0 SURVEILLANCE REQUIREMENTS IF a Surveillance Requirement(s) is not accomplished in the specified interval that prohibits reactor operation; THEN the reactor SHALL NOT be operated until the Surveillance Requirement(s) is satisfied EXCEPT as required to accomplish the required Surveillance(s).
4.1   Reactor Parameters 4.1.1   Reactor Power Calibration Applicability This specification applies to the surveillance of the reactor power calibration.
Objective The objective is to verify the performance and operability of the power measuring channel.
Specification A thermal power channel calibration SHALL be made on the linear power level monitoring channel biennially, not to exceed 30 months.
Basis The thermal power level channel calibration will ensure that the reactor is operated at the authorized power levels.
4.1.2   Reactor Excess Reactivity Applicability This specification applies to surveillance of core excess reactivity.
Objective The objective is to ensure that the reactor excess reactivity does not exceed the Technical Specifications and the limit analyzed in Safety Analysis Report, Chapter 13.
Specification The excess reactivity of the core SHALL be measured annually, not to.
exceed 15 months, and following core or control rod changes equal to or greater than 0.7% Ak/k (-$ 1.00).
Page 32 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 Basis Excess reactivity measurements on this schedule ensure that no unexpected changes have occurred in the core and the core configuration does not exceed excess reactivity limits established in the Specification 3.1.2.
4.1.3 TRIGA Fuel Elements Applicability This specification applies to the surveillance requirements for the TRIGA fuel elements.
Objective The objective is to verify the continuing integrity of the fuel element cladding.
Specification Fuel elements and control rods with fuel followers SHALL be inspected visually for damage or deterioration and measured for length and bend in accordance with the following:
: a. Before being placed in the core for the first time or before return to service.
: b. Every two years, not to exceed 30 months, or at intervals not to exceed the sum of $3,500 in pulse reactivity, whichever comes first, for elements with a NP greater than 1 and for control rods with fueled followers.
: c. Every four years, not to exceed 54 months, for elements with a NP of 1 or less.
: d. Upon being removed from service. Those removed from service are then exempt from further inspection.
Basis The frequency of inspection and measurement schedule is based on the parameters most likely to affect the fuel cladding of a pulsing reactor operated at moderate pulsing levels and utilizing fuel elements whose characteristics are well known.
Page 33 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 4.2 Reactor Control and Safety System 4.2.1 Reactivity Worth Applicability This specification applies to the reactivity worth of the control rods.
Objective The objective is to ensure that the control rods are capable of maintaining the reactor subcritical.
Specification The reactivity worth of each control rod and the shutdown margin for the core loading in use SHALL be determined annually, not to exceed 15 months, or following core or control rod changes equal to or greater than 0.7% Ak/k (-$1.00).
Basis The reactivity worth of the control rod is measured to ensure that the required shutdown margin is available and to provide an accurate means for determining the core excess reactivity, maximum reactivity, insertion rates, and the reactivity worth of experiments inserted in the core.
4.2.2 Reactivity Insertion Rate Applicability This specification applies to control rod movement speed.
Objective The objective is to ensure that the reactivity addition rate specification is not violated and that the control rod drives are functioning.
Specification The rod drive speed both up and down and the time from SCRAM initiation to the full insertion of any control rod from the full up position SHALL be measured annually, not to exceed 15 months, or when any significant work is done on the rod drive or the rod.
Basis This specification ensures that the reactor will be promptly shut down when a SCRAM signal is initiated. Experience and analysis have indicated that for the range of transients anticipated for a TRIGA reactor, the specified SCRAM time is adequate to ensure the safety of the reactor. It also ensures that the maximum reactivity addition rate specification will not be exceeded.
Page 34 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 4.2.3 Reactor Safety System Applicability The specifications apply to the surveillance requirements for measurements, channel tests, and channel checks of the reactor safety systems and watchdog circuit.
Objective The objective is to verify the performance and operability of the systems and components that are directly related to reactor safety.
Specifications
: a. A channel test of the SCRAM function of the wide range linear, power range linear, fuel temperature, manual, and preset timer safety channels SHALL be made on each day that the reactor is to be operated, or prior to each operation that extends more than one day.
: b. A channel test of the detector power supply SCRAM functions for both the wide range and the power range and the watchdog circuit SHALL be performed annually, not to exceed 15 months.
: c. Channel checks for operability SHALL be performed daily on fuel element temperature, wide range linear power, wide range log power, wide range reactor period/SUR, and power range linear power when the reactor is to be operated, or prior to each operation that extends more than one day.
: d. The power range channel SHALL be compared with other independent channels for proper channel indication, when appropriate, each time the reactor is operated.
: e. The pulse peak power channel SHALL be compared to the fuel temperature each time the reactor is pulsed, to ensure proper peak power channel operation.
Basis System components have proven operational reliability.
Basis System components have proven operational reliability.
: a. Daily channel tests ensure accurate SCRAM functions and ensure the detection of possible channel drift or other possible deterioration of operating characteristics.
: a. Daily channel tests ensure accurate SCRAM functions and ensure the detection of possible channel drift or other possible deterioration of operating characteristics.
: b. An annual channel test of the detector power supply SCRAM will ensure that this system works, based on past experience as recorded in the operation log book. An annual channel test of the watchdog circuit is sufficient to ensure operability.
: b. An annual channel test of the detector power supply SCRAM will ensure that this system works, based on past experience as recorded in the operation log book. An annual channel test of the watchdog circuit is sufficient to ensure operability.
: c. The channel checks will make information available to the operator to ensure safe operation on a daily basis or prior to an extended run.Page 35 of 56 TECHNICAL SPECIFICATIONS:
: c. The channel checks will make information available to the operator to ensure safe operation on a daily basis or prior to an extended run.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 d. Comparison of the percent power channel with other independent power channels will ensure the detection of channel drift or other possible deterioration of its operational characteristics.
Page 35 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2
: d. Comparison of the percent power channel with other independent power channels will ensure the detection of channel drift or other possible deterioration of its operational characteristics.
: e. Comparison of the peak pulse power to the fuel temperature for each pulse will ensure the detection of possible channel drift or deterioration of its operational characteristics.
: e. Comparison of the peak pulse power to the fuel temperature for each pulse will ensure the detection of possible channel drift or deterioration of its operational characteristics.
4.2.4 Reactor Interlocks Applicability These specifications apply to the surveillance requirements for the reactor control system interlocks.
4.2.4 Reactor Interlocks Applicability These specifications apply to the surveillance requirements for the reactor control system interlocks.
Objective The objective is to ensure performance and operability of the reactor control system interlocks.
Objective The objective is to ensure performance and operability of the reactor control system interlocks.
Specifications
Specifications
: a. A channel check of the source interlock SHALL be performed each day that the reactor is operated or prior to each operation that extends more than one day except when the neutron signal is greater than the setpoint when the source is removed from the core.b. A channel test SHALL be performed semi-annually, not to exceed 7 1/2 months, on the pulse mode inhibit interlock which prevents pulsing from power levels higher than one kilowatt.c. A channel check SHALL be performed semi-annually, not to exceed 7 1/2 months, on the transient rod interlock which prevents application of air to the transient rod unless the cylinder is fully inserted.d. A channel check SHALL be performed semi-annually, not to exceed 7 1/2 months, on the rod drive interlock which prevents movement of any rod except the transient rod in pulse mode.e. A channel check SHALL be performed semi-annually, not to exceed 7 1/2 months, on the rod drive interlock which prevents simultaneous manual withdrawal of more than one rod.Page 36 of 56 TECHNICAL SPECIFICATIONS:
: a. A channel check of the source interlock SHALL be performed each day that the reactor is operated or prior to each operation that extends more than one day except when the neutron signal is greater than the setpoint when the source is removed from the core.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 Basis The channel test and checks will verify operation of the reactor interlock system. Experience at the PSBR indicates that the prescribed frequency is adequate to ensure operability.
: b. A channel test SHALL be performed semi-annually, not to exceed 7 1/2 months, on the pulse mode inhibit interlock which prevents pulsing from power levels higher than one kilowatt.
After extended operation, the photo neutron source strength may be high enough that removing the source may not drop the neutron signal below the setpoint of the source interlock.
: c. A channel check SHALL be performed semi-annually, not to exceed 7 1/2 months, on the transient rod interlock which prevents application of air to the transient rod unless the cylinder is fully inserted.
With a large intrinsic source there is no practical way to channel check the source interlock.
: d. A channel check SHALL be performed semi-annually, not to exceed 7 1/2 months, on the rod drive interlock which prevents movement of any rod except the transient rod in pulse mode.
In which case there is no need for a source interlock.
: e. A channel check SHALL be performed semi-annually, not to exceed 7 1/2 months, on the rod drive interlock which prevents simultaneous manual withdrawal of more than one rod.
4.2.5 Overpower SCRAM Applicability This specification applies to the high power and fuel temperature SCRAM channels.Objective The objective is to verify that high power and fuel temperature SCRAM channels perform the SCRAM functions.
Page 36 of 56
Specification The high power and fuel temperature SCRAM's SHALL be tested annually, not to exceed 15 months.Basis Experience with the PSBR for more than a decade, as recorded in the operation log books, indicates that this interval is adequate to ensure operability.
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 Basis The channel test and checks will verify operation of the reactor interlock system. Experience at the PSBR indicates that the prescribed frequency is adequate to ensure operability.
After extended operation, the photo neutron source strength may be high enough that removing the source may not drop the neutron signal below the setpoint of the source interlock. With a large intrinsic source there is no practical way to channel check the source interlock. In which case there is no need for a source interlock.
4.2.5 Overpower SCRAM Applicability This specification applies to the high power and fuel temperature SCRAM channels.
Objective The objective is to verify that high power and fuel temperature SCRAM channels perform the SCRAM functions.
Specification The high power and fuel temperature SCRAM's SHALL be tested annually, not to exceed 15 months.
Basis Experience with the PSBR for more than a decade, as recorded in the operation log books, indicates that this interval is adequate to ensure operability.
4.2.6 Transient Rod Test Applicability These specifications apply to surveillance of the transient rod mechanism.
4.2.6 Transient Rod Test Applicability These specifications apply to surveillance of the transient rod mechanism.
Objective The objective is to ensure that the transient rod drive mechanism is maintained in an operable condition.
Objective The objective is to ensure that the transient rod drive mechanism is maintained in an operable condition.
Page 37 of 56 TECHNICAL SPECIFICATIONS:
Page 37 of 56
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 Specifications
 
: a. On each day that pulse mode operation of the reactor is planned, a functional performance check of the transient rod system SHALL be performed.
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
The transient rod drive cylinder and the associated air supply system SHALL be inspected, cleaned, and lubricated as necessary annually, not to exceed 15 months.b. The reactor SHALL be pulsed annually, not to exceed 15 months, to compare fuel temperature measurements and peak power levels with those of previous pulses of the same reactivity value or the reactor SHALL NOT be pulsed until such comparative pulse measurements are performed.
FACILITY LICENSE NO. R-2 Specifications
Basis Functional checks along with periodic maintenance ensure repeatable performance.
: a. On each day that pulse mode operation of the reactor is planned, a functional performance check of the transient rod system SHALL be performed. The transient rod drive cylinder and the associated air supply system SHALL be inspected, cleaned, and lubricated as necessary annually, not to exceed 15 months.
The reactor is pulsed at suitable intervals and a comparison made with previous similar pulses to determine if changes in transient rod drive mechanism, fuel, or core characteristics have taken place.4.3 Coolant System 4.3.1 Fire Hose Inspection Applicability This specification applies to the dedicated fire hoses used to supply water to the pool in an emergency.
: b. The reactor SHALL be pulsed annually, not to exceed 15 months, to compare fuel temperature measurements and peak power levels with those of previous pulses of the same reactivity value or the reactor SHALL NOT be pulsed until such comparative pulse measurements are performed.
Objective The objective is to ensure that these hoses are operable.Specification The two (2) dedicated fire hoses that provide supply water to thepool in an emergency SHALL be visually inspected for damage and wear annually, not to exceed 15 months.Basis This frequency is adequate to ensure that significant degradation has not occurred since the previous inspection.
Basis Functional checks along with periodic maintenance ensure repeatable performance. The reactor is pulsed at suitable intervals and a comparison made with previous similar pulses to determine if changes in transient rod drive mechanism, fuel, or core characteristics have taken place.
Page 38 of 56 TECHNICAL SPECIFICATIONS:
4.3 Coolant System 4.3.1 Fire Hose Inspection Applicability This specification applies to the dedicated fire hoses used to supply water to the pool in an emergency.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 4.3.2 Pool Water Temperature Applicability This specification applies to pool water temperature.
Objective The objective is to ensure that these hoses are operable.
Specification The two (2) dedicated fire hoses that provide supply water to thepool in an emergency SHALL be visually inspected for damage and wear annually, not to exceed 15 months.
Basis This frequency is adequate to ensure that significant degradation has not occurred since the previous inspection.
Page 38 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 4.3.2 Pool Water Temperature Applicability This specification applies to pool water temperature.
Objective The objective is to limit pool water temperature.
Objective The objective is to limit pool water temperature.
Specification The pooi temperature alarm SHALL be calibrated annually, not to exceed 15 months.Basis Experience has shown this instrument to be drift-free and that this interval is adequate to ensure operability.
Specification The pooi temperature alarm SHALL be calibrated annually, not to exceed 15 months.
Basis Experience has shown this instrument to be drift-free and that this interval is adequate to ensure operability.
4.3.3 Pool Water Conductivity Applicability This specification applies to surveillance of pool water conductivity.
4.3.3 Pool Water Conductivity Applicability This specification applies to surveillance of pool water conductivity.
Objective The objective is to ensure that pool water mineral content is maintained at an acceptable level.Specification Pool water conductivity SHALL be measured and recorded daily when the reactor is to be operated, or at monthly intervals when the reactor is shut down for this time period.Basis Based on experience, observation at these intervals provides acceptable surveillance of limits that ensure that fuel clad corrosion and neutron activation of dissolved materials will not occur.Page 39 of 56 TECHNICAL SPECIFICATIONS:
Objective The objective is to ensure that pool water mineral content is maintained at an acceptable level.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 4.3.4 Pool Water Level Alarm Applicability This specification applies to the surveillance requirements for the pool level alarm.Objective The objective is to verify the operability of the pool water level alarm.Specification The pool water level alarm SHALL be channel checked monthly, not to exceed 6 weeks, to ensure its operability.
Specification Pool water conductivity SHALL be measured and recorded daily when the reactor is to be operated, or at monthly intervals when the reactor is shut down for this time period.
Basis Experience, as exhibited by past periodic checks, has shown that monthly checks of the pool water level alarm ensures operability of the system during the month.4.4 Confinement Applicability This specification applies to reactor bay doors.Objective The objective is to ensure that reactor bay doors are kept closed as per Specification 3.4.Specification Doors to the reactor bay SHALL be locked or under supervision by an authorized keyholder.
Basis Based on experience, observation at these intervals provides acceptable surveillance of limits that ensure that fuel clad corrosion and neutron activation of dissolved materials will not occur.
Basis A keyholder is authorized by the Director or his designee.Page 40 of 56 TECHNICAL SPECIFICATIONS:
Page 39 of 56
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 4.5 Facility Exhaust System and Emergency Exhaust System Applicability These specifications apply to the facility exhaust system and emergency exhaust system.Obiective The objective is to ensure the proper operation of the facility exhaust system and emergency exhaust system in controlling releases of radioactive material to the uncontrolled environment.
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 4.3.4 Pool Water Level Alarm Applicability This specification applies to the surveillance requirements for the pool level alarm.
Objective The objective is to verify the operability of the pool water level alarm.
Specification The pool water level alarm SHALL be channel checked monthly, not to exceed 6 weeks, to ensure its operability.
Basis Experience, as exhibited by past periodic checks, has shown that monthly checks of the pool water level alarm ensures operability of the system during the month.
4.4 Confinement Applicability This specification applies to reactor bay doors.
Objective The objective is to ensure that reactor bay doors are kept closed as per Specification 3.4.
Specification Doors to the reactor bay SHALL be locked or under supervision by an authorized keyholder.
Basis A keyholder is authorized by the Director or his designee.
Page 40 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 4.5 Facility Exhaust System and Emergency Exhaust System Applicability These specifications apply to the facility exhaust system and emergency exhaust system.
Obiective The objective is to ensure the proper operation of the facility exhaust system and emergency exhaust system in controlling releases of radioactive material to the uncontrolled environment.
Specifications
Specifications
: a. It SHALL be verified monthly, not to exceed 6 weeks, whenever operation is scheduled, that the emergency exhaust system is operable with correct pressure drops across the filters (as specified in procedures).
: a. It SHALL be verified monthly, not to exceed 6 weeks, whenever operation is scheduled, that the emergency exhaust system is operable with correct pressure drops across the filters (as specified in procedures).
: b. It SHALL be verified monthly, not to exceed 6 weeks, whenever operation is scheduled, that the facility exhaust system is secured when the emergency exhaust system activates during an evacuation alarm (See Technical, Specification 3.6.2 and 5.5).Basis Experience, based on periodic checks performed over years of operation, has demonstrated that a test of the exhaust systems on a monthly basis, not to exceed 6 weeks, is sufficient to ensure the proper operation of the systems. This provides reasonable assurance on the control of the release of radioactive material.4.6 Radiation Monitoring System and Effluents 4.6.1 Radiation Monitoring System and Evacuation Alarm Applicability This specification applies to surveillance requirements for the area radiation monitor, the Beamhole Laboratory radiation monitor, the air radiation monitor, and the evacuation alarm.Objective The objective is to ensure that the radiation monitors and evacuation alarm are operable and to verify the appropriate alarm settings.Specification The area radiation monitor, the Beamhole Laboratory radiation monitor, the continuous air (radiation) monitor, and the evacuation alarm system SHALL be channel tested monthly not to exceed 6 weeks. They SHALL be verified to be operable by a channel check daily when the reactor is to be operated, and SHALL be calibrated annually, not to exceed 15 months.Page 41 of 56 TECHNICAL SPECIFICATIONS:
: b. It SHALL be verified monthly, not to exceed 6 weeks, whenever operation is scheduled, that the facility exhaust system is secured when the emergency exhaust system activates during an evacuation alarm (See Technical, Specification 3.6.2 and 5.5).
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 Basis Experience has shown this frequency of verification of the radiation monitor set points and operability and the evacuation alarm operability is adequate to correct for any variation in the system due to a change of operating characteristics.
Basis Experience, based on periodic checks performed over years of operation, has demonstrated that a test of the exhaust systems on a monthly basis, not to exceed 6 weeks, is sufficient to ensure the proper operation of the systems. This provides reasonable assurance on the control of the release of radioactive material.
Annual channel calibration ensures that units are within the specifications defined by procedures.
4.6 Radiation Monitoring System and Effluents 4.6.1   Radiation Monitoring System and Evacuation Alarm Applicability This specification applies to surveillance requirements for the area radiation monitor, the Beamhole Laboratory radiation monitor, the air radiation monitor, and the evacuation alarm.
Objective The objective is to ensure that the radiation monitors and evacuation alarm are operable and to verify the appropriate alarm settings.
Specification The area radiation monitor, the Beamhole Laboratory radiation monitor, the continuous air (radiation) monitor, and the evacuation alarm system SHALL be channel tested monthly not to exceed 6 weeks. They SHALL be verified to be operable by a channel check daily when the reactor is to be operated, and SHALL be calibrated annually, not to exceed 15 months.
Page 41 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 Basis Experience has shown this frequency of verification of the radiation monitor set points and operability and the evacuation alarm operability is adequate to correct for any variation in the system due to a change of operating characteristics. Annual channel calibration ensures that units are within the specifications defined by procedures.
4.6.2 Argon-41 Applicability This specification applies to surveillance of the Argon-41 produced during reactor operation.
4.6.2 Argon-41 Applicability This specification applies to surveillance of the Argon-41 produced during reactor operation.
Obiective To ensure that the production of Argon-41 does not exceed the limits specified by 10 CFR Part 20.Specification The production of Argon-41 SHALL be measured and/or calculated for each new experiment or experimental facility that is estimated to produce a dose greater than 1 mrem at the exclusion boundary.Basis One (1) mrem dose per experiment or experimental facility represents 1% of the maximum 10 CFR Part 20 annual dose. It is considered prudent to analyze the Argon-41 production for any experiment or experimental facility that exceeds 1% of the annual limit.4.6.3 ALARA Applicability This specification applies to the surveillance of all reactor operations that could result in occupational exposures to radiation or the release of radioactive effluents to the environs.Objective The objective is to provide surveillance of all operations that could lead to occupational exposures to radiation or the release of radioactive effluents to the environs.Specification As part of the review of all operations, consideration SHALL be given to alternative operational modes that might reduce staff exposures, release of radioactive materials to the environment, or both.Page 42 of 56 TECHNICAL SPECIFICATIONS:
Obiective To ensure that the production of Argon-41 does not exceed the limits specified by 10 CFR Part 20.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 Basis Experience has shown that experiments and operational requirements can, in many cases, be satisfied with a variety of combinations of facility options, core positions, power levels, time delays, and effluent or staff radiation exposures.
Specification The production of Argon-41 SHALL be measured and/or calculated for each new experiment or experimental facility that is estimated to produce a dose greater than 1 mrem at the exclusion boundary.
Similarly, overall reactor scheduling achieves significant reductions in staff exposures.
Basis One (1) mrem dose per experiment or experimental facility represents 1% of the maximum 10 CFR Part 20 annual dose. It is considered prudent to analyze the Argon-41 production for any experiment or experimental facility that exceeds 1% of the annual limit.
Consequently, ALARA must be a part of both overall reactor scheduling and the detailed experiment planning.4.7 Experiments Applicability This specification applies to surveillance requirements for experiments.
4.6.3 ALARA Applicability This specification applies to the surveillance of all reactor operations that could result in occupational exposures to radiation or the release of radioactive effluents to the environs.
Objective The objective is to ensure that the conditions and restrictions of Specification 3.7 are met.Specification Those conditions and restrictions listed in Specification 3.7 SHALL be considered by the PSBR authorized reviewer before signing the irradiation authorization for each experiment.
Objective The objective is to provide surveillance of all operations that could lead to occupational exposures to radiation or the release of radioactive effluents to the environs.
Basis Authorized reviewers are appointed by the facility director.Page 43 of 56 TECHNICAL SPECIFICATIONS:
Specification As part of the review of all operations, consideration SHALL be given to alternative operational modes that might reduce staff exposures, release of radioactive materials to the environment, or both.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 5.0 DESIGN FEATURES 5.1 Reactor Fuel Specifications The individual unirradiated TRIGA fuel elements shall have the following characteristics:
Page 42 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 Basis Experience has shown that experiments and operational requirements can, in many cases, be satisfied with a variety of combinations of facility options, core positions, power levels, time delays, and effluent or staff radiation exposures. Similarly, overall reactor scheduling achieves significant reductions in staff exposures. Consequently, ALARA must be a part of both overall reactor scheduling and the detailed experiment planning.
4.7 Experiments Applicability This specification applies to surveillance requirements for experiments.
Objective The objective is to ensure that the conditions and restrictions of Specification 3.7 are met.
Specification Those conditions and restrictions listed in Specification 3.7 SHALL be considered by the PSBR authorized reviewer before signing the irradiation authorization for each experiment.
Basis Authorized reviewers are appointed by the facility director.
Page 43 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 5.0 DESIGN FEATURES 5.1 Reactor Fuel Specifications The individual unirradiated TRIGA fuel elements shall have the following characteristics:
: a. The total uranium content SHALL be either 8.5 wt% or 12.0 wt% nominal and enriched to less than 20% uranium-235.
: a. The total uranium content SHALL be either 8.5 wt% or 12.0 wt% nominal and enriched to less than 20% uranium-235.
: b. The hydrogen-to-zirconium atom ratio (in the ZrHx) SHALL be a nominal 1.65 H atoms to 1.0 Zr atom.c. The cladding SHALL be 304 stainless steel with a nominal 0.020 inch thickness.
: b. The hydrogen-to-zirconium atom ratio (in the ZrHx) SHALL be a nominal 1.65 H atoms to 1.0 Zr atom.
: c. The cladding SHALL be 304 stainless steel with a nominal 0.020 inch thickness.
Basis Nominal values of uranium loading, U-235 enrichment, hydrogen loading and cladding thickness are taken to mean those values specified by the manufacturer as standard values for TRIGA fuel. Minor deviations about these levels may occur due to variations in manufacturing and are not considered to be violations of this specification.
Basis Nominal values of uranium loading, U-235 enrichment, hydrogen loading and cladding thickness are taken to mean those values specified by the manufacturer as standard values for TRIGA fuel. Minor deviations about these levels may occur due to variations in manufacturing and are not considered to be violations of this specification.
5.2 Reactor Core Specifications
5.2 Reactor Core Specifications
: a. The core SHALL be an arrangement of TRIGA uranium-zirconium hydride fuel-moderator elements positioned in the reactor grid plates.b. The reflector, excluding experiments and experimental facilities, SHALL be water, or D20, or graphite, or any combination of the three moderator materials.
: a. The core SHALL be an arrangement of TRIGA uranium-zirconium hydride fuel-moderator elements positioned in the reactor grid plates.
Basis The arrangement of TRIGA fuel elements positioned in the reactor grid plates ensures that adequate space is maintained for effective cooling. The Mark III TRIGA reactor is an open design without provision for reflector except in the form of natural water used for cooling and graphite elements which may be placed in the grid array. Restrictions on the reflector in this specification ensure any changes are analyzed against the criteria for experiments consistent with TS 3.7.Page 44 of 56 TECHNICAL SPECIFICATIONS:
: b. The reflector, excluding experiments and experimental facilities, SHALL be water, or D20, or graphite, or any combination of the three moderator materials.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 5.3 Control Rods Specifications
Basis The arrangement of TRIGA fuel elements positioned in the reactor grid plates ensures that adequate space is maintained for effective cooling. The Mark III TRIGA reactor is an open design without provision for reflector except in the form of natural water used for cooling and graphite elements which may be placed in the grid array. Restrictions on the reflector in this specification ensure any changes are analyzed against the criteria for experiments consistent with TS 3.7.
: a. The shim, safety, and regulating control rods SHALL have SCRAM capability and contain borated graphite, B4C powder, or boron and its compounds in solid form as a poison in stainless steel or aluminum cladding.
Page 44 of 56
These rods may incorporate fueled followers which have the same characteristics as the fuel region in which they are used.b. The transient control rod SHALL have SCRAM capability and contain borated graphite, B4C powder, or boron and its compounds in a solid form as a poison in an aluminum or stainless steel clad. When used as a transient rod, it SHALL have an adjustable upper limit to allow a variation of reactivity insertions.
 
