ML13113A393: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/23/2013
| issue date = 04/23/2013
| title = 4/10/2013 - Summary of Perry Public Meeting to Discuss the 2012 Annual Assessment Results
| title = 4/10/2013 - Summary of Perry Public Meeting to Discuss the 2012 Annual Assessment Results
| author name = Kunowski M A
| author name = Kunowski M
| author affiliation = NRC/RGN-III/DRP/B5
| author affiliation = NRC/RGN-III/DRP/B5
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352
-4352 [Type text]
[Type text]
April 23, 2013 LICENSEE:
April 23, 2013 LICENSEE: First Energy Nuclear Operating Company FACILITY:
First Energy Nuclear Operating Company FACILITY:
Perry Nuclear Power Plant  
Perry Nuclear Power Plant  


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF THE APRIL 10, 201 3 , PERRY PUBLIC MEETING On April 10, 201 3, the Nuclear Regulatory Commission (NRC) held a Public Meeting at the Quail Hollow Resort in Painesville , Ohio , to discuss the 201 2 annual assessment results for Perry. Enclosure 1 is a list of attendees for the meeting, and copies of the slides used by the NRC and the licensee during the meeting are located in ADAMS (ML13101A143 and ML13101A1 5 2).
OF THE APRIL 10, 2013, PERRY PUBLIC MEETING On April 10, 2013, the Nuclear Regulatory Commission (NRC) held a Public Meeting at the Quail Hollow Resort in Painesville, Ohio, to discuss the 2012 annual assessment results for Perry. is a list of attendees for the meeting, and copies of the slides used by the NRC and the licensee during the meeting are located in ADAMS (ML13101A143 and ML13101A152).
The meeting was started with the NRC providing an overview of the reactor oversight program and the results of the 201 2 annual assessment for Perry. The NRC's presentation was followed by a presentation by the Perry plant staff giving the plant priorities for 2013, their overview of the improving performance at Perry, a status of the ongoing refueling outage, improvements to the radiological safety program, and readiness for the NRC 95002 supplemental inspection.
The meeting was started with the NRC providing an overview of the reactor oversight program and the results of the 2012 annual assessment for Perry. The NRCs presentation was followed by a presentation by the Perry plant staff giving the plant priorities for 2013, their overview of the improving performance at Perry, a status of the ongoing refueling outage, improvements to the radiological safety program, and readiness for the NRC 95002 supplemental inspection.
After t he business part of the meeting ended , the NRC and the licensee were available to answer questions from the public; none were asked.
After the business part of the meeting ended, the NRC and the licensee were available to answer questions from the public; none were asked.  
        /RA/ Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50
/RA/
-440 License No. NPF-58
Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-440 License No. NPF-58  


==Enclosure:==
==Enclosure:==
List of Meeting Attendees for the April 10, 201 3 , Public Meeting
List of Meeting Attendees for the April 10, 2013, Public Meeting cc w/encl:
Distribution via List ListServ'


cc w/encl:
Enclosure NRC REGION III April 10, 2013 MEETING ATTENDANCE LIST NRC Attendees C. Pederson, Deputy Regional Administrator S. Reynolds, Director, Division of Reactor Projects P. Louden, Deputy Director, Division of Reactor Safety A. Howe, Deputy Director, Division of Inspection and Regional Support, NRR M. Kunowski, Chief, Branch 5, Division of Reactor Projects B. Dickson, Chief, Health Physics and Incident Response Branch M. Marshfield, Perry Senior Resident Inspector J. Nance, Perry Resident Inspector M. Phalen, Senior Health Physicist J. Jandovitz, Project Engineer H. Logaras, Government Liaison R. Ruiz, LaSalle Senior Resident Inspector P. Chandrathil, Public Affairs Officer D. Flowers, Perry NRC Office Administrative Assistant FirstEnergy Nuclear Operating Company Attendees V. Kaminskas, Site Vice-President J. Grabnar, Director of Site Operations J. Veglia, Director, Site Maintenance S. Baker, Manager, Radiation Protection Members of the Public E. Filppi Ohio Emergency Management Agency (OEMA)
Distribution via List ListServŽ 
E. Klco Mayor, North Perry Village J. Church Lake County Emergency Management Agency (EMA)
R. Leidy Ohio Department of Health (ODH)
D.C. Kosloff Committee for a Constructive Tomorrow


