ENS 40793: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| facility = Westinghouse Electric Corporation | | facility = Westinghouse Electric Corporation | ||
| Organization = | | Organization = | ||
| license number = | | license number = SNM-1107 | ||
| region = 2 | | region = 2 | ||
| state = South Carolina | | state = South Carolina | ||
Line 16: | Line 16: | ||
| event date = 06/04/2004 18:00 EDT | | event date = 06/04/2004 18:00 EDT | ||
| last update date = 06/04/2004 | | last update date = 06/04/2004 | ||
| title = Licensee Reported | | title = Licensee Reported a 4 Hour 91-01 Response Bulletin | ||
| event text = Material accumulation discovered in a 55-gallon drum. The 55-gallon drum was used as a knock-out pot for moisture condensate during high-pressure nitrogen drying of clean UF6 cylinders undergoing re-certification. | | event text = Material accumulation discovered in a 55-gallon drum. The 55-gallon drum was used as a knock-out pot for moisture condensate during high-pressure nitrogen drying of clean UF6 cylinders undergoing re-certification. | ||
In accordance with Westinghouse Operating License (SNM-1107), paragraph 3.7.3 (b.2), this event satisfies the criteria for a 4-hour notification. Specifically, any determination that a criticality safety analysis or evaluation was deficient, or that a particular system was not previously analyzed; and that less than two unlikely, independent, and concurrent changes in process conditions would be required before a criticality accident would be possible. | In accordance with Westinghouse Operating License (SNM-1107), paragraph 3.7.3 (b.2), this event satisfies the criteria for a 4-hour notification. Specifically, any determination that a criticality safety analysis or evaluation was deficient, or that a particular system was not previously analyzed; and that less than two unlikely, independent, and concurrent changes in process conditions would be required before a criticality accident would be possible. |
Latest revision as of 19:41, 24 November 2018
Where | |
---|---|
Westinghouse Electric Corporation Columbia, South Carolina (NRC Region 2) | |
License number: | SNM-1107 |
Reporting | |
Response | |
Time - Person (Reporting Time:+-1.77 h-0.0738 days <br />-0.0105 weeks <br />-0.00242 months <br />) | |
Opened: | Owen Connelly 20:14 Jun 4, 2004 |
NRC Officer: | Chauncey Gould |
Last Updated: | Jun 4, 2004 |
40793 - NRC Website | |