This rod may incorporate a voided or a solid aluminum follower.Basis The poison requirements for the control rods are satisfied by using neutron-absorbing borated graphite, B4C powder, or boron and its compounds.
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
These materials must be contained in a suitable cladding material, such as aluminum or stainless steel, to insure mechanical stability during movement and to isolate the poison from the pool water environment.
FACILITY LICENSE NO. R-2 5.3 Control Rods Specifications
SCRAM capabilities are provided by the rapid insertion of the control rods, which is the primary operational safety feature of the reactor. The transient control rod is designed for use in a pulsing TRIGA reactor and does not by design have a fuel follower.5.4 Fuel Storage Specifications a.; All fuel elements SHALL be stored in a geometrical array where the keff is less than 0.8 for all conditions of moderation.
: a. The shim, safety, and regulating control rods SHALL have SCRAM capability and contain borated graphite, B4C powder, or boron and its compounds in solid form as a poison in stainless steel or aluminum cladding. These rods may incorporate fueled followers which have the same characteristics as the fuel region in which they are used.
: b. The transient control rod SHALL have SCRAM capability and contain borated graphite, B4C powder, or boron and its compounds in a solid form as a poison in an aluminum or stainless steel clad. When used as a transient rod, it SHALL have an adjustable upper limit to allow a variation of reactivity insertions. This rod may incorporate a voided or a solid aluminum follower.
Basis The poison requirements for the control rods are satisfied by using neutron-absorbing borated graphite, B4C powder, or boron and its compounds. These materials must be contained in a suitable cladding material, such as aluminum or stainless steel, to insure mechanical stability during movement and to isolate the poison from the pool water environment. SCRAM capabilities are provided by the rapid insertion of the control rods, which is the primary operational safety feature of the reactor. The transient control rod is designed for use in a pulsing TRIGA reactor and does not by design have a fuel follower.
5.4 Fuel Storage Specifications a.; All fuel elements SHALL be stored in a geometrical array where the keff is less than 0.8 for all conditions of moderation.
: b. Irradiated fuel elements SHALL be stored in an array which SHALL permit sufficient natural convection cooling by water such that the fuel element temperature SHALL NOT reach the safety limit as defined in Section 2.1 of the Technical Specifications.
: b. Irradiated fuel elements SHALL be stored in an array which SHALL permit sufficient natural convection cooling by water such that the fuel element temperature SHALL NOT reach the safety limit as defined in Section 2.1 of the Technical Specifications.
Basis The limits imposed by this specification are conservative and ensure safe storage and handling of nuclear fuel. GA-5402 "Criticality Safety Guide" places a, general limitation on well-moderated U-235 to 300 grams per square foot. A rack of new 12 wt% elements would have no more than 288 grams per square foot (assuming 2''spacing and 60 grams U-235 per element).
Basis The limits imposed by this specification are conservative and ensure safe storage and handling of nuclear fuel. GA-5402 "Criticality Safety Guide" places a, general limitation on well-moderated U-235 to 300 grams per square foot. A rack of new 12 wt% elements would have no more than 288 grams per square foot (assuming 2''
Additional work by General Atomics in 1966 showed that a 2x10 array of 12 wt% elements with no separation would have a keff= 0.7967. The fuel racks used for storage have an actual spacing of 2.0 inches and 2.5 inches and vertically offset by 20 inches, the calculations are conservative.
spacing and 60 grams U-235 per element). Additional work by General Atomics in 1966 showed that a 2x10 array of 12 wt% elements with no separation would have a keff= 0.7967. The fuel racks used for storage have an actual spacing of 2.0 inches and 2.5 inches and vertically offset by 20 inches, the calculations are conservative.
Page 45 of 56 TECHNICAL SPECIFICATIONS:
Page 45 of 56
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 5.5 Reactor Bay and Exhaust Systems Specifications
 
: a. The reactor SHALL be housed in a room (reactor bay) designed to restrict leakage. The minimum free volume total bay volume minus occupied volume)in the reactor bay SHALL be 1900 m-&#xfd;.b. The reactor bay SHALL be equipped with two exhaust systems. Under normal operating conditions, the facility exhaust system exhausts unfiltered reactor bay air to the environment releasing it at a point at least 24 feet above ground level.Upon initiation of a building evacuation alarm, the previously mentioned system is automatically secured and an emergency exhaust system automatically starts. The emergency exhaust system is also designed to discharge reactor bay air at a point at least 24 feet above ground level.Basis The value of 1900 m3 for reactor bay free volume is assumed in the SAR 13.1.1 Maximum Hypothetical Accident and is used in the calculation of the radionuclide concentrations for the analysis.The SAR analysis 13.1.1 Maximum Hypothetical Accident does not take credit for any filtration present in the emergency exhaust system. The height above the ground of the release helps to ensure adequate mixing prior to possible personnel exposure.5.6 Reactor Pool Water Systems Specification The reactor core SHALL be cooled by natural convective water flow.Basis Thermal and hydraulic calculations and operational experience indicate that a compact TRIGA reactor core can be safely operated up to power levels of at least 1.15 Mw (thermal) with natural convective cooling.Page 46 of 56 TECHNICAL SPECIFICATIONS:
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 6.0 ADMINISTRATIVE CONTROLS 6.1 Organization 6.1.1 Structure The University Vice President for Research Dean of the Graduate School (level 1) has the responsibility for the reactor facility license. The management of the facility is the responsibility of the Director (level 2), who reports to the Vice President for Research, Dean of the Graduate School through the office of the Dean of the College of Engineering.
FACILITY LICENSE NO. R-2 5.5 Reactor Bay and Exhaust Systems Specifications
Administrative and fiscal responsibility is within the office of the Dean.The minimum qualifications for the position of Director of the PSBR are an advanced degree in science or engineering, and 2 years experience in reactor operation.
: a. The reactor SHALL be housed in a room (reactor bay) designed to restrict leakage. The minimum free volume total bay volume minus occupied volume) in the reactor bay SHALL be 1900 m-&#xfd;.
Five years of experience directing reactor operations may be substituted for an advanced degree.The Manager of Radiation Protection reports through the Director of Environmental Health and Safety, the assistant Vice President for Safety'and Environmental Services, and to the Senior Vice President for Finance and Business/Treasurer.
: b. The reactor bay SHALL be equipped with two exhaust systems. Under normal operating conditions, the facility exhaust system exhausts unfiltered reactor bay air to the environment releasing it at a point at least 24 feet above ground level.
The qualifications for the Manager of Radiation Protection position are the equivalent of a graduate degree in radiation protection, 3 to 5 years experience with a broad byproduct material license, and certification by The American Board of Health Physics or eligibility for certification.
Upon initiation of a building evacuation alarm, the previously mentioned system is automatically secured and an emergency exhaust system automatically starts. The emergency exhaust system is also designed to discharge reactor bay air at a point at least 24 feet above ground level.
Basis The value of 1900 m3 for reactor bay free volume is assumed in the SAR 13.1.1 Maximum Hypothetical Accident and is used in the calculation of the radionuclide concentrations for the analysis.
The SAR analysis 13.1.1 Maximum Hypothetical Accident does not take credit for any filtration present in the emergency exhaust system. The height above the ground of the release helps to ensure adequate mixing prior to possible personnel exposure.
5.6 Reactor Pool Water Systems Specification The reactor core SHALL be cooled by natural convective water flow.
Basis Thermal and hydraulic calculations and operational experience indicate that a compact TRIGA reactor core can be safely operated up to power levels of at least 1.15 Mw (thermal) with natural convective cooling.
Page 46 of 56


====6.1.2 Responsibility====
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
Responsibility for the safe operation of the reactor facility SHALL be within the chain of command shown in the organization chart. Individuals at the various management levels, in addition to having responsibility for the policies and operation of the reactor facility, SHALL be responsible for safeguarding the public and facility personnel from undue radiation exposures and for adhering to all requirements of the operating license and technical specifications.
FACILITY LICENSE NO. R-2 6.0  ADMINISTRATIVE CONTROLS 6.1 Organization 6.1.1  Structure The University Vice President for Research Dean of the Graduate School (level 1) has the responsibility for the reactor facility license. The management of the facility is the responsibility of the Director (level 2),
who reports to the Vice President for Research, Dean of the Graduate School through the office of the Dean of the College of Engineering.
Administrative and fiscal responsibility is within the office of the Dean.
The minimum qualifications for the position of Director of the PSBR are an advanced degree in science or engineering, and 2 years experience in reactor operation. Five years of experience directing reactor operations may be substituted for an advanced degree.
The Manager of Radiation Protection reports through the Director of Environmental Health and Safety, the assistant Vice President for Safety' and Environmental Services, and to the Senior Vice President for Finance and Business/Treasurer. The qualifications for the Manager of Radiation Protection position are the equivalent of a graduate degree in radiation protection, 3 to 5 years experience with a broad byproduct material license, and certification by The American Board of Health Physics or eligibility for certification.
6.1.2  Responsibility Responsibility for the safe operation of the reactor facility SHALL be within the chain of command shown in the organization chart. Individuals at the various management levels, in addition to having responsibility for the policies and operation of the reactor facility, SHALL be responsible for safeguarding the public and facility personnel from undue radiation exposures and for adhering to all requirements of the operating license and technical specifications.
In all instances, responsibilities of one level may be assumed by designated alternates or by higher levels, conditional upon appropriate qualifications.
In all instances, responsibilities of one level may be assumed by designated alternates or by higher levels, conditional upon appropriate qualifications.
Page 47 of 56 TECHNICAL SPECIFICATIONS:
Page 47 of 56
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 ORGANIZATION CHART Senior Vice President for Finance and Business/Treasurer I I Vice President for Physical Plant I Director of Environmental I Health and Safety Vice President for Research Dean of the Graduate School (Level 1)II Dean, College of Engineering Manager of Radiation Protection I Penn State Reactor Safeguards Committee Director Penn State Breazeale Reactor (Level 2)F l!I I I Associate Director for Operations (Level 2)Operating Staff Senior Reactor Operators (Level 3)Reactor Operators (Level 4)Page 48 of 56 TECHNICAL SPECIFICATIONS:
 
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 6.1.3 Staffing a. The minimum staffing when the reactor is not secured SHALL be: 1) A licensed operator present in the control room, in accordance with applicable regulations.
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 ORGANIZATION CHART Senior Vice President for Finance         Vice President for Research and Business/Treasurer             Dean of the Graduate School (Level 1)
I I     Vice President for Physical Plant Dean, College of Engineering II I
I Director of Environmental Health and Safety I
Manager of Radiation Protection                                               Penn State Reactor Safeguards Committee Director Penn State Breazeale Reactor (Level 2)
F l!
I                 II Associate Director for Operations (Level 2)
Operating Staff Senior Reactor Operators (Level 3)
Reactor Operators (Level 4)
Page 48 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 6.1.3 Staffing
: a. The minimum staffing when the reactor is not secured SHALL be:
: 1) A licensed operator present in the control room, in accordance with applicable regulations.
: 2) A second person present at the facility able to carry out prescribed written instructions.
: 2) A second person present at the facility able to carry out prescribed written instructions.
: 3) If a senior reactor operator is not present at the facility, one SHALL be available by telephone and able to be at the facility within 30 minutes.b. A list of reactor facility personnel by name and telephone number SHALL be readily available in the control room for use by the operator.The list SHALL include: 1) Management personnel.
: 3) If a senior reactor operator is not present at the facility, one SHALL be available by telephone and able to be at the facility within 30 minutes.
: b. A list of reactor facility personnel by name and telephone number SHALL be readily available in the control room for use by the operator.
The list SHALL include:
: 1) Management personnel.
: 2) Radiation safety personnel.
: 2) Radiation safety personnel.
: 3) Other operations personnel.
: 3) Other operations personnel.
: c. Events requiring the direction of a Senior Reactor Operator SHALL include: 1) All fuel or control-rod relocations within the reactor core region.2) Relocation of any in-core experiment with a reactivity worth greater than one dollar.3) Recovery from unplanned or unscheduled shutdown (in this instance, documented verbal concurrence from a Senior Reactor Operator is required).
: c. Events requiring the direction of a Senior Reactor Operator SHALL include:
6.1.4 Selection and Training of Personnel The selection, training, and requalification of operations personnel SHALL meet or exceed the requirements of all applicable regulations and the American National Standard for Selection and Training of Personnel for Research Reactors, ANSI/ANS-15.4-1988, Sections 4-6.Page 49 of 56 TECHNICAL SPECIFICATIONS:
: 1) All fuel or control-rod relocations within the reactor core region.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 6.2 Review and Audit 6.2.1 Safeguards Committee Composition A Penn State Reactor Safeguards Committee (PSRSC) SHALL exist to provide an independent review and audit of the safety aspects of reactor facility operations.
: 2) Relocation of any in-core experiment with a reactivity worth greater than one dollar.
The committee SHALL have a minimum of 5 members and SHALL collectively represent a broad spectrum of expertise in reactor technology and other science and engineering fields. The committee SHALL have at least one member with health physics expertise.
: 3) Recovery from unplanned or unscheduled shutdown (in this instance, documented verbal concurrence from a Senior Reactor Operator is required).
The committee SHALL be appointed by and report to the Dean of the College of Engineering.
6.1.4 Selection and Training of Personnel The selection, training, and requalification of operations personnel SHALL meet or exceed the requirements of all applicable regulations and the American National Standard for Selection and Training of Personnel for Research Reactors, ANSI/ANS-15.4-1988, Sections 4-6.
The PSBR Director SHALL be an ex-officio member of the PSRSC.6.2.2 Charter and Rules The operations of the PSRSC SHALL be in accordance with a written charter, including provisions for: a. Meeting frequency  
Page 49 of 56
-not less than once per calendar year not to exceed 15 months.b. Quorums -at least one-half of the voting membership SHALL be present (the Director who is ex-officio SHALL NOT vote) and no more than One-half of the voting members present SHALL be members of the reactor staff.c. Use of Subgroups  
 