Enclosure  NRC REGION III April 10, 201 3  MEETING ATTENDANCE LIST NRC Attendees  C. Pederson, Deputy Regional Administrator S. Reynolds , Director, Division of Reactor Projects P. Louden , Deputy Director, Division of Reactor Safety A. Howe, Deputy Director, Division of Inspection and Regional Support, NRR M. Kunowski, Chief, Branch 5, Division of Reactor Projects B. Dickson, Chief, Health Physics and Incident Response Branch M. Marshfield, Perry Senior Resident Inspector J. Nance , Perry Resident Inspector M. Phalen , Senior Health Physicist J. Jandovitz
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 April 23, 2013 LICENSEE: First Energy Nuclear Operating Company FACILITY:
, Project Engineer H. Logaras, Government Liaison R. Ruiz, LaSalle Senior Resident Inspector P. Chandrathil , Public Affairs Officer D. Flowers, Perry NRC Office Administrative Assistant FirstEnergy Nuclear Operating Company Attendees  V. Kaminskas, Site Vice-President J. Grabnar, Director of Site Operations J. Veglia, Director, Site Maintenance S. Baker, Manager, Radiation Protection Members of the Public E. Filppi  Ohio Emergency Management Agency (OEMA) E. Klco    Mayor, North Perry Village J. Church  Lake County Emergency Management Agency (E MA) R. Leidy  Ohio Department of Health (ODH) D.C. Kosloff Committee for a Constructive Tomorrow UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
-4352 April 23, 2013 LICENSEE:
First Energy Nuclear Operating Company FACILITY:
Perry Nuclear Power Plant  
Perry Nuclear Power Plant  


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF THE APRIL 10, 2013, PERRY PUBLIC MEETING On April 10, 2013, the Nuclear Regulatory Commission (NRC) held a Public Meeting at the Quail Hollow Resort in Painesville, Ohio, to discuss the 2012 annual assessment results for Perry. Enclosure 1 is a list of attendees for the meeting, and copies of the slides used by the NRC and the licensee during the meeting are located in ADAMS (ML13101A143 and ML13101A1 5 2).
OF THE APRIL 10, 2013, PERRY PUBLIC MEETING On April 10, 2013, the Nuclear Regulatory Commission (NRC) held a Public Meeting at the Quail Hollow Resort in Painesville, Ohio, to discuss the 2012 annual assessment results for Perry. is a list of attendees for the meeting, and copies of the slides used by the NRC and the licensee during the meeting are located in ADAMS (ML13101A143 and ML13101A152).
The meeting was started with the NRC providing an overview of the reactor oversight program and the results of the 2012 annual assessment for Perry. The NRC's presentation was followed by a presentation by the Perry plant staff giving the plant priorities for 2013, their overview of the improving performance at Perry, a status of the ongoing refueling outage, improvements to the radiological safety program, and readiness for the NRC 95002 supplemental inspection.
The meeting was started with the NRC providing an overview of the reactor oversight program and the results of the 2012 annual assessment for Perry. The NRCs presentation was followed by a presentation by the Perry plant staff giving the plant priorities for 2013, their overview of the improving performance at Perry, a status of the ongoing refueling outage, improvements to the radiological safety program, and readiness for the NRC 95002 supplemental inspection.
 
After the business part of the meeting ended, the NRC and the licensee were available to answer questions from the public; none were asked.  
After the business part of the meeting ended, the NRC and the licensee were available to answer questions from the public; none were asked.
/RA/
              /RA/ Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50
Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-440 License No. NPF-58  
-440 License No. NPF-58


==Enclosure:==
==Enclosure:==
List of Meeting Attendees for the April 10, 2013, Public Meeting cc w/encl:
List of Meeting Attendees for the April 10, 2013, Public Meeting cc w/encl:
Distribution via List ListServŽ  DOCUMENT NAME:
Distribution via List ListServ' DOCUMENT NAME:  


==SUMMARY==
==SUMMARY==
OF THE APRIL 10, 2013, PERRY PUBLIC MTG Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RI II  RIII RIII NAME JJandovitz:rj MKunowski DATE 04/23/2013 04/23/2013   OFFICIAL RECORD COPY
OF THE APRIL 10, 2013, PERRY PUBLIC MTG Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JJandovitz:rj MKunowski DATE 04/23/2013 04/23/2013 OFFICIAL RECORD COPY  


Letter to First Energy Nuclear Operating Company from M. Kunowski dated April 23, 2013.
Letter to First Energy Nuclear Operating Company from M. Kunowski dated April 23, 2013.  


