ENS 45052: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 05/10/2009 10:41 EDT
| event date = 05/10/2009 10:41 EDT
| last update date = 05/10/2009
| last update date = 05/10/2009
| title = Intermediate Range Reactor Scram During Transition To Run
| title = Intermediate Range Reactor Scram During Transition to Run
| event text = During Startup of HNP-1, after reaching greater than or equal to 7% RTP [rated thermal power], the crew placed the Reactor MODE switch to 'RUN,' in accordance with the Startup Procedure 34GO-OPS-001-1.  Upon placing the MODE switch to 'RUN,' a full RPS actuation occurred due to upscale trip signals on the Intermediate Range Nuclear Instrumentation (IRM) 1C51K601A, 1C51K601D and 1C51K601H.  Placing the Reactor MODE switch to 'RUN'  bypasses the IRM inputs to the RPS system, so actuation of the RPS from the IRMS was not expected.  All withdrawn control rods inserted properly upon receipt of the full SCRAM signal.  All equipment functioned as expected, with the exception of the unexpected upscale trips of IRMs 1C51K601A, 1C51K601D and 1C51K601H and the subsequent RPS actuation from the IRMs.
| event text = During Startup of HNP-1, after reaching greater than or equal to 7% RTP [rated thermal power], the crew placed the Reactor MODE switch to 'RUN,' in accordance with the Startup Procedure 34GO-OPS-001-1.  Upon placing the MODE switch to 'RUN,' a full RPS actuation occurred due to upscale trip signals on the Intermediate Range Nuclear Instrumentation (IRM) 1C51K601A, 1C51K601D and 1C51K601H.  Placing the Reactor MODE switch to 'RUN'  bypasses the IRM inputs to the RPS system, so actuation of the RPS from the IRMS was not expected.  All withdrawn control rods inserted properly upon receipt of the full SCRAM signal.  All equipment functioned as expected, with the exception of the unexpected upscale trips of IRMs 1C51K601A, 1C51K601D and 1C51K601H and the subsequent RPS actuation from the IRMs.
No reactivity changes were in progress at the time to cause the upscale trip signals.  At this time, investigation is in progress, but the investigation and corrective action have not yet been completed.
No reactivity changes were in progress at the time to cause the upscale trip signals.  At this time, investigation is in progress, but the investigation and corrective action have not yet been completed.

Latest revision as of 21:12, 1 March 2018

ENS 45052 +/-
Where
Hatch Southern Nuclear icon.png
Georgia (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-1.82 h-0.0758 days <br />-0.0108 weeks <br />-0.00249 months <br />)
Opened: Edwen Urquhart
12:52 May 10, 2009
NRC Officer: Mark Abramovitz
Last Updated: May 10, 2009