-the committee chairman can appoint ad-Hoc committees as deemed necessary.
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
d.. Minutes of the meetings -SHALL be recorded, disseminated, reviewed, and approved in a timely manner.Page 50 of 56 TECHNICAL SPECIFICATIONS:
FACILITY LICENSE NO. R-2 6.2 Review and Audit 6.2.1 Safeguards Committee Composition A Penn State Reactor Safeguards Committee (PSRSC) SHALL exist to provide an independent review and audit of the safety aspects of reactor facility operations. The committee SHALL have a minimum of 5 members and SHALL collectively represent a broad spectrum of expertise in reactor technology and other science and engineering fields. The committee SHALL have at least one member with health physics expertise. The committee SHALL be appointed by and report to the Dean of the College of Engineering. The PSBR Director SHALL be an ex-officio member of the PSRSC.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 6.2.3 Review Function The following items SHALL be reviewed: a. 10 CFR Part 50.59 reviews of: 1) Proposed changes in equipment, systems, tests, or experiments.
6.2.2 Charter and Rules The operations of the PSRSC SHALL be in accordance with a written charter, including provisions for:
: 2) All new procedures and major revisions thereto having a significant effect upon safety.3) All new experiments or classes of experiments that could have a significant effect upon reactivity or upon the release of radioactivity.
: a. Meeting frequency - not less than once per calendar year not to exceed 15 months.
: b. Proposed changes in technical specifications, license, or charter.c. Violations of technical specifications, license, or charter. Violations of internal procedures or instructions having safety significance.
: b. Quorums - at least one-half of the voting membership SHALL be present (the Director who is ex-officio SHALL NOT vote) and no more than One-half of the voting members present SHALL be members of the reactor staff.
: c. Use of Subgroups - the committee chairman can appoint ad-Hoc committees as deemed necessary.
d.. Minutes of the meetings - SHALL be recorded, disseminated, reviewed, and approved in a timely manner.
Page 50 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 6.2.3 Review Function The following items SHALL be reviewed:
: a. 10 CFR Part 50.59 reviews of:
: 1) Proposed changes in equipment, systems, tests, or experiments.
: 2) All new procedures and major revisions thereto having a significant effect upon safety.
: 3) All new experiments or classes of experiments that could have a significant effect upon reactivity or upon the release of radioactivity.
: b. Proposed changes in technical specifications, license, or charter.
: c. Violations of technical specifications, license, or charter. Violations of internal procedures or instructions having safety significance.
: d. Operating abnormalities having safety significance.
: d. Operating abnormalities having safety significance.
: e. Special reports listed in 6.6.2.f. Audit reports.6.2.4 Audit The audit function SHALL be performed annually, not to exceed 15 months, preferably by a non-member of the reactor staff. The audit function SHALL be performed by a person not directly involved with the function being audited. The audit function SHALL include selective (but comprehensive) examinations of operating records, logs, and other documents.
: e. Special reports listed in 6.6.2.
Discussions with operating personnel and observation of operations should also be used as appropriate.
: f. Audit reports.
Deficiencies uncovered that affect reactor safety SHALL promptly be reported to the office of the Dean of the College of Engineering.
6.2.4 Audit The audit function SHALL be performed annually, not to exceed 15 months, preferably by a non-member of the reactor staff. The audit function SHALL be performed by a person not directly involved with the function being audited. The audit function SHALL include selective (but comprehensive) examinations of operating records, logs, and other documents. Discussions with operating personnel and observation of operations should also be used as appropriate. Deficiencies uncovered that affect reactor safety SHALL promptly be reported to the office of the Dean of the College of Engineering. The following items SHALL be audited:
The following items SHALL be audited: a. 'Facility operations for conformance to Technical Specifications, license, and procedures (at least once per calendar year with interval not to exceed 15 months).b. The requalification program for the operating staff (at least once every other calendar year with the interval not to exceed 30 months).c. The results of action taken to correct deficiencies that may occur in the reactor facility equipment, systems, structures, or methods of operations that affect reactor safety (at least once per calendar year with the interval not to exceed 15 months).d. The reactor facility emergency plan and implementing procedures (at least once every other calendar year with the interval not to exceed 30 months).Page 51 of 56 TECHNICAL SPECIFICATIONS:
: a. 'Facility operations for conformance to Technical Specifications, license, and procedures (at least once per calendar year with interval not to exceed 15 months).
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 6.3 Operating Procedures Written procedures SHALL be reviewed and approved prior to the initiation of activities covered by them in accordance with Section 6.2.3. Written procedures SHALL be adequate to ensure the safe operation of the reactor, but SHALL NOT preclude the use of independent judgment and action should the situation require such. Operating procedures SHALL be in effect and SHALL be followed for at least the following items: a. Startup, operation, and shutdown of the reactor.b. Core loading, unloading, and fuel movement within the reactor.c. Routine maintenance of major components of systems that could have an effect on reactor safety.d. Surveillance tests and calibrations required by the technical specifications (including daily checkout procedure).
: b. The requalification program for the operating staff (at least once every other calendar year with the interval not to exceed 30 months).
: e. Radiation, evacuation, and alarm checks.f. Release of Irradiated Samples.g. Evacuation.
: c. The results of action taken to correct deficiencies that may occur in the reactor facility equipment, systems, structures, or methods of operations that affect reactor safety (at least once per calendar year with the interval not to exceed 15 months).
: d. The reactor facility emergency plan and implementing procedures (at least once every other calendar year with the interval not to exceed 30 months).
Page 51 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 6.3 Operating Procedures Written procedures SHALL be reviewed and approved prior to the initiation of activities covered by them in accordance with Section 6.2.3. Written procedures SHALL be adequate to ensure the safe operation of the reactor, but SHALL NOT preclude the use of independent judgment and action should the situation require such. Operating procedures SHALL be in effect and SHALL be followed for at least the following items:
: a. Startup, operation, and shutdown of the reactor.
: b. Core loading, unloading, and fuel movement within the reactor.
: c. Routine maintenance of major components of systems that could have an effect on reactor safety.
: d. Surveillance tests and calibrations required by the technical specifications (including daily checkout procedure).
: e. Radiation, evacuation, and alarm checks.
: f. Release of Irradiated Samples.
: g. Evacuation.
: h. Fire or Explosion.
: h. Fire or Explosion.
: i. Gaseous Release.j. Medical Emergencies.
: i. Gaseous Release.
: k. Civil Disorder.1. Bomb Threat.m. Threat of Theft of Special Nuclear Material.n. Theft of Special Nuclear Material.o. Industrial Sabotage.p. Experiment Evaluation and Authorization.
: j. Medical Emergencies.
: q. Reactor Operation Using a Beam Port.Page 52 of 56 TECHNICAL SPECIFICATIONS:
: k. Civil Disorder.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 r. D20 Handling.s. Health Physics Orientation Requirements.
: 1. Bomb Threat.
: m. Threat of Theft of Special Nuclear Material.
: n. Theft of Special Nuclear Material.
: o. Industrial Sabotage.
: p. Experiment Evaluation and Authorization.
: q. Reactor Operation Using a Beam Port.
Page 52 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2
: r. D20 Handling.
: s. Health Physics Orientation Requirements.
: t. Hot Cell Entry Procedure.
: t. Hot Cell Entry Procedure.
: u. Implementation of emergency and security plans.v. Radiation instrument calibration
: u. Implementation of emergency and security plans.
: w. Loss of pool water.6.4 Review and Approval of Experiments
: v. Radiation instrument calibration
: w. Loss of pool water.
6.4 Review and Approval of Experiments
: a. All new experiments SHALL be reviewed for Technical Specifications compliance, 10 CFR Part 50.59 analysis, and approved in writing by level 2 management or designated alternate prior to initiation.
: a. All new experiments SHALL be reviewed for Technical Specifications compliance, 10 CFR Part 50.59 analysis, and approved in writing by level 2 management or designated alternate prior to initiation.
: b. Substantive changes to experiments previously reviewed by the PSRSC SHALL be made only after review and approval in writing by level 2 management or designated alternate.
: b. Substantive changes to experiments previously reviewed by the PSRSC SHALL be made only after review and approval in writing by level 2 management or designated alternate.
6.5 Required Action 6.5.1 Action to be Taken in the Event the Safety Limit is Exceeded In the event the safety limit (1 150'C) is exceeded: a. The reactor SHALL be shut down and reactor operation SHALL NOT be resumed until authorized by the U.S. Nuclear Regulatory Commission.
6.5 Required Action 6.5.1   Action to be Taken in the Event the Safety Limit is Exceeded In the event the safety limit (1 150'C) is exceeded:
: a. The reactor SHALL be shut down and reactor operation SHALL NOT be resumed until authorized by the U.S. Nuclear Regulatory Commission.
: b. The safety limit violation SHALL be promptly reported to level 2 or designated alternates.
: b. The safety limit violation SHALL be promptly reported to level 2 or designated alternates.
: c. An immediate report of the occurrence SHALL be made to the Chairman, PSRSC and reports SHALL be made to the USNRC in accordance with Specification 6.6.d. A report SHALL be prepared which SHALL include an analysis of the causes and extent of possible resultant damage, efficacy of corrective action, and recommendations for measures to prevent or reduce the probability of recurrence.
: c. An immediate report of the occurrence SHALL be made to the Chairman, PSRSC and reports SHALL be made to the USNRC in accordance with Specification 6.6.
This report SHALL be submitted to the PSRSC for review.Page 53 of 56 TECHNICAL SPECIFICATIONS:
: d. A report SHALL be prepared which SHALL include an analysis of the causes and extent of possible resultant damage, efficacy of corrective action, and recommendations for measures to prevent or reduce the probability of recurrence. This report SHALL be submitted to the PSRSC for review.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 6.5.2 Action to be Taken in the Event of a Reportable Occurrence In the event of a reportable occurrence, (1.1.34) the following action SHALL be taken: a. The reactor SHALL be returned to normal or shutdown.
Page 53 of 56
If it is necessary to shutdown the reactor to correct the occurrence, operations SHALL NOT be resumed unless authorized by level 2 or designated alternates.
 
: b. The Director or a designated alternate SHALL be notified and corrective action taken with respect to the operations involved.c. The Director or a designated alternate SHALL notify the office of the Dean of the College of Engineering and the office of the Vice President for Research, Dean of the Graduate School.d. The Director or a designated alternate SHALL notify the Chairman of the PSRSC.e. A report SHALL be made to the PSRSC which SHALL include an analysis of the cause of the occurrence, efficacy of corrective action, and recommendations for measures to prevent or reduce the probability of recurrence.
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
This report SHALL be reviewed by the PSRSC at their next meeting.f. A report SHALL be made to the Document Control Desk, USNRC Washington, DC 20555.6.6 Reports 6.6.1 Operating Reports An annual report SHALL be submitted within 6 months of the end of The Pennsylvania State University fiscal year to the Document Control Desk, USNRC, Washington, DC 20555, including at least the following items: a. A narrative summary of reactor operating experience including the energy produced by the reactor, and the number of pulses > $2.00 but less than or equal to $2.50 and the number greater than $2.50.b. The unscheduled shutdowns and reasons for them including, where applicable, corrective action taken to preclude recurrence.
FACILITY LICENSE NO. R-2 6.5.2 Action to be Taken in the Event of a Reportable Occurrence In the event of a reportable occurrence, (1.1.34) the following action SHALL be taken:
: a. The reactor SHALL be returned to normal or shutdown. If it is necessary to shutdown the reactor to correct the occurrence, operations SHALL NOT be resumed unless authorized by level 2 or designated alternates.
: b. The Director or a designated alternate SHALL be notified and corrective action taken with respect to the operations involved.
: c. The Director or a designated alternate SHALL notify the office of the Dean of the College of Engineering and the office of the Vice President for Research, Dean of the Graduate School.
: d. The Director or a designated alternate SHALL notify the Chairman of the PSRSC.
: e. A report SHALL be made to the PSRSC which SHALL include an analysis of the cause of the occurrence, efficacy of corrective action, and recommendations for measures to prevent or reduce the probability of recurrence. This report SHALL be reviewed by the PSRSC at their next meeting.
: f. A report SHALL be made to the Document Control Desk, USNRC Washington, DC 20555.
6.6 Reports 6.6.1   Operating Reports An annual report SHALL be submitted within 6 months of the end of The Pennsylvania State University fiscal year to the Document Control Desk, USNRC, Washington, DC 20555, including at least the following items:
: a. A narrative summary of reactor operating experience including the energy produced by the reactor, and the number of pulses > $2.00 but less than or equal to $2.50 and the number greater than $2.50.
: b. The unscheduled shutdowns and reasons for them including, where applicable, corrective action taken to preclude recurrence.
: c. Tabulation of major preventive and corrective maintenance operations having safety significance.
: c. Tabulation of major preventive and corrective maintenance operations having safety significance.
: d. Tabulation of major changes in the reactor facility and procedures, and tabulation of new tests and experiments, that are significantly different from those performed previously and are not described in the Safety Analysis Report, including a summary of the analyses leading to the conclusions that no unreviewed safety questions were involved and that 10 CFR Part 50.59 was applicable.
: d. Tabulation of major changes in the reactor facility and procedures, and tabulation of new tests and experiments, that are significantly different from those performed previously and are not described in the Safety Analysis Report, including a summary of the analyses leading to the conclusions that no unreviewed safety questions were involved and that 10 CFR Part 50.59 was applicable.
Page 54 of 56 TECHNICAL SPECIFICATIONS:
Page 54 of 56
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 e. A summary of the nature and amount of radioactive effluents released or discharged to environs beyond the effective control of the owner-operator as determined at or before the point of such release or discharge.
 
The summary SHALL include to the extent practicable an estimate of individual radionuclides present in the effluent.
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
If the estimated average release after dilution or diffusion is less than 25 percent of the concentration allowed or recommended, only a statement to this effect need be presented.
FACILITY LICENSE NO. R-2
: f. A summarized result of environmental surveys performed outside the facility.6.6.2 Special Reports Special reports are used to report unplanned events as well as planned major facility and administrative changes. These special reports SHALL contain and SHALL be communicated as follows: a. There SHALL be a report no later than the following working day by telephone to the Operations Center, USNRC, Washington, DC 20555, to be followed by a written report to the Document Control Desk, USNRC, Washington, DC 20555, that describes the circumstances of the event within 14 days of any of the following:
: e. A summary of the nature and amount of radioactive effluents released or discharged to environs beyond the effective control of the owner-operator as determined at or before the point of such release or discharge. The summary SHALL include to the extent practicable an estimate of individual radionuclides present in the effluent. If the estimated average release after dilution or diffusion is less than 25 percent of the concentration allowed or recommended, only a statement to this effect need be presented.
: 1) Violation of safety limits (See 6.5.1)2) Release of radioactivity from the site above allowed limits (See 6.5.2)3) A reportable occurrence (Section 1.1.34)b. A written report SHALL be made within 30 days to the USNRC, and to the offices given in 6.6.1 for the following:
: f. A summarized result of environmental surveys performed outside the facility.
6.6.2 Special Reports Special reports are used to report unplanned events as well as planned major facility and administrative changes. These special reports SHALL contain and SHALL be communicated as follows:
: a. There SHALL be a report no later than the following working day by telephone to the Operations Center, USNRC, Washington, DC 20555, to be followed by a written report to the Document Control Desk, USNRC, Washington, DC 20555, that describes the circumstances of the event within 14 days of any of the following:
: 1) Violation of safety limits (See 6.5.1)
: 2) Release of radioactivity from the site above allowed limits (See 6.5.2)
: 3) A reportable occurrence (Section 1.1.34)
: b. A written report SHALL be made within 30 days to the USNRC, and to the offices given in 6.6.1 for the following:
: 1) Permanent changes in the facility organization involving level 1-2 personnel.
: 1) Permanent changes in the facility organization involving level 1-2 personnel.
: 2) Significant changes in the transient or accident analysis as described in the Safety Analysis Report.Page 55 of 56 TECHNICAL SPECIFICATIONS:
: 2) Significant changes in the transient or accident analysis as described in the Safety Analysis Report.
PENN STATE BREAZEALE REACTOR (PSBR)FACILITY LICENSE NO. R-2 6.7 Records To fulfill the requirements of applicable regulations, records and logs SHALL be prepared, and retained for the following items: 6.7.1 Records to be Retained for at Least Five Years a. Log of reactor operation and summary of energy produced or hours the reactor was critical.b. Checks and calibrations procedure file.c. Preventive and corrective electronic maintenance log.d. Major changes in the reactor facility and procedures.
Page 55 of 56
 
TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)
FACILITY LICENSE NO. R-2 6.7 Records To fulfill the requirements of applicable regulations, records and logs SHALL be prepared, and retained for the following items:
6.7.1   Records to be Retained for at Least Five Years
: a. Log of reactor operation and summary of energy produced or hours the reactor was critical.
: b. Checks and calibrations procedure file.
: c. Preventive and corrective electronic maintenance log.
: d. Major changes in the reactor facility and procedures.
: e. Experiment authorization file including conclusions that no unreviewed safety questions were involved for new tests or experiments.
: e. Experiment authorization file including conclusions that no unreviewed safety questions were involved for new tests or experiments.
: f. Event evaluation forms (including unscheduled shutdowns) and reportable occurrence reports.g. Preventive and corrective maintenance records of associated reactor equipment.
: f. Event evaluation forms (including unscheduled shutdowns) and reportable occurrence reports.
: h. Facility radiation and contamination surveys.i. Fuel inventories and transfers.
: g. Preventive and corrective maintenance records of associated reactor equipment.
: h. Facility radiation and contamination surveys.
: i. Fuel inventories and transfers.
: j. Surveillance activities as required by the Technical Specifications.
: j. Surveillance activities as required by the Technical Specifications.
: k. Records of PSRSC reviews and audits.6.7.2 Records to be Retained for at Least One Training Cycle a. Requalification records for licensed reactor operators and senior reactor operators.
: k. Records of PSRSC reviews and audits.
6.7.3 Records to be Retained for the Life of the Reactor Facility a. Radiation exposure for all facility personnel and visitors.b. Environmental surveys performed outside the facility.c. Radioactive effluents released to the environs.d. Drawings of the reactor facility including changes.Page 56 of 56}}
6.7.2   Records to be Retained for at Least One Training Cycle
: a. Requalification records for licensed reactor operators and senior reactor operators.
6.7.3   Records to be Retained for the Life of the Reactor Facility
: a. Radiation exposure for all facility personnel and visitors.
: b. Environmental surveys performed outside the facility.
: c. Radioactive effluents released to the environs.
: d. Drawings of the reactor facility including changes.
Page 56 of 56}}

Latest revision as of 03:15, 14 November 2019

Pennsylvania State University, Response to Request for Additional Information (RAI) Dated July 28, 2009
ML092580215
Person / Time
Site: Pennsylvania State University
Issue date: 09/01/2009
From: Unlu K
Pennsylvania State Univ, University Park, PA
To: William Kennedy
Office of Nuclear Reactor Regulation
References
Download: ML092580215 (72)


Text

KENAN UNLU, Ph.D. Phone: (814) 865-6351 Director, Radiation Science and Engineering Center Fax: (814) 863-4840 Professor, Department of Mechanical and Nuclear Engineering E-mail: k-unlu6)npsu.edu The Pennsylvania State University University Park, PA 16802-2304 September 1, 2009 US Nuclear Regulatory Commission ATTN: Mr. William Kennedy, Project Manager Office of Nuclear Reactor Regulation Mail Stop 012-G13 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738

Reference:

Pennsylvania State University Breazeale Nuclear Reactor Docket No.50-005, License No. R-2 USNRC Request for Additional Information (RAI) dated July 28, 2009

Subject:

Response to RAI dated July 28, 2009

Dear Mr. Kennedy:

The.attachment to this letter answers the questions presented in the RAI dated September 1, 2009. The response and attachments do not contain any sensitive information.

If there are any questions regarding the information submitted, please contact Mr. Mark Trump, Associate Director for Operations at the RSEC. I declare under penalty of perjury that the foregoing is true and correct.

Executed on see. , 1 2Cog5 Sincerely yours, Kenan Unuii Director, Radiation Science and Engineering Center Professor, Department of Mechanical and Nuclear Engineering cc: E.J. Pell (w/o)

A.A. Atchley (w/o)

M.A. Trump

.College of Engineering An Equal Opportunity University

PSBR response to NRC RAI Dtd. 07/28/09

1. Provide clarification as to whether the peak-to-measured pulse fuel temperature ratio of 1.6 accounts for the power peaking effects caused by vacant core positions (i.e., water holes).