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF THE APRIL 10, 2013, PERRY PUBLIC MEETING DISTRIBUTION
OF THE APRIL 10, 2013, PERRY PUBLIC MEETING DISTRIBUTION:
: Doug Huyck RidsNrrPMPerry Resource
Doug Huyck RidsNrrPMPerry Resource RidsNrrDorlLpl3-2 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov}}
 
RidsNrrDorlLpl3
-2 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov}}

Latest revision as of 09:21, 11 January 2025

4/10/2013 - Summary of Perry Public Meeting to Discuss the 2012 Annual Assessment Results
ML13113A393
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 04/23/2013
From: Michael Kunowski
NRC/RGN-III/DRP/B5
To:
FirstEnergy Nuclear Operating Co
References
Download: ML13113A393 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352

[Type text]

April 23, 2013 LICENSEE: First Energy Nuclear Operating Company FACILITY:

Perry Nuclear Power Plant

SUBJECT:

SUMMARY

OF THE APRIL 10, 2013, PERRY PUBLIC MEETING On April 10, 2013, the Nuclear Regulatory Commission (NRC) held a Public Meeting at the Quail Hollow Resort in Painesville, Ohio, to discuss the 2012 annual assessment results for Perry. is a list of attendees for the meeting, and copies of the slides used by the NRC and the licensee during the meeting are located in ADAMS (ML13101A143 and ML13101A152).

The meeting was started with the NRC providing an overview of the reactor oversight program and the results of the 2012 annual assessment for Perry. The NRCs presentation was followed by a presentation by the Perry plant staff giving the plant priorities for 2013, their overview of the improving performance at Perry, a status of the ongoing refueling outage, improvements to the radiological safety program, and readiness for the NRC 95002 supplemental inspection.

After the business part of the meeting ended, the NRC and the licensee were available to answer questions from the public; none were asked.

/RA/

Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

List of Meeting Attendees for the April 10, 2013, Public Meeting cc w/encl:

Distribution via List ListServ'

Enclosure NRC REGION III April 10, 2013 MEETING ATTENDANCE LIST NRC Attendees C. Pederson, Deputy Regional Administrator S. Reynolds, Director, Division of Reactor Projects P. Louden, Deputy Director, Division of Reactor Safety A. Howe, Deputy Director, Division of Inspection and Regional Support, NRR M. Kunowski, Chief, Branch 5, Division of Reactor Projects B. Dickson, Chief, Health Physics and Incident Response Branch M. Marshfield, Perry Senior Resident Inspector J. Nance, Perry Resident Inspector M. Phalen, Senior Health Physicist J. Jandovitz, Project Engineer H. Logaras, Government Liaison R. Ruiz, LaSalle Senior Resident Inspector P. Chandrathil, Public Affairs Officer D. Flowers, Perry NRC Office Administrative Assistant FirstEnergy Nuclear Operating Company Attendees V. Kaminskas, Site Vice-President J. Grabnar, Director of Site Operations J. Veglia, Director, Site Maintenance S. Baker, Manager, Radiation Protection Members of the Public E. Filppi Ohio Emergency Management Agency (OEMA)

E. Klco Mayor, North Perry Village J. Church Lake County Emergency Management Agency (EMA)

R. Leidy Ohio Department of Health (ODH)

D.C. Kosloff Committee for a Constructive Tomorrow

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 April 23, 2013 LICENSEE: First Energy Nuclear Operating Company FACILITY:

Perry Nuclear Power Plant

SUBJECT:

SUMMARY

OF THE APRIL 10, 2013, PERRY PUBLIC MEETING On April 10, 2013, the Nuclear Regulatory Commission (NRC) held a Public Meeting at the Quail Hollow Resort in Painesville, Ohio, to discuss the 2012 annual assessment results for Perry. is a list of attendees for the meeting, and copies of the slides used by the NRC and the licensee during the meeting are located in ADAMS (ML13101A143 and ML13101A152).

The meeting was started with the NRC providing an overview of the reactor oversight program and the results of the 2012 annual assessment for Perry. The NRCs presentation was followed by a presentation by the Perry plant staff giving the plant priorities for 2013, their overview of the improving performance at Perry, a status of the ongoing refueling outage, improvements to the radiological safety program, and readiness for the NRC 95002 supplemental inspection.

After the business part of the meeting ended, the NRC and the licensee were available to answer questions from the public; none were asked.

/RA/

Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket No. 50-440 License No. NPF-58

Enclosure:

List of Meeting Attendees for the April 10, 2013, Public Meeting cc w/encl:

Distribution via List ListServ' DOCUMENT NAME:

SUMMARY

OF THE APRIL 10, 2013, PERRY PUBLIC MTG Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME JJandovitz:rj MKunowski DATE 04/23/2013 04/23/2013 OFFICIAL RECORD COPY

Letter to First Energy Nuclear Operating Company from M. Kunowski dated April 23, 2013.

SUBJECT:

SUMMARY

OF THE APRIL 10, 2013, PERRY PUBLIC MEETING DISTRIBUTION:

Doug Huyck RidsNrrPMPerry Resource RidsNrrDorlLpl3-2 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov