ENS 42857: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 09/24/2006 04:30 EDT | | event date = 09/24/2006 04:30 EDT | ||
| last update date = 09/24/2006 | | last update date = 09/24/2006 | ||
| title = Emergency Notification System | | title = Emergency Notification System and Commercial Telephone Line Problems | ||
| event text = On 9/24/06 at approximately 0430 EST, the NRC Duty Officer attempted to contact the plant via the ENS (Emergency Notification System) phone for the daily plant status. Communications via the ENS phone had apparently failed, and attempts by NRC to use the commercial lines for Unit 1, Unit 2 and the Shift Manager were also unsuccessful. The plant was notified at approximately 0650 by the TVA ODS (Operations Duty Specialist) that the NRC was apparently unable to communicate with Sequoyah via the ENS phone and commercial lines. Sequoyah staff was able to communicate with the NRC Duty Officer with a commercial line, however, the ENS phone line was not functional at that time. At approximately 0700, the ENS phone was successfully utilized to communicate with the NRC Duty Officer. This event is being reported under 10CFR50,72(b)(3)(xiii), Loss of Emergency Preparedness Capabilities. An investigation will follow to determine the cause and required corrective actions. | | event text = On 9/24/06 at approximately 0430 EST, the NRC Duty Officer attempted to contact the plant via the ENS (Emergency Notification System) phone for the daily plant status. Communications via the ENS phone had apparently failed, and attempts by NRC to use the commercial lines for Unit 1, Unit 2 and the Shift Manager were also unsuccessful. The plant was notified at approximately 0650 by the TVA ODS (Operations Duty Specialist) that the NRC was apparently unable to communicate with Sequoyah via the ENS phone and commercial lines. Sequoyah staff was able to communicate with the NRC Duty Officer with a commercial line, however, the ENS phone line was not functional at that time. At approximately 0700, the ENS phone was successfully utilized to communicate with the NRC Duty Officer. This event is being reported under 10CFR50,72(b)(3)(xiii), Loss of Emergency Preparedness Capabilities. An investigation will follow to determine the cause and required corrective actions. | ||
The licensee notified the NRC Resident Inspector. | The licensee notified the NRC Resident Inspector. |
Latest revision as of 21:18, 1 March 2018
Where | |
---|---|
Sequoyah Tennessee (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+1.75 h0.0729 days <br />0.0104 weeks <br />0.0024 months <br />) | |
Opened: | Bill Harris 10:15 Sep 24, 2006 |
NRC Officer: | Pete Snyder |
Last Updated: | Sep 24, 2006 |
42857 - NRC Website
| |