Recent analytical modeling work performed in support of the use of LEU fuel in TRIGA reactors has raised questions concerning TRIGA fuel temperature performance during pulsing. These issues were originally satisfied by extensive testing done during the TRIGA development and deployment stage in the 1960's.1 In the 1970s and 80s, PSU and others conducted tests on 8.5 and 12 wt% elements that builds on the earlier work and formed the basis for the limiting reactor pulse ($3.50) in the PSBR SAR.2 '3 Review of the development work for the SAR shows the tests were conducted with new and used instrumented 12 wt% elements in multiple locations (including next to a water hole) with the element rotated to indicate maximum temperatures. The limiting case for the PSBR SAR analysis involved new 12 wt% fuel elements. 8.5 wt% and used

(-8000 MWD/MTU) 12wt% elements were shown to have peak temperatures that do not approach or challenge the fuel safety limit based on lower "in-pin" peaking factors of - 1.1 instead of 1.6. for the 12 wt% elements. Therefore PSU believes the effects of the waterhole peaking are adequately represented in this work and the analysis to ensure fuel safety.

However, the discussion and documentation in the available references is insufficient to provide the level of assurance needed to meet today's expectations for analytical verification without the involvement of the vendor and development of additional PSBR specific neutronic and thermo-hydraulic models. Development of such analysis is not warranted considering the remaining number of new 12 wt% elements and fuel management methodology used at PSBR. A restriction on the use of new 12 wt% elements will eliminate the question raised by the aforementioned recent water hole peaking analysis. Future fuel procurement at PSBR will be 20 and 30 wt% standard LEU TRIGA elements that have been well analyzed. 4 Use of these standard fuels at PSBR will require additional site-specific analysis (in accordance with NUREG-1282) and a license amendment.

Therefore PSU requests a change to the facility technical specifications that restricts the use of new (less than 8000 MWD/MTU) 12 wt% fuel elements adjacent to a water hole (open fuel element position in the contiguous core array not filled with fuel, control rod, graphite, or experiment that displaces water).

Additionally, provide a discussion of requirements in the technical specifications (TS) that ensure the peak-to-measured pulse fuel temperature ratio of 1.6 is conservative for any allowed core configuration.

The 1.6:1 ratio of maximum to measured fuel temperature (which is only applicable during a pulse) was calculated in a 1974 paper by then Director- Breazeale Nuclear Reactor Dr. Samuel Levine (et al.). 2 It was the more conservative of two analyses that expanded the work of Goodwin on 8 wt.% TRIGA fuel.3 The analysis that the authors considered more likely, set the ratio of temperatures at 1.45:1. The use of the higher ratio institutionalized a conservative bias of 1 - (1.60/1.45) = 10% to the pulse temperatures.

Page of 12

PSBR response to NRC RAI Dtd. 07/28/09 In order to maintain the assumptions in the SAR analysis, the following technical specifications are in place at Penn State.

1.) TS 2.2: Limited Safety System Setting. This specification limits the maximum operating temperature of the reactor to 650'C so that there is ample margin to the safety limit. The basis to this specification states that "Thus, 500'C of safety margin exists before the 1150'Csafety limit is reached. This safety marginprovides adequate compensationfor variations in the temperatureprofile of depleted anddifferently loaded fuel" (i.e. 8.5wt% vs. 12wt% fuel elements.).

2.) TS 3.1.5: Core Configuration Limitation. (subsections a, b, c, and e of technical specifications included in this RAI response) These specifications limit the type and configuration of fuel (subsection a) used in the Penn State reactor, the amount of power that the fuel can produce (subsection b), the normalized power and pulsing (subsection c),

and the arrangement of the fuel (subsection e waterholes). These actions help to protect the assumptions in the SAR, including the fuel temperature ratio of 1.6.

3.) TS 5.1: Reactor Fuel. This specification limits the type of fuel used in the Penn State reactor to 8.5 wt% and 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator elements which were analyzed in the SAR. The use of other types of TRIGA fuel is not yet analyzed and therefore prohibited.

4.) TS 5.2: Reactor Core. This specification limits the type of reflectors used in the Penn State reactor in order to limit the effects of flux perturbation caused by unanalyzed materials. Subsection 5.2.b limits the reflector to "water,D 20, or graphiteor any combination of the three moderatormaterials."

The above specifications ensure that the only fuel used in the Penn State reactor is as analyzed in the SAR with a maximum peaking factor of 1.6:1.

Page of 12

PSBR response to NRC RAI Dtd. 07/28/09

2. The table at the top of page 22 of the supplement to your application dated October 31, 2008, shows that the maximum deviation between the measured and calculated pulse fuel temperatures was 13.2 percent for element 1-13 located in core position G-
8. A discussion of the deviation applied to steady-state fuel temperatures follows the table.

Provide a similar discussion of the deviation between the measured and calculated pulse fuel temperatures as it applies to maximum fuel temperature during a pulse.

There are four analyzed cases in the Penn State SAR.

1. New 12 wt % fuel element at steady state power of 1MW (fuel element 1-14)
2. Used 12 wt % fuel element at steady state power of 1MW (fuel element 1-13)
3. New 12 wt % fuel element during pulsing (fuel element 1-14)
4. Used 12 wt % fuel element during pulsing (fuel element 1-13)

The used 12 wt % fuel element (1-13) had aburnup of 2.2 MWd or 8000 MWD/MTU for a 275 gram loading of uranium in a nominal 12 wt % TRIGA fuel element.

Tables 2-1 to 2-4 below show data for cases 1-4 from the SAR and the previous submission question 13.2. Position G-8 is in the B-Ring of the core adjacent to the central water hole.

Position G-10 is in the C-Ring and surrounded by fuel.

Table 2-1: Deviation for a new 12 wt % fuel element at steady state power of 1MW (1-14) 1-14 G-8 2.01 466 467 -0.2%

1-14 G-10 1.84 450 439 2.4%

Table 2-2: Deviation for a Used 12 wt % fuel element at steady state power of 1MW (1-13)

I 1-13 G-8 1.56 411 411 -0.12% I 1-13 G-10 1.39 381 382 -0.24%

Page of 12

PSBR response to NRC RAI Dtd. 07/28/09 Table 2-3: Deviation for a new 12 wt % fuel element during Pulsing (1-14) 1-14 U-8 2.07 517 518 -0.1 U/

1-14 G-10 1.8 466 453 2.8%

Table 2-4: Deviation for a used 12 wt % fuel element during Pulsing (1-13) fauel Q.oFie.NP$27 Isulse M

$v2.7 uls5 e _

1 1-137 G-8 1.62 511 443 13.2%ý:

1-13 G-10 1.54 453 422 6.7% 1 An important distinction in this discussion is that the deviation tabulated here is the difference between the calculated value of the temperature at the thermocouple location and the measured value at the thermocouple location. The actual measurement uncertainty is quite small (on the order of 1-2 degrees Celsius) and is bore out on the steady state temperature predictions to be a based on daily comparisons between a cold fuel element and the pool water temperature.

With that in mind, the SAR explains the relatively large deviation for the partially burned element 1-13 was due to:

1.) Excess burnup of U-235 at the periphery of the fuel element that is not accounted for in the Ao+Bor2 assumed shape of the power distribution and, 2.) The gap temperature difference is probably different in 1-13 and 1-14 (as would be expected for any two instrumented fuel elements)

A partially burned fuel element has a much lower peak-to-measured fuel temperature ratio during a pulse as compared to a new 12 wt % fuel element (1.1 as compared to 1.6).

Page of 12

PSBR response to NRC RAI Dtd. 07/28/09 Using a conservative assumption that the observed calculated/measured difference is a multiplicative error the maximum temperature for a $3.50 pulse in NP 2.2 fuel can be calculated.

For the cases of pulsing the two types of elements, the calculations below are the same as the calculation in the SAR (page XIII-25) and would proceed as follows:

Case 3 (1-14): tpo, = 1.177x1O4

  • NP1
  • akp + 95.8
  • NPj + To (SAR eqn 34) tpo= 1.177x10 4
  • 2.2 * ($3.50
  • 0.007 - 0.007) + 95.8 2.2 + 20 tpo =684'C
  • Uncertainty of 2.8% = 703'C 703 0 C
  • pin radial peaking factor of 1.6 = 1125°C Case 4 (1-13): tpo, = 1.475x1O4
  • NPj *kp + 80
  • NPj + T, (SAR eqn 37) tpoi = 1.475xi04
  • 2.2 * ($3.50
  • 0.007 - 0.007) + 80
  • 2.2 + 20 tpoi =764°C
  • Uncertainty of 13.2% = 865°C 865°C
  • pin radial peaking factor of 1.1 = 951 'C Both cases are below the safety limit with the new (1-14) being limiting. Since 1-13 is not a limiting case the SAR provides not further discussion of the deviations.

Explain any uncertainties in the calculation and measurement of the maximum pulse fuel temperature. Explain how the uncertainties are treated to ensure that the maximum pulse fuel temperature will not exceed the safety limit for any core configuration allowed by the TS.

There is no method to measure the maximum pulse fuel temperature. All methods are computer models (such as the General Atomics work cited below) or extrapolation of experimental data to the to the point of maximum temperature.

The PSBR SAR was based on extrapolation to 12 wt% of analytically derived flux and heat production profiles that were experimentally verified using sophisticated techniques for 8 wt% as described by Goodwin (SAR Chapter 13 Ref. 15). Goodwin's work showed that volumetric heat generation from a pulse was related to the thermal neutron flux profile in an element at the start of the pulse. Fourteen high speed thermocouple junctions were placed in an 8 wt% TRIGA fuel element that was then subjected to multiple pulse events to validate the analytical work and develop .a temperature (hence heat generation and flux) profile for the element. This enabled Goodwin to predict the element's performance and peak temperatures with a good degree of accuracy up to the "adiabatic limit" of the fuel.

Page of 12

PSBR response to NRC RAI Dtd. 07/28/09 The work done by Levine for the PSU 12 wt% elements used the basic theoretical premises of Goodwin - that the temperature profile during a pulse can be predicted based on the volumetric heat generation. Both General Atomics (GA) and Levine (et al.) 2 concluded that the installed thermocouples in an instrumented fuel element perform adequately to be used to develop a temperature relationship between measured values and peak pulse temperatures. Levine used measured temperature values to develop a predictive model.

Penn State experimental data (including any temperature measurement uncertainties) for a new 12 wt% element (1-14) agreed closely with the calculated predictions. Therefore the sum of the errors and uncertainties regarding flux profile and heat generation were determined to be relatively small differences from the actual values and provided appropriate accuracy for the measurement and prediction of pulsing performance. The SAR does not give additional consideration to the uncertainties on the partially depleted 12 wt% fuel element (Q-13) since that case was not limiting due to the burnup and reduced peaking.

Larger uncertainties were encountered with the total heat generation in a 12 wt% element versus an 8 wt%, the flux depression in the 12 wt%, and the resultant heat generation profile. These uncertainties yielded two different values for the peak to measured temperature ratios: 1.45:1 (which Levine considered more likely 2) and 1.6:1. The 'SAR was written with the more conservative 1.6:1 ratio to assure compliance with the safety limit for a maximum allowed pulse of the maximum power element.

In 1975, GA published information on TRIGA performance that included temperature predictions and profiles for 12 wt% elements at the' Sandia ACPR (E-l1177393 Fuel Elements for Pulsed TRIGA Reactor dated 1975). Figure 2-1 shows the calculated temperature distribution of the highest power new 12 wt% TRIGA fuel element during a $4.80 pulse calculated for the Sandia ACPR (20,000 MW pulse peak power). The highest ratio of the maximum temperature anywhere in the fuel to the temperature at the thermocouple location is 1.57:1 and occurs immediately with the pulse. The PSBR SAR assumption of 1.6:1 bounds the GA analysis. Note the maximum predicted temperature anywhere in the hot element is -1000 'C.

One of the principal reasons the PSBR SAR is so conservative is the SAR uses the peak measured fuel temperature at the thermocouple location to calculate the maximum peak temperature. In earlier GA work, it was concluded that the time response was sufficiently fast (SAR Chapter 13 Reference 25 - GA-6216 1965) to measure the peak temperature at the thermocouple following pulsing. Levine's work concluded the same. However, unlike 8 wt%

fuel where there is little change in the thermocouple location temperature for seconds after the pulse the temperature in a 12 wt% at the thermocouple rises significantly for -10 seconds after the pulse as conduction equalizes the element temperature (see Figure 14 GA-6216 which is on page 24 of 40 in the October 31, 2008 RAI response and Figure 2-1 below). Since the SAR applies the 1.6:1 ratio to the peak measured value (not temperature at the thermocouple during the maximum temperature profile), the predicted maximum fuel temperatures in the SAR are conservative.

.Page of 12

PSBR response to NRC RAI Dtd. 07/28/09 From Figure 2-1, the ratio of the maximum fuel temperature (at -. 1 second) to peak measured (at 10 seconds) is -1.3:1, not 1.6:1. Applying the 1.6 ratio to a peak measured temperature in 12 wt% fuel inserts conservancy of 1.6/1.3 = 23%.

i~o6a 990' 80p, U..

I.-,

I.'-

7p,9~

p500.

0.~3 0o1.6% 0ý.,Tý EL-O6 18&

Figure 2-1: Standard Pulse Radial Temperature Distribution in a Fuel Rod (General Atomics E-1 17-393)

Page of 12

PSBR response to NRC RAI Dtd. 07/28/09

3. Your application describes qualified locations within the reactor pool for operation of the reactor. Page 7 of the supplement to your application dated October 31, 2008, states:

"Qualificationof a new operatinglocation is governed by operatingprocedures.

New locations are analyzedfor reactivity coupling effects in addition to stresses and radiationeffects."

Provide clarification as to whether the qualification of a new operating location requires an evaluation, consistent with the criteria of Title 10 of the Code of Federal Regulations (10 CFR) Part 50.59(c), to determine that the new operating location does not require a license amendment.

The qualification of a new operating position per the Standard Operating Procedure (SOP) does not require a re-evaluation of criteria of 1OCRF50(c). The design criterion of the original modification that increased the degrees of movement (reactor bridge modification) for the reactor included that there are no unreviewed reactor safety questions as a result of the motion or new position.

A simple movement of the reactor and subsequent operation at a "new" position does-not qualify as a change as defined by 50.59(a)(1). Movement of the reactor and operation of the reactor in the pool are described by the SAR. Qualificationof a new position is not a modification or addition to or removalfrom the facility or procedures that affects a designfunction. It is not a change to a method ofperforming or controllingthatfunction, nor a change to the evaluation that demonstrates that intendedfunctions will be accomplished. Qualification of a new operating position is the verification that the new operating position did not result in any unexpected radiation levels, reactivity couplings, or affect any design functions.

Since the installation of the bridge modification, two new operating positions have been qualified (and one removed). Both are associated with new irradiation fixtures (D 20 thermal column and Fast Neutron Irradiator). SOP-5 Experiment Evaluation andAuthorization requires an evaluation of 10CFR50.59 for new experiments. AP-12 Change would be used to approve any new irradiation fixture and requires screening for 10CFR50.59 applicability.

Page of 12

PSBR response to NRC RAI Dtd. 07/28/09

4. TS 5.1.b requires that the hydrogen-to-zirconium atom ratio shall be a nominal 1.65 hydrogen atoms to 1.0 zirconium atoms. Section 4.2.1 of the safety analysis report states that this ratio is 1.7 to 1.0 for 8.5 weight percent fuel elements.
a. Clarify this apparent discrepancy.

The optimal ratio of H/Zr has been refined by new research results since the inception of the TRIGA reactor design. TS 5.1 .b states that the nominal ratio shall be 1.65. Nominal is interpreted to be a both target value for fuel fabrication and a value representative of previously procured fuel in use. In 1980 General Atomics revised their specifications for TRIGA fuel H/Zr ratio to a nominal value of 1.6:1 with a maximum of 1.65:1 for both 8.5 and 12.0 wt% 6 (page 4-1). The original loading of 8.5 wt% fuel at Penn State had a nominal value of 1L68 with a maximum of 1.707. The fuel-follower control rods had ratios of 1.72, 1.75 and 1.76, but an explanation for this difference can no longer be located. The documented range of H/Zr in PSU fuel is 1.57 to 1.76.

TRIGA fuel was originally constructed with aluminum cladding, 8 wt% uranium and hydrogen to zirconium ratio of 1:1 on an atomic basis'. The change to stainless steel cladding and the higher hydrogen ratio made the fuel more reliable and robust. Once the hydride concentration gets above 1.5, the fuel is no longer subject to thermal phase separation or the thermal cycling effects that cause hydrogen migration in the earlier fuels 6 (page 2-14/2-16). The nominal H/Zr ratio was stated as 1.6:16 (page 1-1). Figure 4-1 shows the phase diagram for H/Zr. For any ratio > 1.65, the fuel stays in the delta or epsilon phase for all temperatures below the safety limit (11500)6 (Fig 2.4).

The presence of uranium in the matrix drops the transition temperatures slightly 6 (page2-5).

,#-z, Ar* MAitO Fig. 274. Zirconim. hydride ph'ase diagrams showing, bourndary deeermination (from .Ref. 19)

Page of 12

PSBR response to NRC RAI Dtd. 07/28/09 Figure 4-1: Phases of Zirconium-Hydride as a Function of Temperature The safety limit for TRIGA fuel with a stainless steel cladding and a H/Zr ratio of 1.65:1 is listed as 1 150'C under all conditions when the cladding temperature is _<500,C 6 (page 4-1).

Figure 4-2 shows the change in internal pressure for a given H/Zr ratio versus temperature 6 (Fig 2.8). This shows that the internal fuel pressure for a given temperature will be slightly higher for the higher H-Zr ratios in the earlier fuel. Since this is only 8.5 wt% fuel for Penn State, it is not the limiting case.

OXYGEN5; 1400PPM 0

-NITROGEN 4: 200 pPMM C.ARBONU4 ,0PP0, 0.101 t O500 550 600 "0 ' 00 750 800 850 9.,r 950 rtkPIE*ArtI*" (VC)

Fig. 2-8.. Disiociat'ioik pressure iAsochares of zirconrium hydri*de (expressed as H/Zi atom ratios)

(from Ref. 23)

Figure 4-2: Hydrogen Disassociation Pressure from TRIGA Fuel b) Additionally, provide a discussion of any controls in place that ensure TS 5.1.b is satisfied for new fuel received at the facility (e.g., review of vendor quality assurance documentation).

Historically there were no PSU specific administrative controls in place to ensure the Department of Energy (DOE) contract vendors (fuel providers) provided fuel that met the specifications required by the DOE purchase contract and TS 5.1.b. Receipt validation was done on an ad hoc basis. A change to SOP-3 Core Loading and Fuel Handlinghas been initiated to verify and document compliance with TS 5.1 .b prior to loading any new elements into the core.

Page of 12

PSBR response to NRC RAI Dtd. 07/28/09

5. In accordance with 10 CFR 50.36(a)(1), provide bases for proposed technical specifications 5.1 through 5.6. Your response should include the proposed technical specifications in their entirety.

Attached is a copy of the proposed technical specifications which includes the following changes from Amendment 37:

1. Reformatted the entire document - to remove multiple font sizes and margins shift used to accommodate previous amendments;
2. Removed all amendment references and change bars - to support reissue with license renewal;
3. Added a header with title and footer to each page with "page # of #" format -

convenience and clarity;

4. Added a table of contents - not part of PSBR Technical Specifications, provided for convenience only;
5. Updated multiple references to sections of the Safety Analysis Report in technical speculations to reflect the current (new SAR) chapter numbers and if necessary chapter titles - to support reissue with new SAR and license renewal.
6. TS 1.1.34.g changed "containment" to "confinement" - Correct typographic error, the facility does not have a containment;
7. Split TS 3.1.5.c into two specifications 3.1.5.c and 3.1.5.d, changed new TS 3.1.5.d "Reactivity Accident in the Safety Analysis Report" to "Insertion of Excess Reactivity", provided guidance on when the calculation in TS 3.1.5.d is required, and modified basis to support the revision - for clarity of requirement and match wording used the SAR;
8. Added TS 3.1.5.e and associated basis - new restriction on core configuration resulting from review of peaking issues in the vicinity of internal water filled core positions. Refer to question 1 above;
9. Deleted reference to SAR in TS 3.3.2 - information removed from new SAR for security reasons.
10. Added to TS 4.0 permission to operate the reactor to accomplish surveillance requirements that exceed the specified performance interval - current Technical Specifications provide no mechanism to accomplish overdue requirements that require operation of the reactor. This addition corrects that oversight and limits operations to those required to complete the surveillance(s);
11. Added basis to TS Section 5 - to support compliance with 10CFR50.36(a)(1).

