ENS 41002: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 08/31/2004 07:18 EDT
| event date = 08/31/2004 07:18 EDT
| last update date = 08/31/2004
| last update date = 08/31/2004
| title = Rps Actuation Due To Fire In 2B Condensate Pump
| title = Rps Actuation Due to Fire in 2B Condensate Pump
| event text = At 0718 EDT, the reactor was manually tripped from approximately 95% power following notification to the control room of a fire associated with condensate pump 2B.  Initially, upon notification of smoke at the condensate pump, a rapid down power had been commenced, wherein reactor power was reduced from 100% to approximately 95% power.
| event text = At 0718 EDT, the reactor was manually tripped from approximately 95% power following notification to the control room of a fire associated with condensate pump 2B.  Initially, upon notification of smoke at the condensate pump, a rapid down power had been commenced, wherein reactor power was reduced from 100% to approximately 95% power.
An automatic actuation of the auxiliary feedwater system also occurred as designed to maintain steam generator water level following the reactor trip.
An automatic actuation of the auxiliary feedwater system also occurred as designed to maintain steam generator water level following the reactor trip.

Latest revision as of 22:22, 1 March 2018

ENS 41002 +/-
Where
Palisades Entergy icon.png
Michigan (NRC Region 3)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-1.67 h-0.0696 days <br />-0.00994 weeks <br />-0.00229 months <br />)
Opened: Daniel Malone
09:38 Aug 31, 2004
NRC Officer: Bill Gott
Last Updated: Aug 31, 2004
41002 - NRC Website