Page of 12

PSBR response to NRC RAI Dtd. 07/28/09

References:

1. Goodwin, W., "The Measurement of Radial Power Distributions in a TRIGA Fuel Element during Reactor Excursions," Ph.D. Thesis, University of Illinois, 1969.
2. Levine, S., G. Geisler and R. Totenbier, "Temperature Behavior of 12 WT.% U TRIGA Fuel", TOC-5, TRIGA Owners' Conference III, February 1974.
3. Simnad, M., "Fuel Elements for Pulsed TRIGA Research Reactors E- 117-393" General Atomics 1975.
4. U.S. Nuclear Regulatory Commission, "NUREG-1282 Safety Evaluation Report on High-Uranium Content, Low-Enriched Zirconium Hydride Fuels for TRIGA Reactors",

Government Printing Office, Washington D.C., 1987.

5. Penn State Safety Analysis Report Chapter XIII, 1997.
6. Simnad, M., "The U-ZrHx Alloy: Its Properties and Use in TRIGA Fuel E-117-833" General Atomics 1980.
7. PSBR Fuel Receipt Records 1965.

Page of 12

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2

1.0 INTRODUCTION

1 1.1 Definitions 1 2.0 SAFETY LIMIT AND LIMITING SAFETY SYSTEM SETTING 8 2.1 Safety Limit-Fuel Element Temperature 8 2.2 Limiting Safety System Setting (LSSS) 9 3.0 LIMITING CONDITIONS FOR OPERATION 10 3.1 Reactor Core Parameters 10 3.1.1 Non-Pulse Mode Operation 10 3.1.2 Reactivity Limitation 11 3.1.3 Shutdown Margin 12 3.1.4 Pulse Mode Operation 13 3.1.5 Core Configuration Limitation 14 3.1.6 TRIGA Fuel Elements 15 3.2 Reactor Control and Reactor Safety System 16 3.2.1 Reactor Control Rods 16 3.2.2 Manual Control and Automatic Control 17 3.2.3 Reactor Control System 18 3.2.4 Reactor Safety System and Reactor Interlocks 19 3.2.5 Core Loading and Unloading Operation 21 3.2.6 SCRAM Time 21 3.3 Coolant System 22 3.3.1 Coolant Level Limits 22 3.3.2 Detection of Leak or Loss of Coolant 23 3.3.3 Fission Product Activity 23 3.3.4 Pool Water Supply for Leak Protection 24 3.3.5 Coolant Conductivity Limits 24 3.3.6 Coolant Temperature Limits 25 3.4 Confinement 25 3.5 Engineered Safety Features - Facility Exhaust System and Emergency Exhaust System 26 3.6 Radiation Monitoring System 27 3.6.1 Radiation Monitoring Information 27 3.6.2 Evacuation Alarm 28 3.6.3 Argon-41 Discharge Limit 28 3.6.4 As Low As Reasonably Achievable (ALARA) 29 3.7 Limitations of Experiments 29

-i-

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 4.0 SURVEILLANCE REQUIREMENTS 32 4.1 Reactor Parameters 32 4.1.1 Reactor Power Calibration 32 4.1.2 Reactor Excess Reactivity 32 4.1.3 TRIGA Fuel Elements 33 4.2 Reactor Control and Safety System 34 4.2.1 Reactivity Worth 34 4.2.2 Reactivity Insertion Rate 34 4.2.3 Reactor Safety System 35 4.2.4 Reactor Interlocks 36 4.2.5 Overpower' SCRAM 37 4.2.6 Transient Rod Test 37 4.3.1 Fire Hose Inspection 38 4.3.2 Pool Water Temperature 39 4.3.3 Pool Water Conductivity 39 4.3.4 Pool Water Level Alarm 40 4.4 Confinement 40 4.5 Facility Exhaust System and Emergency Exhaust System 41 4.6 Radiation Monitoring System and Effluents 41 4.6.1 Radiation Monitoring System and Evacuation Alarm 41 4.6.2 Argon-41 42 4.6.3 ALARA 42 4.7 Experiments 43 5.0 DESIGN FEATURES 44 5.1 Reactor Fuel 44 5.2 Reactor Core 44 5.3 Control Rods 45 5.4 Fuel Storage 45 5.5 Reactor Bay and Exhaust Systems 46 5.6 Reactor Pool Water Systems 46

- ii -

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 6.0 ADMINISTRATIVE CONTROLS 47 6.1 Organization 47 6.1.1 Structure 47 6.1.2 Responsibility 47 6.1.3 Staffing 49 6.1.4 Selection and Training of Personnel 49 6.2 Review and Audit 50 6.2.1 Safeguards Committee Composition 50 6.2.2 Charter and Rules 50 6.2.3 Review Function 51 6.2.4 Audit 51 6.3 Operating Procedures 52 6.4 Review and Approval of Experiments 53 6.5 Required Action 53 6.6 Reports 54 6.6.1 Operating Reports 54 6.6.2 Special Reports 55 6.7 Records 56 6.7.1 Records to be Retained for at Least Five Years 56 6.7.2 Records to be Retained for at Least One Training Cycle 56 6.7.3 Records to be Retained for the Life of the Reactor Facility 56

- 111 -

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2

1.0 INTRODUCTION

Included in this document are the Technical Specifications and the Basis for the Technical Specifications. These Bases, which provide the technical support for the individual technical specifications, are included for information purposes only. They are not part of the Technical Specifications and they do not constitute limitations or requirements to which the licensee must adhere.

1.1 Definitions 1.1.1 ALARA The ALARA (As Low As Reasonably Achievable) program is a program for maintaining occupational exposures to radiation and release of radioactive effluents to the environs as low as reasonably achievable.

1.1.2 Automatic Control Automatic control mode operation is when normal reactor operations, including start up, power level change, power regulation, and protective power reductions are performed by the reactor control system without, or with minimal, operator intervention.

1.1.3 Channel A channel is the combination of sensor, line, amplifier, and output devices which are connected for the purpose of measuring the value of a parameter.

1.1.4 Channel Calibration A channel calibration is an adjustment of the channel such that its output responds, with acceptable range, and accuracy, to known values of the parameter which the channel measures. Calibration SHALL encompass the entire channel, including equipment actuation, alarm, or trip, and SHALL be deemed to include a Channel Test.

1.1.5 Channel Check A channel check is a qualitative verification of acceptable performance by observation of channel behavior. This verification, where possible, SHALL include comparison of the channel with other independent channels or systems measuring the same variable.

1.1.6 Channel Test A channel test is the introduction of a signal into the channel to verify that it is operable.

1.1.7 Cold Critical Cold critical is the condition of the reactor when it is critical with the fuel and bulk water temperatures both below l00°F (37.8°C).

Page I of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 1.1.8 Confinement Confinement means an enclosure on the overall facility which controls the movement of air into it and out through a controlled path.

1.1.9 Excess Reactivity Excess reactivity is that amount of reactivity that would exist if all control rods (safety, regulating, etc.) were moved to the maximum reactive condition from the point where the reactor is exactly critical (keff=l) in the reference core condition.

1.1.10 Experiment Experiment SHALL mean (a) any apparatus, device, or material which is not a normal part of the core or experimental facilities, but which is inserted in these facilities or is in line with a beam of radiation originating from the reactor core; or (b) any operation designed to measure reactor parameters or characteristics.

1.1.11 Experimental Facility Experimental facility SHALL mean beam port, including extension tube with shields, thermal column with shields, vertical tube, central thimble, in-core irradiation holder, pneumatic transfer system, and in-pool irradiation facility.

1.1.12 Instrumented Element An instrumented element is a TRIGA fuel element in which sheathed chromel-alumel or equivalent thermocouples are embedded in the, fuel.

1.1.13 Limiting Conditions for Operation Limiting conditions for operation of the reactor are those constraints included in the Technical Specifications that are required for safe operation of the facility. These limiting conditions are applicable only when the reactor is operating unless otherwise specified.

1.1.14 Limiting Safety System Setting A limiting safety system setting (LSSS) is a setting for an automatic protective device related to a variable having a significant safety function.

1.1.15 Manual Control Manual control mode is operation of the reactor with the power level controlled by the operator adjusting the control rod positions.

Page 2 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 1.1.16 Maximum Elemental Power Density The maximum elemental power density (MEPD) is the power density of the element in the core producing more power than any other element in that loading. The power density of an element is the total power of the core divided by the number of fuel elements in the core multiplied by the normalized power of that element. This definition is only applicable for non-pulse operation.

1.1.17 Maximum Power Level Maximum Power Level is the maximum measured value of reactor power for non-pulse operation.

1.1.18 Measured Value The measured value is the value of a parameter as it appears on the output of a channel.

1.1.19 Movable Experiment A movable experiment is one where it is intended that the entire experiment may be moved in or near the core or into and out of the reactor while the reactor is operating.

1.1.20 Normalized Power The normalized power, NP, is the ratio of the power of a fuel element to the average power per fuel element.

1.1.21 Operable Operable means a component or system is capable of performing its intended function.

1.1.22 Operating Operating means a component or system is performing its intended function.

1.1.23 PulseMode Pulse mode operation SHALL mean operation of the reactor allowing the operator to insert preselected reactivity by the ejection of the transient rod.

1.1.24 Reactivity Limits The reactivity limits are those limits imposed on reactor core reactivity.

Quantities are referenced to a reference core condition.

Page 3 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 1.1.25 Reactivity Worth of an Experiment The reactivity worth of an experiment is the maximum absolute value of the reactivity change that would occur as a result of intended or anticipated changes or credible malfunctions that alter experiment position or configuration.

1.1.26 Reactor Control System The reactor control system is composed of control and operational interlocks, reactivity adjustment controls, flow and temperature controls, and display systems which permit the operator to operate the reactor reliably in its allowed modes.

1.1.27 Reactor Interlock A reactor interlock is a device which prevents some action, associated with reactor operation, until certain reactor operation conditions are satisfied.

1.1.28 Reactor Operating The reactor is operating whenever it is not secured or shutdown.

1.1.29 Reactor Secured The reactor is secured when:

a. It contains insufficient fissile material or moderator present in the reactor, adjacent experiments, or control rods, to attain criticality under optimum available conditions of moderation, and reflection, or
b. A combination of the following:
1) The minimum number of neutron absorbing control rods are fully inserted or other safety devices are in shutdown positions, as required by technical specifications, and
2) The console key switch is in the off position and the key is removed from the lock, and
3) No work is in progress involving core fuel, core structure, installed control rods, orcontrol rod drives unless they are physically decoupled from the control rods, and
4) No experiments in or near the reactor are being moved or serviced that have, on movement, a reactivity worth exceeding the maximum value allowed for a single experiment or one dollar whichever is smaller.

Page 4 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 1.1.30 Reactor Shutdown The reactor is shutdown if it is subcritical by at least one dollar in the reference core condition and the reactivity worth of all experiments is included.

1.1.31 Reactor Safety System Reactor safety systems are those systems, including their associated input channels, which are designed to initiate automatic reactor protection or to provide information for initiation of manual protective action.

1.1.32 Reference Core Condition The condition of the core when it is at ambient temperature (cold) and the reactivity worth of xenon is negligible (<0.21% Ak/k (-$0.30)).

1.1.33 Research Reactor A research reactor is defined as a device designed to support a self-sustaining neutron chain reaction for research, development, educational, training, or experimental purposes, and which may have provisions for the production of radioisotopes.

1.1.34 Reportable Occurrence A reportable occurrence is any of the following which occurs during reactor operation:

a. Operation with the safety system setting less conservative than specified in Section 2.2, Limiting Safety System Setting.
b. Operation in violation of a limiting condition for operation.
c. Failure of a required reactor safety system component which could render the system incapable of performing its intended safety function.
d. Any unanticipated or uncontrolled change in reactivity greater than one dollar.
e. An observed inadequacy in the implementation of either administrative or procedural controls which could result in operation of the reactor outside the limiting conditions for operation.
f. Release of fission products from a fuel element.
g. Abnormal and significant degradation in reactor fuel, cladding, coolant boundary or confinement boundary that could result in exceeding 10 CFR Part 20 exposure criteria.

Page 5 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 1.1.35 Rod-Transient The transient rod is a control rod with SCRAM capabilities that is capable of providing rapid reactivity insertion for use in either pulse or square wave mode of operation.

1.1.36 Safety Limit Safety limits are limits on important process variables which are found to be necessary to reasonably protect the integrity of certain physical barriers which guard against the uncontrolled release of radioactivity. The principal physical barrier is the fuel element cladding.

1.1.37 SCRAM Time SCRAM time is the elapsed time between reaching a limiting safety system set point and a specified control rod movement.

1.1.38 Secured Experiment A secured experiment is any experiment, experimental facility, or component of an experiment that is held in a stationary position relative to the reactor by mechanical means. The restraining forces must be substantially greater than those to which the experiment might be subjected to by hydraulic, pneumatic, buoyant, or other forces which are normal to the operating environment of the experiment, or by forces which can arise as a result of credible malfunctions.

1.1.39 Secured.Experiment with Movable Parts A secured experiment with movable parts is one that contains parts that are intended to be moved while the reactor is operating.

1.1.40 Shall, Should, and May The word "shall" is used to denote a requirement; the word "should" to denote a recommendation; and the word "may" to denote permission, neither a requirement nor a recommendation.

1.1.41 Shim, Regulating, and Safety Rods A shim, regulating, or safety rod is a control rod having an electric motor drive and SCRAM capabilities. It has a fueled follower section.

Page 6 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 1.1.42 Shutdown Margin Shutdown margin SHALL mean the minimum shutdown reactivity necessary to provide confidence that the reactor can be made subcritical by means of the control and safety systems starting from any permissible operating condition although the most reactive rod is in its most reactive position, and that the reactor will remain subcritical without further operator action.

1.1.43 Square Wave Mode Square wave (SW) mode operation SHALL mean operation of the reactor allowing the operator to insert preselected reactivity by the ejection of the transient rod, and which results in a maximum power within the license limit.

1.1.44 Steady State Power Level Steady state power level is the nominal measured value of reactor power to which reactor power is being controlled whether by manual or automatic actions. Minor variations about this level may occur due to noise, normal signal variation, and reactivity adjustments. During manual, automatic, or square wave modes of operation, some initial, momentary overshoot may occur.

1.1.45 TRIGA Fuel Element A TRIGA fuel element is a single TRIGA fuel rod of standard type, either 8.5 wt% U-ZrH in stainless steel cladding or 12 wt% U-ZrH in stainless steel cladding enriched to less than 20% uranium-235.

1.1.46 Watchdog Circuit A watchdog circuit is a circuit consisting of a timer and a relay. The timer energizes the relay as long as it is reset prior to the expiration of the timing interval. If it is not reset within the timing interval, the relay will de-energize thereby causing a SCRAM.

Page 7 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 2.0 SAFETY LIMIT AND LIMITING SAFETY SYSTEM SETTING 2.1 Safety Limit-Fuel Element Temperature Applicability The safety limit specification applies to the maximum temperature in the reactor fuel.

Objective The objective is to define the maximum fuel element temperature that can be permitted with confidence that no damage to the fuel element and/or cladding will result.

Specification The temperature in a water-cooled TRIGA fuel element SHALL NOT exceed 1150'C under any operating condition.

Basis The important parameter for a TRIGA reactor is the fuel element temperature. This parameter is well suited as a single specification especially since it can be measured at a point within the fuel element and the relationship between the measured and actual temperature is well characterized analytically. A loss in the integrity of the fuel element cladding could arise from a build-up of excessive pressure between the fuel-moderator and the cladding if the maximum fuel temperature exceeds 1150'C.

The pressure is caused by the presence of air, fission product gases, and hydrogen from the dissociation of the hydrogen and zirconium in the fuel-moderator. The magnitude of this pressure is determined by the fuel-moderator temperature, the ratio of hydrogen to zirconium in the alloy, and the rate change in the pressure.

The safety limit for the standard TRIGA fuel is based on data, including the large mass of experimental evidence obtained during high performance reactor tests on this fuel. These data indicate that the stress in the cladding due to the increase in the hydrogen pressure from the dissociation of zirconium hydride will remain below the ultimate stress provided that the temperature of the fuel does not exceed 1150'C and the fuel cladding is below 500'C. See Safety Analysis Report, Ref. 13 and 30 in Section 13 and Simnad, M.T., F.C. Foushee, and G.B. West, "Fuel Elements for Pulsed Reactors," Nucl. Technology, Vol. 28, p. 31-56 (January 1976).

Page 8 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 2.2 Limiting Safety System Setting (LSSS)

Applicability The LSSS specification applies to the SCRAM setting which prevents the safety limit from being reached.

Objective The objective is to prevent the safety limit (1 150'C) from being reached.

Specification The limiting safety system setting SHALL be a maximum of 650'C as measured with an instrumented fuel element if it is located in a core position representative of the maximum elemental power density (MEPD) in that loading. If it is not practical to locate the instrumented fuel in such a position, the LSSS SHALL be reduced.

The reduction of the LSSS SHALL be by a ratio based on the calculated linear relationship between the normalized power at the monitored position as compared to normalized power at the core position representative of the MEPD in that loading.

Basis The limiting safety system setting is a temperature which, if reached, SHALL cause a reactor SCRAM to be initiated preventing the safety limit from being exceeded.

Experiments and analyses described in the Safety Analysis Report, Section 13 -

Accident Analysis, show that the measured fuel temperature at steady state power has a simple linear relationship to the normalized power of a fuel element in the core. Maximum fuel temperature occurs when an instrumented element is in a core position of MEPD. The actual location of the instrumented element and the associated LSSS SHALL be chosen by calculation and/or experiment prior to going to maximum reactor operational power level. The measured fuel temperature during steady state operation is close to the maximum fuel temperature in that element.

Thus, 500*C of safety margin exists before the 11 50'C safety limit is reached. This safety margin provides adequate compensation for variations in the temperature profile of depleted and differently loaded fuel elements (i.e. 8.5 wt% vs. 12 wt%

fuel elements). See Safety Analysis Report, Chapter 13.

If it is not practical to place an instrumented element in the position representative of MEPD the LSSS SHALL be reduced to maintain the 500'C safety margin between the 11 500C safety limit and the highest fuel temperature in the core if it was being measured. The reduction ratio SHALL be determined by calculation using the accepted techniques used in Safety Analysis Report, Chapter 13.

In the pulse mode of operation, the same LSSS SHALL apply. However, the temperature channel will have no effect on limiting the peak power or fuel temperature, generated, because of its relatively long time constant (seconds),

compared with the width of the pulse (milliseconds).

Page 9 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 3.0 LIMITING CONDITIONS FOR OPERATION The limiting conditions for operation as set forth in this section are applicable only when the reactor is operating. They need not be met when the reactor is shutdown unless specified otherwise.

3.1 Reactor Core Parameters 3.1.1 Non-Pulse Mode Operation Applicability These specifications apply to the power generated during manual control mode, automatic control mode, and square wave mode operations.

Objective The objective is to limit the source term and energy production to that used in the Safety Analysis Report.

Specifications

a. The reactor may be operated at steady state power levels of 1 Mw (thermal) or less.
b. The maximum power level SHALL be no greater than 1.1 Mw (thermal).
c. The steady state fuel temperature SHALL be a maximum of 650'C as measured with an instrumented fuel element if it is located in a core position representative of MEPD in that loading. If it is not practical to locate the instrumented fuel in such a position, the steady state fuel temperature SHALL be calculated by a ratio based on the calculated linear relationship between the normalized power at the monitored position as compared to normalized power at the core position representative of the MEPD in that loading. In this case, the measured steady state fuel temperature SHALL be limited such that the calculated steady state fuel temperature at the core position representative of the MEPD in that loading SHALL NOT exceed 650'C.

Basis

a. Thermal and hydraulic calculations and operational experience indicate that a compact TRIGA reactor core can be safely operated up to power levels of at least 1.15 Mw (thermal) with natural convective cooling.
b. Operation at 1.1 Mw (thermal) is within the bounds established by the SAR for steady state operations. See Chapter 13, Section C of the SAR.
c. Limiting the maximum steady state measured fuel temperature of any position to 650'C places an upper bound on the fission product release fraction to that used in the analysis of a Maximum Hypothetical Accident (MHA). See Safety Analysis Report, Chapter 13.

Page 10 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 3.1.2 Reactivity Limitation Applicability This specification applies to the reactivity condition of the reactor and the reactivity worth of control rods, experiments, and experimental facilities. It applies to all modes of operation.

Objective The objective is to ensure that the reactor is operated within the limits analyzed in the Safety Analysis Report and to ensure that the safety limit will not be exceeded.

Specification

a. The maximum excess reactivity above cold, clean, critical plus samarium poison of the core configuration with experiments and experimental facilities in place SHALL be 4.9% Ak/k (-$7.00).
b. During initial measurements of maximum excess reactivity for a new core/experimental configuration this specification is suspended provided the reactor is operated at power levels no greater than 1 kw.

If the power level exceeds 1 kw, power SHALL be reduced to less that 1 kw within one minute. This exemption does not apply for the annual confirmatory measurement of excess reactivity required by TS 4.1.2.

Basis Limiting the excess reactivity of the core to 4.9% Ak/k (-$7.00) prevents the fuel temperature in the core from exceeding 1150'C under any assumed accident condition as described in the Safety Analysis Report, Chapter 13.

The exemption allows the initial physics measurement of maximum excess reactivity for a new core/experimental configuration to be measured without creating a reportable occurrence. Maintaining the power level less that 1 kw during this exemption assures there is no challenge to the safety limit on fuel temperature.

Page 11 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 3.1.3 Shutdown Margin Applicability This specification applies to the reactivity condition of the reactor and the reactivity worth of control rods, experiments, and experimental facilities. It applies to all modes of operation.

Objective The objective is to ensure that the reactor can be shut down at all times and to ensure that the safety limit will not be exceeded.

Specification The reactor SHALL NOT be operated unless the shutdown margin provided by control rods is greater than 0.175% Ak/k (-$0.25) with:

a. All movable experiments, experiments with movable parts and experimental facilities in their most reactive state, and
b. The highest reactivity worth control rod fully withdrawn.

Basis A shutdown margin of 0.175% Ak/k (-$0.25) ensures that the reactor can be made subcritical from any operating condition even if the highest worth control rod should remain in the fully withdrawn position. The shutdown margin requirement may be more restrictive than Specification 3.1.2.

Page 12 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 3.1.4 Pulse Mode Operation Applicability These specifications apply to the energy generated in the reactor as a result of a pulse insertion of reactivity.

Obiective The objective is to ensure that the safety limit will not be exceeded during pulse mode operation.

Specifications

a. The stepped reactivity insertion for pulse operation SHALL NOT exceed 2.45% Ak/k (-$3.50) and the maximum worth of the poison section of the transient rod SHALL be limited to 2.45% Ak/k (-$3.50).
b. Pulses SHALL NOT be initiated from power levels above 1 kw.

Basis

a. Experiments and analyses described in the Safety Analysis Report, Chapter 13, show that the peak pulse temperatures can be predicted for new 12 wt% fuel placed in any core position. These experiments and analyses show that the maximum allowed pulse reactivity of 2.45% Ak/k

(-$3.50), prevents the maximum fuel temperature from reaching the safety limit (1 150'C) for any core configuration that meets the requirements of 3.1.5.

The maximum worth of the pulse rod is limited to 2.45% Ak/k (-$3.50) to preventexceeding the safety limit (1 150'C) with an accidental ejection of the transient rod.

b. If a pulse is initiated from power levels below 1 kw, the maximum allowed full worth of the pulse rod can be used without exceeding the safety limit.

Page 13 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 3.1.5 Core Configuration Limitation Applicability These specifications apply to all core configurations except as noted.

Objective The objective is to ensure that the safety limit (1 150'C) will not be exceeded due to power peaking effects in the various core configurations.

Specifications

a. The critical core SHALL be an assembly of either 8.5 wt% U-ZrH stainless steel clad or a mixture of 8.5 wt% and 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator elements placed in water with a 1.7 inch center line grid spacing.
b. The maximum calculated MEPD SHALL be less that 24.7 kw per fuel element for non-pulse operation.
c. The NP of any core loading with a maximum allowed pulse worth of 2.45% Ak/k (-$3.50) SHALL be limited to 2.2. IF the maximum allowed pulse worth is less than 2.45% Ak/k ($-3.50) for any given core loading (i.e. the pulse can be limited by the total worth of the transient rod, by the core excess, or administratively), THEN the maximum NP may be increased above 2.2 as long as the calculated maximum fuel temperature does not exceed the safety limit with that maximum allowed pulse worth and NP.
d. IF the maximum NP is increased above 2.2 as described in TS 3.41.5.c above, THEN the Insertion of Excess Reactivity analysis in the Safety Analysis Report SHALL be evaluated to ensure that the safety limit is not exceeded with the new conditions (See Safety Analysis Report, Chapter 13.1.2.).
e. The core SHALL NOT be configured such that a 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator element with a burnup less than a nominal 8000 MWD/Metric Ton of Uranium is located adjacent to a vacant (water-filled) internal core position during pulse mode operation.

Basis

a. The safety analysis is based on an assembly of either 8.5 wt% U-ZrH stainless steel clad or a mixture of 8.5 wt% and 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator elements placed in water with a 1.7 inch center line grid spacing.
b. Limiting the MEPD to 24.7 kw per element for non-pulse operation places an upper bound on the elemental heat production and the source term of the PSBR to that used in the analysis of a Loss Of Coolant Accident (LOCA) and Maximum Hypothetical Accident (MHA) respectively. See Safety Analysis Report, Chapter 13.

Page 14 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2

c. The maximum NP for a given core loading determines the peak pulse temperature with the maximum allowed pulse worth. If the maximum allowed pulse worth is reduced the maximum NP may be increased without exceeding the safety limit (1150'C). The amount of increase in the maximum NP allowed SHALL be calculated by an accepted method documented by an administratively approved procedure.
d. If the core loading deviates from the limits set in TS 3.1.5.c then revalidation of the Insertion of Excess Reactivity analysis in the Safety Analysis Report will ensure that the new loading does not inadvertently exceed the safety limit (See Safety Analysis Report, Chapter 13.1.2.).
e. Radial peaking effects in unirradiated 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator elements located adjacent to water-filled internal core position may cause a reduction in the safety margin during pulse mode operation with the maximum allowed pulse worth of 2.45% Ak/k

(-$3.50) and the maximum allowed NP of 2.2. Locating an 8.5 wt% or moderately-irradiated (-8000 Megawatt Days per Metric Ton of Uranium) 12 wt% U-ZrH stainless steel clad TRIGA fuel-moderator element adjacent to vacant water-filled internal core positions provides additional safety margin. 12 wt% elements in the periphery of the core are not subject to this concern as the NP is too low to make these elements limiting.

3.1.6 TRIGA Fuel Elements Applicability These specifications apply to the mechanical condition of the fuel.

Objective The objective is to ensure that the reactor is not operated with damaged fuel that might allow release of fission products.

Specifications The reactor SHALL NOT be operated with damaged fuel except to-detect and identify the fuel element for removal. A TRIGA fuel element SHALL be considered damaged and SHALL be removed from the core if:

a. In measuring the transverse bend, the bend exceeds the limit of 0.125 inch over the length of the cladding.
b. In measuring the elongation, its length exceeds its original length by 0.125 inch.
c. A clad defect exists as indicated by release of fission products.

Page 15 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 Basis

a. The limit of transverse bend has been shown to result in no difficulty in disassembling the core. Analysis of the removal of heat from touching fuel elements shows that there will be no hot spots which cause damage to the fuel.
b. Experience with TRIGA reactors has shown that fuel element bending that could result in touching has occurred without deleterious effects.

This is because (1) during steady state operation, the maximum fuel temperatures are at least 500'C below the safety limit (1150'C), and (2) during a pulse, the cladding temperatures remain well below their stress limit. The elongation limit has been specified to ensure that the cladding material will not be subjected to strains that could cause a loss of fuel integrity and to ensure adequate coolant flow 3.2 Reactor Control and Reactor Safety System 3.2.1 Reactor Control Rods Applicability This specification applies to the reactor control rods.

Obiective The objective is to ensure that sufficient control rods are operable to maintain the reactor subcritical.

Specification There SHALL be a minimum of three operable control rods in the reactor core.

Basis The shutdown margin and excess reactivity specifications require that the reactor can be made subcritical with the most reactive control rod withdrawn. This specification helps ensure it.

Page 16 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 3.2.2 Manual Control and Automatic Control Applicability This specification applies to the maximum reactivity insertion rate associated with movement of a standard control rod out of the core.

Objective The objective is to ensure that adequate control of the reactor can be maintained during manual and 1, 2, or 3 rod automatic control.

Specification The rate of reactivity insertion associated with movement of either the regulating, shim, or safety control rod SHALL be NOT greater than 0.63%

Ak/k (-$0.90) per second when averaged over full rod travel. If the automatic control uses a combination of more than one rod, the sum of the reactivity of those rods SHALL be not greater than 0.63% Ak/k (~$0.90) per second when averaged over full travel.

Basis accident analysis (refer to Safety Analysis Report, Chapter 13) indicates that the safety limit (1150°C) will not be exceeded if the reactivity addition rate is less than 1.75% Ak/k (-$2.50) per second, when averaged over full travel. This specification of 0.63% Ak/k (-$0.90) per second, when averaged over full travel, is well within that analysis.

Page 17 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 3.2.3 Reactor Control System Applicability This specification applies to the information which must be available to the reactor operator during reactor operation.

Objective The objective is to require that sufficient information is available to the operator to ensure safe operation of the reactor.

Specification The reactor SHALL NOT be operated unless the measuring channels listed in Table 1 are operable. (Note that MN, AU, and SW are abbreviations for manual control mode, automatic control mode, and square wave mode, respectively).

Table 1 Measuring Channels Min. No. Effective Mode Measuring Channel Operable, MN, AU & SW Pulse Fuel Element Temperature 1 X X Wide Range Instrument Linear Power 1 X Log Power 1 X Reactor Period/SUR 1 X Power Range Instrument Linear Power 1 X Pulse Peak Power 1 X Basis Fuel temperature displayed at the control console gives continuous information on this parameter which has a specified safety limit. The power level monitors ensure that the reactor power level is adequately monitored for the manual control, automatic control, square wave, and pulsing modes of operation. The specifications on reactor power level and reactor period indications are included in this section to provide assurance that the reactor is operated at all times within the limits allowed by these Technical Specifications.

Page 18 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 3.2.4 Reactor Safety System and Reactor Interlocks Applicability This specification applies to the reactor safety system channels, the reactor interlocks, and the watchdog circuit.

Objective The objective is to specify the minimum number of reactor safety system channels and reactor interlocks that must be operable for safe operation.

Specification The reactor SHALL NOT be operated unless all of the channels and interlocks described in Table 2a and Table 2b are operable.

Basis

a. A temperature SCRAM and two power level SCRAMs ensure the reactor is shutdown before the safety limit on the fuel element temperature is reached. The actual setting of the fuel temperature SCRAM depends on the LSSS for that core loading and the location of the instrumented fuel element (see Technical Specification section 2.2).

Table 2a Minimum Reactor Safety System Channels Number Effective Mode Channel Operable Function MN, AU Pulse SW Fuel Temperature 1 SCRAM < 650'C* X X X High Power 2 SCRAM -<110% of X X maximum reactor operational power not to exceed 1.1 Mw Detector Power 1 SCRAM on failure of X X Supply supply voltage SCRAM Bar on 1 Manual SCRAM x x x Console Preset Timer 1 Transient Rod SCRAM X 15 seconds or less after pulse Watchdog Circuit 1 SCRAM on software or X X X self-check failure The limit of 650'C SHALL be reduced as required by specification 2.2.

Page 19 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 Table 2b.

Minimum Reactor Interlocks Number Effective Mode Channel Operable Function MN, AU Pulse SW Source Level 1 Prevent rod withdrawal X without a neutron induced-signal on the log power channel Pulse Mode Inhibit 1 Prevent pulsing from X levels above 1 kw Transient Rod 1 Prevent applications of X air unless cylinder is fully inserted Shim, Safety, and 1 Prevent movement of X Regulating Rod any rod except the transient rod Simultaneous Rod 1 Prevent simultaneous X X Withdrawal manual withdrawal of two rods

b. The maximum reactor operational power may be administratively limited to less than 1 Mw depending on section 3.1.5.b of this Technical Specification. The high power SCRAMs SHALL be set to no more than 110% of the administratively limited maximum reactor operational power if it is less than 1 Mw.
c. Operation of the reactor is prevented by SCRAM if there is a failure of the detector power supply for the reactor safety system channels.
d. The manual SCRAM allows the operator to shut down the reactor in any mode of operation if an unsafe or abnormal condition occurs.
e. The preset timer ensures that the transient rod will be inserted and the reactor will remain at low power after pulsing.
f. The watchdog circuit will SCRAM the reactor if the software or the self-checks fail (see Safety Analysis Report, Chapter 7).
g. The interlock to prevent startup of the reactor without a neutron induced signal ensures that sufficient neutrons are available for proper startup in all allowable modes of operation.
h. The interlock to prevent the initiation of a pulse above 1 kw is to ensure that fuel temperature is approximately pool temperature when a pulse is performed. This is to ensure that the safety limit is not reached.

Page 20 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2

i. The interlock to prevent application of air to the transient rod unless the cylinder is fully inserted is to prevent pulsing the reactor in the manual control or automatic control mode.
j. In the pulse mode, movement of any rod except the transient rod is prevented by an interlock. This interlock action prevents the addition of reactivity other than with the transient rod.
k. Simultaneous manual withdrawal of two rods is prevented to ensure the reactivity rate of insertion is not exceeded.

3.2.5 Core Loading and Unloading Operation Applicability This specification applies to the source level interlock.

Objective The objective of this specification is to allow bypass of the source level interlock during operations with a subcritical core.

Specification During core loading and unloading operations when the reactor is subcritical, the source level interlock may be momentarily defeated using a spring loaded switch in accordance with the fuel loading procedure.

Basis During core loading and unloading, the reactor is subcritical. Thus, momentarily defeating the source level interlockis a safe operation. Should the core become inadvertently supercritical, the accidental insertion of.

reactivity will not allow fuel temperature to exceed the 11 50°C safety limit because no single TRIGA fuel element is worth more than-1% Ak/k

(-$1.43) in the most reactive core position.

3.2.6 SCRAM Time Applicability This specification applies to the time required to fully insert any control rod to a full down position from a full up position.

Objective The objective is to achieve rapid shutdown of the reactor to prevent fuel damage.

Specification The time from SCRAM initiation to the full insertion of any control rod from a full up position SHALL be less than 1 second.

Page 21 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 Basis This specification ensures that the reactor will be promptly shut down when a SCRAM signal is initiated. Experience and analysis, Safety Analysis Report, Chapter 13, have indicated that for the range of transients anticipated for a TRIGA reactor, the specified SCRAM time is adequate to ensure the safety of the reactor. If the SCRAM signal is initiated at 1. 1 Mw, while the control rod is being withdrawn, and the negative reactivity is not inserted until the end of the one second rod drop time, the maximum fuel temperature does not reach the safety limit.

3.3 Coolant System 3.3.1 Coolant Level Limits Applicability This specification applies to operation of the reactor with respect to a required depth of water above the top of the bottom grid plate.

Objective The objective is to ensure that water is present to provide adequate personnel shielding and core cooling when the reactor is operated, and during a LOCA.

Specification The reactor SHALL NOT be operated with less than 18 ft. of water above the top of the bottom grid plate.

Basis When the water is more than approximately 18 ft. above the top of the bottom grid plate, the water provides sufficient shielding to protect personnel during operation at 1 Mw, and core cooling is achieved with natural circulation of the water through the core. Should the water level drop below approximately 18.25 ft. above the top of the bottom grid plate while operating at 1 Mw, a low pool level alarm (see Technical Specifications 3.3.2) will alert the operator who is required by administratively approved procedure to shutdown the reactor. Once this alarm occurs it will take longer than 1300 seconds before the core is completely uncovered because of a break in the 6" pipe connected to the bottom of the pool. Tests and calculations show that, during a LOCA, 680 seconds is sufficient decay time after shutdown (see Safety Analysis Report, Chapter 13) to prevent the fuel temperature from reaching 950°C. To prevent cladding rupture, the fuel and the cladding temperature must not exceed 950 'C (it is assumed that the fuel and the cladding are the same temperature during air cooling).

Page 22 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 3.3.2 Detection of Leak or Loss of Coolant Applicability This specification applies to detecting a pool water loss.

Objective The objective is to detect the loss of a significant amount of pool water.

Specification A pool level alarm SHALL be activated and corrective action taken when the pool level drops 26 cm from a level where the pool is full.

Basis The alarm occurs when the water level is approximately 18.25 ft. above the top of the bottom grid plate. The point at which the pool is full is approximately 19.1 ft. above the top of the bottom grid plate. The reactor staff SHALL take action to keep the core covered with water according to existing procedures. The alarm is also transmitted to the Police Services annunciator panel which is monitored 24 hrs. a day. The alarm provides a signal that occurs at all times. Thus, the alarm provides time to initiate corrective action before the radiation from the core poses a serious hazard.

3.3.3 Fission Product Activity Applicability This specification applies to the detection of fission product activity.

Objective The objective is to ensure that fission products from a leaking fuel element are detected to provide opportunity to take protective action.

Specification An air particulate monitor SHALL be operating in the reactor bay whenever the reactor is operating. An alarm on this unit SHALL activate a building evacuation alarm.

Basis This unit will be sensitive to airborne radioactive particulate matter containing fission products and fission gases and will alert personnel in time to take protective action.

Page 23 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 3.3.4 Pool Water Supply for Leak Protection Applicability This specification applies to pool water supplies for the reactor pool for leak protection.

Objective The objective is to ensure that a supply of water is available to replenish reactor pool water in the event of pool water leakage.

Specification A source of water of at least 100 GPM SHALL be available either from the University water supply or by diverting the heat exchanger secondary flow to the pool.

Basis Provisions for both of these supplies are in place and will supply more than the specified flow rate. This flow rate will be more than sufficient to handle leak rates that have occurred in the past or any anticipated leak that might occur in the future.

3.3.5 Coolant Conductivity Limits Applicability This specification applies to the conductivity of the water in the pool.

Objectives The objectives are:

a. To prevent activated contaminants from becoming a radiological hazard, and
b. To help preclude corrosion of fuel cladding and other primary system components.

Specification The reactor SHALL NOT be operated if the conductivity of the bulk pool water is greater than 5 microsiemens/cm (5 micromhos/cm).

Basis Experience indicates that 5 microsiemens/cm is an acceptable level of water contaminants in an aluminum/stainless steel system such as that at the PSBR. Based on experience, activation at this level does not pose a significant radiological hazard, and significant corrosion of the stainless steel fuel cladding will not occur when the conductivity is below 5.

microsiemens/cm.

Page 24 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 3.3.6 Coolant Temperature Limits Applicability This specification applies to the pool water temperature.

Objective The objective is to maintain the pool water temperature at a level that will not cause damage to the demineralizer resins.

Specification An alarm SHALL annunciate and corrective action SHALL be taken if during operation the bulk pool water temperature reaches 140°F (60°C).

Basis This specification is primarily to preserve demineralizer resins. Information available indicates that temperature damage will be minimal up to this temperature.

3.4 Confinement Applicability This specification applies to reactor bay doors.

Objective The objective is to ensure that no large air passages exist to the reactor bay during reactor operation.

Specifications The reactor bay truck door SHALL be closed and the reactor bay personnel doors SHALL NOT be blocked open and left unattended if either of the following conditions are true.

a. The reactor is not secured, or
b. Irradiated fuel or a fueled experiment with significant fission product inventory is being moved outside containers, systems or storage areas.

Basis This specification helps to ensure that the air pressure in the reactor bay is lower than the remainder of the building and the outside air pressure. Controlled air pressure is maintained by the air exhaust system. and ensures controlled release of any airborne radioactivity.

Page 25 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 3.5 Engineered Safety Features - Facility Exhaust System and Emergency Exhaust System Applicability This specification applies to the operation of the facility exhaust system and the emergency exhaust system.

Objective The objective is to mitigate the consequences of the release of airborne radioactive materials resulting from reactor operation.

Specification

a. If the reactor is not secured, at least one facility exhaust fan SHALL be operating and, except for periods of time less than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> during maintenance or repair, the emergency exhaust system SHALL be operable.
b. If irradiated fuel or a fueled experiment with significant fission product inventory is being moved outside containers, systems or storage areas, at least one facility exhaust fan SHALL be operating and the emergency exhaust system SHALL be operable.

Basis During normal operation, the concentration of airborne radioactivity in unrestricted areas is below effluent release limits as described in the Safety Analysis Report, Chapter 13. In the event of a substantial release of airborne radioactivity, an air radiation monitor and/or an area radiation monitor will sound a building evacuation alarm which will automatically cause the facility exhaust system to close and the exhausted air to be passed through the emergency exhaust system filters before release. This reduces the radiation within the building. The filters will remove 90% all of the particulate fission products that escape to the atmosphere.

The emergency exhaust system activities only during an evacuation where upon all personnel are required to evacuate the building (section 3.6.2). If there is an evacuation while the emergency exhaust system is out of service for maintenance or repair, personnel evacuation is not prevented.

Personnel dose to the public will be equivalent or less whether or not the emergency exhaust system functions in the unlikely event an accident occurs during the maintenance or repair.

Page 26 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 3.6 Radiation Monitoring System 3.6.1 Radiation Monitoring Information Applicability This specification applies to the radiation monitoring information which must be available to the reactor operator during reactor operation.

Objective The objective is to ensure that sufficient radiation monitoring information is available to the operator to ensure personnel radiation safety during reactor operation.

Specification The reactor SHALL NOT be operated unless the radiation monitoring channels listed in Table 3 are operating.

Table 3 Radiation Monitoring Channels Radiation Monitoring Channels Function Number Area Radiation Monitor Monitor radiation levels 1 in the reactor bay.

Continuous Air Monitor radioactive 1 (Radiation) Monitor particulates in the reactor bay air.

Beamhole Laboratory Monitor radiation in the 1 Monitor Beamhole Laboratory required only when the laboratory is in use.

Basis

a. The radiation monitors provide information to operating personnel of any impending or existing danger from radiation so that there will be sufficient time to evacuate the facility and to take the necessary steps to control the spread of radioactivity to the surroundings.
b. The area radiation monitor in the Beamhole Laboratory provides information to the user and to the reactor operator when this laboratory is in use.

Page 27 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 3.6.2 Evacuation Alarm Applicability This specification applies to the evacuation alarm.

Objective The objective is to ensure that all personnel are alerted to evacuate the PSBR building when a potential radiation hazard exists within this building.

Specification The reactor SHALL NOT be operated unless the evacuation alarm is operable and audible to personnel within the PSBR building when activated by the radiation monitoring channels in Table 3 or a manual switch.

Basis The evacuation alarm produces a loud pulsating sound throughout the PSBR building when there is any impending or existing danger from radiation.

The sound notifies all personnel within the PSBR building to evacuate the building as prescribed by the PSBR emergency procedure.

3.6.3 Argon-41 Discharge Limit Applicability This specification applies to the concentration of Argon-41 that may be discharged from the PSBR.

Obiective The objective is to ensure that the health and safety of the public is not endangered by the discharge of Argon-41 from the PSBR.

Specification All Argon-41 concentrations produced by the operation of the reactor SHALL be below the limits imposed by 10 CFR Part 20 when averaged over a year.

Basis The maximum allowable concentration of Argon-41 in air in unrestricte_

areas as specified in Appendix B, Table 2 of 10 CFR Part 20 is 1.0 x 10 iiCi/ml. Measurements of Argon-41 have been made in the reactor bay when the reactor operates at 1 Mw. These measurements showsthat the concentrations averaged over a year produce less than 1.0 x 10 jtCi/ml in an unrestricted area (see Environmental Impact Appraisal, December 12, 1996).

Page 28 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 3.6.4 As Low As Reasonably Achievable (ALARA)

Applicability This specification applies to all reactor operations that could result in occupational exposures to radiation or the release of radioactive effluents to the environs.

Objective The objective is to maintain all exposures to radiation and release of radioactive effluents to the environs ALARA.

Specification An ALARA program SHALL be in effect.

Basis Having an ALARA program will ensure that occupational exposures to radiation and the release of radioactive effluents to the environs will be ALARA. Having such a formal program will keep the staff cognizant of the importance to minimize radiation exposures and effluent releases.

3.7 Limitations of Experiments Applicability These specifications apply to experiments installed in the reactor and its experimental facilities.

Obiective The objective is to prevent damage to the reactor and to minimize release of radioactive materials in the event of an experiment failure.

Specifications The reactor SHALL NOT be operated unless the following conditions governing experiments exist:

a. The reactivity of a movable experiment and/or movable portions of a secured experiment plus the maximum allowed pulse reactivity SHALL be less than 2.45% k/k (-$3.50). However, the reactivity of a movable experiment and/or movable portions of a secured experiment SHALL have a reactivity worth less than 1.4% Ak/k (-$2.00). During measurements made to determine specific worth, this specification is suspended provided the reactor is operated at power levels no greater than 1 kw. When a movable experiment is used, the maximum allowed pulse SHALL be reduced below the allowed pulse reactivity insertion of 2.45% Ak/k (-$3.50) to ensure that the sum is less 2.45% Ak/k (-$3.50).

Page 29 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2

b. A single secured experiment SHALL be limited to a maximum of 2.45% Ak/k

(-$3.50). The sum of the reactivity worth of all experiments SHALL be less than 2.45% Ak/k (-$3.50). During measurements made to determine experimental worth, this specification is suspended provided the reactor is operated at power levels no greater that 1 kw.

c. When the keffofthe core is less than 1 with all control rods at their upper limit and no experiments in or near the core, secured negative reactivity experiments may be added without limit.
d. An experiment may be irradiated or an experimental facility may be used in conjunction with the reactor provided its use does not constitute an unreviewed safety question. The failure mechanisms that SHALL be analyzed include, but are not limited to corrosion, overheating, impact from projectiles, chemical, and mechanical explosions.

Explosive material SHALL NOT be stored or used in the facility without proper safeguards to prevent release of fission products or loss of reactor shutdown capability.

If an experimental failure occurs which could lead to the release of fission products or the loss of reactor shutdown capability, physical inspection SHALL be performed to determine the consequences and the need for corrective action.

The results of the inspection and any corrective action taken SHALL be reviewed by the Director or a designated alternate and determined to be satisfactory before operation of the reactor is resumed.

e. Experiment materials, except fuel materials, which could off-gas, sublime, volatilize, or produce aerosols under (1) normal operating conditions of the experiment and reactor, (2) credible accident conditions in the reactor, or (3) possible accident conditions in the experiment, SHALL be limited in activity such that the airborne concentration of radioactivity averaged over a year SHALL NOT exceed the limit of Appendix B Table 2 of 10 CFR Part 20.

When calculating activity limits, the following assumptions SHALL be used:

1) If an experiment fails and releases radioactive gases or aerosols to the reactor bay or atmosphere, 100% of the gases or aerosols escape.
2) If the effluent from an experimental facility exhausts through a holdup tank which closes automatically on high radiation level, at least 10% of the gaseous activity or aerosols produced will escape.
3) If the effluent from an experimental facility exhausts through a filter installation designed for greater than 99% efficiency for 0.3 micron particles, at least 10% of these vapors can escape.
4) For materials whose boiling point is above 130'F and where vapors formed by boiling this material can escape only through an undisturbed column of water above the core, at least 10% of these vapors can escape.

Page 30 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 f, Each fueled experiment SHALL be controlled such that the total inventory of iodine isotopes 131 through 135 in the experiment is no greater than 1.5 curies.

In addition, any fueled experiment which would generate an inventory of more than 5 millicuries (mCi) of 1-131 through 1-135 SHALL be reviewed to ensure that in the case of an accident, the total release of iodine will not exceed that postulated for the MHA (see Safety Analysis Report, Chapter 13).

Basis

a. This specification limits the sum of the reactivities of a maximum allowed pulse and a movable experiment to the specified maximum reactivity of the transient rod. This limits the effects of a pulse simultaneous with the failure of the movable experiment to the effects analyzed for a 2 .4 5 % Ak/k (-$3.50) pulse. In addition, the maximum power attainable with the ramp insertion of 1.4% Ak/k

(-$2.00) is less than 500 kw starting from critical.

b. The maximum worth of all experiments is limited to 2.45% Ak/k (-$3.50) so that their inadvertent sudden removal from the cold critical reactor will not result in the reactor achieving a power level high enough to exceed the temperature safety limit (1 150'C). The worth of a single secured experiment is limited to the allowed pulse reactivity insertion as an increased measure of safety. Should the 2.45% Ak/k, (-$3.50) reactivity be inserted by a ramp increase, the maximum power attainable is less than 1 Mw.
c. Since the initial core is subcritical, adding and then inadvertently removing all negative reactivity experiments leaves the core in its initial subcritical condition.
d. The design basis accident is the MHA (See Safety Analysis Report, Chapter 13). A chemical explosion (such as detonated TNT) or a mechanical explosion (such as a steam explosion or a high pressure gas container explosion) may release enough energy to cause release of fission products or loss of reactor shutdown capability. A projectile with a large amount of kinetic energy could cause release of fission products or loss of reactor shutdown capability.

Accelerated corrosion of the fuel. cladding due- to material released by a failed experiment could also lead to release of fission products.

If an experiment failure occurs a special investigation is required to ensure that all effects from the failure are known before operation proceeds.

e. This specification is intended to reduce the likelihood that airborne activities in excess of the limits of Appendix B Table 2 of 10 CFR Part 20 will be released to the atmosphere outside the facility boundary.
f. The 5 mCi limitation on 1-131 through 1-135 ensures that in the event of failure of a fueled experiment, the exposure dose at the exclusion area boundary will be less than that postulated for the MHA (See Safety Analysis Report, Chapter 13) even if the iodine is released in the air.

Page 31 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 4.0 SURVEILLANCE REQUIREMENTS IF a Surveillance Requirement(s) is not accomplished in the specified interval that prohibits reactor operation; THEN the reactor SHALL NOT be operated until the Surveillance Requirement(s) is satisfied EXCEPT as required to accomplish the required Surveillance(s).

4.1 Reactor Parameters 4.1.1 Reactor Power Calibration Applicability This specification applies to the surveillance of the reactor power calibration.

Objective The objective is to verify the performance and operability of the power measuring channel.

Specification A thermal power channel calibration SHALL be made on the linear power level monitoring channel biennially, not to exceed 30 months.

Basis The thermal power level channel calibration will ensure that the reactor is operated at the authorized power levels.

4.1.2 Reactor Excess Reactivity Applicability This specification applies to surveillance of core excess reactivity.

Objective The objective is to ensure that the reactor excess reactivity does not exceed the Technical Specifications and the limit analyzed in Safety Analysis Report, Chapter 13.

Specification The excess reactivity of the core SHALL be measured annually, not to.

exceed 15 months, and following core or control rod changes equal to or greater than 0.7% Ak/k (-$ 1.00).

Page 32 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 Basis Excess reactivity measurements on this schedule ensure that no unexpected changes have occurred in the core and the core configuration does not exceed excess reactivity limits established in the Specification 3.1.2.

4.1.3 TRIGA Fuel Elements Applicability This specification applies to the surveillance requirements for the TRIGA fuel elements.

Objective The objective is to verify the continuing integrity of the fuel element cladding.

Specification Fuel elements and control rods with fuel followers SHALL be inspected visually for damage or deterioration and measured for length and bend in accordance with the following:

a. Before being placed in the core for the first time or before return to service.
b. Every two years, not to exceed 30 months, or at intervals not to exceed the sum of $3,500 in pulse reactivity, whichever comes first, for elements with a NP greater than 1 and for control rods with fueled followers.
c. Every four years, not to exceed 54 months, for elements with a NP of 1 or less.
d. Upon being removed from service. Those removed from service are then exempt from further inspection.

Basis The frequency of inspection and measurement schedule is based on the parameters most likely to affect the fuel cladding of a pulsing reactor operated at moderate pulsing levels and utilizing fuel elements whose characteristics are well known.

Page 33 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 4.2 Reactor Control and Safety System 4.2.1 Reactivity Worth Applicability This specification applies to the reactivity worth of the control rods.

Objective The objective is to ensure that the control rods are capable of maintaining the reactor subcritical.

Specification The reactivity worth of each control rod and the shutdown margin for the core loading in use SHALL be determined annually, not to exceed 15 months, or following core or control rod changes equal to or greater than 0.7% Ak/k (-$1.00).

Basis The reactivity worth of the control rod is measured to ensure that the required shutdown margin is available and to provide an accurate means for determining the core excess reactivity, maximum reactivity, insertion rates, and the reactivity worth of experiments inserted in the core.

4.2.2 Reactivity Insertion Rate Applicability This specification applies to control rod movement speed.

Objective The objective is to ensure that the reactivity addition rate specification is not violated and that the control rod drives are functioning.

Specification The rod drive speed both up and down and the time from SCRAM initiation to the full insertion of any control rod from the full up position SHALL be measured annually, not to exceed 15 months, or when any significant work is done on the rod drive or the rod.

Basis This specification ensures that the reactor will be promptly shut down when a SCRAM signal is initiated. Experience and analysis have indicated that for the range of transients anticipated for a TRIGA reactor, the specified SCRAM time is adequate to ensure the safety of the reactor. It also ensures that the maximum reactivity addition rate specification will not be exceeded.

Page 34 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 4.2.3 Reactor Safety System Applicability The specifications apply to the surveillance requirements for measurements, channel tests, and channel checks of the reactor safety systems and watchdog circuit.

Objective The objective is to verify the performance and operability of the systems and components that are directly related to reactor safety.

Specifications

a. A channel test of the SCRAM function of the wide range linear, power range linear, fuel temperature, manual, and preset timer safety channels SHALL be made on each day that the reactor is to be operated, or prior to each operation that extends more than one day.
b. A channel test of the detector power supply SCRAM functions for both the wide range and the power range and the watchdog circuit SHALL be performed annually, not to exceed 15 months.
c. Channel checks for operability SHALL be performed daily on fuel element temperature, wide range linear power, wide range log power, wide range reactor period/SUR, and power range linear power when the reactor is to be operated, or prior to each operation that extends more than one day.
d. The power range channel SHALL be compared with other independent channels for proper channel indication, when appropriate, each time the reactor is operated.
e. The pulse peak power channel SHALL be compared to the fuel temperature each time the reactor is pulsed, to ensure proper peak power channel operation.

Basis System components have proven operational reliability.

a. Daily channel tests ensure accurate SCRAM functions and ensure the detection of possible channel drift or other possible deterioration of operating characteristics.
b. An annual channel test of the detector power supply SCRAM will ensure that this system works, based on past experience as recorded in the operation log book. An annual channel test of the watchdog circuit is sufficient to ensure operability.
c. The channel checks will make information available to the operator to ensure safe operation on a daily basis or prior to an extended run.

Page 35 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2

d. Comparison of the percent power channel with other independent power channels will ensure the detection of channel drift or other possible deterioration of its operational characteristics.
e. Comparison of the peak pulse power to the fuel temperature for each pulse will ensure the detection of possible channel drift or deterioration of its operational characteristics.

4.2.4 Reactor Interlocks Applicability These specifications apply to the surveillance requirements for the reactor control system interlocks.

Objective The objective is to ensure performance and operability of the reactor control system interlocks.

Specifications

a. A channel check of the source interlock SHALL be performed each day that the reactor is operated or prior to each operation that extends more than one day except when the neutron signal is greater than the setpoint when the source is removed from the core.
b. A channel test SHALL be performed semi-annually, not to exceed 7 1/2 months, on the pulse mode inhibit interlock which prevents pulsing from power levels higher than one kilowatt.
c. A channel check SHALL be performed semi-annually, not to exceed 7 1/2 months, on the transient rod interlock which prevents application of air to the transient rod unless the cylinder is fully inserted.
d. A channel check SHALL be performed semi-annually, not to exceed 7 1/2 months, on the rod drive interlock which prevents movement of any rod except the transient rod in pulse mode.
e. A channel check SHALL be performed semi-annually, not to exceed 7 1/2 months, on the rod drive interlock which prevents simultaneous manual withdrawal of more than one rod.

Page 36 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 Basis The channel test and checks will verify operation of the reactor interlock system. Experience at the PSBR indicates that the prescribed frequency is adequate to ensure operability.

After extended operation, the photo neutron source strength may be high enough that removing the source may not drop the neutron signal below the setpoint of the source interlock. With a large intrinsic source there is no practical way to channel check the source interlock. In which case there is no need for a source interlock.

4.2.5 Overpower SCRAM Applicability This specification applies to the high power and fuel temperature SCRAM channels.

Objective The objective is to verify that high power and fuel temperature SCRAM channels perform the SCRAM functions.

Specification The high power and fuel temperature SCRAM's SHALL be tested annually, not to exceed 15 months.

Basis Experience with the PSBR for more than a decade, as recorded in the operation log books, indicates that this interval is adequate to ensure operability.

4.2.6 Transient Rod Test Applicability These specifications apply to surveillance of the transient rod mechanism.

Objective The objective is to ensure that the transient rod drive mechanism is maintained in an operable condition.

Page 37 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 Specifications

a. On each day that pulse mode operation of the reactor is planned, a functional performance check of the transient rod system SHALL be performed. The transient rod drive cylinder and the associated air supply system SHALL be inspected, cleaned, and lubricated as necessary annually, not to exceed 15 months.
b. The reactor SHALL be pulsed annually, not to exceed 15 months, to compare fuel temperature measurements and peak power levels with those of previous pulses of the same reactivity value or the reactor SHALL NOT be pulsed until such comparative pulse measurements are performed.

Basis Functional checks along with periodic maintenance ensure repeatable performance. The reactor is pulsed at suitable intervals and a comparison made with previous similar pulses to determine if changes in transient rod drive mechanism, fuel, or core characteristics have taken place.

4.3 Coolant System 4.3.1 Fire Hose Inspection Applicability This specification applies to the dedicated fire hoses used to supply water to the pool in an emergency.

Objective The objective is to ensure that these hoses are operable.

Specification The two (2) dedicated fire hoses that provide supply water to thepool in an emergency SHALL be visually inspected for damage and wear annually, not to exceed 15 months.

Basis This frequency is adequate to ensure that significant degradation has not occurred since the previous inspection.

Page 38 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 4.3.2 Pool Water Temperature Applicability This specification applies to pool water temperature.

Objective The objective is to limit pool water temperature.

Specification The pooi temperature alarm SHALL be calibrated annually, not to exceed 15 months.

Basis Experience has shown this instrument to be drift-free and that this interval is adequate to ensure operability.

4.3.3 Pool Water Conductivity Applicability This specification applies to surveillance of pool water conductivity.

Objective The objective is to ensure that pool water mineral content is maintained at an acceptable level.

Specification Pool water conductivity SHALL be measured and recorded daily when the reactor is to be operated, or at monthly intervals when the reactor is shut down for this time period.

Basis Based on experience, observation at these intervals provides acceptable surveillance of limits that ensure that fuel clad corrosion and neutron activation of dissolved materials will not occur.

Page 39 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 4.3.4 Pool Water Level Alarm Applicability This specification applies to the surveillance requirements for the pool level alarm.

Objective The objective is to verify the operability of the pool water level alarm.

Specification The pool water level alarm SHALL be channel checked monthly, not to exceed 6 weeks, to ensure its operability.

Basis Experience, as exhibited by past periodic checks, has shown that monthly checks of the pool water level alarm ensures operability of the system during the month.

4.4 Confinement Applicability This specification applies to reactor bay doors.

Objective The objective is to ensure that reactor bay doors are kept closed as per Specification 3.4.

Specification Doors to the reactor bay SHALL be locked or under supervision by an authorized keyholder.

Basis A keyholder is authorized by the Director or his designee.

Page 40 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 4.5 Facility Exhaust System and Emergency Exhaust System Applicability These specifications apply to the facility exhaust system and emergency exhaust system.

Obiective The objective is to ensure the proper operation of the facility exhaust system and emergency exhaust system in controlling releases of radioactive material to the uncontrolled environment.

Specifications

a. It SHALL be verified monthly, not to exceed 6 weeks, whenever operation is scheduled, that the emergency exhaust system is operable with correct pressure drops across the filters (as specified in procedures).
b. It SHALL be verified monthly, not to exceed 6 weeks, whenever operation is scheduled, that the facility exhaust system is secured when the emergency exhaust system activates during an evacuation alarm (See Technical, Specification 3.6.2 and 5.5).

Basis Experience, based on periodic checks performed over years of operation, has demonstrated that a test of the exhaust systems on a monthly basis, not to exceed 6 weeks, is sufficient to ensure the proper operation of the systems. This provides reasonable assurance on the control of the release of radioactive material.

4.6 Radiation Monitoring System and Effluents 4.6.1 Radiation Monitoring System and Evacuation Alarm Applicability This specification applies to surveillance requirements for the area radiation monitor, the Beamhole Laboratory radiation monitor, the air radiation monitor, and the evacuation alarm.

Objective The objective is to ensure that the radiation monitors and evacuation alarm are operable and to verify the appropriate alarm settings.

Specification The area radiation monitor, the Beamhole Laboratory radiation monitor, the continuous air (radiation) monitor, and the evacuation alarm system SHALL be channel tested monthly not to exceed 6 weeks. They SHALL be verified to be operable by a channel check daily when the reactor is to be operated, and SHALL be calibrated annually, not to exceed 15 months.

Page 41 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 Basis Experience has shown this frequency of verification of the radiation monitor set points and operability and the evacuation alarm operability is adequate to correct for any variation in the system due to a change of operating characteristics. Annual channel calibration ensures that units are within the specifications defined by procedures.

4.6.2 Argon-41 Applicability This specification applies to surveillance of the Argon-41 produced during reactor operation.

Obiective To ensure that the production of Argon-41 does not exceed the limits specified by 10 CFR Part 20.

Specification The production of Argon-41 SHALL be measured and/or calculated for each new experiment or experimental facility that is estimated to produce a dose greater than 1 mrem at the exclusion boundary.

Basis One (1) mrem dose per experiment or experimental facility represents 1% of the maximum 10 CFR Part 20 annual dose. It is considered prudent to analyze the Argon-41 production for any experiment or experimental facility that exceeds 1% of the annual limit.

4.6.3 ALARA Applicability This specification applies to the surveillance of all reactor operations that could result in occupational exposures to radiation or the release of radioactive effluents to the environs.

Objective The objective is to provide surveillance of all operations that could lead to occupational exposures to radiation or the release of radioactive effluents to the environs.

Specification As part of the review of all operations, consideration SHALL be given to alternative operational modes that might reduce staff exposures, release of radioactive materials to the environment, or both.

Page 42 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 Basis Experience has shown that experiments and operational requirements can, in many cases, be satisfied with a variety of combinations of facility options, core positions, power levels, time delays, and effluent or staff radiation exposures. Similarly, overall reactor scheduling achieves significant reductions in staff exposures. Consequently, ALARA must be a part of both overall reactor scheduling and the detailed experiment planning.

4.7 Experiments Applicability This specification applies to surveillance requirements for experiments.

Objective The objective is to ensure that the conditions and restrictions of Specification 3.7 are met.

Specification Those conditions and restrictions listed in Specification 3.7 SHALL be considered by the PSBR authorized reviewer before signing the irradiation authorization for each experiment.

Basis Authorized reviewers are appointed by the facility director.

Page 43 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 5.0 DESIGN FEATURES 5.1 Reactor Fuel Specifications The individual unirradiated TRIGA fuel elements shall have the following characteristics:

a. The total uranium content SHALL be either 8.5 wt% or 12.0 wt% nominal and enriched to less than 20% uranium-235.
b. The hydrogen-to-zirconium atom ratio (in the ZrHx) SHALL be a nominal 1.65 H atoms to 1.0 Zr atom.
c. The cladding SHALL be 304 stainless steel with a nominal 0.020 inch thickness.

Basis Nominal values of uranium loading, U-235 enrichment, hydrogen loading and cladding thickness are taken to mean those values specified by the manufacturer as standard values for TRIGA fuel. Minor deviations about these levels may occur due to variations in manufacturing and are not considered to be violations of this specification.

5.2 Reactor Core Specifications

a. The core SHALL be an arrangement of TRIGA uranium-zirconium hydride fuel-moderator elements positioned in the reactor grid plates.
b. The reflector, excluding experiments and experimental facilities, SHALL be water, or D20, or graphite, or any combination of the three moderator materials.

Basis The arrangement of TRIGA fuel elements positioned in the reactor grid plates ensures that adequate space is maintained for effective cooling. The Mark III TRIGA reactor is an open design without provision for reflector except in the form of natural water used for cooling and graphite elements which may be placed in the grid array. Restrictions on the reflector in this specification ensure any changes are analyzed against the criteria for experiments consistent with TS 3.7.

Page 44 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 5.3 Control Rods Specifications

a. The shim, safety, and regulating control rods SHALL have SCRAM capability and contain borated graphite, B4C powder, or boron and its compounds in solid form as a poison in stainless steel or aluminum cladding. These rods may incorporate fueled followers which have the same characteristics as the fuel region in which they are used.
b. The transient control rod SHALL have SCRAM capability and contain borated graphite, B4C powder, or boron and its compounds in a solid form as a poison in an aluminum or stainless steel clad. When used as a transient rod, it SHALL have an adjustable upper limit to allow a variation of reactivity insertions. This rod may incorporate a voided or a solid aluminum follower.

Basis The poison requirements for the control rods are satisfied by using neutron-absorbing borated graphite, B4C powder, or boron and its compounds. These materials must be contained in a suitable cladding material, such as aluminum or stainless steel, to insure mechanical stability during movement and to isolate the poison from the pool water environment. SCRAM capabilities are provided by the rapid insertion of the control rods, which is the primary operational safety feature of the reactor. The transient control rod is designed for use in a pulsing TRIGA reactor and does not by design have a fuel follower.

5.4 Fuel Storage Specifications a.; All fuel elements SHALL be stored in a geometrical array where the keff is less than 0.8 for all conditions of moderation.

b. Irradiated fuel elements SHALL be stored in an array which SHALL permit sufficient natural convection cooling by water such that the fuel element temperature SHALL NOT reach the safety limit as defined in Section 2.1 of the Technical Specifications.

Basis The limits imposed by this specification are conservative and ensure safe storage and handling of nuclear fuel. GA-5402 "Criticality Safety Guide" places a, general limitation on well-moderated U-235 to 300 grams per square foot. A rack of new 12 wt% elements would have no more than 288 grams per square foot (assuming 2

spacing and 60 grams U-235 per element). Additional work by General Atomics in 1966 showed that a 2x10 array of 12 wt% elements with no separation would have a keff= 0.7967. The fuel racks used for storage have an actual spacing of 2.0 inches and 2.5 inches and vertically offset by 20 inches, the calculations are conservative.

Page 45 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 5.5 Reactor Bay and Exhaust Systems Specifications

a. The reactor SHALL be housed in a room (reactor bay) designed to restrict leakage. The minimum free volume total bay volume minus occupied volume) in the reactor bay SHALL be 1900 m-ý.
b. The reactor bay SHALL be equipped with two exhaust systems. Under normal operating conditions, the facility exhaust system exhausts unfiltered reactor bay air to the environment releasing it at a point at least 24 feet above ground level.

Upon initiation of a building evacuation alarm, the previously mentioned system is automatically secured and an emergency exhaust system automatically starts. The emergency exhaust system is also designed to discharge reactor bay air at a point at least 24 feet above ground level.

Basis The value of 1900 m3 for reactor bay free volume is assumed in the SAR 13.1.1 Maximum Hypothetical Accident and is used in the calculation of the radionuclide concentrations for the analysis.

The SAR analysis 13.1.1 Maximum Hypothetical Accident does not take credit for any filtration present in the emergency exhaust system. The height above the ground of the release helps to ensure adequate mixing prior to possible personnel exposure.

5.6 Reactor Pool Water Systems Specification The reactor core SHALL be cooled by natural convective water flow.

Basis Thermal and hydraulic calculations and operational experience indicate that a compact TRIGA reactor core can be safely operated up to power levels of at least 1.15 Mw (thermal) with natural convective cooling.

Page 46 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 6.0 ADMINISTRATIVE CONTROLS 6.1 Organization 6.1.1 Structure The University Vice President for Research Dean of the Graduate School (level 1) has the responsibility for the reactor facility license. The management of the facility is the responsibility of the Director (level 2),

who reports to the Vice President for Research, Dean of the Graduate School through the office of the Dean of the College of Engineering.

Administrative and fiscal responsibility is within the office of the Dean.

The minimum qualifications for the position of Director of the PSBR are an advanced degree in science or engineering, and 2 years experience in reactor operation. Five years of experience directing reactor operations may be substituted for an advanced degree.

The Manager of Radiation Protection reports through the Director of Environmental Health and Safety, the assistant Vice President for Safety' and Environmental Services, and to the Senior Vice President for Finance and Business/Treasurer. The qualifications for the Manager of Radiation Protection position are the equivalent of a graduate degree in radiation protection, 3 to 5 years experience with a broad byproduct material license, and certification by The American Board of Health Physics or eligibility for certification.

6.1.2 Responsibility Responsibility for the safe operation of the reactor facility SHALL be within the chain of command shown in the organization chart. Individuals at the various management levels, in addition to having responsibility for the policies and operation of the reactor facility, SHALL be responsible for safeguarding the public and facility personnel from undue radiation exposures and for adhering to all requirements of the operating license and technical specifications.

In all instances, responsibilities of one level may be assumed by designated alternates or by higher levels, conditional upon appropriate qualifications.

Page 47 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 ORGANIZATION CHART Senior Vice President for Finance Vice President for Research and Business/Treasurer Dean of the Graduate School (Level 1)

I I Vice President for Physical Plant Dean, College of Engineering II I

I Director of Environmental Health and Safety I

Manager of Radiation Protection Penn State Reactor Safeguards Committee Director Penn State Breazeale Reactor (Level 2)

F l!

I II Associate Director for Operations (Level 2)

Operating Staff Senior Reactor Operators (Level 3)

Reactor Operators (Level 4)

Page 48 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 6.1.3 Staffing

a. The minimum staffing when the reactor is not secured SHALL be:
1) A licensed operator present in the control room, in accordance with applicable regulations.
2) A second person present at the facility able to carry out prescribed written instructions.
3) If a senior reactor operator is not present at the facility, one SHALL be available by telephone and able to be at the facility within 30 minutes.
b. A list of reactor facility personnel by name and telephone number SHALL be readily available in the control room for use by the operator.

The list SHALL include:

1) Management personnel.
2) Radiation safety personnel.
3) Other operations personnel.
c. Events requiring the direction of a Senior Reactor Operator SHALL include:
1) All fuel or control-rod relocations within the reactor core region.
2) Relocation of any in-core experiment with a reactivity worth greater than one dollar.
3) Recovery from unplanned or unscheduled shutdown (in this instance, documented verbal concurrence from a Senior Reactor Operator is required).

6.1.4 Selection and Training of Personnel The selection, training, and requalification of operations personnel SHALL meet or exceed the requirements of all applicable regulations and the American National Standard for Selection and Training of Personnel for Research Reactors, ANSI/ANS-15.4-1988, Sections 4-6.

Page 49 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 6.2 Review and Audit 6.2.1 Safeguards Committee Composition A Penn State Reactor Safeguards Committee (PSRSC) SHALL exist to provide an independent review and audit of the safety aspects of reactor facility operations. The committee SHALL have a minimum of 5 members and SHALL collectively represent a broad spectrum of expertise in reactor technology and other science and engineering fields. The committee SHALL have at least one member with health physics expertise. The committee SHALL be appointed by and report to the Dean of the College of Engineering. The PSBR Director SHALL be an ex-officio member of the PSRSC.

6.2.2 Charter and Rules The operations of the PSRSC SHALL be in accordance with a written charter, including provisions for:

a. Meeting frequency - not less than once per calendar year not to exceed 15 months.
b. Quorums - at least one-half of the voting membership SHALL be present (the Director who is ex-officio SHALL NOT vote) and no more than One-half of the voting members present SHALL be members of the reactor staff.
c. Use of Subgroups - the committee chairman can appoint ad-Hoc committees as deemed necessary.

d.. Minutes of the meetings - SHALL be recorded, disseminated, reviewed, and approved in a timely manner.

Page 50 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 6.2.3 Review Function The following items SHALL be reviewed:

a. 10 CFR Part 50.59 reviews of:
1) Proposed changes in equipment, systems, tests, or experiments.
2) All new procedures and major revisions thereto having a significant effect upon safety.
3) All new experiments or classes of experiments that could have a significant effect upon reactivity or upon the release of radioactivity.
b. Proposed changes in technical specifications, license, or charter.
c. Violations of technical specifications, license, or charter. Violations of internal procedures or instructions having safety significance.
d. Operating abnormalities having safety significance.
e. Special reports listed in 6.6.2.
f. Audit reports.

6.2.4 Audit The audit function SHALL be performed annually, not to exceed 15 months, preferably by a non-member of the reactor staff. The audit function SHALL be performed by a person not directly involved with the function being audited. The audit function SHALL include selective (but comprehensive) examinations of operating records, logs, and other documents. Discussions with operating personnel and observation of operations should also be used as appropriate. Deficiencies uncovered that affect reactor safety SHALL promptly be reported to the office of the Dean of the College of Engineering. The following items SHALL be audited:

a. 'Facility operations for conformance to Technical Specifications, license, and procedures (at least once per calendar year with interval not to exceed 15 months).
b. The requalification program for the operating staff (at least once every other calendar year with the interval not to exceed 30 months).
c. The results of action taken to correct deficiencies that may occur in the reactor facility equipment, systems, structures, or methods of operations that affect reactor safety (at least once per calendar year with the interval not to exceed 15 months).
d. The reactor facility emergency plan and implementing procedures (at least once every other calendar year with the interval not to exceed 30 months).

Page 51 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 6.3 Operating Procedures Written procedures SHALL be reviewed and approved prior to the initiation of activities covered by them in accordance with Section 6.2.3. Written procedures SHALL be adequate to ensure the safe operation of the reactor, but SHALL NOT preclude the use of independent judgment and action should the situation require such. Operating procedures SHALL be in effect and SHALL be followed for at least the following items:

a. Startup, operation, and shutdown of the reactor.
b. Core loading, unloading, and fuel movement within the reactor.
c. Routine maintenance of major components of systems that could have an effect on reactor safety.
d. Surveillance tests and calibrations required by the technical specifications (including daily checkout procedure).
e. Radiation, evacuation, and alarm checks.
f. Release of Irradiated Samples.
g. Evacuation.
h. Fire or Explosion.
i. Gaseous Release.
j. Medical Emergencies.
k. Civil Disorder.
1. Bomb Threat.
m. Threat of Theft of Special Nuclear Material.
n. Theft of Special Nuclear Material.
o. Industrial Sabotage.
p. Experiment Evaluation and Authorization.
q. Reactor Operation Using a Beam Port.

Page 52 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2

r. D20 Handling.
s. Health Physics Orientation Requirements.
t. Hot Cell Entry Procedure.
u. Implementation of emergency and security plans.
v. Radiation instrument calibration
w. Loss of pool water.

6.4 Review and Approval of Experiments

a. All new experiments SHALL be reviewed for Technical Specifications compliance, 10 CFR Part 50.59 analysis, and approved in writing by level 2 management or designated alternate prior to initiation.
b. Substantive changes to experiments previously reviewed by the PSRSC SHALL be made only after review and approval in writing by level 2 management or designated alternate.

6.5 Required Action 6.5.1 Action to be Taken in the Event the Safety Limit is Exceeded In the event the safety limit (1 150'C) is exceeded:

a. The reactor SHALL be shut down and reactor operation SHALL NOT be resumed until authorized by the U.S. Nuclear Regulatory Commission.
b. The safety limit violation SHALL be promptly reported to level 2 or designated alternates.
c. An immediate report of the occurrence SHALL be made to the Chairman, PSRSC and reports SHALL be made to the USNRC in accordance with Specification 6.6.
d. A report SHALL be prepared which SHALL include an analysis of the causes and extent of possible resultant damage, efficacy of corrective action, and recommendations for measures to prevent or reduce the probability of recurrence. This report SHALL be submitted to the PSRSC for review.

Page 53 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 6.5.2 Action to be Taken in the Event of a Reportable Occurrence In the event of a reportable occurrence, (1.1.34) the following action SHALL be taken:

a. The reactor SHALL be returned to normal or shutdown. If it is necessary to shutdown the reactor to correct the occurrence, operations SHALL NOT be resumed unless authorized by level 2 or designated alternates.
b. The Director or a designated alternate SHALL be notified and corrective action taken with respect to the operations involved.
c. The Director or a designated alternate SHALL notify the office of the Dean of the College of Engineering and the office of the Vice President for Research, Dean of the Graduate School.
d. The Director or a designated alternate SHALL notify the Chairman of the PSRSC.
e. A report SHALL be made to the PSRSC which SHALL include an analysis of the cause of the occurrence, efficacy of corrective action, and recommendations for measures to prevent or reduce the probability of recurrence. This report SHALL be reviewed by the PSRSC at their next meeting.
f. A report SHALL be made to the Document Control Desk, USNRC Washington, DC 20555.

6.6 Reports 6.6.1 Operating Reports An annual report SHALL be submitted within 6 months of the end of The Pennsylvania State University fiscal year to the Document Control Desk, USNRC, Washington, DC 20555, including at least the following items:

a. A narrative summary of reactor operating experience including the energy produced by the reactor, and the number of pulses > $2.00 but less than or equal to $2.50 and the number greater than $2.50.
b. The unscheduled shutdowns and reasons for them including, where applicable, corrective action taken to preclude recurrence.
c. Tabulation of major preventive and corrective maintenance operations having safety significance.
d. Tabulation of major changes in the reactor facility and procedures, and tabulation of new tests and experiments, that are significantly different from those performed previously and are not described in the Safety Analysis Report, including a summary of the analyses leading to the conclusions that no unreviewed safety questions were involved and that 10 CFR Part 50.59 was applicable.

Page 54 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2

e. A summary of the nature and amount of radioactive effluents released or discharged to environs beyond the effective control of the owner-operator as determined at or before the point of such release or discharge. The summary SHALL include to the extent practicable an estimate of individual radionuclides present in the effluent. If the estimated average release after dilution or diffusion is less than 25 percent of the concentration allowed or recommended, only a statement to this effect need be presented.
f. A summarized result of environmental surveys performed outside the facility.

6.6.2 Special Reports Special reports are used to report unplanned events as well as planned major facility and administrative changes. These special reports SHALL contain and SHALL be communicated as follows:

a. There SHALL be a report no later than the following working day by telephone to the Operations Center, USNRC, Washington, DC 20555, to be followed by a written report to the Document Control Desk, USNRC, Washington, DC 20555, that describes the circumstances of the event within 14 days of any of the following:
1) Violation of safety limits (See 6.5.1)
2) Release of radioactivity from the site above allowed limits (See 6.5.2)
3) A reportable occurrence (Section 1.1.34)
b. A written report SHALL be made within 30 days to the USNRC, and to the offices given in 6.6.1 for the following:
1) Permanent changes in the facility organization involving level 1-2 personnel.
2) Significant changes in the transient or accident analysis as described in the Safety Analysis Report.

Page 55 of 56

TECHNICAL SPECIFICATIONS: PENN STATE BREAZEALE REACTOR (PSBR)

FACILITY LICENSE NO. R-2 6.7 Records To fulfill the requirements of applicable regulations, records and logs SHALL be prepared, and retained for the following items:

6.7.1 Records to be Retained for at Least Five Years

a. Log of reactor operation and summary of energy produced or hours the reactor was critical.
b. Checks and calibrations procedure file.
c. Preventive and corrective electronic maintenance log.
d. Major changes in the reactor facility and procedures.
e. Experiment authorization file including conclusions that no unreviewed safety questions were involved for new tests or experiments.
f. Event evaluation forms (including unscheduled shutdowns) and reportable occurrence reports.
g. Preventive and corrective maintenance records of associated reactor equipment.
h. Facility radiation and contamination surveys.
i. Fuel inventories and transfers.
j. Surveillance activities as required by the Technical Specifications.
k. Records of PSRSC reviews and audits.

6.7.2 Records to be Retained for at Least One Training Cycle

a. Requalification records for licensed reactor operators and senior reactor operators.

6.7.3 Records to be Retained for the Life of the Reactor Facility

a. Radiation exposure for all facility personnel and visitors.
b. Environmental surveys performed outside the facility.
c. Radioactive effluents released to the environs.
d. Drawings of the reactor facility including changes.

Page 56 of 56